MAURY USCG vessel records Sign in
← All vessels

SPIRIT OF PHILADELPHIA

SPIRIT OF PHILADELPHIA is a 1989 passenger vessel (inspected). The Coast Guard has recorded 97 inspections since 1989, most recently in August 2026, along with 122 deficiencies and 17 casualty investigations between 2009 and 2025.

Records from 1989 to 2026. Most recent: inspection, 5 August 2026.

Built
1989
Last inspected
5 August 2026
Documentation
Case Pending · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDD4763
322995
Flag
UNITED STATES
367148710
Maury page id
psix-322995

Inspections, by type

…with no type recorded25
Years with a record 36 calendar years (1989–2026)
The 97 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)156.7 ft × 35.0 ft × 7.1 ft
Registered tonnagegross 94 / net 64
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBLOUNT MARINE CORPORATION · WARREN, RI, UNITED STATES · built 1989
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPHILADELPHIA, PA
Trade endorsementsCoastwise, unrestricted
DocumentationCase Pending · issued 15 December 2025 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it94 - Regulatory (Subpart C or D), Gross Ton
64 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDD4763MMSI 367148710 · active · compulsorily equipped · granted 13 August 2026, expires 3 November 2036
WAA5488MMSI 366955570 · expired · compulsorily equipped · granted 11 June 2004, cancelled 16 August 2014
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 97

5 August 2026 Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8456649
21 July 2026 Vessel Attendance
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8443438
18 March 2026 Administrative Inspection · MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8304858
22 September 2025 Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8238733
26 February 2025 Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8084823
26 January 2025 Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8069893
26 January 2025 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8085013
23 December 2024 Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8050399
18 December 2024 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8083821
13 December 2024 Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8047287
2 December 2024 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8041911
2 June 2024 Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7924926
13 March 2024 Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7877676
28 February 2024 Plan Review (Other than "T") · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7871503
17 January 2024 Hull Examination · Deficiency Check · Internal Structural Exam · Construction Oversight
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7847076
18 August 2023 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7771369
15 May 2023 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7688774
8 March 2023 Annual Inspection · Administrative Inspection · Deficiency Check · MTSA Verification · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7646378
15 September 2022 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7548894
26 January 2022 MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7371605
24 March 2021 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7162278
4 March 2020 Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6919546
10 August 2019 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6791301
12 July 2019 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6747373
3 May 2019 Internal Structural Exam · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6606985
1 May 2019 Annual Inspection · Deficiency Check · Administrative Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6674551
9 August 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6505609
28 February 2018 Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6362757
19 November 2017 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6350801
13 November 2017 Plan Review (Other than "T")
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6316497
9 August 2017 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6235016
19 June 2017 Damage Survey · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6180767
17 June 2017 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6194105
13 June 2017 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6294988
31 January 2017 Administrative Inspection · COI Inspection · DAPI Audit · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6080555
16 February 2016 Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5834199
16 May 2014 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4873224
31 January 2012 MTSA Verification · DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4235103
31 January 2012 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4235147
2 December 2011 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4202845
7 February 2011 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3940414
13 January 2011 Construction Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3928233
30 November 2010 MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3901411
12 October 2010 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3868207
20 September 2010 Examination of Repairs · Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3854079
16 September 2010 Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3851491
4 March 2010 Deadweight Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3690013
28 January 2010 Annual Inspection · In-Service Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3671275
7 January 2009 Drydock Exam · Deficiency Check · Examination of Repairs
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3390238
7 January 2009 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3390393
1 January 2009 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3389047
23 September 2008 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3325329
26 February 2008 Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3153297
23 January 2008 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3135094
1 February 2007 MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2865520
15 September 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2778824
7 March 2006 Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2596987
6 March 2005 Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2406405
3 March 2004 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2017057
7 January 2004 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1977384
16 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1968364
10 March 2003 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1772229
27 February 2002 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1489670
28 February 2001 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1058337
1 March 2000 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 815804
1 March 1999 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 799293
21 January 1999 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1410012
4 September 1998 Damage Survey
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 797400
17 July 1998 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 109442
9 March 1998 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1122471
18 May 1997 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 81361
10 March 1997 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1099036
