← All vessels
CHABLIS
Passenger (Inspected) · Passenger Ship class · Built 1990s · USCG Southwest District (CGD-SW) · Other hulls named CHABLIS
CHABLIS is a 1990 passenger vessel (inspected). The Coast Guard has recorded 99 inspections since 1988, most recently in April 2025, along with 174 deficiencies, 3 operational controls and 3 casualty investigations between 2008 and 2021.
Records from 1988 to 2025. Most recent: inspection, 29 April 2025.
- Built
- 1990
- Last inspected
- 29 April 2025
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 174 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 3 investigations · 2008–2021
Identity
959592
WDH6250
314409
Flag
UNITED STATES
367636050 (licence lapsed)
Maury page id
psix-314409
Inspections, by type
…with no type recorded12
Years with a record
34 calendar years (1988–2025)
The 99 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)48.2 ft × 23.8 ft × 4.0 ft
Registered tonnagegross 38 / net 30
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHUMBOLDT BELLE INC · FIELDS LANDING, CA, UNITED STATES · built 1990
Hull materialWood
PropulsionDiesel Reduction
Hull shapeBox
Hull configurationMonohull
Hailing portMORRO BAY, CA
Trade endorsementsCoastwise, unrestricted, Recreational, Registry
DocumentationValid · issued 9 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it38 - Simplified, Gross Ton
30 - Simplified, Net Ton
30 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDH6250MMSI 367636050 · expired · compulsorily equipped · granted 12 August 2014, cancelled 16 November 2024
WCX3889MMSI not assigned · expired · compulsorily equipped · granted 8 April 1997, cancelled 10 June 2007 · licensed under a name not among this hull’s recorded names (not shown)
WAL8780MMSI not assigned · expired · compulsorily equipped · granted 30 March 1995, cancelled 30 July 2005
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 99
29 April 2025
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8127446
25 April 2024
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7902215
23 February 2024
Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7867884
5 April 2023
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7636209
5 April 2022
COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7418351
17 February 2022
In-Service Inspection · Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7396182
21 June 2021
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7189430
24 May 2021
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7205667
23 May 2021
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7205817
16 February 2021
Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7140147
22 June 2020
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6973344
11 June 2019
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6683923
21 February 2019
Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6629178
9 July 2018
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6475993
9 October 2017
Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6284314
8 October 2017
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6284240
10 April 2017
COI Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6114522
12 January 2017
Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6069631
15 June 2016
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5900354
5 June 2016
Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5900300
12 August 2011
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 4113677
7 January 2011
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3924643
18 November 2010
Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3892501
23 March 2009
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3437285
3 September 2008
Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3316375
3 September 2008
DAPI Audit
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3330903
9 July 2008
Drydock Extension
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3262739
26 April 2008
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3193114
26 April 2008
Damage Survey
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3193115
6 March 2008
Drydock Extension · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3158436
12 April 2007
Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2906726
5 April 2007
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2902601
5 May 2006
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2641355
8 March 2006
Hull Examination · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2594091
25 January 2006
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2542029
7 June 2005
Deficiency Check · Annual Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2333118
13 October 2004
Hull Examination · Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2215319
9 July 2004
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2127421
19 March 2004
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2027526
15 January 2004
Hull Examination · Internal Structural Exam
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1983683
16 January 2003
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1731300
2 January 2003
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1724379
20 December 2002
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1721764
7 November 2002
Annual Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1704230
20 March 2002
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1495285
14 January 2002
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1478277
23 October 2001
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1456030
17 January 2001
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1397555
17 February 2000
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 815552
28 January 2000
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 815285
23 April 1999
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 791059
3 March 1999
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 804764
15 January 1999
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1437497
7 December 1998
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 806575
3 December 1998
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 805478
27 November 1998
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 805435
10 February 1998
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1113688
26 January 1998
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 781912
26 March 1997
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1368213
10 March 1997
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 805862
10 March 1997
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1116141
10 March 1997
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1371778
9 May 1996
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1088130
1 March 1996
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 884583
18 December 1995
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1184854
27 November 1995
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1374449
27 November 1995
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1469127
1 November 1995
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 880092
24 October 1995
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1183485
2 October 1995
Inclining Experiment
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 874858
16 August 1995
Plan Review "T" Boat · Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1462451
8 August 1995
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 658401
3 August 1995
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 877554
22 July 1995
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 34064
21 July 1995
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 213201
2 December 1994
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1157711
7 December 1993
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1158767
21 October 1993
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1155973
10 September 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1142215
10 June 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 838641
20 April 1992
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1255882
30 March 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 911166
21 February 1991
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 917965
21 February 1991
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1307577
15 October 1990
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 926683
10 April 1990
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 921333
2 April 1990
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 905565
26 February 1990
Initial Construction-Excluding Oversight · COI Inspection · Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 906102
4 February 1990
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 982824
5 November 1989
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 981078
8 September 1989
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1316262
31 August 1989
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1351069
23 August 1989
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1348063
30 June 1989
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1209497
18 May 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1035286
17 March 1989
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1342044
31 December 1988
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1352429
1 September 1988
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1196806
31 July 1988
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1038962
Deficiency record · 174
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 April 2025
Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart, and in such a manner as to avoid chafing and other damage.
