Records from 1988 to 2014. Most recent: inspection, 29 October 2014.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 33
29 October 2014
Drydock Exam · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5034346
8 August 2011
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4110503
27 May 2008
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3340236
19 May 2008
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3338620
25 September 2007
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3066364
25 August 2006
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2759680
11 May 2006
Hull Examination
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2647762
28 June 2005
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2406473
13 June 2005
Examination of Repairs
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2389405
4 October 2004
Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2213227
27 August 2003
Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1888987
4 October 2002
Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1685940
15 April 2002
Hull Examination
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1622918
17 September 2001
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1432564
6 July 2000
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1432352
29 June 1999
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1451428
31 August 1998
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1470473
7 July 1997
COI Inspection · Examination of Repairs
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1114254
7 February 1997
Hull Examination
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1104249
1 July 1996
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1088549
31 July 1995
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1191850
27 June 1994
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1333759
13 June 1994
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1327038
9 June 1993
Re-Inspection
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1143968
3 May 1993
Hull Examination
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 842032
18 June 1992
Re-Inspection
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1258734
20 June 1991
COI Inspection
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1333172
23 May 1990
Re-Inspection
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 906736
20 June 1989
Re-Inspection
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1350270
18 May 1989
Type not recorded
No type recorded · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 891542
12 October 1988
Type not recorded
No type recorded · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1197468
18 August 1988
Initial Certification
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1345891
7 July 1988
Hull Examination
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1345893
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 8 August 2011
Resolved
Provide proof of operation of visual/audio high water level alarm at operating station.
Action required: 705 - Other - as specified
Due 9 September 2011
Resolved 15 August 2011
Resolution: High water level alarm visually/audibly operating at operating station.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 19 May 2008
Resolved
STBD engine wet exhaust piping is leaking into the hull of the vessel at a non metallic expansion joint. Make permanent repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 May 2008
Resolution: Provided new non metallic joint
Engineering › Bilge Water Management System › Hose
Issued 19 May 2008
Resolved
Main space bilge hose is not ASE approved. Install proper hose.
Due 20 June 2008
Resolved 27 May 2008
Resolution: Installed approved hose.
Electrical › Lighting (service) › Lighting Fixture
Issued 19 May 2008
Resolved
Lighting globe in main space melted and attached with electrical tape. replace with properly fitting fixture.
Due 20 June 2008
Resolved 27 May 2008
Resolution: Replaced fixture in main space.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 19 May 2008
Resolved
Fwd hatch cover fitted with silicone sealant. Remove sealant and fit with proper gasket.
Due 1 March 2009
Resolved 27 May 2008
Resolution: Fitted with new gasket
Construction/Loadline › Penetrations › Gasket
Issued 25 September 2007
Resolved
Renew seal/ gasket in watertight hatch in forepeak overhead forward of collision blkhd.
Due 26 October 2007
Resolved 17 October 2007
Resolution: Resealed and water tested.
Lifesaving › Visual Distress Signals (General) › Condition
Issued 25 September 2007
Resolved
Replace float light on life float or make serviceable.
Due 25 October 2007
Resolved 17 October 2007
Resolution: Float light replaced.
Electrical › Lighting (service) › Lighting Feeder
Issued 25 September 2007
Resolved
Install overhead elec. wire hanger in head/ forepeak ovhd.
Due 25 October 2007
Resolved 17 October 2007
Resolution: hanger installed.
Electrical › Electric Generation Source (service) › Generator
Issued 25 September 2007
Resolved
Repair/replace generator bracket on port side mde.
Due 25 October 2007
Resolved 17 October 2007
Resolution: Cracked generator bracket re-welded.
Engineering › Lubricating Oil Service System › Filter
Issued 25 September 2007
Resolved
Repair oil filter housing on port mde forward side/ seat or regasket.
Due 25 October 2007
Resolved 17 October 2007
Resolution: Oil filter housing replaced and housing is seated on gasket.
