MAURY USCG vessel records
← All vessels

ZHEN HUA 25

ZHEN HUA 25 is a 1988 freight ship. The Coast Guard has recorded 7 inspections since 2019, most recently in May 2026, along with 2 deficiencies and 2 operational controls, 1 with no removal date recorded.

Records from 2019 to 2026. Most recent: inspection, 5 May 2026.

Built
1988
Last inspected
5 May 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
1 with no removal date recorded

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 5 May 2026
…with no type recorded2
Operational controls 1 with no removal date recorded
Years with a record 5 calendar years (2019–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8700242
316819
Flag
HONG KONG
Maury page id
psix-316819

Documentation record

Tonnage as PSIX records it11476 - Convention (Subpart B), Net Ton
67162 - Displacement, Metric Ton
49099 - Dead Weight, Metric Ton
38255 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 7

5 May 2026 PSC A
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8354581
14 October 2024 PSC A · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8018769
9 February 2022 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7393304
29 October 2020 PSC A
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7086380
27 March 2019 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6650359
18 March 2019 PI Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6643244
14 March 2019 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6642581

Deficiency record · 2

14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 18 March 2019 Resolved
THE ARRANGEMENT ON BOARD THE SHIP FOR THE EXTRACTION OF SAMPLES FROM THE 15 PPM BILGE ALARM SHOULD GIVE A TRULY REPRESENTATIVE SAMPLE OF THE EFFLUENT WITH ADEQUATE PRESSURE & FLOW. PSCO OBSERVED A VALVE INSTALLED IN THE SAMPLE EXTRACTION LINE. THIS VALVE IS INCLUDED IN THE VESSEL'S APPROVED PIPING DIAGRAM PROVIDED BY THE SHIP’S CREW BUT IS CONTRARY TO THE INSTALLATION INSTRUCTIONS FOR THE INSTALLED OIL CONTENT METER MODEL, XOC-1. THE INSTRUCTIONS STATE: “EXCEPT FOR THE ORIGINAL VALVE, THE VALVE CANNOT BE INSTALLED IN THE WHOLE SAMPLING PIPELINE.” [name withheld] THE INSTALLED VALVE IN THE SAMPLE LINE CAN PREVENT THE OCM FROM RECEIVING A TRULY REPRESENTATIVE SAMPLE OF THE EFFLUENT. MARPOL 73/78 ANNEX I REG. 14.7 MEPC 107(49) 6.2.2 17ac
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 March 2019
Resolution: Received and reviewed class report from ABS stating the deficiency has been rectified. The sample line and valve has been removed from the inlet to the content meter. The installation is in accordance with the manual provided onboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 18 March 2019 Resolved
EFFICENT GUARD RAILS SHALL BE FITTED TO ALL EXPOSED PARTS OF THE FREEBOARD AND SUPERSTRUCTURE DECK. ONE STANCHION WAS BROKEN ON FORWARD PORT SIDE. ILLC Reg 25/3 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 18 March 2019
Resolution: Crew welded stanchion

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.