6 March 1997 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1096517
7 March 1996 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 884570
11 April 1995 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 667819
28 March 1995 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 871536
25 March 1995 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 225555
26 July 1994 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 667820
22 July 1994 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 131874
24 March 1994 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 856176
2 March 1994 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1457157
2 September 1993 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1138003
3 August 1993 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1154929
30 March 1993 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1387312
27 March 1993 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 46104
27 March 1993 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 140421
24 March 1993 Deficiency Check · COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 835938
27 March 1992 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1262093
10 May 1991 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1236086
27 March 1991 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1217965
25 May 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 915444
10 April 1990 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1223047
23 January 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 933434
14 June 1989 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1345429
10 June 1989 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1349265
15 May 1989 Initial Certification · Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1349214
1 January 1989 Initial Construction-Excluding Oversight
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1196729

Deficiency record · 122

14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 18 March 2026 Resolved
A vessel with installed toilet facilities must have a marine sanitation device that complies with 33 CFR part 159. MI observed a small pinhole in the main sanitation pipe that allowed residual sewage in bilge. Operator is to supply a repair proposal to OCMI, if a temporary repair clamp is used the Operator shall ensure a permanent repair is proposed prior to next drydock. Permanent repair shall be made in sufficient time with approved proposal, final inspection of pipe shall be made to satisfaction of attending MI. Vessel shall not carry passengers until a temp repair has been completed iaw the OCMI approved repair proposal.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 March 2026
Resolution: Temp repairs were made.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 March 2026 Resolved
A vessel more than 65 feet in length must carry a minimum of 3 ife buoys, each life buoy must follow; iaw Sub-chapter Q 160,050; line around life buoy must not be permanently attached and a corrosion resistant clip around waterlight attached to life buoy. MI noticed 01 life ring buoy with waterlight did not have lanyard attached with corrosion resistant clip. Operator is to make repairs to life buoy to satisfaction of MI.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 April 2026
Resolved 20 March 2026
Resolution: Corrosion resistant clip was added to life ring.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 March 2026 Resolved
Electrical equipment on a vessel must be installed and maintained to: provide services necessary for safety under normal and emergency conditions: MI observed equipment in the lazarette space that is no longer being used. Operator is to remove or tag out equipment in space to comply with regs.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 April 2026
Resolved 31 March 2026
Resolution: Received phots of compressor removed from space
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 March 2026 Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect crew, other persons, and the vessel from electrical hazards. MI observed that a receptacle was not attached to bulkhead and free-floating in the lazarette space. Operator shall attach receptacle to ensure it is not free-floating to satisfaction of MI.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 April 2026
Resolved 31 March 2026
Resolution: Removed outlet completely.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 18 March 2026 Resolved
New installations of fire protection equipment on an existing vessel, which are completed to the satisfaction of the OCMI on or after March 11, 1996 must comply with regulations of this part. Vessel had new fire-fighting panel and equipment installed. The new fire panel was tested and operational. MI observed the old fire alarm in pilothouse still had power. Operator shall remove or secure and tag-out the old fire panel to satisfaction on attending MI.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 April 2026
Resolved 6 April 2026
Resolution: Verified fire detection from old alarm was removed and met satisfaction of MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 January 2025 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of hull in which it is installed and capable of operating at constant marine load; Port engine starved of fuel, causing temporary loss of power/ propulsion. Vessel restricted prior to movement pending attendance from marine inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 28 January 2025
Resolution: Verified operational propulsion system, cleared def accordingly.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 December 2024 Resolved
(a) Fire hazards to be minimized. The general construction of the vessel must be such as to minimize fire hazards insofar as it is reasonable and practicable. Vessel had moving blankets stuffed into the ventilation of the steering room and other compartments to keep the spaces warm so the pipes didn't freeze. When the blanket fell or was placed on the exhaust by a contractor from a previous installation, the hot dry exhaust pipe caught the blanket fire. Vessel is restricted prior to movement until a damage survey can be completed by the attending marine inspector. 46 CFR 116.405 (a) 60C
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 December 2024
Resolution: No major damage was found
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 13 December 2024 Resolved
(b) At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. MI observed excessive 5 gallon buckets of oil and excessive # of oil absorbent pads in the engine room. Vessel is restricted prior to movement until the fire hazards have been removed. 46 CFR 115.830 (b) 60C
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 December 2024
Resolution: Oil and absorbents were removed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 February 2024 Resolved
Provide approval letter from Marine Safety Center for Fixed Fire Detection System.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 March 2024
Resolved 28 February 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 February 2024 Resolved
Provide approval letter from Marine Safety Center for Fire Detection System.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 March 2024
Resolved 28 February 2024
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 17 January 2024 Resolved
Grind out clad weld in bow thruster tunnel. Provide UT shots on the ring.
