Professional
The full record for this vessel
Behind this panel: 1 inspection, each with its date, unit and type; 16 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Communications › Radio Communications › VHF Radiotelephone
Issued 22 November 2016
Resolved
Program DSC VHF Radio with MMSI number and connect radio to GPS receiver.
Due 22 December 2016
Resolved 6 January 2017
Resolution: MMSI number uploaded and GPS receiver connected to VHF.
Engineering › Sea-water System (primary cooling) › Piping
Issued 22 November 2016
Resolved
Replace non-functioning jacket water temperature gauge.
Due 22 December 2016
Resolved 20 December 2016
Construction/Loadline › Hull › Bracket
Issued 21 September 2016
Resolved
Replace swim platform brackets and fasteners.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 October 2016
Resolved 1 November 2016
Fire Fighting › Fire Pumps › Arrangement
Issued 21 September 2016
Resolved
Provide plans to install a power bilge pump with assocuiated components per 46 CFR 181.300.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 November 2016
Resolved 1 November 2016
Construction/Loadline › Hull › Side Shell
Issued 18 July 2016
Resolved
Provide repair proposal for USCG approval and make permanent repairs to port hull cracks in FRP at rub rail and splash rail as identified.
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 21 September 2016
Construction/Loadline › Hull › Side Shell
Issued 18 July 2016
Resolved
Repair screw hole in port FRP side shell as identified.
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 21 September 2016
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 18 July 2016
Resolved
Remove toilet and associated piping and remove old hand bilge pump piping. MSD tank has been removed at this DDE and the hand bilge pump has been removed and replaced with submersible electric bilge pumps several years ago.
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 21 September 2016
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 18 July 2016
Resolved
Blank off toilet raw water through hull fitting/valve.
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 1 November 2016
Construction/Loadline › Structures › Deck Plating
Issued 13 July 2016
Resolved
Straighten/shim vertical deck supports as marked.
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 21 September 2016
Engineering › Bilge Water Management System › Piping
Issued 13 July 2016
Resolved
Raise amidships bilge pump thru hull fitting to the height of the fore and aft bilge pump thru hull fittings and cap off unused thru hull fitting.
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 21 September 2016
Construction/Loadline › Hull › Longitudinal Frame
Issued 13 July 2016
Resolved
Make permanent repairs to starboard stringer at aft engine mount bracket.
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 21 September 2016
Construction/Loadline › Hull › Bottom Plating
Issued 13 July 2016
Resolved
Make permanent repairs to delaminated FRP on bottom plating forward of the rudder port fitting.
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 21 September 2016
Construction/Loadline › Hull › Side Shell
Issued 13 July 2016
Resolved
Make permanent repairs or provide transom drain fitting/plug to the hole located at the center of the transom intentional made to drain water from the hull while vessel was out of the water.
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 21 September 2016
Documentation › Certificates/Documents › Certificate of Inspection
Issued 13 May 2016
Resolved
Vessel overdue for annual inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 November 2016
Resolved 22 November 2016
Engineering › Fuel Oil Service System › Hose
Issued 13 May 2016
Resolved
Vessel currently has no MDE or fuel lines installed. Ensure all fuel hoses installed in vessel meet SAE J1942 and all hose end fittings meet the requirements of SAE J1475.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 November 2016
Resolved 22 November 2016
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 13 May 2016
Resolved
Install netting, mesh, or additional course rails between the top most and main deck so that no space is greater than 4 inches. Submit plans to OCMI for approval prior to conducting repairs.
Due 22 December 2016
Resolved 6 January 2017
Resolution: Steel wire installed to create rail courses.