FT. MORGAN is a 1988 passenger vessel (inspected). The Coast Guard has recorded 128 inspections since 1988, most recently in June 2026, along with 390 deficiencies and 12 casualty investigations between 2011 and 2025.

Records from 1988 to 2026. Most recent: inspection, 4 June 2026.

Built
1988
Last inspected
4 June 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDE4893
318121
Flag
UNITED STATES
367359250
Maury page id
psix-318121

Inspections, by type

…with no type recorded25
Years with a record 37 calendar years (1988–2026)
The 128 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)140.0 ft × 30.0 ft × 7.0 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD INDUSTRIES, INC · MORGAN CITY, LA, UNITED STATES · built 1988
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMOBILE, AL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 August 2026 · expires 31 August 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDE4893MMSI 367359250 · active · compulsorily equipped · granted 4 June 2018, expires 28 May 2028
WDC5878MMSI 367047830 · cancelled · compulsorily equipped · granted 7 June 2005, cancelled 15 August 2008
WUU2737MMSI not assigned · expired · compulsorily equipped · granted 21 October 1998, cancelled 10 January 2009
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 128

4 June 2026 Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8369386
28 June 2025 Damage Survey · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8169279
28 June 2025 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8227114
17 June 2025 Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8160972
27 May 2025 Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8133224
2 January 2025 Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8056687
22 May 2024 Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7917356
25 May 2023 Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7696604
11 January 2023 Drydock Exam · Administrative Inspection · Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7619974
31 October 2022 Administrative Inspection · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7592768
1 September 2022 In-Service Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7552374
18 July 2022 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7510327
5 July 2022 Administrative Inspection · In-Service Inspection · Examination of Repairs · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7504023
25 June 2022 Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7486615
4 June 2022 Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7477198
2 May 2022 COI Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7448939
9 August 2021 Administrative Inspection · Damage Survey · Examination of Repairs · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7282261
9 August 2021 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7282811
7 May 2021 Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7191774
7 January 2021 Drydock Exam · Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7138291
13 June 2020 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6976995
13 June 2020 Administrative Inspection · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6985027
4 May 2020 Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6948112
9 March 2020 Examination of Repairs · In-Service Inspection · Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6922937
8 March 2020 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6923139
18 December 2019 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6955476
8 November 2019 Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6851999
13 May 2019 Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6682808
7 February 2019 Drydock Exam · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6621988
29 June 2018 Deficiency Check · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6459434
28 June 2018 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6469673
25 June 2018 Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6456405
14 May 2018 Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6414092
15 August 2017 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6241802
23 February 2017 Examination of Repairs · COI Inspection · Internal Structural Exam · Hull Examination · DAPI Audit · Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6093729
12 October 2016 Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6021938
11 October 2016 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6019947
10 June 2016 Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5906168
26 January 2016 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5803799
22 January 2016 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5801969
12 January 2016 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5796028
24 December 2015 Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5786741
10 October 2015 Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5741027
27 August 2015 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5228176
15 July 2015 Administrative Inspection · Plan Review "T" Boat
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5185060
5 October 2014 Examination of Repairs · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4999259
5 October 2014 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5003090
6 August 2014 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4969536
1 August 2014 Deficiency Check · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4943469
30 June 2014 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4913788
8 March 2014 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4826892
1 February 2012 Annual Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4219183
16 January 2012 Damage Survey · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4225673
31 December 2011 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4218135
7 January 2011 COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3919707
11 February 2009 Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3402882
23 January 2009 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3399026
18 September 2008 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3321975
30 May 2008 Hull Examination · Deadweight Survey · Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3128276
15 March 2007 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2888363
13 February 2007 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2871632
26 January 2007 Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2862374
11 January 2007 Annual Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2854044
10 February 2006 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2583108
4 October 2005 Deficiency Check · Hull Examination · Internal Structural Exam · Damage Survey · Examination of Repairs · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2507352
13 June 2005 Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2390139
24 May 2005 Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2366741
7 September 2004 Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2189426
7 January 2004 Administrative Inspection
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1977568
29 October 2003 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1939244
9 September 2003 Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1900523
7 April 2003 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1791745
18 December 2002 Deficiency Check · Examination of Repairs · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1720463
12 November 2002 Administrative Inspection
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1704060
18 October 2002 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1692210
1 October 2002 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1679542
3 April 2002 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1605288
2 October 2001 Re-Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 1601462
28 September 2000 Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 823983
17 April 2000 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1048487
16 December 1999 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 812370
30 September 1999 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1401094
29 December 1998 Re-Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1473088
16 June 1998 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 215597
1 December 1997 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1114554
12 November 1997 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 789153
23 October 1997 Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1372020
28 February 1997 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1105073
7 January 1997 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1416426
3 October 1996 Deficiency Check · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1367932
17 April 1996 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 131893
29 March 1996 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 185857
1 December 1995 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1353832
11 October 1995 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1190773
2 October 1995 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1387857
20 July 1995 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1189104
3 February 1995 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1170040
23 December 1994 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1419352
9 November 1994 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1168258
18 October 1994 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1172058
4 October 1994 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1358555
21 June 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1025003
7 April 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1169017
25 March 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1167196
11 March 1994 Deadweight Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 855308
4 February 1994 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1170440
16 November 1993 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 851265
15 October 1993 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1148301
6 October 1993 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 826174
21 June 1993 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1157693
11 January 1993 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 61729
15 December 1992 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1140294
7 October 1992 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1246033
5 February 1992 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1269728
24 October 1991 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 939482
9 October 1991 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1251094
24 October 1990 Deficiency Check · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 911964
24 October 1990 Damage Survey · Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1243357
15 October 1990 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 899470
2 March 1990 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 914664
1 March 1990 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 928596
1 February 1990 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 915594
13 December 1989 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 927375
1 November 1989 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 917322
25 January 1989 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 887163
1 December 1988 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1038677
21 November 1988 Initial Certification
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 895095
7 November 1988 Hull Examination · Plan Review "T" Boat · Initial Construction-Excluding Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1204486

Deficiency record · 390

02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 4 June 2026 Resolved
On vessels carrying vehicles, suitable chains, cable, or other barriers shall be installed at the ends of each vehicle runways. MI observed a 6 foot crack on the hinged plate of the ferry vessel's ramp. Vessel is restricted from on loading & off loading vehicles on the cracked ramp until permanent repairs are affected. Submit a permanent repair proposal for MI review within 7 days. 46 CFR 177.35-10 (a) (Old-T)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 8 June 2026
Resolution: Recieved repair report and attended to verify SAT repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 June 2025 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Vessel operator reported loss of propulsion due to broken propeller shaft for #2 aft engine. Repair propeller shaft to the satisfaction of the Marine Inspector. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 July 2025
Resolution: Sea trials were conducted of the new shaft underway, SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 June 2025 Resolved
A vessel must be provided with a main steering gear that is of adequate strength and capable of steering the vessel at all service speeds. Vessel experienced loss of steering at the dock. Prior to departure, vessel will repair and O/O will demonstrate proper operation of steering system to satisfaction of Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 July 2025
Resolution: Satisfactory sea trials in 8169279 completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 27 May 2025 Resolved
A hatch exposed to the weather must be watertight. MI observed that the gaskets on the engine room escape hatches were damaged. 46 CFR 179.360(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 9 June 2025
Resolution: Received photo evidence of new gaskets installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 May 2025 Resolved
A suitable metal marine type strainer, meeting the requirements of the engine manufacturer, must be fitted in the fuel supply line in the engine compartment. Strainers must be leak free. Strainers must be the type of opening on top for cleaning screens. A drip pan fitted with flame screen must be installed under gasoline strainers. Fuel filter and strainer bowls must be highly resistant to shattering due to mechanical impact and resistant to failure due to thermal shock. MI observed that the generator fuel filter was missing a bowl.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 9 June 2025
Resolution: Received photo evidence of repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 May 2025 Resolved
All safety and relief valves for use on pressure vessels or piping systems must be designed to meet the protection and service requirements for which they are intended and must be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel or piping system. MI was unable to verify the setting on the on the air compressor's safety relief valve.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 9 June 2025
Resolution: Received photo evidence of new safety relief valve installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 May 2023 Resolved
Flexible nonmetallic hose must meet SAE J-1942 or be specifically approved by the Commandant. Fuel hose on generator was not marked. Replace fuel hose with approved hose.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2023
Resolved 28 June 2023
Resolution: New fuel lines installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 October 2022 Resolved
Shaft cutlass bearing interior rubber was missing thus allowing the shaft to have excessive movement with no support.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 31 October 2022
Resolved 31 October 2022
Resolution: Deficiencies rectified and documenarty evidence provided
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 July 2022 Resolved
Need to conduct Sea Trials with CG onboard prior to carrying passengers.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 August 2022
Resolved 25 July 2022
Resolution: Witnessed sea trials.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 June 2022 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. Vessel fwd shaft broke. Vessel shall not depart pier in Dauphin Island until shipyard and transit plan are approved by a Coast Guard Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 July 2022
Resolution: Shaft repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 June 2020 Resolved
At approximately 1718 on 13JUN2020 the Ft. Morgan ferry suffered a loss of propulsion. All main propulsion machinery is required to be maintained so as to prevent machinery failure. Provide technician's report indicating adequate repairs have been completed and that the engine is fully operational prior to the carriage of passengers
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 June 2020
Resolved 30 June 2020
Resolution: Vessel was operationally tested to the satisfaction of the attending inspectors to ensure M/E was fully functional after top end overhaul
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 March 2020 Resolved
01-13199-A vessel must be provided with a main steering gear that is of adequate strength and capable of steering the vessel at all service speeds. Vessel struck debris and sheered bolts causing the rudder to be inoperable.-46CFR182.610(a)(1)- 17C
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 9 March 2020
Resolved 10 March 2020
Resolution: Replaced all bolts with grade 8 bolts.
Engineering › Fuel Oil Service System › Hose
Issued 14 May 2018 Resolved
Fule hose on both generators does not meet SAE J-1942 and does not have apprpriate hose end fittings. Provide proper hoses and fittings.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2018
Resolved 25 June 2018
Electrical › Electric Supply System (service) › Battery Installation
Issued 14 May 2018 Resolved
Battery terminals are secured with wing nuts. Provide permanent type connections.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2018
Resolved 25 June 2018
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 May 2018 Resolved
Dead end wire passing through machinery/steering bulkhead. remove dead end wire.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2018
Resolved 25 June 2018
Communications › Radio Communications › VHF Radiotelephone
Issued 14 May 2018 Resolved
MMSI not programmed into VHF radio installation. Provide proof of programming and GPS integration.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2018
Resolved 25 June 2018
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 30 May 2017 Resolved
Both engines gauges in engine room need to be operational. IAW 46 CFR 182.20-5(b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 27 June 2017
Resolution: Vessel replaced J/W temp gauge with new, sat.
Electrical › Electric Generation Source (emergency) › Overcurrent Device
Issued 30 May 2017 Resolved
Show proof of both generators being properly derated and provide name plate for emergency generator. IAW 46 CFR 183.10-5/10-5(f)(2)
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 15 August 2017
Resolution: Attested to the de-rating of generators and plate placement.