Stability › Watertight Integrity › General
Issued 25 August 2006
Resolved
CAP OFF OR STOP OFF PIPING FROM FOREMOST COMPARTMENT THROUGH WATERTIGHT BULKHEAD TO #2 COMPARTMENT IN BILGE AREA 46CFR179.320
Due 5 September 2006
Resolved 14 September 2006
Resolution: piping capped off
Electrical › Electrical Distribution System (service) › Junction Box
Issued 25 August 2006
Resolved
INSTALL OR REPACK ELECTRICAL OUTLET INBOARD IN #2 COMPARTMENT IAW SUBCHAPTER J.
Due 5 September 2006
Resolved 14 September 2006
Resolution: outlet replaced along with wiring packing.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 25 August 2006
Resolved
REMOVE OLD PIPING LAYING IN BILGE AND CLEAN ENGINE ROOM BILGE TO MAKE INSPECTION READY.
Due 5 September 2006
Resolved 14 September 2006
Resolution: Bilge cleaned and old piping removed/ vessel ready for inspection
Electrical › Electric Supply System (service) › Battery Installation
Issued 25 August 2006
Resolved
INSTALL LOCKNUTS ON WINGNUTS ON BATTERIES TO ENSURE NUTS STAY SECURE IAW 46CFR183.350
Due 5 September 2006
Resolved 14 September 2006
Resolution: Locknut installed.
Electrical › Electric Supply System (service) › Battery Installation Ventilation
Issued 25 August 2006
Resolved
INSTALL BATTERY BOXES WITH COVER IN ENGINE ROOM IAW 46CFR183.350
Due 5 September 2006
Resolved 14 September 2006
Resolution: Boxes and covers installed
Engineering › Bilge Water Management System › Pump
Issued 25 August 2006
Resolved
INSTALL HOSE CLAMPS AND VALVE JUST PRIOR TO OVERBOARD ON ENGINE ROOM BILGE PUMP OVERBOARD HOSE. 46CFR182.520
Due 31 October 2006
Resolved 14 September 2006
Resolution: valves and hose clamps installed
Lifesaving › Lifefloat › Markings
Issued 25 August 2006
Resolved
STENCIL NAME OF VESSEL ON LIFEFLOAT AND SECURE MANROPES AND BASKET PROPERLY.
Due 5 September 2006
Resolved 14 September 2006
Resolution: lifefloat stencilled and manropes and basket properly secured.
Lifesaving › Lifefloat › Paddle
Issued 25 August 2006
Resolved
INSTALL LIFEFLOAT PADDLES AND SECURE WITH NAME OF VESSEL.
Due 5 September 2006
Resolved 14 September 2006
Resolution: paddles installed and stencilled
Personnel › Training › Fire Fighting Basic
Issued 25 August 2006
Resolved
PERFORM SATISFACTORY MAN OVERBOARD AND FIRE DRILLS.
Due 5 September 2006
Resolved 14 September 2006
Resolution: mob and fire drill conducted with crew satisfactorily
Engineering › Bilge Water Management System › Pump
Issued 25 August 2006
Resolved
PROVIDE POSITIVE SHUTOFF VALVE AT THROUGH HULL PENETRATION FOR LAZARETTE SPACE ELEC. BILGE PUMP AND MAKE LAZARETTE SPACE WATERTIGHT AT LOCATION OF BILGE PIPING DECK PENETRATION 46 CFR 182.520
Due 31 October 2006
Resolved 14 September 2006
Resolution: shutoff valve provided close to hull penetration
Documentation › Certificates/Documents › Certificate of Inspection
Issued 25 August 2006
Resolved
MAKE AVAILABLE ALL VESSEL DOCUMENTS.
Due 5 September 2006
Resolved 14 September 2006
Resolution: all documents available for inspection
Operations/Management › Equipment Service/Testing › EPIRB
Issued 4 October 2004
Resolved
Replace EPIRB Battery prior to 2005 operating Season
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 May 2005
Resolved 28 June 2005
Operations/Management › Equipment Service/Testing › EPIRB
Issued 4 October 2004
Resolved
Replace Hydro-Static Release for Epirb priop to 2005 operating Season
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 May 2005
Resolved 28 June 2005
Electrical › Electrical Distribution System (service)
Issued 27 August 2003
Resolved
Secure loose wires at front of starboard engine. LEGACY COMPONENT DESC: Wiring
Due 27 September 2003
Resolved 4 September 2003
Engineering › Fuel Oil Service System
Issued 27 August 2003
Resolved
Repair fuel oil line to starboard engine to eliminate fuel seep. LEGACY COMPONENT DESC: Piping
Due 27 September 2003
Resolved 4 September 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 27 August 2003
Resolved
Remove dead ended copper tubing at aft end of starboard engine.