Action required: 705 - Other - as specified
Resolved 22 February 2024
Resolution: UT shots were acceptable. Installed new stainless steel sacrificial ring in bow thruster tunnel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 August 2023 Resolved
Auxiliary machinery. All machinery necessary to the routine operation of the vessel shall be checked. The stbd generator lube oil pressure switch was leaking oil. Vessel is to operate on the port generator only until the switch can be renewed. In the event it becomes necessary to operate the stbd generator the master shall notify the CG Sec Del Bay Command Center immediately.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 September 2023
Resolved 23 August 2023
Resolution: Switch was renewed. Operational test witnessed, all sat.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 8 March 2023 Resolved
The marine employer shall ensure that all individuals engaged or employed on board a vessel are fully indoctrinated in the requirements of this subpart, and that appropriate vessel personnel are trained as necessary in the practical applications of these requirements. Vsl recently transitioned to a new consortium for their DAPI program but was unable to provide enrolment documentation. Vsl was able to provide us the MIS report from 2021 and are waiting for the 2022 report. New consortium started February 01 2023.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2023
Resolved 7 April 2023
Resolution: Conducted DAPI audit IAW Chemical Testing Program Compliance Audit form, vsl was found in compliance.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 March 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Notice unauthorized power strip surge protector was being utilized in the pilot house.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 March 2023
Resolved 17 March 2023
Resolution: Vsl provided objective evidence of an approved receptacle outlet installed.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 8 March 2023 Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 150 degrees F must be insulated where necessary to prevent injuries. Lagging on the Port engine and the STBD generator are deteriorated.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 March 2023
Resolved 17 March 2023
Resolution: Vsl provided objective evidence of areas where lagging was addressed with heat resistant wrap. Vsl ordered new blankets and flange covers, invoice provided as objective evidence as well.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 8 March 2023 Resolved
Penetrations in A-Class fire control boundaries for electrical cables, pipes, trunks, ducts, etc. must be constructed to prevent the passage of flame and smoke for one hour. Cable and wire run in the galley penetrating the ceiling does not prevent the passage of flame or smoke.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 March 2023
Resolved 17 March 2023
Resolution: Vsl provided objective evidence of approved fire stop putty and sealant from STI Marine was used.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 8 March 2023 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. Various first aid kits had expired contents.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 March 2023
Resolved 17 March 2023
Resolution: Vsl provided objective evidence of discarding expired items in the first aid kit and replacing with in kind.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 8 March 2023 Resolved
A door in a bulkhead required to be A-60, A-30, or A-15 Class must be of hollow steel or equivalent material construction, solidly filled with approved structural insulation, and capable of meeting the requirements of an A-15 Class bulkhead. Noticed that the double swinging doors from the galley (A-Class boundary) into a accommodation space was not a rated boundary door that was noted in Vessels structural fire protection plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2023
Resolved 30 November 2023
Resolution: Attend vessel and witnessed proper install and operation of new A-15 fire doors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 January 2022 Resolved
No major repairs or alterations shall be made without the knowledge and approval of the [name withheld] thruster's rudder feedback linkage had rope lashing to prevent the worn ball joint from disconnecting. Replace worn ball joint. 46 CFR 176.20-1(a).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 February 2022
Resolved 2 February 2022
Resolution: Replaced in kind, video sent showing full range working range with no issues.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 26 January 2022 Resolved
