J.J. CALLIS is a 1989 passenger vessel (inspected). The Coast Guard has recorded 111 inspections since 1989, most recently in December 2025, along with 170 deficiencies and 11 casualty investigations between 2006 and 2025.

Records from 1989 to 2025. Most recent: inspection, 2 December 2025.

Built
1989
Last inspected
2 December 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDI7538
322165
Flag
UNITED STATES
366719030, 367107990 (licence lapsed)
Maury page id
psix-322165

Inspections, by type

…with no type recorded16
Years with a record 36 calendar years (1989–2025)
The 111 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)105.2 ft × 25.0 ft × 7.2 ft
Registered tonnagegross 98 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULF CRAFT, INC · PATTERSON, LA, UNITED STATES · built 1989
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portORIENT, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 10 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDI7538MMSI 367107990 · expired · compulsorily equipped · granted 23 April 2016, cancelled 27 June 2026 · licensed under a name not among this hull’s recorded names (not shown)
WDC9890MMSI 367107990 · terminated · voluntarily equipped · granted 19 April 2006, cancelled 22 April 2016 · licensed under a name not among this hull’s recorded names (not shown)
WCW5904MMSI 366719030 · expired · compulsorily equipped · granted 15 May 1996, cancelled 15 July 2006 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 111

2 December 2025 Damage Survey · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8277123
28 November 2025 Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8275731
28 November 2025 Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8275795
9 April 2025 COI Inspection · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8105198
19 August 2024 Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7984608
19 September 2023 Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7786042
3 May 2023 Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7662779
1 June 2022 Annual Inspection · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7459441
12 April 2022 Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7414068
15 December 2021 Administrative Inspection · In-Service Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7369737
21 April 2021 Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7170885
9 July 2020 Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6979205
25 February 2020 Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6915108
20 September 2019 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6819771
19 September 2019 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6820631
26 June 2019 Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6726447
28 March 2019 Administrative Inspection · Internal Structural Exam · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6650692
29 August 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6526155
13 June 2018 Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6430068
23 March 2018 Annual Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6377331
6 April 2017 Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6119826
5 December 2016 Internal Structural Exam · Administrative Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6052824
14 July 2016 Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5923871
25 May 2016 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5886520
20 April 2016 Internal Structural Exam · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5863259
13 July 2015 Deficiency Check · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5182937
12 June 2014 Annual Inspection · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4889455
7 May 2014 Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4853702
7 May 2014 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4892223
19 June 2012 Annual Inspection · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4348724
30 January 2012 Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4234472
9 December 2011 Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4205296
7 December 2010 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3905846
23 November 2010 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3902004
10 September 2010 Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3833150
23 March 2010 Internal Structural Exam · COI Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3698733
28 April 2009 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3462815
11 February 2009 Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3414904
9 February 2009 Internal Structural Exam · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3414798
21 November 2008 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3422951
21 October 2008 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3348873
11 July 2008 Drydock Exam · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3264290
7 May 2008 Internal Structural Exam · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3200880
20 March 2008 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3170854
5 March 2008 Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3159356
27 June 2007 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2977438
12 June 2007 Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2959094
30 May 2007 Annual Inspection · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2953957
10 January 2007 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2853394
13 October 2006 Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2799730
4 September 2006 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2769835
21 August 2006 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2754627
18 July 2006 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2719247
15 June 2006 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2686909
23 May 2006 Annual Inspection · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2656497
18 April 2005 Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2336783
16 March 2005 Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2312383
10 March 2005 Internal Structural Exam · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2303657
28 June 2004 Internal Structural Exam · Annual Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2113953
12 February 2004 Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2005788
10 October 2003 Examination of Repairs · Hull Examination · Inclining Experiment
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1924805
27 June 2003 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1923102
8 May 2003 Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1793657
1 May 2003 Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1785059
27 March 2003 Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1764561
9 March 2003 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1766358
24 October 2002 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1698839
11 October 2002 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1705939
11 September 2002 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1676097
11 September 2002 Damage Survey
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1676235
16 August 2002 Deficiency Check · In-Service Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1663395
25 July 2002 Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1651877
14 March 2002 Internal Structural Exam · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1493621
24 April 2001 Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1450613
13 April 2000 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1456820
23 March 2000 MARPOL Annex V Examination · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1427805
4 November 1999 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 799662
7 May 1999 Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1393152
15 April 1999 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1369119
25 March 1999 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 85751
25 March 1999 Damage Survey
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 778397
21 May 1998 Plan Review "T" Boat
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 815091
21 April 1998 Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 815086
6 March 1998 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1431924
29 May 1997 Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 786419
24 March 1997 COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1107210
24 January 1997 Examination of Repairs
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1428889
5 February 1996 MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1189999
18 January 1996 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 874905
20 November 1995 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 873080
2 June 1995 Damage Survey · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1181002
3 February 1995 Deficiency Check · COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1164135
2 August 1994 Excursion Permit
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1176105
16 March 1994 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 859178
4 February 1994 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 859161
15 November 1993 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 849544
27 March 1993 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1438063
18 February 1993 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 839946
19 October 1992 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 953833
1 October 1992 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1257192
16 July 1992 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1259442
16 June 1992 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 955117
10 June 1992 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 951018
10 March 1992 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1269689
19 February 1992 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 957947
25 February 1991 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 910117
7 November 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 923168
9 May 1990 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1212512
2 March 1990 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 902749
15 July 1989 Excursion Permit
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1344165
3 March 1989 Initial Construction-Excluding Oversight · Hull Examination · Plan Review "T" Boat · Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1198018

Deficiency record · 170

02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 28 November 2025 Resolved
Crew observed a 1" hole approx 12-18" above waterline on starboard side lazarette. Issued 835 to repair hole in hull.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 December 2025
Resolved 4 December 2025
Resolution: Insert placed to the satisfaction of the attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 April 2025 Resolved
Forepeak space unable to take suction from bilge pump. Demonstrate dewatering in forpeak.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2025
Resolved 11 April 2025
Resolution: Vessel sent pic and video to clear deficiency and show suction in the forepeak
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 June 2022 Resolved
Provide correct labeling for child life jackets; quantity and visibly marked "child" so they are easily distinguishable from adult life jackets. 46 CFR 180.78(a)(5)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 June 2022
Resolution: proper labels provided
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 February 2020 Resolved
Ring Buoy needs correct line.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2020
Resolved 26 March 2020
Resolution: New line provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 February 2020 Resolved
Ring Buoy needs to replace ineffective retro tape.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2020
Resolved 26 March 2020
Resolution: New retro-reflective tape installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 September 2019 Resolved
Vessels stbd inboard shaft seal spacer is cracked. Temp repair is authorized for single voyage to Plum Island to Orient Point, NY. Vessel to make additional temp repair to the satisfaction of attending [name withheld] approved vessel is athorzed an additional 14 days to make permenant repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2019
Resolved 22 September 2019
Resolution: Vessel went to shipyard and carried out permanent repairs. New shaft seal installed.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 29 August 2018 Resolved
Vsl is broadcasting Invalid Call Sign, no dimension information (AIS Antenna Position ABCD values equals 0) and no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Due 18 November 2018
Resolved 25 June 2019
Resolution: Verified CG NAVCEN VIVS, no AIS deficiencies pending per website.