Due 27 September 2003
Resolved 4 September 2003
Construction/Loadline › Markings
Issued 15 April 2002
Resolved
Mark vessel hull with draft marks prior to the compliance date. LEGACY COMPONENT DESC: Draft Marks/Indicating System
Due 20 April 2002
Resolved 1 May 2002
Stability › Freeing Ports
Issued 15 April 2002
Resolved
Remove half-piping covers from around all freeing ports prior to the compliance date.
Condition: Design Flaw
Due 20 April 2002
Resolved 1 May 2002
Lifesaving
Issued 17 September 2001
Resolved
Replace hyro-static release on EPIRB prior to the compliance date, vessel is restricted to the Straights of Mackinac not more than 3 miles from land until new release is installed.
Condition: Unknown
Due 15 May 2002
Resolved 4 October 2002
Documentation
Issued 17 September 2001
Resolved
Provide and post original Certificate of Inspection prior to the compliancedate.
Condition: Unknown
Due 17 September 2001
Resolved 17 September 2001
Documentation
Issued 17 September 2001
Resolved
Provide currenty certificate of documentation sticker prior to the compliance date.
Condition: Unknown
Due 17 September 2001
Resolved 17 September 2001
Documentation
Issued 6 July 2000
Resolved
THE VESSEL MUST UNDERGO A SIMPLIFIED STABILITY TEST AS REQUIRED BY 46 CFR 178.320 PRIOR TO CARRYING PASSENGERS IN THE YEAR 2001 AND BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 May 2001
Resolved 25 October 2000
Fire Fighting
Issued 6 July 2000
Resolved
BEFORE GETTING UNDERWAY, IMPROVE MOUNTINGS TO SECURE FIXED CO2 CYLINDER TO BULKHEAD, TO BE COMPLETED PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 13 July 2000
Resolved 10 July 2000
Lifesaving
Issued 6 July 2000
Resolved
POST LIFE PRESERVER DONNING INSTRUCTIONS BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 13 July 2000
Resolved 17 July 2000
Engineering
Issued 6 July 2000
Resolved
SECURE REACH RODS TO BOTH EMERGENCY FUEL STOPS VALVES WITH WIRE, BEFORE THECOMPLIANCE DATE.
Condition: Unknown
Due 13 July 2000
Resolved 10 July 2000
Electrical
Issued 6 July 2000
Resolved
BEFORE GETTING UNDERWAY, CLEAN BATTERY BOXES AND CLEAN AND TIGHTEN ALL MAINBATTERY TERMINALS, PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 13 July 2000
Resolved 10 July 2000
Construction/Loadline
Issued 6 July 2000
Resolved
CLEAN BILGES BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 13 July 2000
Resolved 17 July 2000
Accommodation/Occupational Safety
Issued 6 July 2000
Resolved
BEFORE CARRYING PASSENGERS, REPAIR LATCH ON EXTERIOR DOOR, BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 13 July 2000
Resolved 10 July 2000
Navigation
Issued 6 July 2000
Resolved
PRIOR TO GETTING UNDERWAY, REPLACE AND ADJUST SET SCREWS ON PORT AND STARBOARD RUDDER STOCKS, PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 13 July 2000
Resolved 10 July 2000
Engineering
Issued 6 July 2000
Resolved
INSTALL SUPPORTS FOR FUEL OIL SUPPLY AND RETURN PIPING IN ENGINEROOM BEFORETHE COMPLIANCE DATE.
Condition: Unknown
Due 13 July 2000
Resolved 17 July 2000
Engineering
Issued 6 July 2000
Resolved
PROVIDE FLAME BOWLS AND METALLIC PLUGS ON BOTH FUEL FILTER ASSEMBLIES BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 6 August 2000
Resolved 17 July 2000
Lifesaving
Issued 6 July 2000
Resolved
IMPROPER STOWAGE, LIFE FLOAT IMPEDED BY IMPROPERLY STOWED FENDERS AND LINES, CORRECTED DURING INSPECTION.