at re inspection the marine inspector shall require that all unsafe practices and hazardous situations be corrected. Exhaust hood above the dish washer had excessive accumulation. Clean ventilation above dishwater. 46 CFR 176.25-50.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2022
Resolved 31 January 2022
Resolution: Exhaust hood cleaned
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 May 2021 Resolved
02 light fixtures in pilothouse have exposed lamps. Provide suitable lens for fixture or alternatively replace fixture if lens is not available.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2021
Resolved 25 May 2021
Resolution: Lens provided and fitted for each fixture.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 May 2021 Resolved
Life buoy was found with wasted grab lines. Replace in kind with life buoy approved under 160.050.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2021
Resolved 25 May 2021
Resolution: Life buoy replaced.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 7 May 2021 Resolved
Fire detection system requires servicing. Have fire panel inspected and serviced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2021
Resolved 11 June 2021
Resolution: 01 detector replaced and 01 end of line resistor replaced. Attending inspector witnessed full function of system.
09 - Working and Living Conditions › 091 - Living Conditions › Cleanliness
Issued 7 May 2021 Resolved
Galley fans and vents require cleaning of foreign matter for cleanliness and fire hazard. Clean fans and vents.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2021
Resolved 25 May 2021
Resolution: Vents and fans cleaned.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 7 May 2021 Resolved
Tank space exit is not labeled. Label on both sides in clearly legible letters at least 2 inches high: “EMERGENCY EXIT, KEEP CLEAR”
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2021
Resolved 25 May 2021
Resolution: Labeling put in place.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018 Resolved
Vsl is broadcasting: Incorrect NAME.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 6 November 2018
Resolution: AIS information updated.
Engineering › Pressure Vessel › Relief Valve
Issued 28 February 2018 Resolved
Make air reciever available for hydrostatic testing and make arrangements for testing of air relief valve to the satisfaction of attending marine inspector. 46 CFR "Old T" 182.10-5(d)
Action required: 705 - Other - as specified
Due 28 March 2018
Resolved 19 March 2018
Resolution: Air receiver had satisfactory internal inspection in 2015 by USCG MI, hydro not required. New relief valve installed, witness operation, lifted at 136 psi.
Engineering › Fuel Oil Service System › Hose
Issued 28 February 2018 Resolved
Install chaffe gear on main engine flex hose as discussed. Replace damaged flex hose on starboard engine. 46 CFR 115.800(a)
Action required: 705 - Other - as specified
Due 28 March 2018
Resolved 19 March 2018
Resolution: New hoses (J1942) installed and chaffe gear installed.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 28 February 2018 Resolved
Investigate location of exhaust leak in muffler void and repair as necessary. 46 CFR "Old T" 182 20-20
Action required: 705 - Other - as specified
Due 28 March 2018
Resolved 3 May 2019
Resolution: Exhaust muffler replaced during drydock. Witnessed operation underway. All sat.
Electrical › Electric Supply System (service) › Cable
Issued 19 June 2017 Resolved
EKO01: Submit electrical load analysis for port and starboard generators for review by USCG Marine Inspector. Prior to Carrying Passengers Underway.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 10 July 2017
Resolution: Cleared in Person by [name withheld]
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 19 June 2017 Resolved
EKO02: Develop and submit repair proposal for damaged legs on port generator for review by USCG Marine Inspector. Prior to Carrying Passengers Underway.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 10 July 2017
Resolution: Cleared in person by [name withheld].
Electrical › Electric Generation Source (service) › Generator Cable
Issued 19 June 2017 Resolved
ML01: Develop and submit to satisfaction of CGMI, load sharing policy for vessel when operating with 3 compressors to operate 1/both gensets to prevent further loss of power incidents.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 10 July 2017
Resolution: Cleared in person by [name withheld]
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 16 March 2016 Resolved
Repair water tight door indicator for the pumproom watertight door.