Wiring for the Fireboy and lighting in the machinery space overhead IWO the center beam is not secure. Install metal supports at least every 24 inches to prevent damage and mitigate fire/safety hazards. 46 CFR 183.340(b)(4)
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Health protection, medical care?)
Issued 29 April 2025
Resolved
The marine employer must have a sufficient number of alcohol testing devi es readily accessible on board the vessel to determine the presence of alcohol in the system of each individual who was directly involved in the SMI.
Alcohol test strips were expired. Provide testing devices for total crew onboard.
46 CFR 4.06-15(a)(1)
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 5 April 2023
Resolved
A vessel must carry either a first-aid kit approved
under approval series 160.041 or a kit with equivalent
contents and instructions. Items in kit were expired/
missing. Make kit in compliance with regulations.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 5 April 2023
Resolved
The master and crew of a vessel will be familiar with
the content of and have mounted at the operating
station, emergency instructions containing the actions
to be taken in the event of fire, heavy weather, or man
overboard conditions. The Certificate of Inspection and
any SOLAS Certificates must be posted under glass or
other suitable transparent material, such that all pages
are visible, in a conspicuous place on the vessel where
observation by passengers is likely. The stability
letter must be posted under glass or other suitable
transparent material, such that all pages are visible,
at the operating station of the vessel. Post all
required documents as required by regulation and to the
satisfaction of the attending Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 April 2023
Resolved
Each ring life buoy on a vessel must be approved in
accordance with § 160.050 in sub-chapter Q of 46 CFR, or
other standard specified by the Commandant, including,
but not limited to, approval series 160.150. 01 life
buoy grab-line was wasted. Make grab line satisfactory
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 April 2023
Resolved
Each floating waterlight must be approved in accordance
with § 161.010 in subchapter Q of 46 CFR, or other
standard specified by the Commandant, including, but not
limited to, approval series 160.110. Waterlight is not
of the approved type. Replace current unauthorized
waterlight with correct type.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 April 2022
Resolved
All machinery and equipment must be installed and
maintained in such a manner as to afford adequate
protection from causing fire, explosion, machinery
failure, and personnel injury. Vessel's propulsion main
engine began overheating while underway, forcing vessel
to anchor and shutdown engine. Vessel must diagnose and
submit diagnosis and repair to the USCG and perform
underway operational test to the satisfaction of an
attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 April 2022
Resolved
A vessel must be provided with a satisfactory
arrangement for draining any watertight compartment,
other than small buoyancy compartments, under all
practicable conditions. Vessel was not able to dewater
engine room bilge or mid-ship bilge with installed bilge
system. Make bilge system in compliance with regulations
and to satisfaction of attending Marine Inspector
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 5 April 2022
Resolved
The person in command of a documented vessel must have
on board that vessel the original Certificate of
Documentation (COD) currently in effect for that vessel.
Vessel did not have valid COD on board. Provide proof of
valid COD to attending Marine Inspector.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 5 April 2022
Resolved
A vessel must carry either a first-aid kit approved
under approval series 160.041 or a kit with equivalent
contents and instructions. Items in kit were expired/
missing. Make kit in compliance with regulations.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 April 2022
Resolved
Each child size life jacket must be stowed in a location
that is appropriately marked and separated from adult
life jackets so the child size life jackets are not
mistaken for adult life jackets. The number and
identification of the items stowed inside, and their
sizes, must be marked in clearly legible letters and
numbers on each container for life jackets. Child size
life jackets were stowed with adult life jackets.