Navigation › Piloting/Steering › US Coast Pilot
Issued 30 May 2017 Resolved
Need updated Coast Pilot. IAW 46 CFR 184.420
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 27 June 2017
Resolution: Vessel provided current Coast Pilot.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 30 May 2017 Resolved
Need company drug policy onboard, Employee Assistance information posted and proof of supervisor training. IAW 46 CFR 16
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 27 June 2017
Resolution: Vessel rep provided documentation for DAPI program.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 13 October 2016 Resolved
Wastage found in watertight bulkhead between fwd port engine room and fwd port ballast tank. Make temporary repairs to the satisfaction of attending CG Marine Inspector prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 October 2016
Resolved 14 October 2016
Resolution: Temporary repair made via doubler plate.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 13 October 2016 Resolved
Wastage found in watertight bulkhead between fwd port engine room and fwd port ballast tank. Make permanent repairs to the satisfaction of attending CG Marine Inspector at next scheduled dry dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 19 May 2017
Resolution: wasted area cropped and renewed. Tested via soap and blow.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 6 January 2016 Resolved
12v panel box in engine room needs blank cover breakers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Installed blanks
Electrical › Electrical Distribution System (service) › Cable
Issued 6 January 2016 Resolved
Dead end wire found near generator in engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Removed Dead End wire
Electrical › Lighting (service) › Lighting Fixture
Issued 6 January 2016 Resolved
Light in engine room missing bulb guard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Installed bulb guard
Electrical › Lighting (service) › Lighting Fixture
Issued 6 January 2016 Resolved
Light in engine room was not mounted properly.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Installed bulb guard
Electrical › Electrical Distribution System (service) › Panelboard
Issued 6 January 2016 Resolved
Distribution panel box cover in engine room was loose.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Secured distribution panel box
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 6 January 2016 Resolved
Engine lagging found loose on exhaust pipe.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Secured lagging
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 6 January 2016 Resolved
Outlet box in engine room needs cover.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Installed cover
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 6 January 2016 Resolved
Found pipe in engine room not being used opened. Needs to be plugged.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Plugged pipe
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 6 January 2016 Resolved
Found pipe running along deck in engine room not properly held down with clamp.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Secured pipe
Electrical › Electric Generation Source (service) › Generator
Issued 6 January 2016 Resolved
Generator was not labeled with derated placard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2016
Resolved 26 January 2016
Resolution: Installed placard
Engineering › Fuel Oil Service System › Hose
Issued 10 October 2015 Resolved
Conduct repairs to #1 MDE (fuel leak) to the satisfaction of attending Marine Inspector prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 October 2015
Resolution: Operator replaced ruptured fuel oil line with new, approved line to the satisfaction of attending Marine Inspector.
Fire Fighting › Nozzles › Condition
Issued 1 February 2012 Resolved
Properly secure the tip/nozzle on the all purpose nozzle on the forward fire station.
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 27 April 2012
Resolution: The nozzle tip was secured with a chained attached.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 1 February 2012 Resolved
Properly stow all life jackets and clean all child size life jackets.
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 27 April 2012
Resolution: The life jackets were properly stowed and cleaned.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (hydraulic)
Issued 1 February 2012 Resolved
Secure the gear oil leak in way of gear shifter on #1 reduction gear.
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 27 April 2012
Resolution: The leaks were secured.
Engineering › Steering Gear System › Hydraulic Hose
Issued 1 February 2012 Resolved
Secure all hydraulic oil leaks on the hydraulic oil tank, all associated hoses and piping in the #1 engine room.
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 27 April 2012
Resolution: The leaks were secured.
Engineering › Fuel Oil Service System › Suction Strainer
Issued 1 February 2012 Resolved
Secure all fuel oil leaks on the fuel oil filters on the #1 main diesel engine.
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 27 April 2012
Resolution: The leaks were secured.
Engineering › Diesel Engine (propulsion-reduction gear) › Distributor (fuel injection)
Issued 1 February 2012 Resolved
Repair the lube oil leaks on #1 main diesel engine.
Action required: 705 - Other - as specified
Due 1 February 2012
Resolved 27 April 2012
Resolution: The leaks were secured.
Electrical › Electric Generation Source (service) › Power Requirement
Issued 1 February 2012 Resolved
Prove proper operation of the volt and hertz meters for the ship service generator.
Action required: 705 - Other - as specified
Due 1 February 2012
Resolved 27 April 2012
Resolution: All of the meters were working properly.
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 1 February 2012 Resolved
Prove the integrity of the gasket in the inspection cover on the bottom of the reduction gear on the #2 reduction gear.
Action required: 705 - Other - as specified
Due 1 February 2012
Resolved 27 April 2012
Resolution: The gasket was replaced and tested.
Fire Fighting › Fire Pumps › Arrangement
Issued 1 February 2012 Resolved
Prove proper operation of the fuel fill cap on the fire pump engine.
Action required: 705 - Other - as specified
Due 1 February 2012
Resolved 27 April 2012
Resolution: A new cap was purchased and installed.
Documentation › Certificates/Documents › FCC SSL
Issued 7 January 2011 Resolved
Provide current FCC Radiotelephony Certificate.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Provided current FCC certificate.
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 7 January 2011 Resolved
Provide current Bridge-to-Bridge Certificate.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Provided current Bridge-to-Bridge Certificate.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 7 January 2011 Resolved
Prove all nav lights meet UL1104.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Proved all nav lights meet UL1104.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 7 January 2011 Resolved
Prove proper operation of L/O pressure gauge on both main propulsion engines at controlling station.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Proved proper operation of L/O pressure gauge on both main propulsion engines at controlling station.
Engineering › Lubricating Oil Service System › Piping
Issued 7 January 2011 Resolved
Make repairs to hydraulic leaks on fwd and aft ramp controls.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Made repairs to hydraulic leaks on fwd and aft ramp controls.
Fire Fighting › Fire Pumps › Suction Valve
Issued 7 January 2011 Resolved
Conduct maintenance on fire pump suction strainer.
Action required: 705 - Other - as specified
Resolved 23 March 2011
Resolution: Replaced fire pump suction strainer.
Engineering › Fuel Oil Service System › Filter
Issued 7 January 2011 Resolved
Make repairs to fuel leak on generator fuel filter assembly.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Made repairs to fuel leak on generator fuel filter assembly.
Construction/Loadline › Structures › Ventilators
Issued 7 January 2011 Resolved
Prove proer operation of all engine room vent closures.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Proved proer operation of all engine room vent closures.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 7 January 2011 Resolved
Properly secure coke machine.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Properly secured coke machine.
Operations/Management › Drills/Instruction › Fire
Issued 7 January 2011 Resolved
Prove proficiency of all drills.
Action required: 705 - Other - as specified
Resolved 3 February 2011
Resolution: Proved proficiency of all drills.
Engineering › Fuel Oil Service System › Piping
Issued 7 January 2011 Resolved
Make repairs to hydraulic leaks on reduction gears in fwd engine room.
Action required: 705 - Other - as specified
Resolved 23 March 2011
Resolution: Made repairs to hydraulic leaks on reduction gears in fwd engine room.
Electrical › Electric Supply System (service) › Cable
Issued 10 January 2008 Resolved
Provide electrical details of the steering control system and its power supply circuits.
Due 30 May 2008
Resolved 30 May 2008
Resolution: No changes were made to the electrical circuit for the steering system.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 10 January 2008 Resolved
Provide shaft and strut calculations proving the material is sufficient in size to accommodate the increased BHP of the new main propulsion engines and reduction gear installations.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 23 January 2009
Resolution: Received letter from MSC approving arrangements.
Engineering › Lubricating Oil Service System › Flange
Issued 10 January 2008 Resolved
Hydro the newly installed hydraulic piping for the bilge pumps to one and a half times the maximum allowable working pressure and prove proper operations of the bilge system.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The hydro was witnessed and one leak was found and fixed.
Engineering › Fuel Oil Service System › Piping
Issued 10 January 2008 Resolved
Hydro the newly installed piping for the fuel return and supply for both main engines.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 30 June 2008
Resolution: No changes were made to the system.
Engineering › Lubricating Oil Service System › Flange
Issued 10 January 2008 Resolved
Remove the treaded piping in the hydraulic piping for the bilge pumps located in the dog house and install welded socket fitting as per approved plans.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 31 May 2008
Resolution: Weld socket were completed.
Engineering › Steering Gear System › Power Unit
Issued 10 January 2008 Resolved
Provide manufactures’ documentation showing that the pressure containing components for the steering system are suitable for the maximum allowable working pressure.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 9 June 2008
Resolution: MSC letter dated June 9, 2008 cleared this item.
Fire Fighting › Fire Pumps › Arrangement
Issued 10 January 2008 Resolved
Prove proper operation of the fire pump, the fire main, fire hoses and the fire nozzles.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The fire pump was tested with the gauge at the pump reading 62 psi. The fire main, hoses and the nozzles were all satisfactory.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 10 January 2008 Resolved
Provide and install the appropriate size gasket in the aft engine room engine hatch cover to prevent the tripping hazard.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The gasket was replaced.
Electrical › Electric Supply System (service) › Cable
Issued 10 January 2008 Resolved
Properly support and secure the electric cables located just below the wheel house.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 30 June 2008
Resolution: The cables were properly supported and secured.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 10 January 2008 Resolved
Replace the broken window located in the office space with safety glass.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The window was replaced as instructed.
Engineering › Fuel Oil Service System › Valve, Control
Issued 10 January 2008 Resolved
Properly label the fuel shut offs for both engine rooms.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 30 May 2008
Resolution: The shut offs were labeled.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 10 January 2008 Resolved
Properly label all vents located on the main deck and provide a flame screen for the fuel tank vent.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 18 September 2008
Electrical › Electric Supply System (service) › Cable
Issued 10 January 2008 Resolved
Provide and install the proper shore power connection for the vessel.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The deteriorated shore tie connection was renewed.
Accommodation/Occupational Safety › Ventilation › General
Issued 10 January 2008 Resolved
Properly mount the vent cover on the starboard inboard bulkhead of the dog house.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 30 May 2008
Resolution: The cover was properly mounted.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 January 2008 Resolved
Prove proper operation of the navigation equipment.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The operation of the navigation equipment proven.
Lifesaving › Lifebuoys › Stowage
Issued 10 January 2008 Resolved
Properly secure the ring life buoys throughout the vessel.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The ring life buoys were all properly secured.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 January 2008 Resolved
Provide and install the knockouts/screw plugs for the light fixture in the fire pump room.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The light fixture was replaced.
Engineering › Fuel Oil Service System › Piping
Issued 10 January 2008 Resolved
Properly secure the hydraulic piping with pipe hangers through out the vessel including in the ballast tanks and voids.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 18 September 2008
Electrical › Electric Supply System (service) › Cable
Issued 10 January 2008 Resolved
Properly secure the electric cables in both engine rooms.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: All electrical cables were properly secured.