Communications › Radio Communications › EPIRB
Issued 7 April 2017 Resolved
Update call sign on EPIRB registration
Due 5 May 2017
Resolved 18 May 2017
Resolution: Call sign updated.
Construction/Loadline › Hull › Stiffener
Issued 7 April 2017 Resolved
Repair cracks in welds on top of aft stancion in forepeak
Due 5 May 2017
Resolved 18 May 2017
Resolution: Additional gussets installed. Cracks repaired.
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 18 October 2016 Resolved
Make port side pressure vessel in the generator room available for inspection. Pressure vessel is not listed on the COI and is greater than 5 cubic feet.
Condition: Invalid
Action required: 705 - Other - as specified
Due 21 November 2016
Resolved 19 December 2016
Resolution: Air receiver inspected and added to COI.
Construction/Loadline › Structures › Manhole
Issued 20 April 2016 Resolved
Forepeak scuttle has holes from rust. Prove watertight integrity of forepeak scuttle.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 25 May 2016
Resolution: Adjusted dogs, hose tested and logged
Documentation › Certificates/Documents › FCC SSL
Issued 20 April 2016 Resolved
Vessel did not have an updated SSL on board. Provide an updated SSL.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 25 May 2016
Resolution: Provide updated FCC Station License
Construction/Loadline › Penetrations › Gasket
Issued 20 April 2016 Resolved
Found multiple cable penetrations through watertight bulkheads that were not sealed. Properly seal all watertight bulkhead penetrations.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 25 May 2016
Resolution: Seal All Cable Penetrations in watertight bulkheads –sealed,
Engineering › Generator (propulsion/auxiliary-electric) › Cable
Issued 20 April 2016 Resolved
Loose cables were found IWO starboard generator. Secure the loose cables on the starboard generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 25 May 2016
Resolution: Secure loose wires IWO starboard generator – Secured
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 20 April 2016 Resolved
Life line on port aft life ring was deteriorating. Renew life line on port aft life ring.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 25 May 2016
Resolution: Renew life line on port aft life ring - Renewed
Construction/Loadline › Structures › Deck Plating
Issued 9 December 2011 Resolved
Remove aft port deck fitting for further inspection and make repairs as appropriate to deck during next drydock.
Action required: 705 - Other - as specified
Due 30 November 2012
Resolved 6 November 2012
Stability › Watertight Integrity › General
Issued 9 December 2011 Resolved
Staboard E/R repack wiring stuffing tube in overhead leaking water from deck.
Action required: 705 - Other - as specified
Due 23 March 2012
Resolved 21 June 2012
Resolution: Tube repacked.
Construction/Loadline › Structures › Superstructure
Issued 9 December 2011 Resolved
Repair starboard frames on main deck forward quarter (frames 3, 6 &7) during next drydock.
Action required: 705 - Other - as specified
Due 30 November 2012
Resolved 6 November 2012
Resolution: Frames repaired and a new ring for the deck hatch installed
Construction/Loadline › Structures › Deck Plating
Issued 9 December 2011 Resolved
Repair crack in deck at forepeak hatch during next drydock.
Action required: 705 - Other - as specified
Due 30 November 2012
Resolved 6 November 2012
Resolution: A new ring installed and stiffener below bulwark frame.
Construction/Loadline › Hull › Bracket
Issued 9 December 2011 Resolved
Make repairs in forepeak to cracked welds and structures as marked during next drydock.
Action required: 705 - Other - as specified
Due 30 November 2012
Resolved 23 November 2012
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 23 November 2010 Resolved
Compressor maybe used as long as a 150lb relief valve is installed in the tank. When plan review is completed item to be cleared.
Due 23 December 2010
Resolved 7 December 2010
Resolution: Received email from MSC approving the receiver.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 10 September 2010 Resolved
Provide documentation for new air receiver to meet the requirements of 46 CFR 54.01-5. New air receiver is not to be placed in service until CG Marine Inspector inspects it in accordance with 46 CFR 54.10-3(c).
Action required: 705 - Other - as specified
Due 30 November 2010
Resolved 23 November 2010
Resolution: Cleared with the installation of a 150lbs relief valve.
Engineering › Compressed Air System (start air) › Compressor
Issued 10 September 2010 Resolved
Provide documentation of the weight of the old air receiver that was removed from the vessel.
Action required: 705 - Other - as specified
Due 23 November 2010
Resolved 17 November 2010
Resolution: Received weight information.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 23 March 2010 Resolved
Replace missing exhaust lagging on starboard, outboard MDE.