Action required: 705 - Other - as specified
Due 30 March 2016
Resolved 30 March 2016
Resolution: Verified proper operation onboard.
Engineering › Fuel Oil Service System › Gauge
Issued 16 March 2016 Resolved
Make port fule tank sight glass availalbe for inspection.
Action required: 705 - Other - as specified
Due 30 March 2016
Resolved 30 March 2016
Resolution: Vessel installed new sightglass.
Engineering › Compressed Air System (control) › Valve
Issued 16 March 2016 Resolved
Prove proper function of ER air reciever relief valve.
Action required: 705 - Other - as specified
Due 16 April 2016
Resolved 4 May 2016
Resolution: New safety relief valve was purchased and installed.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 16 March 2016 Resolved
Properly lable circuit breaker on vent panel outside ER and port side 2nd deck (GFCI breakers)
Action required: 705 - Other - as specified
Due 16 April 2016
Resolved 30 March 2016
Resolution: All breakers properly labeled.
Documentation › Logs/Records › Logbook (official)
Issued 16 February 2012 Resolved
Current logbook does not reflect crew training. Maintain a current training log. 46 CFR 122.420
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 1 March 2012
Resolution: 2. Reviewed VSL''''''''s current training logs; all logs and drills were documented and up to date for crew. Cleared 835
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 16 February 2012 Resolved
Vessl found with no EAP displays, contact info or training. Comply with EAP requirements as per DAPI Program. 46 CFR 16.401
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 1 March 2012
Resolution: VSL distributed EAP information, displayed program numbers in public crew member places, and conducted and logged 1 hour training with rep and crew. Cleared 835.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 16 February 2012 Resolved
Repair 4 emergency lighting fixture found not working. 46 CFR 120.432
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 1 March 2012
Resolution: 4. The 4 not working emergency lighting was repaired, cleared 835.
Electrical › Lighting (service) › Lighting Fixture
Issued 16 February 2012 Resolved
Repair Deck lighting on port side fantail. 46 CFR 120.410
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 1 March 2012
Resolution: 3. Deck lighting portside fantail repaired, cleared 835.
Engineering › Compressed Air System (control) › Valve
Issued 3 February 2012 Resolved
while conducting test, relief failed. temp replacement valve was installed (1/2"). 835 issued till corrrect 3/4" valve could be installed. due date 07FEB12.
Action required: 705 - Other - as specified
Due 7 February 2012
Resolved 7 February 2012
Resolution: tested replacement (new) 3/4 150 PSI relief valve, SAT cleared 835
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 1 February 2012 Resolved
Hydro test of pressure vessel required prior to use.
Action required: 705 - Other - as specified
Resolved 3 February 2012
Resolution: hydro test conducted on UPV, all SAT
Electrical › Lighting (service) › Lighting Fixture
Issued 17 May 2011 Resolved
Provide complete list of all lights used in January 2011 renovation and prove proper UL testing standard IAW 46CFR120.410 in 14 days.
Action required: 705 - Other - as specified
Resolved 22 December 2011
Resolution: light list was provided and confirmed that the lights used were correct.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 24 March 2011 Resolved
new fire and evacuation plans were still being constructed, old ones are still hung in exit locations. Rep needed 3 weeks to have them made, issued (01) 835 item to re-write plans to attending marine inspector by 14 April 2011.
Action required: 705 - Other - as specified
Due 29 April 2011
Resolved 29 April 2011
Resolution: posted new plans, corrected. all SAT
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 19 March 2011 Resolved
Vessel restricted from carrying passengers on main deck. Passenger count on upper decks to be in accordance with stability letter. Following complete set-up of main deck, it shall be verified by a marine inspector.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 24 March 2011
Resolution: Completed deck set-up and policed up all gear, safety gear in place ready to carry passengers.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 18 March 2011 Resolved
Label emergency escape hatch for E/R, galley store, and pump room "Emergency Escape Hatch Keep Clear".