Containers for life jackets were not correctly marked.
Make containers and stowage as required by regulation
and attending Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 April 2022
Resolved
Each floating waterlight must be approved in accordance
with § 161.010 in subchapter Q of 46 CFR. Waterlight
had incorrect type battery. Replace battery as per manufacturer requirements.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 April 2022
Resolved
Electrical equipment on a vessel must be installed and
maintained to protect passengers, crew, other persons,
and the vessel from electrical hazards, including fire,
caused by or originating in electrical equipment, and
electrical shock. Electronic control panel under helm
broken. Repair broken control panel to satisfaction of
attending Marine Inspector.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 5 April 2022
Resolved
On a vessel on which the number of passengers permitted
on upper decks is limited by stability criteria, as
indicated by the vessel's stability letter, the maximum
number of passengers allowed on an upper deck must be
indicated by a durable marking of at least 25
millimeters (1 inch) numbers and letters at the
entranceway to that deck. Vessel is only allowed 56
passengers on its upper deck, but is marked for 65.
Correct markings as required and to the satisfaction of
attending Marine Inspector.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 5 April 2022
Resolved
The master and crew of a vessel will be familiar with
the content of and have mounted at the operating
station, emergency instructions containing the actions
to be taken in the event of fire, heavy weather, or man
overboard conditions. The Certificate of Inspection and
any SOLAS Certificates must be posted under glass or
other suitable transparent material, such that all pages
are visible, in a conspicuous place on the vessel where observation by passengers is likely. The stability
letter must be posted under glass or other suitable
transparent material, such that all pages are visible,
at the operating station of the vessel. Post all
required documents as required by regulation and to the
satisfaction of the attending Marine Inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 28 March 2022
Resolved
Deck rails must be designed and constructed to withstand a point load of 200 pounds applied at any point in any direction, and a uniform load of 50 pounds per foot applied to the top rail in any direction. The point and uniform loads do not need to be applied simultaneously. Rails on upper weatherdeck were not yet fully installed and required hot work. Repair/replace rails to satisfaction of attending Marine Inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 28 March 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Lighting around wheelhouse was in disrepair and an electrical hazard. Remove/make lighting in compliance with regulations to satisfaction of attending Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 March 2022
Resolved
A weathertight door must be provided for each opening located in a deck house or companionway. Wheelhouse was not yet made weathertight after dry-docking. Make weathertight with good marine practice as required by the regulation and to the satisfaction of the attending Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 June 2021
Resolved
Remove paint stored below decks or provide paint locker.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 21 June 2021
Resolved
Provide alcohol testing devices.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 21 June 2021
Resolved
Fire hose leaking. Deonstrate proper operation of fire hose.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 22 June 2020
Resolved
First aid kit contained expired items. Provide current and complete first aid kit that meets 46 CFR 160.041.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 22 June 2020
Resolved
Fire drills and abandon ship drills were not logged. Log drills.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 June 2020
Resolved
Plastic (combustible) garbage can found behind bar. Remove combustible garage receptacles from accommodation spaces.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 9 July 2018
Resolved
Renew COD.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 July 2018
Resolved
Provide 7 additional adult lifejackets for a total of 98; vessel restricted to 91 passengers until corrected.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 July 2018
Resolved
Provide 04 servicable fire extinguishers and provide service report prior to operating with passengers.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 9 July 2018
Resolved
Post stability letter at operating station.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 July 2018
Resolved
Properly mark lifejacket storage with proper count.
Engineering › Steering Gear System › Rudder
Issued 9 October 2017
Resolved
Make vessel available for dockside & underway inspection of hull and steering gear by a USCG Marine Inspector prior to carrying passengers.
Lifesaving › Buoyant Apparatus › Readily Accessible
Issued 10 April 2017
Resolved
Properly rig ring buoy, line and electric waterlight, and place on station.
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 10 April 2017
Resolved
Prove proper operation of waterlight.
Engineering › Bilge Water Management System › Pump
Issued 10 April 2017
Resolved
Securely mount the lazarette high bilge alarm float switch.
Fire Fighting › Fire Pumps › Pressure
Issued 10 April 2017
Resolved
Troubleshoot fire pump to improve pressure/water flow.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 10 April 2017
Resolved
Display EAP info & 800 hotline number.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 10 April 2017
Resolved
Provide company drug policy info.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 April 2017
Resolved
Repair anchor light.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 10 April 2017
Resolved
Provide log of drills/training.