Due 23 April 2010
Resolved 12 May 2010
Resolution: Sighted new lagging
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2010 Resolved
Repair pin hole leak at starboard forward bit.
Due 23 April 2010
Resolved 12 May 2010
Resolution: Pin hole weld up.
Construction/Loadline › Structures › Scuttle
Issued 23 March 2010 Resolved
Replace gasket on lazarette scuttle.
Due 23 April 2010
Resolved 12 May 2010
Resolution: Sighted new gasket
Electrical › Electrical Distribution System (service) › Cable
Issued 23 March 2010 Resolved
Remove dead ended cable from lazarette (port side).
Due 23 April 2010
Resolved 12 May 2010
Resolution: Wires are gone.
Accommodation/Occupational Safety › Heating › Piping
Issued 23 March 2010 Resolved
Repair leaking heater line in starboard void in lower passenger cabin.
Due 23 April 2010
Resolved 12 May 2010
Resolution: Pipe is not leaking.
Documentation › Markings/Placards › Vessel Number (state)
Issued 23 March 2010 Resolved
Correct hailing port on stern. Due at next haul out.
Action required: 705 - Other - as specified
Resolved 7 December 2010
Resolution: Hailing port was changed at last haul out.
Construction/Loadline › Penetrations › Gasket
Issued 19 February 2009 Resolved
Repair/replace gasket on fwd scuttle and prove to be watertight
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 28 April 2009
Communications › Visual Communication › Warning Sign (gangway)
Issued 9 February 2009 Resolved
Restencil Emergency Escape Hatch Forward
Action required: 705 - Other - as specified
Resolved 28 April 2009
Fire Fighting › Fire Main › Condition
Issued 9 February 2009 Resolved
Make permanent repairs to firemain piping over furnace.
Action required: 705 - Other - as specified
Resolved 28 April 2009
Construction/Loadline › Hull › Weld
Issued 9 February 2009 Resolved
Make repairs to cracked welds at bulward to deck connection starboard side forward at next DD.
Due 31 March 2009
Resolved 19 February 2009
Stability › Watertight Integrity › General
Issued 9 February 2009 Resolved
Make repairs to forward hatch and Prove watertight integrity at next DD.
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 19 February 2009
Construction/Loadline › Penetrations › Weld
Issued 9 February 2009 Resolved
Make repairs to port fuel tank at next DD.
Action required: 705 - Other - as specified
Resolved 19 February 2009
Deck/Cargo › Cargo Stowage › General
Issued 9 February 2009 Resolved
Provide nut for bolt on port aft chain bracket.
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 28 April 2009
Lifesaving › Launching Appliances › Davit
Issued 11 August 2008 Resolved
Conduct a satisfactory MOB drill using newly installed davit. Drill must be witnessed by a Marine Inspector in the vessel's COTP zone prior to putting the davit into service.
Action required: 705 - Other - as specified
Resolved 21 October 2008
Resolution: Satisfactory drill conducted.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 5 March 2008 Resolved
Make permanent repair to stbd inboard fuel tank leak fwd boundary IWO stbd keelson connection to tank plate.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 March 2008
Resolved 7 March 2008
Resolution: Examined weld repair and witnessed air test using 1.5 psig. All sat.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 30 May 2007 Resolved
Replace or service relief valves on both air receivers.
Due 29 June 2007
Resolved 27 June 2007
Resolution: Relief vlaves replaced.
Fire Fighting › Fire Hydrants › Material
Issued 30 May 2007 Resolved
Replace wasted nipples on P&S fire stations, last male fittine.
Due 29 June 2007
Resolved 27 June 2007
Resolution: Nipples replaced.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 30 May 2007 Resolved
Reconfigure pull control for generator space system.
Due 29 June 2007
Resolved 27 June 2007
Resolution: Pull controls properly installed.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 30 May 2007 Resolved
Provide proof of servicing.
Due 29 June 2007
Resolved 27 June 2007
Resolution: System serviced.
Construction/Loadline › Structures › Scuttle
Issued 30 May 2007 Resolved
Replace/repair broken T handle on E/R emergency escape hatch.
Due 29 June 2007
Resolved 27 June 2007
Resolution: New hatch provided.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 21 August 2006 Resolved
Provide additional support for deck plating, aft of port inboard MDE.
Due 12 September 2006
Resolved 12 October 2006
Engineering › Bilge Water Management System › Pump
Issued 18 July 2006 Resolved
Demonstrate satisfactory Bilge water suction in steering compartment.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 September 2006
Resolved 3 August 2006
Electrical › Electric Generation Source (service) › Generator Cable
Issued 18 July 2006 Resolved
Operational Test of Generator and verify panel feed cable IAW previously approved plans to SAT of attending Marine Inspector prior to carriage.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 August 2006
Resolved 3 August 2006
Construction/Loadline › Structures › Deck Plating
Issued 18 July 2006 Resolved
Properly repair cracked welds near mooring bit mount in forepeak overhead/main deck to satisfactory of attending inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 October 2006
Resolved 12 October 2006
Construction/Loadline › Structures › Deck Plating
Issued 18 July 2006 Resolved
Properly repair cracked welds in steering compartment and hose test to satisfactory of attending inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 October 2006
Resolved 12 October 2006
Engineering › Steering Gear System › Rudder
Issued 18 July 2006 Resolved
Operational test of steering system due to newly installed Aquamet 17 shafts and (2) new rudders to satisfactory of attending inspector prior to carriage.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 August 2006
Resolved 2 August 2006
Electrical › Electrical Distribution System (service) › Panelboard
Issued 18 July 2006 Resolved
Locate and repair source of ground indicated on main panel as a result of ground detection.
Action required: 705 - Other - as specified
Due 12 August 2006
Resolved 15 August 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 July 2006 Resolved
Verify A/C Electrical installation in accordance with approved plans (as originally approved).
