Records from 2016 to 2025. Most recent: inspection, 22 September 2025.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 22 September 2025
Resolved
Starboard rudder post was excessively leaking while underway, replace or tighten packing to the satisfaction of the attending marine inspector.
46 CFR 182.30-1(a)
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2025
Resolved 24 September 2025
Resolution: Vessel tightened packing for rudder post, got underway with no leaks.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 22 September 2025
Resolved
Both engine room air vents need gaskets to prevent air from escaping, install gaskets to the satisfaction of the attending marine inspector.
46 CFR 182.465(l)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2025
Resolved 24 September 2025
Resolution: Vessel closed holes in vents and fitted closures with gasket material.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 22 September 2025
Resolved
Engine room forward bulkhead needs fire stop between watertight bulkheads, properly plug wire runs to the satisfaction of the attending marine inspector.
46 CFR 183.220(d)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2025
Resolved 24 September 2025
Resolution: Vessel used fire block to seal penetrations in the engine room.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 September 2025
Resolved
Port side forward engine room electrical panel was not labeled, insert labels to the satisfaction of the attending marine inspector.
46 CFR 183.220(d)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2025
Resolved 24 September 2025
Resolution: Vessel labeled panel
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 September 2025
Resolved
PFD donning placard was missing on top deck, replace with new one to the satisfaction of the attending marine inspector. to the satisfaction of the attending marine inspector.
46 CFR 185.516(a)
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2025
Resolved 24 September 2025
Resolution: Vessel installed new placard on top deck
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 September 2025
Resolved
Forward compartment needs to be designated as crew only due to additional life jackets not meant for passengers.
46 CFR 180.78(b)
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2025
Resolved 24 September 2025
Resolution: Vessel relabeled fwd compartment for crew only
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 22 September 2025
Resolved
Max passenger signs on ladders were faded, replace with new ones.
46 CFR 185.602(g)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2025
Resolved 24 September 2025
Resolution: Vessel re-stenciled placard.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 10 December 2024
Resolved
Portable watertight containers for distress flares... shall be of bright color. Provide watertight container of bright color.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2024
Resolved 18 December 2024
Resolution: Purchased new orange watertight container for flares.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 10 December 2024
Resolved
A hatch exposed to the weather must be watertight. Fore-peak hatch was unable to latch. Provide proper securing device for hatch.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2024
Resolved 18 December 2024
Resolution: Hatch properly secures.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 December 2024
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] distribution panel on bridge has loose breakers and missing blanks. Provide satisfactory repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2024
Resolved 18 December 2024
Resolution: Properly repaired breaker box.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 December 2024
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] box in center bilge was corroded. Provide satisfactory repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2024
Resolved 18 December 2024
Resolution: New junction box installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 December 2024
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] plate and electrical outlet were broken. Provide satisfactory repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2024
Resolved 20 December 2024
Resolution: Replaced outlet cover.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 10 December 2024
Resolved
Freezer not secured. Provide securing arrangements.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2024
Resolved 18 December 2024
Resolution: Freezer secured with brackets.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 December 2024
Resolved
Replace rubber section in overhead fire main with metallic piping.
Conduct repairs at next dry dock.
Action required: 705 - Other - as specified
Due 31 January 2025
Resolved 4 April 2025
Resolution: Def cleared.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 October 2022
Resolved
THE VESSEL IS AN SPV-T AND THEREFORE IS NOT REQUIRED TO HAVE A SAFETY MANAGEMENT SYSTEM PER REGULATION. REQUIREMENTS [2 THROUGH 4] ARE OBJECTIVE EVIDENCE THAT A SERIOUS SUBSTANDARD CONDITION HAS NOT BEEN PROACTIVELY MANAGED BY THE VESSEL'S OWNER/OPERATOR, LEADING TO A LACK OF SAFETY CULTURE ONBOARD THE VESSEL.
Action required: 30 - Ship detained
Due 30 November 2022
Resolved 4 November 2022
Resolution: All deficiencies have been rectified to the satisfaction of the Coast Guard.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 October 2022
Resolved
The power fire pump shall be self priming and of such size as to discharge an effective stream from a hose connected to the highest outlet. The intake hose to the fire pump burst rendering the fire pump ineffective.
Action required: 30 - Ship detained
Due 30 November 2022
Resolved 4 November 2022
Resolution: Intake hose was replaced and fire pump is operational.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 October 2022
Resolved
An adult life jacket must be provided for each person carried on board a vessel. Vessel is authorized 150 passengers. 136 life jackets were found in good condition. 14 life jackets found defective.