Electrical › Electric Supply System (service) › Cable
Issued 10 January 2008 Resolved
Remove the dead ended electrical cables in the forward engine room's forward bulkhead junction box.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The dead ended electrical cables were removed.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 January 2008 Resolved
Provide and install globes and guards for the light bulbs through out the vessel.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: Globes and guards were provided for all exposed light bulbs.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 10 January 2008 Resolved
Provide and install guards over all rotating machinery in both engine rooms.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 18 September 2008
Engineering › Lubricating Oil Service System › Piping
Issued 10 January 2008 Resolved
Properly support the non metallic hose for the valve cover vent and intake air on the ship service generator.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The hose was shorten elevating the problem.
Navigation › Piloting/Steering › Marine Charts
Issued 10 January 2008 Resolved
Provide the required navigation publications and charts.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The required charts and publications were provided.
Construction/Loadline › Penetrations › Gasket
Issued 10 January 2008 Resolved
Make the water tight bulkheads in the engine rooms water tight in way of the stuffing tubes.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: All bulkhead penetrations were made watertight.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 10 January 2008 Resolved
Provide and install a cover for the junction box in the forward engine room aft bulkhead.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: A cover was install on the junction box.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 10 January 2008 Resolved
Prove proper operation of the emergency escape hatches in both engine rooms.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: Both escape hatches were tested and proven watertight.
Electrical › Electric Supply System (service) › Battery Installation Ventilation
Issued 10 January 2008 Resolved
Properly install the electric wires in the light fixture in way of the emergency escape hatch in the aft engine room.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The electrical wires were properly installed.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 10 January 2008 Resolved
Remove the exhaust blankets in the battery box, clean and properly secure the top.
Due 30 June 2008
Resolved 6 June 2008
Resolution: The exhaust blankets were removed from the battery box and the box was cleaned.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 10 January 2008 Resolved
Provide and install a cover for the junction box on the supply fan motor in the forward engine room.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: A cover was installed on the junction box of the fan motor.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 10 January 2008 Resolved
Make the proper repairs to the air supply fan motor inspection cover to prevent the cover from falling into the motor.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The cover on the fan motor was properly secured.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 10 January 2008 Resolved
Clean the bilges in both engine rooms by removing the hydraulic oil, oily rags and water.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The bilges in both engine rooms were cleaned.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 10 January 2008 Resolved
Provide protective rails or netting of at lease 39 1/2 inches high at both ramps.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 30 May 2008
Resolution: A netting was installed on both ends of the ferry.
Engineering › Compressed Air System (control) › Compressor
Issued 10 January 2008 Resolved
Provide approved plans for the new engine controls.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 18 September 2008
Fire Fighting › Firemans Outfit › Axe
Issued 10 January 2008 Resolved
Provide a fire axe.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: A fire axe was provided and stored on the forward bulkhead of the pilot house.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 10 January 2008 Resolved
Properly mount the fire extinguisher in the wheel house.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The extinguisher was properly mounted.
Electrical › Electrical Distribution System (service) › Cable
Issued 10 January 2008 Resolved
Properly wire #2 engine room power supply to the selector switch in the wheel house.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The switch was properly wired.
Engineering › Lubricating Oil Service System › Hose
Issued 10 January 2008 Resolved
Replace the non metallic hose that's too short on the starboard ram for the forward ramp.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The hose was removed and replaced.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 10 January 2008 Resolved
Prove the bilge high level alarm.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The bilge high level alarms were properly tested.
Operations/Management › Navigation Safety › Persons Allowed in Pilothouse/Navigation Bridge
Issued 10 January 2008 Resolved
Provide a radio operators permit.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The radio operator''s permit was provided by the captain.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 10 January 2008 Resolved
Provide a certificate of documentation.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 30 May 2008
Resolution: The COD was onboard the vessel.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 10 January 2008 Resolved
Prove the crew is enrolled in a drug testing program.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The crew provided drug cards showing they are enrolled in a drug program.
Operations/Management › Drills/Instruction › Fire
Issued 10 January 2008 Resolved
Provide a current training manual.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 18 September 2008
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 January 2008 Resolved
Prove operation of the navigation lights.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2008
Resolved 6 June 2008
Resolution: All required navigation lights were tested with satisfactory results.
Engineering › Diesel Engine (propulsion-electric) › Air Silencer
Issued 10 January 2008 Resolved
Prove proper operation of the jacket water temp gauges for the main engine in the wheel house.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The jacket water temp gauges in the wheel house were tested with sat. results.
Electrical › Electric Generation Source (service) › Generator
Issued 10 January 2008 Resolved
Prove proper operation of the ship service generator.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The engine for the generator was replaced and tested with satisfactory results.
Construction/Loadline › Penetrations › Gasket
Issued 10 January 2008 Resolved
Provide and install the rubber grummets in the through bolts for watertight hatches.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The grummets were install in all of the hatches.
Fire Fighting › Fire Pumps › Capacity
Issued 10 January 2008 Resolved
Prove the fire pump pumping capacity
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Resolution: The pumping capacity was proven by filling five gallon buckets in less than five seconds.
Engineering › Bilge Water Management System › Pump
Issued 10 January 2008 Resolved
Prove the pumping capacity of the bilge pump.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 6 June 2008
Lifesaving › Lifefloat › Serviceable
Issued 12 January 2007 Resolved
Removed the deteriorated lifefloat in accordance with 46 CFR 180.200
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: The life float was removed from the vessel.
Engineering › Steering Gear System › Linkage
Issued 12 January 2007 Resolved
Rebush and repin tiller arms on both rudders in accordance with 46 CFR 182.610
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: New clevises were install on all four steering rams.
Engineering › Diesel Engine (propulsion-electric) › Piping (exhaust)
Issued 12 January 2007 Resolved
Make repairs to the exhaust leak on the generator exhaust piping in accordance with 46 CFR 182.430
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: New gaskets were installed in the flange connections.
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (hydraulic)
Issued 12 January 2007 Resolved
Prove proper operation of the clutch on #2 main diesel engine in accordance with 46 CFR 182.200
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: Witnessed proper operation.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 12 January 2007 Resolved
Make alterations to guards on rotating machinery to comply with 46 CFR 177.960
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 14 March 2007
Resolution: Made alterations to the guards on rotating machinery.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 12 January 2007 Resolved
Repack and tighten shaft packing glands on both forward and aft propulsion shafts in accordance with 46 CFR 176.800
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 16 March 2007
Resolution: Repacked and tightened shaft packing glands on both forward and aft propulsion shafts.
Engineering › Compressed Air System (control) › Valve
Issued 12 January 2007 Resolved
Prove proper operation of pressure relief valve on auxillary air compressor in accordance with 46 CFR 61.10-5
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: Witnessed satisfactory test of the relief valve.
Engineering › Generator (propulsion-electric) › Winding
Issued 12 January 2007 Resolved
Have the windings on the ship service generator professional cleaned in accordance with 46 CFR 176.800
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: The winding were cleaned.
Electrical › Electric Supply System (service) › Battery Installation
Issued 12 January 2007 Resolved
Clean batteries and battery boxes of dirt and oil in accordance with 46 CFR 176.800
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: The batteries boxes were cleaned.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 12 January 2007 Resolved
Make both engine rooms ready for inspection by removing all oil residues on bilges, bulkheads, overheads, and machinery in accordance with 46 CFR 176.800
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 16 March 2007
Resolution: Made both engine rooms ready for inspection by removing all oil residues on bilges, bulkheads, overheads, and machinery.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder Head
Issued 12 January 2007 Resolved
Make repairs to excessive oil leaks on both main diesel engines and thruster engines in accordance with 46 CFR 176.800
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 16 March 2007
Resolution: Made repairs to excessive oil leaks on both main diesel engines and thruster engines.
Engineering › Fuel Oil Service System › Piping
Issued 12 January 2007 Resolved
Make repairs to leaking fuel oil return lines in #2 engine room in accordance with 46 CFR 182.455
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: The leaking fuel oil lines were repaired.
Engineering › Fuel Oil Service System › Piping
Issued 12 January 2007 Resolved
Provide and install plugs in lube oil drains for all engines in accordance with 46 CFR 182.455
Action required: 705 - Other - as specified
Due 12 February 2007
Resolved 19 February 2007
Resolution: Plugs were installed in drains.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 11 January 2007 Resolved
Make temporary repairs, as discussed, to the deteriorated area in the watertight bulkhead between the engine room and the #2 center ballast tank, just below the shaft tube.
Action required: 705 - Other - as specified
Due 11 February 2007
Resolved 12 January 2007
Resolution: Made temporary repairs the deteriorated area in the bulkhead between the engine room and the #2 center ballast tank, just below the shaft tube.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 11 January 2007 Resolved
Make permanent repairs to the deteriorated area in the watertight bulkhead between the engine room and the #2 center ballast tank, just below the shaft tube. These repairs must be made permanent at the next scheduled dry-dock examination.
Action required: 705 - Other - as specified
Due 11 January 2008
Resolved 22 May 2008
Resolution: Permanent repairs were made to the watertight bulkhead in way of the #2 center ballast tank and the engine room just below the shaft.