Documentation › Certificates/Documents › Stability Letter
Issued 10 April 2017
Resolved
Post stability letter.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 12 January 2017
Resolved
Thoroughly clean E/R bilge and remove standing water.
Engineering › Bilge Water Management System › Piping
Issued 12 January 2017
Resolved
E/R: Fwd bilge pipe inboard – clean with wire brush & inspect
Construction/Loadline › Hull › Side Shell
Issued 12 January 2017
Resolved
Port & stbd sewage compt: address weeping aft overhead/bulkhead seam
Construction/Loadline › Hull › Side Shell
Issued 12 January 2017
Resolved
Port aft sideshell: submit plans for sideshell repair (impact damage)
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 12 January 2017
Resolved
MDE starting battery circuit: replace cartridge fuse breaker with appropriate circuit breaker.
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 January 2017
Resolved
Reefer room: remove power strip and install accessible receptacle
Construction/Loadline › Hull › Side Shell
Issued 12 January 2017
Resolved
Repair decayed plywood at port transom.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 12 January 2017
Resolved
Remove/replace inboard pipe for generator keel cooler
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 12 January 2017
Resolved
Cap unused penetration of port fwd bulkhead in void under salon
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 January 2017
Resolved
Remove dead-end wire in #2 void
Construction/Loadline › Hull › Side Shell
Issued 12 January 2017
Resolved
Dry/treat decayed plywood in #2 void, stbd side
Stability › Watertight Integrity › General
Issued 12 January 2017
Resolved
Locate/repair water leak (from exterior) in #2 void.
Engineering › Steering Gear System › Rudder Stock
Issued 12 January 2017
Resolved
Repair or replace bent rudder stock.
Construction/Loadline › Hull › Bottom Plating
Issued 12 January 2017
Resolved
Complete post-drydock check-ride
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 15 June 2016
Resolved
Re-wrap generator exhaust piping.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 15 June 2016
Resolved
Stabilize E/R deck board (port side).
Engineering › Steering Gear System › Piping
Issued 15 June 2016
Resolved
Laz: Replace crimped copper line and check all fittings for weeps.
Engineering › Steering Gear System › Pin
Issued 15 June 2016
Resolved
Install chafing gear on steering hose.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 15 June 2016
Resolved
Install blanks on shore power box (3 total)
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 15 June 2016
Resolved
Bar: Repair receptacle near fridge, and secure wires entering junction box.
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 15 June 2016
Resolved
Remove flammables (paints, epoxies) from vessel
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 15 June 2016
Resolved
Post EAP 800 #
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 15 June 2016
Resolved
Service f/f equipment
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 15 June 2016
Resolved
Secure engine mounts to engine bed to prevent engine movement.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 15 June 2016
Resolved
Attach 60-ft of line and electric waterlight to ring buoy.
Construction/Loadline › Hull › Side Shell
Issued 6 June 2016
Resolved
Make in-kind repairs to port side boarding door jamb and window frames.
Construction/Loadline › Hull › Side Shell
Issued 5 June 2016
Resolved
Vessel may not operate with passengers until a USCG MI has attended the vessel to conduct a damage survey, and any required repairs are completed to the satisfaction of the attending USCG MI.
Electrical › Electric Generation Source (service) › Generator
Issued 12 August 2011
Resolved
Make permanent repairs to fractured high pressure fuel piping in way of the diesel generator injector pump.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 November 2010
Resolved
Prove proper installlation of Vessel electrical service installation IAW applicable section of 46 CFR.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 3 September 2008
Resolved
Display EAP info aboard vessel (policy statement, EAP infor w/ hotline #).
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 3 September 2008
Resolved
Provide supervisor training.
Construction/Loadline › Hull › Bottom Plating
Issued 26 April 2008
Resolved
Prior to operating with passengers, make vessel available for ISE.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 12 April 2007
Resolved
Provide 12 adult L/Js. Crew and passengers are reduced to 112 until the required L/Js are provided.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 12 April 2007
Resolved
Repair leaking fuel shut-off valve.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 12 April 2007
Resolved
Seal E/R and make compartment vapor tight.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 12 April 2007
Resolved
Provide proposal and install adequate ventilation for E/R.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 12 April 2007
Resolved
Provide electrical receptacles cover under the bar.