Action required: 705 - Other - as specified
Due 2 September 2006
Resolved 10 January 2007
Resolution: Electrical Installation check completed.
Electrical › Electric Generation Source (service) › Generator
Issued 18 July 2006 Resolved
Provide approved plans for electrical modifications involving generator upgrade.
Action required: 705 - Other - as specified
Due 2 September 2006
Resolved 10 January 2007
Resolution: Recieved approved plans from MSC
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 23 May 2006 Resolved
Provide repair proposal for Main engine sea water cooling lines.
Due 16 June 2006
Resolved 2 August 2006
Resolution: All sea water cooling lines replace 316 SS.
Construction/Loadline › Structures › Door
Issued 23 May 2006 Resolved
prove proper operation of engine room WTD open indicator light (on bridge) for the engine room.
Due 16 June 2006
Resolved 2 August 2006
Fire Fighting › Fire Main › Condition
Issued 10 March 2005 Resolved
Repair fire main pipe in way of port side furnace.
Condition: Unknown
Due 18 March 2005
Resolved 16 March 2005
Resolution: Tested sat
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 10 March 2005 Resolved
Prove proper operation of aft wind shield wiper.
Condition: Improper/Lack of Maintenance
Due 18 March 2005
Resolved 16 March 2005
Resolution: tested sat
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 10 March 2005 Resolved
Make proper repair to stern section of vessel in way of ramp area. Missing rail port side, cracked rail starboard side.
Condition: Improper/Lack of Maintenance
Due 10 April 2005
Resolved 14 July 2005
Electrical › Electrical Distribution System (service) › Panelboard
Issued 10 March 2005 Resolved
Relabel panel box in pilot house.
Condition: Unknown
Due 18 March 2005
Resolved 16 March 2005
Resolution: Sighted corrections.
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 10 March 2005 Resolved
Make proper repairs to MSD discharge system.
Condition: Unknown
Due 10 April 2005
Resolved 14 July 2005
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 10 March 2005 Resolved
Provide exhaust lagging over exhaust brackets.
Condition: Unknown
Due 10 April 2005
Resolved 14 July 2005
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 10 March 2005 Resolved
Diagnose and correct source of starboard side vibration
Condition: Unknown
Due 10 April 2005
Resolved 14 July 2005
Construction/Loadline › Structures › Door
Issued 10 March 2005 Resolved
Prove proper operation of water tight doors.
Condition: Unknown
Due 18 March 2005
Resolved 16 March 2005
Resolution: Tested Sat
Navigation › Piloting/Steering › Compass Deviation Table
Issued 28 June 2004 Resolved
Provide current deviation table for magnetic compass.
Condition: Unknown
Due 14 July 2004
Resolved 10 March 2005
Resolution: Current table posted.
Fire Fighting › Ventilation Systems
Issued 10 October 2003 Resolved
Provide adequate ventilation duct covers on newly installed dry exhaust stacks. LEGACY COMPONENT DESC: Duct Hatches
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2004
Resolved 12 February 2004
Resolution: Sighted new covers
Stability › Incline Test › General
Issued 10 October 2003 Resolved
Provide copy of new stability letter.r
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2004
Resolved 12 February 2004
Resolution: MSC issued ltr dtd 2/9/04.
Communications › Internal Communications System
Issued 10 October 2003 Resolved
Make permanent repairs to public address system. LEGACY COMPONENT DESC: public address system
Due 29 February 2004
Resolved 12 February 2004
Resolution: Tested sat
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 10 October 2003 Resolved
Complete sea trial inspection of new engine installation. LEGACY COMPONENT DESC: re-power
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2004
Resolved 12 February 2004
Resolution: Conducted sat sea trials
Stability › Watertight Integrity
Issued 10 October 2003 Resolved
replace leaking deck hatch seal for engine room emergency escape hatch. LEGACY COMPONENT DESC: deck hatch seal
Condition: Placed in Improper Service
Due 29 February 2004
Resolved 12 February 2004
Resolution: Hatch tested sat.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 1 May 2003 Resolved
Install port inboard main turbo lagging. LEGACY COMPONENT DESC: Turbocharger
Due 8 May 2003
Resolved 8 May 2003
Resolution: Lagging received were all bottom pieces, new pieces received and installed
Electrical › Electric Generation Source (service)
Issued 27 March 2003 Resolved
Remove deadended wire on Port SSDG LEGACY COMPONENT DESC: wire
Due 27 April 2003
Resolved 1 May 2003
Resolution: Wires were removed
Accommodation/Occupational Safety › Medical/First Aid
Issued 27 March 2003 Resolved
Provide asprin and eyewash for the first aid kit. LEGACY COMPONENT DESC: Medicine Chest
Due 1 May 2003
Resolved 1 May 2003
Resolution: Sighted eye wash and asprin
Navigation › Piloting/Steering
Issued 27 March 2003 Resolved
provide corrected charts IAW local notices to mariners. LEGACY COMPONENT DESC: Local Notices to Mariners
Due 27 April 2003
Resolved 1 May 2003
Resolution: Sighted corrected charts.
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 27 March 2003 Resolved
Prove monthly inspection and servicing of portable fire extinguishers. LEGACY COMPONENT DESC: Service
Due 27 April 2003
Resolved 1 May 2003
Resolution: Sighted inspection records
Lifesaving › Lifejacket/PFD (Type V)
Issued 27 March 2003 Resolved
Provide approved line for 02 deck ring buoy to attach float light. LEGACY COMPONENT DESC: line
Due 27 April 2003
Resolved 1 May 2003
Resolution: Sighted line.