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 March 2011
Resolution: Escape hatches properly labeled.
Fire Fighting › Means of Escape › Emergency Lighting
Issued 18 March 2011 Resolved
Label emergency lighting.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 March 2011
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 18 March 2011 Resolved
Replace first aid kit at Man Overboard Station.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 March 2011
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 13 January 2011 Resolved
Issued 835 not to carry passengers till inspection of all repairs, renovations, and safety gear inspected by attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 March 2011
Resolution: Fire load and safety labels, placards, egress routes, signage, etc verified.
Construction/Loadline › Penetrations › Pipe Flange
Issued 23 September 2010 Resolved
while onboard inspecting section of pipe repaired from sea chest to valve in sewage system, noted another section of pipe wasted and leaking just after valve, 835 issued not to operate sewage system and keep valve closed until piping cropped out and renewed to original condition.
Action required: 705 - Other - as specified
Resolved 23 September 2010
Resolution: New piece of pipe installed, system visually inspected. All SAT.
Construction/Loadline › Hull › Bottom Plating
Issued 20 September 2010 Resolved
Provide plan proposal for repairs to crack to the reinforcing ring for the port rudder trunk.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 September 2010
Resolution: General Shipyard provided a satisfactory proposal for the repairs to the port rudder trunk.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 20 September 2010 Resolved
Provide plan proposal to renew two sections of keel cooler on the starboard side.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 September 2010
Resolution: General Shipyard provided an adequate plan to replace the keel cooler piping to the starboard side.
Construction/Loadline › Penetrations › Weld
Issued 16 September 2010 Resolved
Not to sail untill proper repair proposal provided to Coast Guard
Action required: 705 - Other - as specified
Resolved 12 October 2010
Resolution: repairs completed, all repairs attested to by CG Marine Inspectors.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 September 2010 Resolved
provide proper wiring and junction boxes for refer compressors in lazzarett in 30 days
Action required: 705 - Other - as specified
Due 12 October 2010
Resolved 12 October 2010
Resolution: attended vessel, refer compressor in lazarett was removed completely, cleared 835.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 28 January 2010 Resolved
Replace open blank breaker #25 in galley electrical panel.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 March 2010
Resolved 2 March 2010
Resolution: Saw breaker #25 in the galley electrical panel blanked properly, cleared 835
Electrical › Electrical Distribution System (service) › Junction Box
Issued 28 January 2010 Resolved
In line / anchor locker, enclose 110V wires in approved junction box.
Action required: 705 - Other - as specified
Due 3 March 2010
Resolved 2 March 2010
Resolution: proper enclosure for electrical connections in anchor / line locker on the bow, and cleared 835.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 28 January 2010 Resolved
Provide plan to replace worn and faded life jacket retro on life jackets onboard.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 May 2010
Resolved 3 August 2010
Resolution: 03AUG2010: RCV E-mail from [name withheld] OF PHILADELPHIA stating they had finished replacing all the retro on the life jackets, attended vsl and spot checked several locations, all retro replaced, all SAT cleared 835.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 28 January 2010 Resolved
Install cover on engine room ventilation fan junction box.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 March 2010
Resolved 2 March 2010
Resolution: engine room fan electrical box properly enclosed, cleared 835
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 28 January 2010 Resolved
Provide prove of enrollment in current drug and alcohol program.
Action required: 705 - Other - as specified
Due 3 March 2010
Resolved 5 March 2010
Resolution: REC via E-MAIL proper enrollment of current drug program.
Electrical › Electric Generation Source (service) › Generator
Issued 28 January 2010 Resolved
Prove proper operation of port SSDG, engine motor mount needs to be repaired and appears to have an exhaust leak.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 26 April 2010
Resolution: witnessed operation of generator with no exhaust leaks. Engine motor mount was replaced.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 28 January 2010 Resolved
Repair or replace outlet in galley aft side of sink.