Electrical › Electric Generation Source (service) › Panelboard
Issued 11 January 2006 Resolved
Ensure the 24 volt system electrical panel is dripproof as req. by 46 CFR 183.210
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: Provided drip covers for panels
Electrical › Electric Supply System (service) › Cable
Issued 11 January 2006 Resolved
Properly install electrical wiring in pilot house
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 10 February 2006
Resolution: Installed wiring in pilot house light
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 11 January 2006 Resolved
Repair electrical outlet in #1 engine room where pulled from outlet box
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 10 February 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder Head
Issued 11 January 2006 Resolved
Repair excessive oil leaks on #1main engine
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 10 February 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (electric)
Issued 11 January 2006 Resolved
Provide hold down device for battery covers in engine rooms
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 10 February 2006
Lifesaving › Launching Appliances › Lines
Issued 11 January 2006 Resolved
Provide safety harness for use with rescue ladder.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 February 2006
Resolved 11 January 2006
Resolution: Provided safety harness
Electrical › Electrical Distribution System (service) › Cable
Issued 3 January 2006 Resolved
Properly support all electrical wiring. IAW 46 CFR 183.340 b 4
Action required: 705 - Other - as specified
Due 6 January 2006
Resolved 6 January 2006
Resolution: supported all electrical wiring
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 3 January 2006 Resolved
provide current tide tables as required by 46 CFR 184.420
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Provided current tide tables
Fire Fighting › Means of Escape › Escape Route Signs
Issued 3 January 2006 Resolved
Mark emergency exits as required by 46 CFR 185-606
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: Marked exits
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 3 January 2006 Resolved
Mark lifejacket storage locker with the total amount of lifejackets required for 100% of persons carried
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: Marked life jacket storage locker
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 3 January 2006 Resolved
Provide proof that the first aid kit meets the requirements of 160.041
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: provided new CG approved first aid kit
Fire Fighting › Fire Pumps › Pressure
Issued 3 January 2006 Resolved
Prove proper operation of fire pump as reqired by 46CFR 181.300
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 February 2006
Resolved 3 January 2006
Resolution: proved proper operation of fire pump
Engineering › Lubricating Oil Service System › Gauge
Issued 3 January 2006 Resolved
Prove proper operation of the #1 main engine oil PSI gauge
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: Oil gauged worked
Engineering › Freshwater System (cylinder head cooling) › Sensor
Issued 3 January 2006 Resolved
Prove proper operation of the #2 main engine water temp. gauge
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: water temp gauged worked
Engineering › Steering Gear System › Pin
Issued 3 January 2006 Resolved
Provide cotter pins for the tiller arms as required by 46CFR 184.610
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: installed pins in the tiller arms
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 3 January 2006 Resolved
prove proper operation of the rudder angle indicator
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: proved proper operation of rudder angle indicator
Engineering › Steering Gear System › Hydraulic Hose
Issued 3 January 2006 Resolved
repair leaks on the steering pump non metallic hoses on the #1 steering system
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: installed new steering hoses /reaired leaks
Engineering › Fuel Oil Service System › Filter
Issued 3 January 2006 Resolved
provide proof that the RACOR filters are UL approved and marine grade
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: installed new marine grade RACOR fuel filters
Engineering › Steering Gear System › Hydraulic Hose
Issued 3 January 2006 Resolved
Repair hydraulic leaks on the #2 MDE and clutch assembly
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: installed new hyd. hoses / repaired leaks
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 January 2006 Resolved
provide professional grade guards for rotating machinery
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: installed proper guards
Engineering › Bilge Water Management System › Pump
Issued 3 January 2006 Resolved
provide self priming bilge pumps as required by 46 CFR 176.804
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: installed self priming pumps
Engineering › Bilge Water Management System › Not Operational
Issued 3 January 2006 Resolved
Prove proper operation of the bilge system from every compartment serviced
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: proved operation of bilge pump
Communications › Alarms/Indicators › Bilge Alarm
Issued 3 January 2006 Resolved
prove proper operation of the bilge high level alarms as req. by 46 CFR 182.530
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Proved proper operation
Documentation › Markings/Placards › Garbage Placard
Issued 3 January 2006 Resolved
Provide and post MARPOL V placard as req. by 33 CFR 151.59
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: posted MARPOL V placard
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 3 January 2006 Resolved
Ensure bilges are free of oil and trash and debris as req. by 46 CFR 176.830
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Cleaned the bilges
Stability › Watertight Integrity › General
Issued 3 January 2006 Resolved
Remove the dead ended cables IWO entrance to the engine room and properly seal
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Removed dead ended wire/removed penetration and welded up the area
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 3 January 2006 Resolved
Provide illumination for the emergency exit area in both engine rooms
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: exit area illuminated
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 3 January 2006 Resolved
Provide a one lie digram for the bilge suction system as req. by 46 CFR 177.202
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: provided one line diagram
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 3 January 2006 Resolved
Provide a one lie digram for the bilge suction system as req. by 46 CFR 177.202
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: provided one line diagram
Electrical › Electric Generation Source (service) › Panelboard
Issued 3 January 2006 Resolved
Ensure the 110 volt system electrical panel is drip proof as required by 46 CFR 183.210
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: provided prip cover for panels
Engineering › Compressed Air System (control) › Piping
Issued 3 January 2006 Resolved
Provide support for copper air lines in the engine room
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Installed support for air lines
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 3 January 2006 Resolved
Provide new handle for the hatch for the engine room
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 10 February 2006
Resolution: installed new handle
Engineering › Fuel Oil Service System › Valve
Issued 3 January 2006 Resolved
Install drain plug for the F/O tank drain valve in cofferdam
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Installed plug
Construction/Loadline › Hull › Bracket
Issued 4 October 2005 Resolved
Properly Secure all hydraulic piping under overhang
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: secured piping under over hang
Construction/Loadline › Penetrations › Pipe Flange
Issued 4 October 2005 Resolved
Remove PVC pipe penetrating the hull IAW: 46CFR 182.520 (f)
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: removed all PVC piping penetrating the vessels hull
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2005 Resolved
Aftpeak / crop and renew all deteriorated vertical and transverse structural members.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: renewed all deteriorated vertical and transverse structural members
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2005 Resolved
Crop and renew with minimum 18x18 insert, holed area in forward bulkhead in Aftpeak ensuring cut lines are to good steel.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: renewed the forward bulkhead in aft peak tank
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2005 Resolved
Prove thickness of watertight bulkhead in aftpeak
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: provided gauge reading for all water tight bulkheads
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 4 October 2005 Resolved
Crop and renew deteriorated transverse and side long structural members IWO the escape hatch in FWD engine room.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: renewed deteriorated transverse and side longs in engine room
Construction/Loadline › Structures › Deck Plating
Issued 4 October 2005 Resolved
Make repairs to structural members under overhang as marked.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: renewed deteriorated structural members under overhang
Construction/Loadline › Hull › Hull Plating
Issued 4 October 2005 Resolved
Remove fractured wash plates on both ends of vessel / crop and renew bottom plate in steering ram coffer dams with a minimum 18x18 insert / renew all wash plates.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: removed fractured washplats and renewed bottom plate under steering coffer dam
Construction/Loadline › Structures › Manhole
Issued 4 October 2005 Resolved
Crop and renew ladder in ballast tank #5.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: renewed deteriorated ladder in 35 ballast tank
Deck/Cargo › Ballast › Piping
Issued 4 October 2005 Resolved
Crop and renew holed ballast piping in ballast tank #5.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: renewed holed ballast piping in #5 ballast tank
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2005 Resolved
Forepeak / crop and renew all deteriorated vertical and transverse structural members.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: renewed all deteriorated vertical and transverse structural members in the forpeak
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2005 Resolved
Prove thickness of watertight bulkhead, aft bulkhead in forepeak
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2005 Resolved
Crop and renew deteriorated areas in swash bulkhead in forepeak.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: Renewed deteriorated areas of the swash bulkhead
Construction/Loadline › Hull › Bottom Plating
Issued 4 October 2005 Resolved
Make ballast tanks 1,2,3, and 6 ready for inspection by removing all the water sludge and heavy rust scale.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: made areas ready for inspection
Deck/Cargo › Ballast › Tank
Issued 4 October 2005 Resolved
Make fuel tank coffer dam ready for inspection
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: made cofferdam ready for inspection
Construction/Loadline › Hull › Bottom Plating
Issued 4 October 2005 Resolved
Remove epoxy patch from bottom plate and FWD bulkhead IWO ladder in #1 ballast tank
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 6 January 2006
Resolution: removed apoxy patch from bottom plate and forward bulkhead in #1 ballast tank
Construction/Loadline › Structures › End Bulkhead
Issued 4 October 2005 Resolved
Crop and renew the FWD and aft bulkhead of the # 4 ballast as needed any of the bulkhead remaining, the CG has to verify the cut lines
Action required: 705 - Other - as specified
Resolved 6 January 2006
Resolution: renewed deteriorated areas of bulkheads in #4 ballast tank
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2005 Resolved
Crop and renew the swash BHD's at frames 40 and 42 IWO bottom 18" Crop and renew corner brackets as marked
Action required: 705 - Other - as specified
Resolved 6 January 2006
Resolution: newed deteriorated areas of swash bulkhead
Deck/Cargo › Ballast › Piping
Issued 4 October 2005 Resolved
Replace ballast piping in ballast tanks and at manifold area.
Action required: 705 - Other - as specified
Resolved 6 January 2006
Resolution: replaced ballast piping at ballast tank manifold
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2005 Resolved
Crop and renew all structural members in ballast tank #4
Action required: 705 - Other - as specified
Resolved 6 January 2006
Resolution: renewed all structural members in #4 ballast tank
Construction/Loadline › Hull › Stiffener
Issued 4 October 2005 Resolved
Crop and renew three side longs at the aft end os #1 engine room IWO emergency escape hatch.
Action required: 705 - Other - as specified
Resolved 6 January 2006
Resolution: renewed deteriorated areas of side longs in #1 engine room
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 4 October 2005 Resolved
Provide covers for junction boxes on both supply blowers for the engine rooms
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Installed box covers
Engineering › Bilge Water Management System › Piping
Issued 4 October 2005 Resolved
Properly secure bilge suction piping in #1 engine room
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Secured bilge piping
Engineering › Fuel Oil Service System › Piping
Issued 4 October 2005 Resolved
Properly secure F/O piping for the generator
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Secured F/O piping
Engineering › Fuel Oil Service System › Hose
Issued 4 October 2005 Resolved
Ensure all hoses meet SAE J-1942
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Installed Hoses that meet SAE J-1942
Electrical › Electric Generation Source (service) › Conductor
Issued 4 October 2005 Resolved
Secure all electrical cables with metal supports spaced not more than 24 In apart as req. by 46 CFR 183.340
Action required: 705 - Other - as specified
Due 3 February 2006
Resolved 6 January 2006
Resolution: Secured all electrical cables
Electrical › Electric Generation Source (service) › Generator
Issued 18 June 2005 Resolved
Prove proper operation of main generator.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: proved proper operation of new generator
Communications › Alarms/Indicators › Bilge Alarm
Issued 13 June 2005 Resolved
Prove proper operation of the high bilge alarm as per 46 CFR 182.530.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: bilge alarms worked properly
Fire Fighting › Fire Main › Pressure
Issued 13 June 2005 Resolved
Renew pressure gauge for the fire main system at the pump outlet as per 46 CFR 181.10-1(c).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: installed new PSI gauge
Fire Fighting › Fire Main › Condition
Issued 13 June 2005 Resolved
Prove proper operation of the fire pump demonstrating that the minimum capacity of the pump is at least 50 gallons per minute at a pressure of not less than 60 PSI at the pump outlet as per 46 CFR 181.10-1(c).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: verified the operation of fire main system
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 13 June 2005 Resolved
Suitable chains, cable, or other barriers shall be installed at the ends of the vehicle runways as per 46 CFR 177.35-10.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: cargo nets installed.