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 27 March 2003 Resolved
Provide approved mounting bracket for portable fire ex. #4. LEGACY COMPONENT DESC: Mounting Bracket
Due 27 April 2003
Resolved 1 May 2003
Resolution: Sighted new bracket
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 27 March 2003 Resolved
Double clamp all raw water hoses. LEGACY COMPONENT DESC: Clamps
Due 27 April 2003
Resolved 1 May 2003
Resolution: Hoses were double clamped
Engineering › Compressed Air System (start air)
Issued 27 March 2003 Resolved
Provide and attach handle for starting air crossover line. LEGACY COMPONENT DESC: Piping
Due 27 April 2003
Resolved 1 May 2003
Resolution: Handle installed
Engineering › Bilge Water Management System
Issued 27 March 2003 Resolved
Re attach bildge sution pipe to bracket in the forepeak. LEGACY COMPONENT DESC: Piping
Due 27 April 2003
Resolved 8 May 2003
Resolution: sution reattached
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 27 March 2003 Resolved
Make proper repairs to the exhaust piping on all diesel engines. LEGACY COMPONENT DESC: Piping (exhaust)
Due 28 May 2003
Resolved 12 February 2004
Resolution: New exhaust installed
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 27 March 2003 Resolved
Reduce oil leaks on all diesel engines. LEGACY COMPONENT DESC: Oil leaks
Due 7 May 2003
Resolved 8 May 2003
Resolution: Leaks corrected.
Engineering › Diesel Engine (auxiliary)
Issued 27 March 2003 Resolved
Properly mount strb SSDG to the bedplate. LEGACY COMPONENT DESC: Bedplate
Due 27 April 2003
Resolved 1 May 2003
Resolution: Sighted mounts.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 27 March 2003 Resolved
Test and inspect fixed fire fighting system IAW NFPA. LEGACY COMPONENT DESC: Operating Controls
Due 7 May 2003
Resolved 8 May 2003
Resolution: Sighted inspection tag
Stability › Watertight Integrity
Issued 27 March 2003 Resolved
Make proper repairs to trans. weld port side at the deck. LEGACY COMPONENT DESC: Crack in weld between trans. and hull
Due 27 April 2003
Resolved 1 May 2003
Resolution: Tested weld repairs
Construction/Loadline › Hull
Issued 11 September 2002 Resolved
Provide underwater survey results of vessel to CG Marine Inspector.Survey results must be reviewed and accepted by the Coast Guard. LEGACY COMPONENT DESC: Bottom Plating
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 September 2002
Resolved 16 September 2002
Resolution: Dive survey received. Two props replaced. No damage to hull.
Engineering › Shafting/Propeller Arrangements
Issued 16 August 2002 Resolved
Renew all pipe nipples on all shaft cooling bellows. LEGACY COMPONENT DESC: Stern Tube Lubrication/Sealing
Due 23 August 2002
Resolved 23 August 2002
Resolution: Sighted new pipe nipples.
Engineering › Reduction Gearing/Clutches
Issued 16 August 2002 Resolved
Renew copper tube IWO inboard stbd MDE R/G LEGACY COMPONENT DESC: other
Due 23 August 2002
Resolved 23 August 2002
Resolution: Pipe was cleaned and found in good condition.
Engineering › Sea-water System (primary cooling)
Issued 16 August 2002 Resolved
Replace raw water cooling hose to exh colector on the port o/b MDE. LEGACY COMPONENT DESC: Piping
Due 23 August 2002
Resolved 23 August 2002
Resolution: Hose replaced.
Engineering › Shafting/Propeller Arrangements
Issued 16 August 2002 Resolved
Prior to carrying passengers make proper repairs to port O/B prop shaft stuffing box bellows. LEGACY COMPONENT DESC: Coupling
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 August 2002
Resolved 23 August 2002
Resolution: Bellows tightened and found sat.
Electrical › Electric Generation Source (service)
Issued 16 August 2002 Resolved
Prior to carrying passengers repair L/O & R/W leaks on the #2 SSDG. LEGACY COMPONENT DESC: Generator
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 August 2002
Resolved 23 August 2002
Resolution: Tested #2 SSDG and found it sat.
Accommodation/Occupational Safety › Occupational Safety
Issued 16 August 2002 Resolved
Vessel to comply with the requirments of the DAPI program. 50% random tested, records for the past year, after hour testing facility in CT & NY, ltr from MRO, and submit MSIS report for 2001. LEGACY COMPONENT DESC: DAPI
Due 23 August 2002
Resolved 23 August 2002
Resolution: Review DAPI plan and found it in compliance.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Nozzle
Issued 25 July 2002 Resolved
Provide plans of installed fixed CO2 system. LEGACY COMPONENT DESC: Plans
Due 2 June 2003
Resolved 23 August 2007
Resolution: Recieved Fax from vsl rep from fire service company of testing system.
Fire Fighting › Fire Main
Issued 25 July 2002 Resolved
Provide directions for operation including line drawing. LEGACY COMPONENT DESC: Instructions
Due 28 May 2003
Resolved 8 May 2003
Resolution: Sighted drawing
Engineering › Bilge Water Management System
Issued 25 July 2002 Resolved
Provide directions for use including a line drawing. LEGACY COMPONENT DESC: Instrution for use
Due 28 May 2003
Resolved 8 May 2003
Resolution: Sighted drawing
Lifesaving › Embarkation Appliances/Stations
Issued 25 July 2002 Resolved
Provide platform for base of rescue ladder so that a crewmember can stand on it when preforming MOB pickup. LEGACY COMPONENT DESC: Rescue ladder
Due 28 May 2003
Resolved 8 May 2003
Resolution: Tested platform sat.
Engineering › Fuel Oil Service System
Issued 25 July 2002 Resolved
Refit fuel oil vents with proper flame screens. LEGACY COMPONENT DESC: Piping
Due 30 September 2002
Resolved 27 March 2003
Resolution: Cited new screens
Lifesaving › Embarkation Appliances/Stations
Issued 25 July 2002 Resolved
Provide and post life raft launching instructions. LEGACY COMPONENT DESC: Life Raft launching instrutions
Due 30 September 2002
Resolved 27 March 2003
Resolution: Cited instructions.