Action required: 30 - Ship detained
Due 30 November 2022
Resolved 4 November 2022
Resolution: 14 new adult life jackets were replaced. Vessel is authorized 150 passengers.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 25 October 2022
Resolved
The owner, charter, master or managing operator shall instruct each crew member at least once every 3 months as to the emergency duties that the crew member is expected to perform. Crew training shall be logged or otherwise documented for review. The vessel could not provide documentation of required training.
Action required: 30 - Ship detained
Due 30 November 2022
Resolved 4 November 2022
Resolution: Operator conducted manover board and fire drill and documented training.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 25 October 2022
Resolved
Emergency instructions shall be mounted at the operating station. The vessel did not have emergency instructions posted at operating station.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2022
Resolved 4 November 2022
Resolution: Owner posted emergency instructions at operating station.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 October 2022
Resolved
Each floating waterlight must be approved in accordance with 161.010 in subchapter Q. Battery must be changed ever 2 years according to manufacturer's instructions. Battery expired in January 2022. Vessel is limited to daylight operations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2022
Resolved 4 November 2022
Resolution: Owner replaced battery according to manufacturer's instructions.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 October 2022
Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. The breather box on the engine was found covered in oil and debris.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2022
Resolved 4 November 2022
Resolution: Breather box on the engine was cleaned and in satisfactory condition.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 October 2022
Resolved
Cables entering boxes or fittings shall be protected from abrasion, and shall conform with the following requirements: (2) The cable armor shall be secured to the box fitting. Twist type connectors. 46 CFR 183.10-20 "Old T"
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2022
Resolved 4 November 2022
Resolution: Cable box was replaced and wires secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 October 2022
Resolved
Light fixtures shall be constructed in accordance with the requirements of Underwriters' Laboratories, Inc. Standard for Marine Type Electric Lighting Fixtures, Subject 595, or shall bear the proper Underwriters; Laboratories, Inc. "Marine Type" label, or shall be constructed in accordance with the requirements of recognized testing laboratories. Cover of lighting in engine room missing. 46 CFR 183.10-20 "Old T"
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2022
Resolved 4 November 2022
Resolution: Owner removed all old lighting fixtures and covers and replaced them with new lighting fixtures and covers.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 25 October 2022
Resolved
As appropriate for the intended voyage, all vessels must carry adequate and up-to-date (a) charts. Charts on board have been expired for 3 yrs. 46 CFR 185.20-35 "Old T"
Action required: 30 - Ship detained
Due 10 November 2022
Resolved 4 November 2022
Resolution: Owner replaced old charts with updated 2022 charts.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 19 January 2021
Resolved
Electrical wiring for high water level switch is not free from effects of bilge water. Water-proof both wires leading to switch at crimp connections in bilge area.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 February 2021
Resolved 20 January 2021
Resolution: Verified following day by inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 September 2020
Resolved
An adult life jacket must be provided for each person. Vessel missing eleven life jackets; restricted to 139 total persons on board until replaced.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2020
Resolution: Master Provided evidence of missing life jackets been on board.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 September 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection. Both generator raw water flexible pipes are cracked. Replace flexible piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 October 2020
Resolved 16 October 2020
Resolution: Master replaced hoses.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 September 2020
Resolved
Each item of lifesaving equipment with an expiration date on it must be replaced if the expiration date has passed. Floating water light battery expire. Replace.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 October 2020
Resolved 1 October 2020
Resolution: Replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 September 2020
Resolved
Each vessel must be equipped with at least two operable portable battery lights.
Action required: 10 - Deficiency Rectified
Due 25 September 2020
Resolved 25 September 2020
Resolution: Master replaced missing portable lights.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 25 September 2020
Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, the maximum number of passengers allowed must be indicated at the entranceway. Add markings to the entrace way.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2020
Resolved 2 October 2020
Resolution: Max POB markings installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 September 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection. Port fuel tank shut off valve reach rod is loose at the valve. Complete rapairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2020
Resolved 1 October 2020
Resolution: Additional screw installed.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 25 September 2020
Resolved
The employer shall provide an Employee Assistance Program (EAP) for all crewmembers. Complete 60 minutes supervisor training, establish designated employee represantative and provide means of alcohol testing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2020
Resolved 1 October 2020
Resolution: Completed 60 minutes supervisor training, established designated employee represantative and provided alcohol testing strips.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 December 2019
Resolved
ALL VESSELS SHALL BE PROVIDED WITH APPROVED ADULT TYPE LIFE PRESERVER FOR EACH PERSON CARRIED. VESSEL WAS SHORT 10 LIFE PERSERVERS. REPLACE WITH 10 NEW LIFE PERSERVERS. REDUCED PASSENGER COUNT BY 10.