Construction/Loadline › Penetrations › Gasket
Issued 12 April 2007
Resolved
Make aft E/R door weather tight.
Documentation › Certificates/Documents › Stability Letter
Issued 12 April 2007
Resolved
Provide stability letter.
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 12 April 2007
Resolved
Repair grounding on electrical receptacles.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 12 April 2007
Resolved
Label breaker panel under the bar.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 12 April 2007
Resolved
Provide proof of entry into drug testing program.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 12 April 2007
Resolved
Provide update COD indicating that the hull is constructed of wood.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 April 2007
Resolved
Vessel is restricted from carrying passengers until a satisfactory drydock exam is completed to the satisfaction of the attending Marine Inspector.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 4 May 2006
Resolved
Correct vessel's Certificate of Documentation to the correct hull material- vessel is of wood construction.
Operations/Management › Passenger Operations › Safety Orientation
Issued 1 March 2006
Resolved
Complete credit hull exam.
Stability › Weathertight Integrity › General
Issued 25 January 2006
Resolved
Renew cracked window in way of main deck port side, sixth window fwd.
Construction/Loadline › Hull › Longitudinal Frame
Issued 25 January 2006
Resolved
Repair/replace cracked frame in way of #2 void, port side, aft of collision bulkhead and crack in molded, overhead ceiling.
Construction/Loadline › Structures › Superstructure
Issued 25 January 2006
Resolved
Renew as original cracked stem block in bow void.
Stability › Watertight Integrity › General
Issued 25 January 2006
Resolved
Make watertight all thru bulkhead penetrations in lazarette to include bilge pump wires and hydraulic lines to steering gear.
Engineering › Bilge Water Management System › Pump
Issued 25 January 2006
Resolved
Secure bilge pump and float switches in lazarette. Also properly set-up kinked bilge pump overboard hose.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 25 January 2006
Resolved
Replace welding cables in engine room with proper cables IAW 46 CFR 120.340.
Construction/Loadline › Hull › Hull Plating
Issued 13 October 2004
Resolved
Repair hull delamination amidship in way of starboard chine to the satisfaction of the attending Marine Inspector.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 13 October 2004
Resolved
Make watertight bulkheads beneath margin line watertight in way of PVC penetration and stuffing tubes IAW CFR 179.320
Construction/Loadline › Structures › Transverse Bulkhead
Issued 13 October 2004
Resolved
Provide plans to repair 4" x 4" area of dry rot in collision bulkhead on port side IAW CFR 176.700.
Construction/Loadline › Structures › Deck Plating
Issued 13 October 2004
Resolved
Repair 4" x 4" area of dry rot in deck above third deck beam forward of eng room bulkhead on starboard side.
Communications
Issued 19 March 2004
Resolved
Provide Emergency Broadcast placard.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 19 March 2004
Resolved
Provide updated tide and current tables.
Lifesaving › Lifejacket/PFD (General)
Issued 19 March 2004
Resolved
Undo / unhook all straps on lifejackets and make jackets ready for use in an emergency.
Lifesaving › Lifejacket/PFD (General)
Issued 19 March 2004
Resolved
Provide unobstructed storage for childs lifejackets.
Engineering › Fuel Oil Service System
Issued 16 January 2004
Resolved
Renew all flex hose fuel oil lines in engine room with flex hose meeting standards in 46CFR182.720 or SAE J1942 standards. LEGACY COMPONENT DESC: Hose
Stability › Watertight Integrity
Issued 16 January 2004
Resolved
Make all PVC penetrations through any watertight bulkhead comply with 46 CFR 182.720(a). Vessel restricted to less than 49 passengers until resolved.
Engineering › Bilge Water Management System › Not Operational
Issued 16 January 2004
Resolved
Submit proposal to install bilge alarm as req'd by 46 CFR 182.530.
Construction/Loadline › Structures › Superstructure
Issued 16 January 2004
Resolved
Repair as new railing in way of rusted supports.
Construction/Loadline › Structures › Superstructure
Issued 16 January 2004
Resolved
Repair as new the ladder on the bow from 2nd deck to main deck.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 16 January 2004
Resolved
Submit proposal to repair as new wood rot or defects in way of port side from main deck up.
Construction/Loadline › Hull
Issued 15 January 2004
Resolved
Severe wood rot located in hull in way of stbd side hull below sliding door entry (frames 4-11). Provide repair proposal to crop and renew.