System not recorded
Issued 24 April 2001 Resolved
REPAIR CRACKS IN STBD INBD & OUTBD MDE EXH COLLECTORS.
Condition: Unknown
Due 30 June 2001
Resolved 24 July 2002
Construction/Loadline
Issued 24 April 2001 Resolved
MUCK OUT LAZZ BILGE, ACCUMULATION OF OIL/GREASE IN WTR.
Condition: Unknown
Due 7 May 2001
Resolved 8 May 2001
Lifesaving
Issued 24 April 2001 Resolved
PROVE PROPER OPERATION OF FIRE/BILGE PUMP.
Condition: Unknown
Due 15 May 2001
Resolved 6 December 2001
Lifesaving
Issued 24 April 2001 Resolved
POST FIRE/BILGE PUMP OPERATING INSTRUCTIONS
Condition: Unknown
Due 7 May 2001
Resolved 6 December 2001
Engineering
Issued 24 April 2001 Resolved
FIRE PUMP GA OOC. REPAIR/REPLACE.
Condition: Unknown
Due 7 May 2001
Resolved 8 May 2001
Construction/Loadline
Issued 24 April 2001 Resolved
REPAIR EIGHT BOLT HOLES INCLUDING 7 FILLED WITH SILICONE IN LAZZ OVERHEAD.
Condition: Unknown
Due 7 June 2001
Resolved 8 May 2001
Navigation
Issued 24 April 2001 Resolved
P & S PILOT HOUSE WINDOW WINDSHIELD WIPER MOTORS OBSCURE ARC OF VIS FOR P & S RUNNING LIGHTS.
Condition: Unknown
Due 7 May 2001
Resolved 8 May 2001
Engineering
Issued 24 April 2001 Resolved
REPAIR BROKEN VALVE STEM ON PORT F/O TANK COV AND PROVE PROPER OPERATION. CLEARED 25APR01.
Condition: Unknown
Due 25 April 2001
Resolved 26 April 2001
System not recorded
Issued 24 April 2001 Resolved
REPAIR CRACKED PORT S/S D/G EXH COLLECTOR.
Condition: Unknown
Due 30 June 2001
Resolved 24 July 2002
Engineering
Issued 24 April 2001 Resolved
PROPERLY REPAIR PORT MDE R/W/ PIPING, MARINE-TEX REPAIRS ARE UNSAT.
Condition: Unknown
Due 30 June 2001
Resolved 24 July 2002
Engineering
Issued 24 April 2001 Resolved
REPAIR CRACKED PORT MDE EXH COLLECTOR.
Condition: Unknown
Due 30 June 2001
Resolved 24 July 2002
Fire Fighting
Issued 4 November 1999 Resolved
Install proper piping for the fixed CO2 system in the machinery space. (A- 53F) piping installed at this time is not approved for fixed fire fighting.
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Engineering
Issued 7 May 1999 Resolved
Repair emergency fuel shutoff on port fuel tank
Condition: Unknown
Due 21 June 1999
Resolved 27 May 1999
Engineering
Issued 7 May 1999 Resolved
Repair port diesel generator overspeed trip.
Condition: Unknown
Due 21 June 1999
Resolved 27 May 1999
Electrical
Issued 7 May 1999 Resolved
Replace directories in circuit breaker panels located in galley and on after bulkhead of engine room
Condition: Unknown
Due 21 June 1999
Resolved 27 May 1999
Engineering
Issued 7 May 1999 Resolved
Replace raw water hose on Starboard Inboard main diesel engine.
Condition: Unknown
Due 21 June 1999
Resolved 27 May 1999
Fire Fighting
Issued 7 May 1999 Resolved
Install time delay and operation indicating light on fixed CO2 fire extinguishing system
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Engineering
Issued 15 April 1999 Resolved
REPLACE STOP BALLS IN F/O VENTS
Condition: Unknown
Due 26 April 1999
Resolved 26 April 1999
Engineering
Issued 15 April 1999 Resolved
REPAIR PORT OVERBOARD SEA SUCTION BALL VALVE, AND SHOW PROPER OPERATION. MOUNTING HOLE IN HANDLE EGG SHAPED, NOT ALLOWING PROPER OPERATION OF VALVE.INSTALL NEW HANDLE.
Condition: Unknown
Due 26 April 1999
Resolved 26 April 1999
Fire Fighting
Issued 15 April 1999 Resolved
CROP & RENEW FIRE MAIN OBERBOARD SPOOL PIECE IN WAY OF CORROSION HOLE.
Condition: Unknown
Due 26 April 1999
Resolved 26 April 1999
Fire Fighting
Issued 15 April 1999 Resolved
SUBMIT PROPOSAL FOR REPLACING INSTALLED C02 SYSTEM PIPING. (A-53F) PIPING INSTALLED AT THIS TIME, NOT APPROVED FOR FFF.
Condition: Unknown
Due 15 April 1999
Resolved 15 April 1999
Construction/Loadline
Issued 25 March 1999 Resolved
Discharge all oily water located in the lazarette to a authorized receptionfacility. In addition, fill the bolt holes to make the compartment watertight.
Condition: Unknown
Due 30 March 1999
Resolved 7 May 1999
Construction/Loadline
Issued 25 March 1999 Resolved
Prior to the carriage of passengers, conduct a dive survey of the hull to inspect for damage. Provide written report of findings.
Condition: Unknown
Due 30 March 1999
Resolved 7 May 1999
Construction/Loadline
Issued 25 March 1999 Resolved
Prior to the carriage of passengers, install proper hi-level bilge alarms IAW 46 CFR 182.530.
Condition: Unknown
Due 30 March 1999
Resolved 7 May 1999
Accommodation/Occupational Safety
Issued 21 April 1998 Resolved
REPLACE 175 PSI PRESSURE RELIEF VALVES WITH 125 PSI RELIEF VALVES AND TEST.