Construction/Loadline › Structures › Manhole
Issued 13 June 2005 Resolved
Prove water tightness of all deck hatches as per 46 CFR 171.124(a).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: inspected all hatches for water tightness
Construction/Loadline › Structures › Manhole
Issued 13 June 2005 Resolved
Each hatch cover must be attached to the hatch frame or coaming by hinges, captive chains, or other devices to prevent its loss as per 46 CFR 171.124(b)(2).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: all the hatchs have retaining devices
Engineering › Compressed Air System (control) › Valve
Issued 13 June 2005 Resolved
Prove operation of air receiver relief valve as per 46 CFR 61.10-5(i).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: proved proper operation of air receiver
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 13 June 2005 Resolved
Open air receiver for internal examination as required by 46 CFR 61.10-5(b).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Visually examined internals of receiver
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 13 June 2005 Resolved
Provide documentation that the 60 gallon air receiver complies with the requirements of 46 CFR Part 54 and provide manufacture's data report for the air receiver as per 46 CFR 54.10-25
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Received manufactures U1a report
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 13 June 2005 Resolved
Provide evidence of enrolment in a chemical testing program as per 46 CFR Part 16.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: Receive enrollment paperwork for employees
Documentation › Certificates/Documents › Certificate of Inspection
Issued 13 June 2005 Resolved
Post all pages of the vessel's Certificate of Inspection as required by 46 CFR 176.107 and 46 CFR 176.302.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 18 August 2005
Resolution: COI posted
Documentation › Certificates/Documents › Stability Letter
Issued 13 June 2005 Resolved
Post vessel's stability letter as required by 46 CFR 176.306.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: Stability letter posted in wheelhouse
Personnel › Training › First Aid/CPR
Issued 13 June 2005 Resolved
Provide red cross first aid/CFR cards for 50% of the crew as per NVIC 1-91.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: reviewed cpr Card
Documentation › Certificates/Documents › FCC SSL
Issued 13 June 2005 Resolved
Provide for review FCC Station License, FCC Safety Certificate, and FCC Marine Radio Operator Permit as required by 46 CFR 184.25.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: reviewed all FCC documentation
Navigation › Piloting/Steering › Magnetic Compass
Issued 13 June 2005 Resolved
Provide and prove operation of compass light as required by 46 CFR 184.402(c).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: light operational
Navigation › Piloting/Steering › Marine Charts
Issued 13 June 2005 Resolved
Provide updated charts and nautical publications as required by 46 CFR 184.420.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: charts and pubs onboard
Documentation › Logs/Records › Logbook (official)
Issued 13 June 2005 Resolved
Provide for review training logbook as required by 46 CFR 185.420.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: log onboard
Documentation › Logs/Records › Logbook (official)
Issued 13 June 2005 Resolved
Provide for review lifesaving equipment maintenance records as required by 46 CFR 185.702.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: log onboard
Documentation › Logs/Records › Logbook (official)
Issued 13 June 2005 Resolved
Provide for review bridge log as required by 46 CFR 185.520 and 46 CFR 185.524.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: log onboard
Documentation › Manifests/Lists › Emergency Checkoff List
Issued 13 June 2005 Resolved
Provide and post emergency instructions as per 46 CFR 185.25.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: posted in wheelhouse
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 13 June 2005 Resolved
Repair and prove operation of all navigational lights as per 46 CFR 183.420 and 33 CFR Part 84.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: all nav lights operational
Fire Fighting › Means of Escape › Escape Route Signs
Issued 13 June 2005 Resolved
All escape hatches and other emergency exits shall be marked on both sides using at least 1 inch letters as per 46 CFR 185.30-15.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 13 June 2005 Resolved
Remote fuel shutoff stations shall be marked in at least 1 inch letters indicating purpose of the valve and direction of operation as per 46 CFR 185.30-20.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: properly labeled
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 13 June 2005 Resolved
Repair/renew 150 pound danforth anchor and prove adequate anchor hold as per 46 CFR 184.10.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: anchor operational
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 13 June 2005 Resolved
Renew expired items in first aid kit and properly mount so that kit is readily available and visible to the crew as required by 46 CFR 184.710.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: first aid kit correct
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 13 June 2005 Resolved
Clean all lifejackets and renew retro-reflective tape on twelve adult life preservers as noted by marine inspector.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: jackets maintenanced and retro restored.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 13 June 2005 Resolved
Properly mark life jacket stowage locker as per 46 CFR 185.30-10.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: properly marked
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 13 June 2005 Resolved
Install a 60-ft long lifeline to one ring buoy as required by 46 CFR 180.70(c).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: line attached
Lifesaving › Emergency Outfit › Fire ax
Issued 13 June 2005 Resolved
The required fire axe shall be located in or adjacent to the pilothouse as per 46 CFR 181.35-1.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: fire axe located outside pilothouse
Fire Fighting › Fire Hydrants › Condition
Issued 13 June 2005 Resolved
Install securing device to both port and starboard fire hose storage racks.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: devices installed
Engineering › Freshwater System (jacketwater cooling) › Containment
Issued 13 June 2005 Resolved
Repair water leak on the main propulsion engine in #2 engine room.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: repaired the water leak on the main engine
Engineering › Lubricating Oil Service System › Manifold
Issued 13 June 2005 Resolved
Repair lube oil leak on main engine in #1 engine room.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Repaired the lube oil leak on the #1 engine
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 13 June 2005 Resolved
Repair or renew ball check vent to fuel oil tank.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Repaired the ball check vent for the fuel tank
Engineering › Lubricating Oil Service System › Gauge
Issued 13 June 2005 Resolved
Repair and prove operation of main propulsion engine gauges for oil pressure and clutch pressure for thruster engine in #1 engine room.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Discharge Hose/Tube
Issued 13 June 2005 Resolved
Renew discharged B-III fire extinguisher in #2 engine room.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Replaced discharged B-III
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Discharge Hose/Tube
Issued 13 June 2005 Resolved
Renew B-III fire extinguisher discharge hose retaining strap in #1 engine room.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Repaired B-III Fire extinguisher strap
Construction/Loadline › Structures › Manhole
Issued 13 June 2005 Resolved
Weld underside of newly installed deck hatch located in #1 engine room.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: welded underside of all newly installed deck hatches
Engineering › Compressed Air System (control) › Piping
Issued 13 June 2005 Resolved
Properly support all propulsion control tubing in both engine rooms.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: supported all control tubing
Engineering › Bilge Water Management System › Pump
Issued 13 June 2005 Resolved
Prove proper operation of both required bilge pumpswith the capability of pumping each compartment.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Fire Fighting › Nozzles › Condition
Issued 13 June 2005 Resolved
Repair or renew both fire nozzles.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: new fire nozzles in place
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 June 2005 Resolved
Seal all electrical cable penetrations located in the watertight bulkhead common withthe fuel oil tank compartment.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: sealed all electrical cable penetrations
Electrical › Lighting (emergency) › Lighting Fixture
Issued 13 June 2005 Resolved
repair and prove operation of emergency lighting in port and starboard engione rooms.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: provided lamps for the emergency lighting in engine room
Engineering › Compressed Air System (start air) › Piping
Issued 13 June 2005 Resolved
Properly support all compressed air piping in engine room.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: provided support for compressed air piping
Engineering › Freshwater System (cylinder head cooling) › Piping
Issued 13 June 2005 Resolved
Provide double hose clamps for non-metallic flex connector for all grid coolers side shell penetrations as required by 46 CFR 182.422(d)
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: double hose clamped non metallic hoses on the grid cooler
Electrical › Electric Supply System (service) › Battery Installation
Issued 13 June 2005 Resolved
Provide an emergency switch on the normally ungrounded main supply conductor from all batteries and locate as closely as practicable to the supply battery as required by 46 CFR 183.05-10(f).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 4 January 2006
Electrical › Electrical Distribution System (service) › Switchboard
Issued 13 June 2005 Resolved
Provide a non-conducting mat on the deck in front of switchboard as required by 46 CFR 183.10-15(b).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: There is no main switch board
Electrical › Lighting (service) › Lighting Fixture
Issued 13 June 2005 Resolved
Provide lens covers for all lighting fixtures located in #1 and #2 engine room as required by 46 CFR 183.10-20(k)(1).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: provided lens covers for all lighting covers
Engineering › Fuel Oil Service System › Valve
Issued 13 June 2005 Resolved
Install shutoff valves in the fuel supply piping, one at the tank connection and one at the engine end of the fuel oil piping as required by 46 CFR 182.20-40(b)(3).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: installed F/O shutoff valves
Engineering › Fuel Oil Service System › Suction Strainer
Issued 13 June 2005 Resolved
Provide caps or plugs at each valve on all water traps and strainers to prevent fuel leakage as required by 46 CFR 182.20-40(b)(3).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Pluged all valves at all water traps
Engineering › Fuel Oil Service System › Piping
Issued 13 June 2005 Resolved
Provide pipe supports to prevent excessive movement and vibration for all piping located in both engine rooms as required by 46 CFR 182.20-40(b)(2).
Due 1 October 2005
Resolved 6 January 2006
Resolution: provided supports for all loose piping in the engine room
Electrical › Electric Generation Source (service) › Power Requirement
Issued 13 June 2005 Resolved
Provide data plate proving the operating ambient temperature of the generator is 50 degrees celsius or derate the generator to 80% of full load rating as required by 46 CFR 183.10-5(f)(2).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Derated the new generator below the 20% as required
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 June 2005 Resolved
Provide chaffing gear for all non-metallic piping and electrical cables where they come in contact with hard surfaces.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: installed chafing gear on non metallic piping in areas of possible rubbuing
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 13 June 2005 Resolved
Provide two additional B-II fire extinguishers, one for each engine room as required by 46 CFR 181.30-1.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: installed two B-II/ one in each engine room
Engineering › Lubricating Oil Service System › Piping
Issued 13 June 2005 Resolved
Properly support all hydraulic piping located in shaft compartments.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: properly supported all hydraulic piping
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 13 June 2005 Resolved
Renew lagging for generator exhaust piping.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: renewed lagging for the new generator
Engineering › Fuel Oil Service System › Piping
Issued 13 June 2005 Resolved
Properly support 1/2" fuel oil piping to generator.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: provided supports for 1/2" fuel piping
Engineering › Fuel Oil Service System › Hose
Issued 13 June 2005 Resolved
Renew all fuel oil hoses to the generator prime mover with non-metalic hose meeting SAE J-1942.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: renewed all fuel hoses for the generator
Engineering › Fuel Oil Service System › Filter
Issued 13 June 2005 Resolved
All racor fuel oil filters/separator need to be UL accepted for marine application with bottom plugs attached.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: provided new RACORS for the RACORS that were possibly not marine grade
Engineering › Generator (propulsion-electric) › Winding
Issued 13 June 2005 Resolved
Generator windings need to be cleaned and free of oil.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: installed a new generator
Communications › Alarms/Indicators › High Water Alarm
Issued 13 June 2005 Resolved
Conductor in the bilge level alarm indicator circuit must be 22 AWG or larger as per 46 CFR 183.340(c).
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: installed new conductor for the bilge high level alarms
Engineering › Fuel Oil Service System › Vent Pipe
Issued 13 June 2005 Resolved
Renew flame screen to fuel oil tank vent.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: installed new flame screen for F/O vent
Engineering › Fuel Oil Service System › Vent Pipe
Issued 13 June 2005 Resolved
Weld support bracket for fuel oil tank vent on main deck.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: welded support for F/O vent piping
Lifesaving › Buoyant Apparatus › Approval
Issued 13 June 2005 Resolved
Remove buoyant apparatus from the vessel only life floats are authorized to be on board vessel after 11 MAR 1996 as per 46 CFR 180.15.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 11 August 2005
Resolution: BA removed
Lifesaving › Lifefloat › Painter
Issued 13 June 2005 Resolved
Provide 100 foot painter with weak link to both 22 man life floats as per 180.175.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: Vessel not required to have life floats/vessel keeping 1 float and meets all requirements for the float
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 13 June 2005 Resolved
Provide 18 foot of line for water lights attached to both 22 man life floats as per 46 CFR 180.175.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: installed 18 ft line for the life float water light
Lifesaving › Lifefloat › Paddle
Issued 13 June 2005 Resolved
Properly mark paddles for life floats with vessel's name and properly secure to the body of each float as per 46 CFR 185.604.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: marked the 4ft life float paddles with vessels name
Construction/Loadline › Structures › Ventilators
Issued 13 June 2005 Resolved
Repair and prove operation of all ventilation closures as per 46 CFR 182.20-45.