Action required: 705 - Other - as specified
Due 3 March 2010
Resolved 2 March 2010
Resolution: properly enclosed electrical outlet near sink in galley, cleared 835.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 28 January 2010 Resolved
Galley fire door needs to be replaced or repaired IAW manufactures specification.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 March 2010
Resolved 23 April 2010
Resolution: Replaced galley fire door, witnessed SAT test.
Stability › Incline Test › General
Issued 28 January 2010 Resolved
Vessel's passenger count restricted to 270 passengers and 10 crew untill marine surveyor conducts dead weight survey / incline test to ensure vessel is in compliance with all applicable regulations.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 18 March 2010
Resolution: New Stability Letter issued.
Construction/Loadline › Structures › Deck Plating
Issued 7 January 2009 Resolved
Repair two 1' x 3' holes in deck under the refers in galley.
Due 19 January 2009
Resolved 13 January 2009
Resolution: Vessel rep investigated further and found those openings were for a ventilation system.
Construction/Loadline › Hull › Hull Plating
Issued 7 January 2009 Resolved
Provide UT of Grey water tank area and sewage tank.
Due 19 January 2009
Resolved 13 January 2009
Resolution: UTs were taken of area with no thin areas noted.
Construction/Loadline › Hull › Hull Plating
Issued 7 January 2009 Resolved
Provide UT to marked areas on the hull.
Due 19 January 2009
Resolved 13 January 2009
Resolution: UTs were taken of area with no thin areas noted.
Electrical › Lighting (service) › Lighting Feeder
Issued 7 January 2009 Resolved
Permanently seal wires in laz.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Vessel provided new stuffing tbes for wires.
Electrical › Lighting (service) › Lighting Fixture
Issued 7 January 2009 Resolved
Replace lens cover for light in laz.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Replaced lens cover.
Accommodation/Occupational Safety › Potable Water System › General
Issued 7 January 2009 Resolved
Crop out/ renew hot water piping on h/w heater outlet.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Piping renewed with new steel piping and fittings.
Construction/Loadline › Penetrations › Weld
Issued 7 January 2009 Resolved
Repair stanchions for hydraulic lines.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Stanchions were repaired and welded to pipes for support.
Accommodation/Occupational Safety › Potable Water System › General
Issued 7 January 2009 Resolved
Replace 45 degree fitting in muffler compt.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Fitting replaced with new steel fitting.
Accommodation/Occupational Safety › Potable Water System › General
Issued 7 January 2009 Resolved
Replace identified piping in muffler compt.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Piping replaced with new steel fitting.
Accommodation/Occupational Safety › Potable Water System › General
Issued 7 January 2009 Resolved
Replace fitting on grease trap line in muffler compt
Due 19 January 2009
Resolved 27 January 2009
Resolution: Fitting replaced with new steel fitting.
Engineering › Steering Gear System › Piping
Issued 7 January 2009 Resolved
Replace 90 degree fitting in laz.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Fitting replaced with new steel fitting.
Engineering › Steering Gear System › Piping
Issued 7 January 2009 Resolved
Repair/replace coupling in laz.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Coupling replaced with new steel coupling.
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 7 January 2009 Resolved
Gas free sewage tank and make available for inspection.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Gas free test was completed by a certified Marine Chemist and inspected, sat.
Accommodation/Occupational Safety › Potable Water System › General
Issued 7 January 2009 Resolved
Open grey water tank, gas free, and make available for inspection.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Gas free test completed by a certified Marine Chemist and inspected for damage, none noted.
Construction/Loadline › Structures › Deck Plating
Issued 7 January 2009 Resolved
Provide repairs to holes in deck in laz.
Due 19 January 2009
Resolved 27 January 2009
Resolution: Repairs made by shipyard personnel.
Documentation › Certificates/Documents › FCC SSL
Issued 26 February 2008 Resolved
Vessel has a current FCC safety Certificate, but the call sign does not match the COI or FCC Station License. Vessel required to have a current Safety Certificate with the correct call sign.
Due 26 March 2008
Resolved 6 March 2008
Resolution: Received copy of current safety cert with correct call sign.