Condition: Unknown
Due 21 April 1998
Resolved 21 April 1998
Documentation
Issued 21 April 1998 Resolved
PROVIDE COPY OF SAFETY RADIOTELEPHONE CERTIFICATE.
Condition: Unknown
Due 21 April 1998
Resolved 21 April 1998
Fire Fighting
Issued 29 May 1997 Resolved
Submit plans for installation of fixed CO2 systems for engine room and generator spaces.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Lifesaving
Issued 24 March 1997 Resolved
SECURE PADDLES TO EACH LIFEFLOAT.
Condition: Unknown
Due 24 April 1997
Resolved 29 January 1998
Lifesaving
Issued 24 March 1997 Resolved
PROVIDE 100% PRIMARY LIFSAVING APPLIANCES. UNTIL THIS REQUIREMENT IS MET, THE VESSEL IS RESTRICTED TO 100 TOTAL PERSONS ON BOARD.
Condition: Unknown
Due 24 March 1997
Resolved 24 March 1997
Construction/Loadline
Issued 24 March 1997 Resolved
UNTIL CREDIT DRYDOCK,PRIOR TO EACH VOYAGE OF VSL, CONDUCT A PRE-OPERATIONALINTERNAL HULL EXAM/WALK THROUGH OF SPACES AND VOIDS BY THE VESSEL'S MASTER.LOOK FOR SIGNS OF WEEPING OF SEAMS. IF THERE ARE ANY DEFECTS, CONTACT THE LOCAL [name withheld] AT [phone withheld] AND DO NOT GET UNDERWAY.
Condition: Unknown
Due 24 March 1997
Resolved 24 March 1997
Documentation
Issued 24 March 1997 Resolved
PROVIDE COPY OF FCC CERTIFICATE.
Condition: Unknown
Due 24 March 1997
Resolved 24 March 1997
Lifesaving
Issued 24 March 1997 Resolved
PROVE PROPER OPERATION OF THE STBD LIFEFLOAT WATER LIGHT.
Condition: Unknown
Due 24 April 1997
Resolved 30 January 1998
Lifesaving
Issued 24 March 1997 Resolved
PLACE THE VESSEL'S NAME ON EACH LIFESAVING APPLIANCE.
Condition: Unknown
Due 24 April 1997
Resolved 30 January 1998
Fire Fighting
Issued 24 March 1997 Resolved
PROVIDE ANNUAL SERVICING CERTIFICATES FOR THE FIXED AND PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 24 April 1997
Resolved 30 January 1998
Lifesaving
Issued 24 March 1997 Resolved
PROVIDE RETRO-REFLECTIVE TAPE ON EACH RING BOUY AND LIFEFLOATS.
Condition: Unknown
Due 24 April 1997
Resolved 30 January 1998
Documentation
Issued 24 March 1997 Resolved
PROVIDE A DRUG AND ALCOHOL PROGRAM IN COMPLIANCE WITH FEDERAL REGULATIONS.
Condition: Unknown
Due 24 March 1997
Resolved 24 March 1997
Lifesaving
Issued 24 March 1997 Resolved
PROVIDE CHILD-SIZE LIFEJACKET PLACARD.
Condition: Unknown
Due 24 April 1997
Resolved 30 January 1998
Documentation
Issued 24 March 1997 Resolved
IMPLEMENT A SPEED RESTRICTION PLAN TO REDUCE HULL STRESSES UNTIL A CREDIT DRYDOCK HAS BEEN COMPLETED.
Condition: Unknown
Due 24 March 1997
Resolved 24 March 1997
Construction/Loadline
Issued 24 January 1997 Resolved
Provide X-ray results of shots taken on hull while in drydock at Thames Shipyard in Jan-Feb 1997. If results are not available, present a proposalfor X-rays to be taken on hull.
Condition: Unknown
Due 5 March 1997
Resolved 15 April 1997
Accommodation/Occupational Safety
Issued 5 February 1996 Resolved
REPAIR PASSENGER SEAT BACK FASTENINGS.
Condition: Unknown
Due 5 February 1996
Resolved 5 February 1996
Fire Fighting
Issued 5 February 1996 Resolved
INSTALL A VACUUM RELIEF SYSTEM ON THE VENT DAMPERS RECENTLY FITTED IN THE MACHINE SPACE VENTS FOR THE FIXED FIRE EXTINGUISHING SYSTEM. SUBMIT PLANS FOR THE INSTALLATION.
Condition: Unknown
Due 5 February 1996
Resolved 5 February 1996
Engineering
Issued 5 February 1996 Resolved
INSTALL CHAFFING GEAR ON MAIN ENGINE FLEXIBLE FUEL PIPING NEAR ENGINE FOUNDATIONS.
Condition: Unknown
Due 5 February 1996
Resolved 5 February 1996
Lifesaving
Issued 5 February 1996 Resolved
MARK ALL CHILD PFDS W/ VESSEL'S NAME.
Condition: Unknown
Due 5 February 1996
Resolved 5 February 1996
Electrical
Issued 3 February 1995 Resolved
REPAIR/REPLACE SHORE TIE CONNECTION. N.B. SHORE TIE IS OUT OF SERVICE UNTIL REPAIRED._x001C_
Condition: Unknown
Due 3 February 1995
Resolved 3 February 1995
Construction/Loadline
Issued 3 February 1995 Resolved
CLOSE BOLT HOLES IN CABIN DECK AFT OF PORT LADDER.
Condition: Unknown
Due 3 February 1995
Resolved 3 February 1995
Lifesaving
Issued 3 February 1995 Resolved
MARK VSL NAME ON RING BUOYS.
Condition: Unknown
Due 3 February 1995
Resolved 3 February 1995
Lifesaving
Issued 3 February 1995 Resolved
LABEL STORAGE FOR CHILD PFD'S W/NO + SIZE.