Construction/Loadline › Hull
Issued 15 January 2004
Resolved
Wood rot in way of port bow hull (frames 18-21). Provide repair proposal to crop and renew.
Construction/Loadline › Hull
Issued 15 January 2004
Resolved
Delamination of exterior fiberglass over hull in way of port bow and midship along rub rail; areas marked with chalk; provide proposal for relaminating.
Construction/Loadline › Hull
Issued 15 January 2004
Resolved
Wood rot on exterior and interior of vertical hull and bottom of hull in way of portside bow (frames 15-18). Interior wood rot is primarily in way of bulkhead at base of frame 16. Provide repair proposal to crop and renew.
Construction/Loadline › Hull
Issued 15 January 2004
Resolved
Pull fastener in way of portside beam (frame 10) located 21" up from chine for cause due to wasted/rusted head.
Construction/Loadline › Hull
Issued 15 January 2004
Resolved
Remove temporary wood patch in hull in way of port side engine room and make permanent repair. Provide repair proposal for approval. (Severe delamination of exterior fiberglass and wood rot behind patch).
Construction/Loadline › Hull
Issued 15 January 2004
Resolved
Crop and renew portside top rubrail in way of door frame. (Severe wood rot).
Construction/Loadline › Structures
Issued 15 January 2004
Resolved
Crop and renew worm shoe in way of area that is 6' fwd of the keel cooler.
Construction/Loadline › Structures
Issued 15 January 2004
Resolved
Renew rotted trim around aft 18' section of the keel on both port and stbd sides.
Construction/Loadline › Structures
Issued 15 January 2004
Resolved
Provide screw for shaft mounting plate under hull.
Electrical › Electrical Distribution System (service)
Issued 2 January 2003
Resolved
Install metallic clamps to support wiring in engine room IAW 46 CFR 183.340(4) LEGACY COMPONENT DESC: Wiring
Lifesaving
Issued 7 November 2002
Resolved
Replace expired medication in First Aid Kit.
Engineering › Diesel Engine (propulsion-direct drive)
Issued 7 November 2002
Resolved
Make engine room vapor tight. Gaps in overhead beams (4th from aft on port, center fwd), hole aft stbd at overhead. Provide stop for door vent cover.
Electrical › Electrical Distribution System (service)
Issued 7 November 2002
Resolved
Properly label fwd breaker panel. LEGACY COMPONENT DESC: Circuit Breaker
Deck/Cargo › Cargo Stowage
Issued 7 November 2002
Resolved
Properly mount CO2 bottle in bar area. LEGACY COMPONENT DESC: CO2 tank
Engineering › Diesel Engine (propulsion-direct drive)
Issued 7 November 2002
Resolved
Provide machinery guard for v-belt.
Navigation › Piloting/Steering
Issued 7 November 2002
Resolved
Adjust rudder stop to prevent contact when at full port.
Electrical › Lighting (service)
Issued 7 November 2002
Resolved
Repair/replace wire for heat lamp. LEGACY COMPONENT DESC: Conductor
Lifesaving › Hand Flares › Marking
Issued 7 November 2002
Resolved
Properly mark flare and orange smoke container with "distress signals."
Electrical › Electric Supply System (service)
Issued 14 January 2002
Resolved
Repair wire conduit in forward hold.
Electrical › Electric Supply System (service)
Issued 14 January 2002
Resolved
Repair wire conduit (grey pvc) port side, mid hold.
Engineering
Issued 14 January 2002
Resolved
Replace engine fuel line (rubber flex portion) with fuel hose that meets SAE J-1942. LEGACY COMPONENT DESC: Hose
Construction/Loadline › Hull
Issued 14 January 2002
Resolved
Replace keel cooler blocks, starboard side. LEGACY COMPONENT DESC: Bracket
Construction/Loadline › Hull
Issued 14 January 2002
Resolved
Replace damaged (water logged/bugs) wood in forward portion of keel. LEGACY COMPONENT DESC: Keel
Construction/Loadline › Structures
Issued 14 January 2002
Resolved
Tigheen bolts (for bench) on starboard side framing
Electrical
Issued 26 January 1998
Resolved
ELECTRICAL PANEL BOX - INSTALL 3 BLANKS FOR OPEN BREAKER SLOTS
Documentation
Issued 26 January 1998
Resolved
WASTE MANAGEMENT PLAN, PROVIDE COPY ON BOARD
Documentation
Issued 26 March 1997
Resolved
PROVIDE CURRENT DEVIATION TABLE FOR MAGNETIC COMPASS.