Condition: Unknown
Due 10 July 2000
Resolved 10 July 2000
Engineering
Issued 31 August 1998
Resolved
LABEL EMERGENCY FUEL VALVES WITH DIRECTION OF CLOSURE AS PER 46 CFR 185.608BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Unknown
Issued 31 August 1998
Resolved
PROVE COMPLIANCE WITH DRUG TESTING REQUIREMENTS IN 46 CFR 16 BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Navigation
Issued 31 August 1998
Resolved
PROVIDE CURRENT COPIES OF 46 CFR SUBCHAPTER T AND NAVIGATION RULES BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Lifesaving
Issued 31 August 1998
Resolved
PROVIDE FIRST AID KIT IN COMPLIANCE WITH 46 CFR 184.710 PRIOR TO CARRYING PASSENGERS AND BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Lifesaving
Issued 31 August 1998
Resolved
PROVIDE MEANS OF MAINTAINING PASSENGER COUNT ASHORE AS PER 46 CFR 185.504 BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Lifesaving
Issued 31 August 1998
Resolved
PROVIDE 6 SMOKE DISTRESS SIGNALS AS PER 46 CFR 180.68 PRIOR TO CARRYING PASSENGERS AND BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Construction/Loadline
Issued 31 August 1998
Resolved
ADJUST AND LUBRICATE WATERTIGHT DOOR IN WAY OF COLLISION BULKHEAD BEFORE_x001C_ THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Lifesaving
Issued 31 August 1998
Resolved
RENEW REFLECTIVE TAPE, REFASTEN LIFELINE, AND BLACKOUT PRIOR VESSEL NAMES ON LIFE FLOAT, PRIOR TO CARRYING PASSENGERS AND BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Construction/Loadline
Issued 31 August 1998
Resolved
INSTALL HOSE CLAMP ON PUMP DISCHARGE HOSE FOR MANUAL ENGINEROOM BILGE PUMP._x001C_ CORRECTED ON SPOT
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Lifesaving
Issued 31 August 1998
Resolved
CHILD SIZE PFD'S MIXED IN WITH ADULT SIZE, CORRECTED ON SPOT, ALSO TYPE IIIPFD'S ARE TO BE KEPT SEPARATE FROM PRIMARY LIFESAVING EQUIPMENT WHEN PASSENGERS ARE ABOARD._x001C_
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Fire Fighting
Issued 31 August 1998
Resolved
FIRE BUCKETS NOT PROPERLY LABELLED, CORRECTED ON SPOT.
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Navigation
Issued 31 August 1998
Resolved
INSTALL MARINE TYPE MAGNETIC COMPASS AS PER 46 CFR 184.402 AND PROVE PROPEROPERATION OF SAME BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Documentation
Issued 31 July 1995
Resolved
Carry no passengers for hire until a valid FCC Great lakes Agreement is provided.
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Documentation
Issued 31 July 1995
Resolved
Carry no passengers for hire until a licensed master is provided.
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Fire Fighting
Issued 13 June 1994
Resolved
Service portable B-I fire extinguisher.
Condition: Unknown
Due 13 June 1994
Resolved 13 June 1994
Fire Fighting
Issued 13 June 1994
Resolved
Service CO2 cylinder for fixed fire protection system in engine room.
Condition: Unknown
Due 13 June 1994
Resolved 13 June 1994
Documentation
Issued 18 August 1988
Resolved
PROVIDE CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 18 August 1988
Resolved 18 August 1988
Engineering
Issued 18 August 1988
Resolved
PROVE OPERATION OF STARBOARD ENGINE AND DRIVE TRAIN.
Condition: Unknown
Due 18 August 1988
Resolved 18 August 1988
Construction/Loadline
Issued 18 August 1988
Resolved
CROP AND RENEW PITTED PLATING AND ASSOCIATED INTERNALS IN FOREPEAK.
Condition: Unknown
Due 18 August 1988
Resolved 18 August 1988
Unknown
Issued 18 August 1988
Resolved
PERMNENTLY MARK OFFICIAL NUMBER ON VESSEL.
Condition: Unknown
Due 18 August 1988
Resolved 18 August 1988