Action required: 705 - Other - as specified
Due 10 January 2020
Resolved 17 December 2019
Resolution: Went on vessel and verified 10 new life jackets.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 10 December 2019
Resolved
A VESSEL MUST COMPLY WITH THE APPLICABLE REQUIREMENTS FOR ANY RADIO INSTALLATIONS AS SET FORTH IN 47 CFR 80. VHF RADIO WAS NOT PROGRAMMED WITH VESSEL MMSI NOR LINKED TO GPS. PROVE PROPER SET UP OF BOTH THE VHF AND SSB RADIOS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 8 January 2020
Resolution: Went onboard and tested new VHF radio. Radio has MMSI number and GPS location information in good working order.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 10 December 2019
Resolved
A VISUAL AND AUDIBLE ALARM MUST BE PROVIDED AT THE OPERATING STATION TO INDICATE A HIGH WATER LEVEL IN EACH OF THE FOLLOWING UNMANNED SPACES: A MACHINERY SPACE. BILGE ALARM IN MER DID NOT SHOW VISUAL OR SOUND ON BRIDGE. REPLACE SWITCH ON BRIDGE.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 17 December 2019
Resolution: Went on the vessel and tested the bilge alarm. Alarm worked visually and was audible.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 10 December 2019
Resolved
AS APPROPRIATE FOR THE INTENDED VOYAGE, ALL VESSELS MUST CARRY ADEQUATE AND UP TO DATE COAST GUARD LIGHT LIST.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 17 December 2019
Resolution: Light list was up to date and onboard the vessel.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 November 2018
Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. Battery charger in fwd engine room installed with a plug and outlet. Install as a permanent installation. 46 CFR 183.05-50 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 11 January 2019
Resolution: Witnessed permanent installation.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 November 2018
Resolved
Junction boxes shall be of watertight construction. Bilge/fire pump power supply cabling is currently spliced outside of housing and needs to be permanently installed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 11 January 2019
Resolution: Power supply cable is permanently installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 16 November 2018
Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. Port generator water pump leaking near gasket. Repair to stop leak.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 11 January 2019
Resolution: Valve was replaced. Witnessed operation, no leaks.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 November 2018
Resolved
Battery connections shall be made to the battery terminals with permanent type connectors. Identified wing nuts on multiple battery installations throughout vessel. Replace with regular nuts.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 11 January 2019
Resolution: Battery connections were made permanent.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 November 2018
Resolved
Electrical installations shall be such that the safety of passengers and crew from electrical hazards will be ensures. Identified multiple dead-end wires from STBD main engine. Remove dead-end wires.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 11 January 2019
Resolution: Dead-end wires were cut back.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 November 2018
Resolved
Wiring joints and splices shall be mechanically secure and made in junction boxes (or of a pressure connector type). Wire nuts being used for connection on loud-hailer at operating station. Splice wires with pressure-type connection or enclose in a junction box.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 11 January 2019
Resolution: Loud-hailer wires were properly spliced and covered.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 31 October 2018
Resolved
Hydrostatic release for EPIRB was expired. Replace hydrostatic release for EPIRB. Route will be limited to no more than 3 nautical miles from shore until replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Owner decided to remove EPIRD from required equipment. Amended COI to reflect updated routes and conditions.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 31 October 2018
Resolved
Excessive fuel was found in starboard side fuel filter flame shield. Properly dispose of fuel and clean flame shield to ensure there is no residual fuel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2018
Resolved 16 November 2018
Resolution: Verified all residual fuel was removed.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 31 October 2018
Resolved
There were no guards on the main diesel engines moving parts. Guards need to be installed to prevent injury of crew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Verified guards were installed.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 31 October 2018
Resolved
There were no functioning lights in the engine room. Install or replace lights.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Verified lights were repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 October 2018
Resolved
Ground wires in engine room were found to be floating. Attach ground wires to a grounding plate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Verified grounding wires were properly attached to grounding plate.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 31 October 2018
Resolved
Maintenance, Drill, and Radio logs need to be maintained. No maintenance or radio logs were made available. The last drill performed was on 5/28/17 and had not been performed regularly prior to that date. Ensure all applicable entries are made in logbook.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Verified new log book being maintained at operating station. Discussed all requirements with Master to ensure familiarity.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 31 October 2018
Resolved
There were no donning placards located on the upper passenger deck. Install donning placards on upper deck in view of passengers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Verified correct donning placards were posted.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 31 October 2018
Resolved
Concession stand fire extinguisher is too small for the installed bracket. Replace extinguisher with appropriate size to fit bracket or install new bracket.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Verified serviced fire extinguisher fit in installed bracket.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 31 October 2018
Resolved
Bilge pump used for forepeak has short discharge hose. Replace with hose long enough to allow overboard discharge of water.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 11 January 2019
Resolution: Bilge pump/hose replaced. Witnessed overboard discharge.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 31 October 2018
Resolved
Gasket on forepeak scuttle is torn. Replace gasket on scuttle to ensure watertight integrity.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Gasket replaced. Verified installed correctly and watertight.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 31 October 2018
Resolved
Port generator is inoperable. Return port generator to operating condition.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Verified operation of port generator.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 31 October 2018
Resolved
Missing DAPI enrollment letter. Provide DAPI enrollment letter showing names of crew enrolled.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 11 January 2019
Resolution: All crew members were added to enrollment letter.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 31 October 2018
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2018
Resolved 16 November 2018
Resolution: Verified updated certificates being processed.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 27 December 2017
Resolved
Life ring light not working.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 17 January 2018
Resolution: Cleared. Confirmed light operational.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 27 December 2017
Resolved
Restencil markings on aft life ring.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 17 January 2018
Resolution: Cleared.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 27 December 2017
Resolved
Both propulsion engine lube oil pressure gauges do not work.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 17 January 2018
Resolution: Cleared. Confirmed operation by starting engines.