Documentation
Issued 26 March 1997
Resolved
PROVIDE CURRENT STATION LICENSE.
Lifesaving
Issued 26 March 1997
Resolved
PROVIDE RETRO-REFLECTIVE TAPE FOR RING BUOY.
Construction/Loadline
Issued 26 March 1997
Resolved
TREAT FOR TERMITES.
Electrical
Issued 1 March 1996
Resolved
REQUIRE ELECTRICAL LOAD PLANS FOR NEW GENERATOR INSTALLATION AND WEIGHT CHANGES FROM OLD GEN. TO NEW GEN. FOR STABILITY PURPOSES.
Electrical
Issued 27 November 1995
Resolved
REPORT TO MARINE SAFETY OFFICE INSPECTIONS UPON INSTALLATION OF 1200 RPM GENERATOR.
Construction/Loadline
Issued 27 November 1995
Resolved
PROVIDE AFT LAZARETTE BILGE SUCTION WHICH IS LED TO CENTRAL CONTROL POINT OR MANIFOLD, AND IS PROVIDED WITH A STOP VALVE AT THE CONTROL POINT OR MANIFOLD IN ACCORDANCE WITH 46 CFR 182.25-5.
Construction/Loadline
Issued 27 November 1995
Resolved
PLUG END OF PADDLEWHEEL BEAM AT TRANSOM.
Lifesaving
Issued 27 November 1995
Resolved
PROVIDE 10 ADDITIONAL ADULT LIFEJACKETS BEFORE INCREASING ADDITIONAL CREW ALLOWANCE.
Construction/Loadline
Issued 2 October 1995
Resolved
PROVIDE AFT LAZARETTE BILGE SUCTION WHICH IS LED TO A CENTRAL CONTROL POINTOR MANIFOLD, AND IS PROVIDED WITH A STOP VALVE AT THE CONTROL POINT OR MANIFOLD IN ACCORDANCE WITH 46 CFR 182.25-5. BILGE SUCTION LINE DEEMED NECESSARY BY SUBDIVISION CALCULATIONS OF 02OCT95. RBS/CAH.
Electrical
Issued 16 August 1995
Resolved
PROVIDE WIRING SCHEMATIC FOR ELECTRICAL PANEL IN ENGINE ROOM.
Engineering
Issued 16 August 1995
Resolved
LAG EXHAUST STACK FOR MAIN DIESEL ENGINE.
Engineering
Issued 16 August 1995
Resolved
PERMANENTLY CONNECT THROTTLE CONTROL.
Construction/Loadline
Issued 16 August 1995
Resolved
REMOVE SHORING IN WAY OF KEEL AND MAIN DECK, FIRST COMPARTMENT AFT OF COLLISION BULKHEAD, AND PROVIDE PLANS FOR SUPPORT.
Construction/Loadline
Issued 16 August 1995
Resolved
PROPERLY SISTER 4TH TRANSVERSE FRAME IN FIRST COMPARTMENT AFT OF COLLISION BULKHEAD.
Construction/Loadline
Issued 16 August 1995
Resolved
REMOVE SHORING AND PROVIDE PROPOSAL FOR DECK SUPPORT IN THE SECOND COMPARTMENT AFT OF THE COLLISION BULKHEAD.
Construction/Loadline
Issued 16 August 1995
Resolved
PROPERLY REPAIR LEAKING AFT WATERTIGHT BULKHEAD IN SECOND COMPARTMENT AFT OF COLLISION BULKHEAD. REMOVE EPOXY.
Electrical
Issued 16 August 1995
Resolved
SUBMIT CURRENT WIRING DIAGRAM.
Navigation
Issued 16 August 1995
Resolved
INSTALL MASTHEAD AND SIDE LIGHTS IN ACCORDANCE WITH 33CFR84.03 AND 33CFR84.05.
Construction/Loadline
Issued 16 August 1995
Resolved
REMOVE ALL IMPROPER COTTON AND EPOXY CAULKING LAID RANDOMLY ALONG THE TOP OUTBOARD EDGE OF THE CHINE AND ASSESS WATERTIGHTNESS.
Construction/Loadline
Issued 16 August 1995
Resolved
SUBMIT CORRECT DRAWING OF INTERIOR OVERHEAD CONSTRUCTION, WITH KEY.