Condition: Unknown
Due 3 February 1995
Resolved 3 February 1995
Lifesaving
Issued 3 February 1995 Resolved
PROVE PROPER OPERATION OF EPIRB.
Condition: Unknown
Due 3 February 1995
Resolved 3 February 1995
Lifesaving
Issued 4 February 1994 Resolved
PROVE OPERATION OF EPIRB.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Accommodation/Occupational Safety
Issued 4 February 1994 Resolved
REPAIR FRESH WATER PUMP.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 4 February 1994 Resolved
MAKE NECESSARY REPAIRS TO STBD INBOARD MDE TO CORRECT "WET STACK" CONDITIONAND ELIMANATE OIL DISCHARGE TO SEA.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Lifesaving
Issued 4 February 1994 Resolved
REPLACE 3 WORN RINGBUOYS.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Lifesaving
Issued 4 February 1994 Resolved
REPLACE OUTDATED HYDROSTATIC RELEASES ON RAFTS.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Lifesaving
Issued 4 February 1994 Resolved
REPAIR/REPLACE DAMAGED 10 PERSONS LIFE FLOAT.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 4 February 1994 Resolved
REPAIR PORT INBOARD MDE CLUTCH/ RED GEAR.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Documentation
Issued 4 February 1994 Resolved
PROVIDE VSL CALL SIGN/FCC CERTIFICATE (CONTACT FCC FOR APPLICABLE REGULATIONS)(VSL OWNED BY US GOV'T).
Condition: Unknown
Due 4 February 1994
Resolved 4 February 1994
Navigation
Issued 4 February 1994 Resolved
REPAIR UPPER RED SPECIAL PURPOSE 32PT LIGHT ON MAST.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 4 February 1994 Resolved
REPLACE/REPAIR RELIEF VALVE ON PORT AIR RECEIVER.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Deck/Cargo
Issued 18 February 1993 Resolved
PERFORM OPERATIONAL TEST OF ANCHOR WINDLASS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Construction/Loadline
Issued 18 February 1993 Resolved
REPAIR BROKEN WELD AT STBD CORNER OR STERN AT RAMP INDENT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Navigation
Issued 18 February 1993 Resolved
RAISE PORT AND STARBOARD SIDE LIGHTS TO TOP OF RAIL ON 0-1 DECK._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Lifesaving
Issued 18 February 1993 Resolved
PROVIDE THREE ORANGE AND SIX RED DISTRESS FLARES._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Engineering
Issued 18 February 1993 Resolved
REPAIR EXHAUST LEAK AT MUFFLER FLANGE IN PORT INBOARD MAIN ENGINE EXHAUST LINE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Construction/Loadline
Issued 16 July 1992 Resolved
CLEAN OIL FROM ENGINE SPACE BILGES.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Construction/Loadline
Issued 16 July 1992 Resolved
PROVIDE A PLAN FOR ELIMINATION OF ELECTROLYSIS IN VESSELS FIRE AND BILGE PIPING SYSTEM.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Construction/Loadline
Issued 16 July 1992 Resolved
MAKE PERMANENT REPAIRS TO BILGE DISCHARGE PIPING.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Lifesaving
Issued 19 February 1992 Resolved
LIFERAFTS AND HYDROSTATIC RELEASES ARE TO BE INSPECTED AT APPROVED INSPECTION FACILITY. RAFTS ARE TO BE INSPECTED IN PRESENCE OF CG INSPECTOR.
Condition: Unknown
Due 19 February 1992
Resolved 19 February 1992
Engineering
Issued 19 February 1992 Resolved
PERFORM HYDROSTATIC TEST OF TWO AIR RECEIVERS AT 1 1/2 MAWP. TEST TO BE PERFORMED IN PRESENCE OF CG INSPECTOR.
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Lifesaving
Issued 19 February 1992 Resolved
RENEW BATTERIES IN ALL WATER LIGHTS.
Condition: Unknown
Due 19 February 1992
Resolved 19 February 1992
Engineering
Issued 25 February 1991 Resolved
PROVE PROPER OPERATION OF THE PORTSIED INBOARD MDE.
Condition: Unknown
Due 25 February 1991
Resolved 25 February 1991
Unknown
Issued 7 November 1990 Resolved
PROVIDE FLAME SCREENS ON ALL FUEL OIL TANK VENTS WITH 30 X 30 MESH SCREENS.
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Construction/Loadline
Issued 7 November 1990 Resolved
CROP AND RENEW SECTION OF SHEAR STRAKE JUST BELOW GUNNEL PORTSIDE APPROX. 18" X 18" WITH RADIUS CORNER.
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Construction/Loadline
Issued 7 November 1990 Resolved
CROP AND RENEW SECTION ON PUNCTURE HOLE PORTSIDE AFTER 3RD FRAME WITH APROX. 8" CIRCLE.
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Accommodation/Occupational Safety
Issued 2 March 1990 Resolved
PROVIDE ADEQUATE VENTILATION EXTENDING TO LOWER AREA OF ENGINEROOM AS REQUIRED BY 46CFR182.20-45
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990

Casualty record · 11

15 June 2006Routine · role: Involved in a Marine Casualty · activity 2686909
4 September 2006Routine · role: Involved in a Marine Casualty · activity 2769835
20 March 2008Routine · role: Involved in a Marine Casualty · activity 3170854
21 November 2008Routine · role: Involved in a Marine Casualty · activity 3422951
29 October 2009Routine · role: Involved in a Marine Casualty · activity 3632709
3 November 2009Routine · role: Involved in a Marine Casualty · activity 3632772
15 November 2009Routine · role: Involved in a Marine Casualty · activity 3634644
28 January 2013Routine · role: Involved in a Marine Casualty · activity 4545179
7 May 2014Routine · role: Involved in a Marine Casualty · activity 4892223
19 September 2019Routine · role: Involved in a Marine Casualty · activity 6820631
28 November 2025Routine · role: Involved in a Marine Casualty · activity 8275731
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.