Action required: 705 - Other - as specified
Due 1 October 2005
Resolved 6 January 2006
Resolution: proved proper operation of vent closures
Construction/Loadline › Hull › Stiffener
Issued 21 January 2005 Resolved
Repair as new three longitudinal stiffeners in #1 center ballast tank IAW NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 January 2005
Resolved 24 January 2005
Resolution: Three new stiffeners were welded satisfactory, replacing old ones.
Communications › Radio Communications › VHF Radiotelephone
Issued 20 December 2004 Resolved
The vessel's FCC Safety Radiotelephone Certificate was expired and needs replaced IAW 46 CFR 184.502.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 January 2005
Resolved 21 January 2005
Resolution: Vessel''s FCC Safety Radiotelephone certificate was provided.
Engineering › Steering Gear System › Hydraulic Hose
Issued 20 December 2004 Resolved
Observed a leak in the hydraulic line leading to the forward steering ram. Needs to be repaired IAW 46 CFR 176.800.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 January 2005
Resolved 6 January 2006
Resolution: Replaced hydraulic hose for steering rams
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 20 December 2004 Resolved
Recent tide and current tables were not available on vessel as required by 46 CFR 184.420.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 January 2005
Resolved 21 January 2005
Resolution: Tide and current tables were provided.
Communications › Alarms/Indicators › High Water Alarm
Issued 20 December 2004 Resolved
The vessel had no high water bilge alarms as required by 46 CFR 182.530.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 January 2005
Resolved 6 January 2006
Resolution: Vessel installed a new bilge alarm system with visual and audible alarms
Operations/Management › Drills/Instruction
Issued 9 September 2003 Resolved
Provide current training logbook as required by 46 CFR 122.520.
Action required: 705 - Other - as specified
Due 31 October 2003
Resolved 29 October 2003
Resolution: A training log was provided.
Operations/Management › Drills/Instruction
Issued 9 September 2003 Resolved
Provide bridge log. 46 CFR 122.702
Due 31 October 2003
Resolved 1 October 2003
Resolution: The bridge log was found prior to the completion of the exam.
Accommodation/Occupational Safety › Occupational Safety
Issued 9 September 2003 Resolved
[name withheld] Exits in both engine rooms. 46 CFR 122.606.
Action required: 705 - Other - as specified
Due 31 October 2003
Resolved 29 October 2003
Resolution: The emergency exits in both engine rooms were marked IAW regulations.
Construction/Loadline › Penetrations
Issued 9 September 2003 Resolved
Repair or replace pin in ventilation cover for engine room vent. 46 CFR 116.600 (d).
Due 31 October 2003
Resolved 1 October 2003
Resolution: The pin was frozen in place by rust. Crew removed the pin, cleaned and lubicated it and returned it into service.
Operations/Management › Drills/Instruction
Issued 9 September 2003 Resolved
Show proof of passenger safety orientation. 46 CFR 122.506.
Due 31 October 2003
Resolved 29 October 2003
Resolution: the passenger safety orentation was delivered over the Public Address System.
Lifesaving › Buoyant Apparatus
Issued 9 September 2003 Resolved
Prove aft bouyant apparatus meets 160.010.8. 46 CFR 117.200(4).
Due 31 October 2003
Resolved 1 October 2003
Resolution: The placard for this gear was attached but hidden by a bracket.
Operations/Management › Equipment Service/Testing
Issued 9 September 2003 Resolved
Prove maintenance of survival craft. Vessel did not have a log proving the lifesaving gear was being maintained. 46 CFR 122.702.
Due 31 October 2003
Resolved 29 October 2003
Resolution: A log was provided to record the maintenance of the lifesaving equipment.
Engineering › Fuel Oil Service System
Issued 9 September 2003 Resolved
Provide solid bottom plugs for all fuel filters 46 CFR 119.455 (3). LEGACY COMPONENT DESC: Filter
Due 31 October 2003
Resolved 29 October 2003
Resolution: The fuel filters were provided with solid bottom plugs.
Engineering › Fuel Oil Service System
Issued 9 September 2003 Resolved
Prove Racor filters are of the marine type. 46 CFR 119.455 (3). LEGACY COMPONENT DESC: Filter
Due 31 October 2003
Resolved 29 October 2003
Resolution: Vessel rep provided documentation from the manufacturer that the filters were of the Marine type.
Engineering › Shafting/Propeller Arrangements
Issued 9 September 2003 Resolved
Tighten stuffing box for shafts. 46 CFR 115.830. LEGACY COMPONENT DESC: Stern Tube
Due 31 October 2003
Resolved 29 October 2003
Resolution: The stuffing boxes for the shafts were tightend.
Electrical › Lighting (service)
Issued 9 September 2003 Resolved
Provide suitable guard for engine room light. 46 CFR 120.410.
Due 31 October 2003
Resolved 29 October 2003
Resolution: A suitable guard was placed over the light.
Electrical › Lighting (service)
Issued 9 September 2003 Resolved
Provide portable lighting in machinery spaces. 46 CFR 120.430. 46 CFR 120.430.
Due 31 October 2003
Resolved 29 October 2003
Resolution: Two flashlights in working order were placed in the entry to the machinery spaces.
Stability › Watertight Integrity
Issued 9 September 2003 Resolved
Provide lanyard for hatch covers. 46 CFR 116.1160(2).
Due 31 October 2003
Resolved 29 October 2003
Resolution: Lanyards were attached to the hatch covers and the vessel.
Electrical › Electrical Distribution System (service)
Issued 9 September 2003 Resolved
Provide cover for junction box in stuffing box space. 46 CFR 120.210(3). LEGACY COMPONENT DESC: Junction Box
Due 31 October 2003
Resolved 29 October 2003
Resolution: A cover was provided over the junction box.
Electrical › Electrical Distribution System (service) › Cable
Issued 7 March 2003 Resolved
Resubmit electrical drawing to MSC to indicate vessel as built condition. LEGACY COMPONENT DESC: Plans
Due 13 March 2003
Resolved 12 October 2004
Resolution: Plans were submitted and approved and all comments addressed.
Accommodation/Occupational Safety › Ventilation
Issued 7 March 2003 Resolved
Resubmit ventilation details to indicate as built condition.
Due 13 March 2003
Resolved 19 March 2003
Resolution: Plan re-submitted and approved.
Engineering › Pressure Vessel
Issued 7 March 2003 Resolved
Provide approved plans for pressure vessel. Must meet 46 CFR subchapter F part 54 (54.01-2). LEGACY COMPONENT DESC: Appoved system
Due 13 March 2003
Resolved 15 April 2003
Resolution: This deficiency was recended, vsl elected to existing air start system vice installing a new one.
Accommodation/Occupational Safety › Occupational Safety
Issued 7 March 2003 Resolved
Provide guards on tail shaft for existing engines. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Due 13 March 2003
Resolved 7 April 2003
Resolution: Guards provided.
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 7 March 2003 Resolved
Prove proper operation of Hi jacket water and Lo lube alarms for pump jet engines. LEGACY COMPONENT DESC: Alarms
Due 13 March 2003
Resolved 7 April 2003
Resolution: Engine alarms tested.
Engineering › Non-conventional Propulsion/Steering
Issued 7 March 2003 Resolved
Provide approved plans for Jet pump and associated system. LEGACY COMPONENT DESC: plans
Due 19 March 2003
Resolved 19 March 2003
Resolution: Plans approved.
Engineering › Non-conventional Propulsion/Steering
Issued 7 March 2003 Resolved
Vessel is prohibited from operating jet pumps until approved and sea trials are conducted. LEGACY COMPONENT DESC: prohibited operation
Due 13 March 2003
Resolved 7 April 2003
Resolution: Pump jet approved, conducted sea trails w/ pump jet engine.
Documentation › Certificates/Documents
Issued 13 February 2003 Resolved
Resubmit general arrangement plan 02-510A-1001 to indicate vessel as built. Delete passive engine exhaust and show location of air intakes and generator.
Due 13 March 2003
Resolved 19 March 2003
Resolution: Plans approved.
Fire Fighting › Fire Main
Issued 13 February 2003 Resolved
Hydro all new fire main piping.
Due 13 March 2003
Resolved 3 March 2003
Resolution: All new piping hydro''d.
Operations/Management › Equipment Service/Testing
Issued 13 February 2003 Resolved
Hydro all new hydraulic lines and new ballast piping.
Due 13 March 2003
Resolved 3 March 2003
Resolution: HYDRO''''d.
Accommodation/Occupational Safety › Occupational Safety
Issued 13 February 2003 Resolved
Label engine room escape hatches.
Due 13 March 2003
Resolved 7 March 2003
Resolution: hatches labelded.
Electrical › Electrical Distribution System (service)
Issued 13 February 2003 Resolved
Reroute battery cables for #1 catapiller engine. Mount above bilges. LEGACY COMPONENT DESC: Wiring
Due 13 March 2003
Resolved 7 April 2003
Resolution: cables re-routed.
Construction/Loadline › Hull
Issued 18 December 2002 Resolved
Replace 4 vertical stiffeners in 2 center stuffing box compartments. LEGACY COMPONENT DESC: Stiffener
Due 18 January 2003
Resolved 13 February 2003
Resolution: Replaced.
Construction/Loadline › Hull
Issued 18 December 2002 Resolved
Insert swash bulkhead in 2 stuffing box compartments near ladder. LEGACY COMPONENT DESC: Transverse Frame
Action required: 705 - Other - as specified
Due 18 January 2003
Resolved 13 February 2003
Resolution: Repaired.
Construction/Loadline › Hull
Issued 18 December 2002 Resolved
Insert wasted swash bulkheads (2) as marked in port ballast tank. 1st & 2nd bulkheads.
Due 18 January 2003
Resolved 13 February 2003
Resolution: repaired.
Construction/Loadline › Hull
Issued 18 December 2002 Resolved
Replace ladder in 2 center ballast.
Action required: 705 - Other - as specified
Due 18 January 2003
Resolved 13 February 2003
Resolution: replaced.
Construction/Loadline › Hull
Issued 18 December 2002 Resolved
Clean up overhead longs in center ballast & make ready for inspection.
Action required: 705 - Other - as specified
Due 18 January 2003
Resolved 13 February 2003
Resolution: Overhead longs replaced. Found to be wasted.
Construction/Loadline › Hull
Issued 18 December 2002 Resolved
Repair /replace floor longs (4) in 1 center ballast tank.
Due 18 January 2003
Resolved 13 February 2003
Resolution: Floor longs replaced.
Construction/Loadline › Hull
Issued 18 December 2002 Resolved
Clean hull and make ready for inspection.
Action required: 705 - Other - as specified
Due 18 January 2003
Resolved 13 February 2003
Resolution: Hull cleaned and inspected.
Construction/Loadline › Structures
Issued 1 October 2002 Resolved
Replace hatch, which leads from the PORT engine room to the weather deck NLT 30 October 02. Hatch is excessively wasted. LEGACY COMPONENT DESC: Scuttle
Due 30 October 2002
Resolved 5 March 2003
Lifesaving › Buoyant Apparatus
Issued 1 October 2002 Resolved
Bouyant Apparatus is to be repaired or replaced NLT 30 Oct 02 due to several rips and small holes.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 October 2002
Resolved 18 October 2002
Resolution: Replaced (10) pers B.A. with a (22) pers Lifefloat.