Communications › Radio Communications › VHF Radiotelephone
Issued 27 December 2017
Resolved
Recharge vhf radio batteries
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 December 2017
Resolved 17 January 2018
Resolution: Cleared. New batteries installed.
Documentation › Certificates/Documents › Stability Letter
Issued 27 December 2017
Resolved
Post Stability Letter.
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 17 January 2018
Resolution: Cleared.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 27 December 2017
Resolved
Provide FCC safety radio certificate
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 17 January 2018
Resolution: Cleared.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 27 December 2017
Resolved
Replace missing hose clamp on upper fuel fill
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 27 December 2017
Resolution: Corrected on the spot.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 27 December 2017
Resolved
Re-install grounding wire
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 27 December 2017
Resolution: Corrected on the spot.
Engineering › Sea-water System (primary cooling) › Piping
Issued 27 December 2017
Resolved
Fix raw water leak on stbd main engine exhaust cooling.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 17 January 2018
Resolution: Cleared. Tested insallation by running engine for approx. 2 mins.
Navigation › Collision/Grounding Avoidance › Radar
Issued 27 December 2017
Resolved
Mark radars not in service or repair/remove.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 17 January 2018
Resolution: Cleared.
Lifesaving › Embarkation Appliances/Stations › Steps
Issued 27 December 2017
Resolved
Provide longer boat hook for man overboard (corrected) and shorten rescue platform.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 17 January 2018
Resolution: Cleared.
Lifesaving › Lifefloat › Serviceable
Issued 15 September 2016
Resolved
02 Lifefloats need to be repaired or replaced. Route reduced to Lakes Bays and Sounds until the deficiency is cleared.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Owner has chosen to not replace life floats. Life floats removed. COI route changed to Lakes, Bays & Sounds.
Electrical › Electric Generation Source (service) › Generator
Issued 15 September 2016
Resolved
Port generator raw water intake hose is damaged at the hull penetration, Repair or replace.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 September 2016
Resolved 17 October 2016
Resolution: Hose replaced.
Electrical › Electric Generation Source (service) › Generator
Issued 15 September 2016
Resolved
Stbd generator expansion tank overflow hose is damaged. Replace with approved hose.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 September 2016
Resolved 17 October 2016
Resolution: Hose replaced.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 15 September 2016
Resolved
Install belt guard on stbd generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Hose rerouted around moving parts. Due to location of belt assembly (back corner of E/R) no guard required.
Communications › Audible Communications › Horn/Whistle
Issued 15 September 2016
Resolved
Ship's whistle is not operational, vessel must have approved sound producing device on board.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 September 2016
Resolved 16 September 2016
Resolution: Portable sound producing device was placed on board.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 15 September 2016
Resolved
Install lagging on both port and stbd exhaust piping for MDE's as they are over 150 degrees.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Lagging properly installed.
Accommodation/Occupational Safety › Potable Water System › General
Issued 15 September 2016
Resolved
Properly mount potable water pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Potable water pump mounted properly.
Engineering › Bilge Water Management System › Pump
Issued 15 September 2016
Resolved
Properly wire bilge pump.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Bilge pump wired properly.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 15 September 2016
Resolved
prove proper operation of fixed fire alarm system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 September 2016
Resolved 17 October 2016
Resolution: Fire alarm not required, alarm removed.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 15 September 2016
Resolved
Properly mount the following electrical assemblies: 120Vc outlet in forward compartment, 120Vc outlet in the Laz.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Properly mounted.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 September 2016
Resolved
Properly mount fan motor assembly in forpeak and provide permanent wiring to the fan.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Fan removed.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 15 September 2016
Resolved
Label switches and electrical panel port side forward e/r and blank off open space or install a switch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Blanked off and labeled.