Construction/Loadline
Issued 16 August 1995
Resolved
PROVIDE BILGE SUCTION FOR AFT LAZARETTE.
Construction/Loadline
Issued 16 August 1995
Resolved
PROVIDE PLANS TO CONNECT TRANSVERSE FRAMES TO VERTICAL FRAMES.
Construction/Loadline
Issued 16 August 1995
Resolved
RE-FASTEN THE REMAINING 50% OF HULL, 25% AT EACH DRYDOCK (25% AT SEP 1998, AND FINAL 25% AT MAR 2000 CREDIT DRYDOCKINGS).
Electrical
Issued 16 August 1995
Resolved
PROPERLY SUPPORT WIRES AND PIPING._x001C_
Construction/Loadline
Issued 16 August 1995
Resolved
THROUGH BOLT TRANSVERSE DECK FRAME TO COLLISION BULKHEAD.
Construction/Loadline
Issued 16 August 1995
Resolved
REPAIR HOLE IN PORT SIDE, MAIN DECK, BETWEEN FRAME ONE AND COLLISION BULKHEAD.
Construction/Loadline
Issued 16 August 1995
Resolved
REPAIR DELAMINATED PORT STERN CORNER.
Navigation
Issued 16 August 1995
Resolved
DEMONSTRATE PROPER OPERATION OF RUDDER STOPS._x001C_
Construction/Loadline
Issued 16 August 1995
Resolved
PROVIDE VENTILATION FOR FOREPEAK.
Construction/Loadline
Issued 16 August 1995
Resolved
GRIND OUT AND REPAIR AREAS NOTED PORT SIDE, FORWARD AND ABAFT OF AMIDSHIP.
Construction/Loadline
Issued 16 August 1995
Resolved
REPAIR WOOD ROT IN WAY OF STARBOARD COMPARTMENT ACCESS, SECOND COMPARTMENT AFT OF COLLISION BULKHEAD._x001C_ _x001C_
Engineering
Issued 21 February 1991
Resolved
MODIFY BELT GUARD ON MAIN ENGINE TO PROVIDE PROTECTION ON UNDERSIDE OF PULLEY. (BELT GUARD DOES NOT EXTEND DOWN FAR ENOUGH TO PROTECT BOTTOM OF PULLEY.)
Fire Fighting
Issued 21 February 1991
Resolved
PROVIDE SERVICING FOR ALL CO2 EXTINGUISHERS.
Lifesaving
Issued 21 February 1991
Resolved
PROVIDE VESSEL WITH AN ADDITIONAL 18 ADULT SIZE LIFE JACKETS. VESSEL IS_x001C_ RESTRICTED TO THE CARRIAGE OF 92 PASSENGERS AND A TOTAL OF 95 PERSONS UNTILADDITIONAL LIFE JACKETS ARE PROVIDED.
Documentation
Issued 26 February 1990
Resolved
POST STABILITY LETTER.
Accommodation/Occupational Safety
Issued 26 February 1990
Resolved
FOR THE UPPER DECK RAILS: PROVIDE BULWARKS, CHAIN LINK FENCING, WIRE MESH, OR THE EQUIVALENT IN THE SPACES BELOW THE UPPER RAIL. SIMILAR NYLON NETTINGTO THAT ALREADY INSTALLED BELOW THE LOWER COURSE IS ACCEPTABLE.
Electrical
Issued 26 February 1990
Resolved
MOUNT GUARD OVER GENERATOR FLYWHEEL & PULLEYS.
Accommodation/Occupational Safety
Issued 26 February 1990
Resolved
TIGHTLY SECURE RAIL HANDLE AT TOP OF STAIRS.
Navigation
Issued 26 February 1990
Resolved
COMPLETE INSTALLATION OF VHF RADIO.
Documentation
Issued 26 February 1990
Resolved
PROVIDE AND POST (FCC) RADIOTELEPHONY CERTIFICATE.
Engineering
Issued 26 February 1990
Resolved
REPAIR EXHAUST LEAK TO ENGINE MANIFOLD.
Casualty record · 3
26 April 2008Routine · role: Involved in a Marine Casualty · activity 3193114
8 October 2017Routine · role: Involved in a Marine Casualty · activity 6284240
23 May 2021Routine · role: Involved in a Marine Casualty · activity 7205817
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.