Lifesaving
Issued 30 September 1999 Resolved
PROVIDE DRUG TESTING PROGRAM AS REQUIRED BY 46 CFR PART 16.
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Lifesaving
Issued 30 September 1999 Resolved
RE-STENCIL PADDLES ON LIFEFLOATS AS REQUIRED BY 46 CFR 180.604(G)
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Lifesaving
Issued 30 September 1999 Resolved
PROVIDE SEPARATION OF CHILDREN PFD'S FROM ADULTS AS REQUIRED BY 46 CFR 180.78(a)(5).
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Unknown
Issued 30 September 1999 Resolved
PROVIDE VENTILATION FOR GENERATOR FUEL TANK AS REQUIRED BY 46 CFR 182.450.
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Engineering
Issued 30 September 1999 Resolved
REMOVE PORTABLE FUEL TANK FROM GENERATOR FUEL TANK SPACE AS REQUIRED BY 46 CFR 176.830.
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Lifesaving
Issued 23 October 1997 Resolved
PROVIDE AND PROVE THE PROPER OPERATION OF A RESCUE BOAT OR PLATFORM TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR. SEE 46 CFR 117.210.
Condition: Unknown
Due 23 October 1997
Resolved 23 October 1997
Documentation
Issued 23 October 1997 Resolved
PROVIDE ON BOARD VESSEL VALID RED CROSS CPR/FIRST AID CARDS FOR FIFTY PERCENT OF DECKHANDS IN ACCORDANCE WITH COAST GUARD NVIC 1-91.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Accommodation/Occupational Safety
Issued 23 October 1997 Resolved
PROVIDE AND PROPERLY POST "NO SMOKING" SIGNS THROUGHOUT THE VESSEL. SEE 46CFR 122.340(C).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
PROVIDE SIX VALID ORANGE DAYSMOKES ABOARD THE VESSEL. SEE 46 CFR 117.68(A).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
PROVIDE ON BOARD VESSEL A CATEGORY 1, 406MHZ EPIRB. SEE 46 CFR 117.64.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
PROPERLY RENEW ALL LIFEFLOAT SEA PAINTERS. SEE 46 CFR 117.137(B)(2).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
PROVIDE THE PROPER TAGS FOR ALL LIFEFLOATS WEAK LINKS ABOARD THE VESSEL. SEE 46 CFR 117.137(B)(1).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
PROVIDE DOCUMENTATION THAT ALL LIFEFLOATS MEET THE REQUIREMENTS OF 46 CFR 160.027. SEE 46 CFR 117.200(A)(2).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
RENEW 49 DETERIORATED TYPE I ADULT PFD'S. VESSEL IS RESTRICTED TO 209 TOTAL PERSONS UNTIL THIS REQUIREMENT IS COMPLETED TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR. SEE 46 CFR 180.71(A).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
RENEW ALL LIFERINGS ABOARD VESSEL. SEE 46 CFR 117.70.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
RENEW THE SIXTY FOOT LIFELINE FOR THE LIFERING BUOY. SEE 46 CFR 117.70.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Navigation
Issued 23 October 1997 Resolved
PROVIDE ON BOARD THE VESSEL THE REQUIRED NAUTICAL PUBLICATIONS NECESSARY FOR SAFE NAVIGATION. SEE 46 CFR 121.420.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Engineering
Issued 23 October 1997 Resolved
PROPERLY RENEW THE DETERIORATED LAGGING ON THE EXHAUST PIPING LOCATED IN THE #1 ENGINE ROOM. SEE 46 CFR 182.15-15(B)(4).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Electrical
Issued 23 October 1997 Resolved
PROVIDE THE PROPER SUITABLE GLOBES/GUARDS FOR ALL LIGHTING FIXTURES LOCATEDTHROUGHOUT THE VESSEL. SEE 46 CFR 183.01-5.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Documentation
Issued 23 October 1997 Resolved
PROVIDE ON BOARD VESSEL VALID FCC OPERATOR'S LICENSE. SEE 47 CFR 80.155.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
PROVIDE A FIRST AID KIT ON BOARD THE VESSEL IN ACCORDNCE WITH 46 CFR 121.710 AND 160.041.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Lifesaving
Issued 23 October 1997 Resolved
PERFORM SATISFACTORY FIRE AND MAN OVERBOARD DRILL TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR. SEE 46 CFR 122.420 AND NVIC 1- 91.
Condition: Unknown
Due 23 October 1997
Resolved 23 October 1997
Fire Fighting
Issued 23 October 1997 Resolved
SERVICE THE B-I PORTABLE FIRE EXTINGUISHER LOCATED ON THE BRIDGE IN ACCORDANCE WITH 46 CFR 115.810.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Fire Fighting
Issued 23 October 1997 Resolved
REMOVE FROM VESSEL OR SERVICE AND PROVIDE A VALID BRACKET FOR THE B-II CO2 PORTABLE FIRE EXTINGUISHER LOCATED IN THE GENERATOR ROOM. SEE 46 CFR 115.810.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Engineering
Issued 23 October 1997 Resolved
PROPERLY INSTALL A FUEL SHUTOFF VALVE AT THE ENGINE END OF THE FUEL LINE FOR THE GENERATOR. SEE 46 CFR 182.20-40(B)(3).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Construction/Loadline
Issued 23 October 1997 Resolved
PROPERLY REPAIR/RENEW THE DETERIORATED BILGE STRAINER LOCATED IN THE #2 ENGINE ROOM. SEE 46 CFR 182.25-5(B).
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Navigation
Issued 23 October 1997 Resolved
PROPERLY REPAIR/RENEW THE DETERIORATED PIPE BRACKETS FOR THE HYDRAULIC PIPING IN THE #2 ENGINE ROOM. SEE 46 CFR 119.700.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Engineering
Issued 23 October 1997 Resolved
PROPERLY REFASTEN THE EXHAUST PIPING LOCATED IN THE #2 ENGINE ROOM. SEE 46 CFR 119.700.
Condition: Unknown
Due 10 November 1997
Resolved 17 November 1997
Fire Fighting
Issued 7 January 1997 Resolved
RENEW THE DETERIORATED FIRE PUMP MUFFLER TO THE VESSEL'S FIRE PUMP IN WAY OF ENGINE ROOM ENTRANCE IAW 46 CFR 181.120.
Condition: Unknown
Due 7 January 1997
Resolved 7 January 1997
Construction/Loadline
Issued 7 January 1997 Resolved
RENEW DETERIORATED HINGE PIVET PIN TO THE AFT VEHICLE RAMP.
Condition: Unknown
Due 7 January 1997
Resolved 7 January 1997
Construction/Loadline
Issued 7 January 1997 Resolved
RENEW THE DETERIORATED I-BEAM FLANGE ON BOTH VEHICLE RAMPS ENSURING THAT THE GUSSET PLATES DO NOT RUB THE I-BEAMS.
Condition: Unknown
Due 7 January 1997
Resolved 7 January 1997
Engineering
Issued 7 January 1997 Resolved
REMOVE THE PECK COCK IN THE FUEL PIPING SYSTEM LOCATED IN THE FORWARD ENGINE ROOM IAW 46 CFR 182.455(A)(3).
Condition: Unknown
Due 7 January 1997
Resolved 7 January 1997
Navigation
Issued 7 January 1997 Resolved
REPAIR/RENEW THE BROKEN HYDRAULIC PIPE SUPPORT LOCATED IN THE AFT ENGINE ROOM.
Condition: Unknown
Due 7 January 1997
Resolved 7 January 1997
Lifesaving
Issued 3 October 1996 Resolved
PROPERLY MARK VEHICLE DECK WITH VEHICLE RUNWAYS IAW 46 CFR 122.306 AT NEXT DRYDOCK.
Condition: Unknown
Due 3 October 1996
Resolved 3 October 1996
Construction/Loadline
Issued 3 October 1996 Resolved
PROVIDE AND VERIFY DRAFT MARKS AT NEXT DRYDOCK IN THE PRESENCE OF THE ATTENDING USCG MARINE INSPECTOR IAW 46 CFR 122.602 (c)(1)OR (d) OR (f).
Condition: Unknown
Due 3 October 1996
Resolved 3 October 1996
Lifesaving
Issued 3 October 1996 Resolved
MAKE PROPER REPAIRS TO FOUR (4) LIFE FLOATS IAW 46 CFR 160.027. RECOAT, PROPERLY MARK IAW 46 CFR 122.604 AND INSTALL RETRO-REFLECTIVE TAPE.
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Documentation
Issued 3 October 1996 Resolved
POST VESSEL'S STABILITY LETTER IN THE PILOT HOUSE IAW 46 CFR 115.306.
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Documentation
Issued 3 October 1996 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Lifesaving
Issued 3 October 1996 Resolved
PROVIDE CREW TRAINING LOG IAW 46 CFR 122.420.
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Navigation
Issued 3 October 1996 Resolved
PROVIDE AND POST EMERGENCY BRAODCAST PLACARD IAW 46 CFR 121.508.
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Lifesaving
Issued 3 October 1996 Resolved
PROVIDE AND POST HEAVY WEATHER EMERGENCY SAFETY PLAN IAW 46 CFR 122.517.
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Engineering
Issued 3 October 1996 Resolved
PROVIDE AND PROPERLY INSTALL EXHAUST BLANKETS FOR GENERATOR EXHAUST PIPE AND FIRE PUMP PRIME MOVER EXHAUST PIPE IAW 46 CFR 119.430 (a).
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Electrical
Issued 3 October 1996 Resolved
PROVIDE AND PROPERLY MOUNT PORTABLE LIGHTING IAW 46 CFR 120.430.
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Navigation
Issued 3 October 1996 Resolved
PROVIDE UP TO DATE NAUTICAL PUBLICATIONS IAW 46 CFR 121.420.
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Navigation
Issued 3 October 1996 Resolved
PROVIDE AND POST WASTE MANAGEMENT PLAN.
Condition: Unknown
Due 30 October 1996
Resolved 10 December 1996
Lifesaving
Issued 2 October 1995 Resolved
DEMONSTRATE PROPER OPERATION OF TWO WATER LIGHTS
Condition: Unknown
Due 16 October 1995
Resolved 16 October 1995
Engineering
Issued 2 October 1995 Resolved
PROVIDE BOLTS IN NEWLY REPAIRED FLANGE.
Condition: Unknown
Due 16 October 1995
Resolved 16 October 1995
Electrical
Issued 2 October 1995 Resolved
PROVIDE UPDATED ELECTRICAL DRAWING.
Condition: Unknown
Due 2 October 1995
Resolved 2 October 1995
Engineering
Issued 2 October 1995 Resolved
TIGHTEN FUEL FILTERS.
Condition: Unknown
Due 16 October 1995
Resolved 16 October 1995
Engineering
Issued 2 October 1995 Resolved
CLEAN OIL FROM BILGES.
Condition: Unknown
Due 16 October 1995
Resolved 16 October 1995
Lifesaving
Issued 2 October 1995 Resolved
REPLACE WASTED PADDLES.
Condition: Unknown
Due 16 October 1995
Resolved 16 October 1995
Fire Fighting
Issued 2 October 1995 Resolved
PROVIDE PRESSURE GUAGE ON FIRE PUMP.
Condition: Unknown
Due 16 October 1995
Resolved 16 October 1995
Engineering
Issued 2 October 1995 Resolved
REPLACE WASTED FLAME SCREEN.
Condition: Unknown
Due 16 October 1995
Resolved 16 October 1995
Fire Fighting
Issued 2 October 1995 Resolved
SERVICE ALL FIRE EXTINGUISHERS.
Condition: Unknown
Due 16 October 1995
Resolved 16 October 1995
Accommodation/Occupational Safety
Issued 9 November 1994 Resolved
MAINTAIN ON BOARD A PORTABLE TOILET UNTIL SUCH TIME A PROP AND SHAFT MODIFICATION IS COMPLETE AND TRANSIT TIME IS VERIFIED BY MSO.
Condition: Unknown
Due 15 January 1995
Resolved 8 March 1995
Lifesaving
Issued 4 October 1994 Resolved
PROVIDE AND POST CHECKOFF LIST.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Electrical
Issued 4 October 1994 Resolved
REMOVE TEMPORARY CONNECTIONS IN SENSER WIRING ON PORT AND STARBOARD ENGINES.
Condition: Unknown
Due 23 December 1994
Resolved 3 January 1995
Lifesaving
Issued 4 October 1994 Resolved
PROVIDE 2 PADDLES OPPOSITE WHEELHOUSE.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Electrical
Issued 4 October 1994 Resolved
MISSING LIGHT BULB MAIN DECK HOUSE SIDE.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Engineering
Issued 4 October 1994 Resolved
30 X 30 MESH FOR E.O. VENT IN COMPARTMENT OPPOSITE HOUSE.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Engineering
Issued 4 October 1994 Resolved
PROVIDE PULLEY GUARD FOR MAIN ENGINES.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Electrical
Issued 4 October 1994 Resolved
CLOSE STUFFING TUBES FOR WIRES IN ENGINE ROOM BULKHEADS.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Lifesaving
Issued 4 October 1994 Resolved
PROVIDE NAME ON RING AT LADDER TO WHEELHOUSE.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Lifesaving
Issued 4 October 1994 Resolved
CLEAN WATER LIGHT LENS BEHIND WHEELHOUSE.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Lifesaving
Issued 4 October 1994 Resolved
LASH PADDLES TO LIFE FLOATS.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Electrical
Issued 4 October 1994 Resolved
RELABLE ELECTRICAL PANEL DIRECTORY IN DOG HOUSE.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Electrical
Issued 4 October 1994 Resolved
LABEL CONTROLER ON/OFF IN DOG HOUSE.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Electrical
Issued 4 October 1994 Resolved
PERMENTLY MOUNT ALL WIRES THOUGHOUT.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Construction/Loadline
Issued 4 October 1994 Resolved
FRACTURED WELD IN WATERTIGHT DOOR, HOUSE SIDE AT TOP.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Accommodation/Occupational Safety
Issued 4 October 1994 Resolved
MARK EXITS FROM MANCHINERY SPACE ON INTERIOR.
Condition: Unknown
Due 23 December 1994
Resolved 3 January 1995
Accommodation/Occupational Safety
Issued 4 October 1994 Resolved
PROVIDE ON BOARD A PORTABLE TOILET AND MAKE WRITTEN PROPOSAL.
Condition: Unknown
Due 4 October 1994
Resolved 4 October 1994
Engineering
Issued 4 October 1994 Resolved
REMOVE PORTABLE LIGHTS AND FANS FROM ENGINE ROOM.
Condition: Unknown
Due 18 October 1994
Resolved 19 October 1994
Electrical
Issued 7 April 1994 Resolved
PROVIDE APPROVED PLANS FOR THE LIGHTING SYSTEM IN THE ENGINE ROOMS.
Condition: Unknown
Due 7 April 1994
Resolved 7 April 1994
Construction/Loadline
Issued 7 April 1994 Resolved
PROVIDE APPROVED PLANS FOR HULL MODIFICATIONS, ADDITION OF ANTI-CAVITATION PLATES FORE AND AFT.
Condition: Unknown
Due 7 April 1994
Resolved 7 April 1994
Construction/Loadline
Issued 7 April 1994 Resolved
PROVIDE APPROVED PLANS FOR MODIFICATIONS TO THE BILGE AND BALLAST SYSTEM.
Condition: Unknown
Due 7 April 1994
Resolved 7 April 1994
Electrical
Issued 25 March 1994 Resolved
REMOVE DEAD ENDED ELECTRICAL WIRING IN WHEELHOUSE.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Navigation
Issued 25 March 1994 Resolved
PROVIDE CURRENT DEVIATION TABLE FOR BOTH COMPASSES.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Engineering
Issued 25 March 1994 Resolved
PROVIDE MAIN ENGINE SHUTDOWNS IN WHEELHOUSE.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Electrical
Issued 25 March 1994 Resolved
PROVIDE COVER PLATE FOR SWITCH IN OVERHEAD OF WHEELHOUSE.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Electrical
Issued 25 March 1994 Resolved
PROPERLY SECURE ELECTRICAL WIRING IN WHEELHOUSE CONTROL CONSOLES.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Lifesaving
Issued 6 October 1993 Resolved
REMOVE, IN PAIRS, ALL LIFEFLOATS FOR RENEWAL AND REPAIR. REPLACING ALL ASSOCIATED EQUIPMENT INCLUDING BUT NOT LIMITED TO PAINTERS, WEAK LINKS, ETC.
Condition: Unknown
Due 6 October 1993
Resolved 6 October 1993
Engineering
Issued 9 October 1991 Resolved
INSTALL APPROVED FLAME SHIELD FOR FUEL FILTER TO #2 MAIN ENGINE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 9 October 1991 Resolved
INSTALL GASKETS IN #1 AND #2 ENGINE ROOM DOORS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 October 1991
Resolved 25 October 1991
Lifesaving
Issued 9 October 1991 Resolved
RENEW LIFELINE TO #3 AND #4 RING BUOYS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 October 1991
Resolved 25 October 1991
Fire Fighting
Issued 15 October 1990 Resolved
DEMONSTRATE 50 PSI ON BOTH FIRE PUMPS WITH BOTH FIRE STATION HOSES OPEN.
Condition: Unknown
Due 15 October 1990
Resolved 15 October 1990
Electrical
Issued 15 October 1990 Resolved
CLEAN BATTERY BOXES
Condition: Unknown
Due 15 October 1990
Resolved 15 October 1990
Engineering
Issued 15 October 1990 Resolved
PROVIDE PROPER MARINE ACCEPTABLE FLEXIBLE HOSES FOR FUEL OIL RETURN AND FIREMAIN LINES. HOSES SHALL BE COAST GUARD APPROVED.
Condition: Unknown
Due 15 October 1990
Resolved 15 October 1990
Lifesaving
Issued 15 October 1990 Resolved
PROPERLY INSTALL SEA PAINTERS AND WATER LIGHTS TO LIFE FLOATS.
Condition: Unknown
Due 15 October 1990
Resolved 15 October 1990
Electrical
Issued 15 October 1990 Resolved
PROPERLY INSTALL AUXILIARY FIRE PUMP POWER SUPPLY LINE TO 12 VOLT BATTERY
Condition: Unknown
Due 15 October 1990
Resolved 15 October 1990
Construction/Loadline
Issued 15 October 1990 Resolved
REPLACE ALL GASKETS TO HATCH COVERS
Condition: Unknown
Due 15 October 1990
Resolved 15 October 1990
Lifesaving
Issued 15 October 1990 Resolved
PROVIDE -9- ADULT AND -2- CHILD LIFE PRESERVERS OR RELABEL NUMBER OF LIFEJACKETS ON BULKHEAD.
Condition: Unknown
Due 15 October 1990
Resolved 15 October 1990
Unknown
Issued 1 November 1989 Resolved
RENEW DAMAGED 2"DIA HYDRAULIC HOSE ON STARBOARD HYDRO-PUMP.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989 Resolved
INSTALL LEAD LINING IN MAIN ENGINE START BATTERY BOXES.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Documentation
Issued 1 November 1989 Resolved
PROVIDE FCC EQUIPMENT SAFETY CERIFICATION.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Documentation
Issued 1 November 1989 Resolved
POST VESSEL'S STABILITY LETTER.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Lifesaving
Issued 1 November 1989 Resolved
MARK PERSON CAPACITY ON ALL LIFEFLOATS.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Unknown
Issued 1 November 1989 Resolved
INSTALL SAFETY GUARDS OVER BOTH MAIN ENGINE-HYDRO PUMP DRIVE SHAFTS.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989 Resolved
SUBMIT FOR APPROVAL PLANS/DRAWINGS OF SERVICE GENERATOR AND ASSOCIATED 110 VAC WIRING DISTRIBUTION SYSTEM.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989 Resolved
REPLACE 40DEGREES CELSIUS AMBIENT RATED SERVICE GENERATOR WITH 50DEGREES CELSIUS AMBIENT RATED GENERATOR OR DERATE AMPEREAGE OUTPUT TO 80%.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989 Resolved
INSTALL AMMETER, VOLTMETER AND FREQUENCY METER FOR SERVICE GEN.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989 Resolved
REPLACE FUEL HOSES TO GENERATOR WITH ACCEPTABLE TYPE.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989 Resolved
INSTALL VENT PIPE (6.25" DIA. MIN.) WITH 30X30 MESH FLAME SCREEN ON GENERATOR FUEL TANK.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989 Resolved
REMOVE PLASTIC SIGHT GAUGE FROM GENERATOR FUEL TANK.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Lifesaving
Issued 21 November 1988 Resolved
POST EMERGENCY CHECK OFF LIST.
Condition: Unknown
Due 21 November 1988
Resolved 21 November 1988
Lifesaving
Issued 21 November 1988 Resolved
PROVIDE FOUR PADDLES FOR LIFE FLOATS AND STENCIL ALL PADDLES WITH VESSEL'S NAME.
Condition: Unknown
Due 21 November 1988
Resolved 21 November 1988
Fire Fighting
Issued 21 November 1988 Resolved
PROVIDE ONE HAND PORTABLE FIRE PUMP.
Condition: Unknown
Due 21 November 1988
Resolved 21 November 1988

Casualty record · 12

31 December 2011Routine · role: Involved in a Marine Casualty · activity 4218135
8 March 2014Routine · role: Involved in a Marine Casualty · activity 4826892
23 April 2014Routine · role: Involved in a Marine Casualty · activity 4845673
30 June 2014Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4913788
5 October 2014Routine · role: Involved in a Marine Casualty · activity 5003090
31 October 2015Routine · role: Involved in a Marine Casualty · activity 5791991
28 June 2018Routine · role: Involved in a Marine Casualty · activity 6469673
18 December 2019Routine · role: Involved in a Marine Casualty · activity 6955476
13 June 2020Routine · role: Involved in a Marine Casualty · activity 6976995
9 August 2021Routine · role: Involved in a Marine Casualty · activity 7282811
18 July 2022Routine · role: Involved in a Marine Casualty · activity 7510327
28 June 2025Routine · role: Involved in a Marine Casualty · activity 8227114
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.