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 26 February 2008 Resolved
Vessel restricted from carrying passengers until it can be proven that a member of the crew has a valid FCC Marine Radio Operator Permit.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2008
Resolution: Company provided a faxed copy of a Secondary Capt. for the vessel with a valid radio operator licnese.
Operations/Management › Drills/Instruction › Not Conducted
Issued 22 February 2007 Resolved
Conduct Man Overboard Drill.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 February 2007
Resolution: Witnessed satisfactory man overboard drill.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 7 March 2006 Resolved
Prove service of fire extinguisher #12 & #10.
Action required: 705 - Other - as specified
Due 14 March 2006
Resolved 8 March 2006
Resolution: Witnessed service valid service tags on extinguishers.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 7 March 2006 Resolved
Repair emergency lighting in Men's head.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2006
Resolved 8 March 2006
Resolution: Witnessed satisfactory test & installation of new emergency lights.
Documentation › Certificates/Documents
Issued 3 March 2004 Resolved
Provide current FCC Safety Certificate. LEGACY COMPONENT DESC: FCC SSL
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 31 March 2004
Resolution: Provided Certificate.
Accommodation/Occupational Safety › Occupational Safety
Issued 3 March 2004 Resolved
Clean out 4th deck locker, remove extra paint.
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 31 March 2004
Resolution: Locker clean.
Electrical › Electric Supply System (service)
Issued 3 March 2004 Resolved
Remove extra wires in D.J's corner. LEGACY COMPONENT DESC: Cable
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 31 March 2004
Resolution: Wires removed.
Lifesaving › Lifebuoys
Issued 3 March 2004 Resolved
Replace retro tape on Life Rings. LEGACY COMPONENT DESC: Markings (ship name/port)
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 4 March 2004
Resolution: Replaced retro tape.
Electrical › Electric Supply System (service)
Issued 3 March 2004 Resolved
Replace phone box on port wing control station.
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 31 March 2004
Resolution: Replace phone box.
Electrical › Electric Supply System (service)
Issued 3 March 2004 Resolved
Beer system in aft steering mount junction box, replace switch cover and properly secure all components.
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 31 March 2004
Resolution: All components secure.
Engineering
Issued 3 March 2004 Resolved
Replace compressor cover in port side dry stores.
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 31 March 2004
Resolution: Compressor cover replaced.
Lifesaving › Lifejacket/PFD (Type I)
Issued 3 March 2004 Resolved
Provide 7 more life jackets. LEGACY COMPONENT DESC: Quantity
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 4 March 2004
Resolution: Provided life jackets.
Lifesaving › Lifebuoys
Issued 3 March 2004 Resolved
Replace Life ring on port side of pilot house.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 March 2004
Resolution: Provided lifering.
Construction/Loadline › Structures
Issued 3 March 2004 Resolved
Clean and properly coat deck behind the ovens in galley. LEGACY COMPONENT DESC: Deck Plating
Condition: Improper/Lack of Maintenance
Due 3 April 2004
Resolved 31 March 2004
Resolution: Deck cleaned and coated.
Electrical › Lighting (service)
Issued 10 March 2003 Resolved
Provide globe and cage above stbd steering pump in laz. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 10 April 2003
Resolution: Provided globe and cage.
Electrical › Electrical Distribution System (service)
Issued 10 March 2003 Resolved
Provide cover for keg cooler.
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 10 April 2003
Resolution: Provided cover.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 10 March 2003 Resolved
Adjust galley fire door to allow for complete closure.
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 10 April 2003
Resolution: Adjusted door.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 March 2003 Resolved
Provide diffuser for florescent lighting in galley.
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 10 April 2003
Resolution: Provided diffuser.
Engineering › Diesel Engine (propulsion-electric)
Issued 10 March 2003 Resolved
Remove excess oil from outboard generator (port).
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 10 April 2003
Resolution: Removed oil.
Engineering › Sea-water System (primary cooling) › Valve
Issued 10 March 2003 Resolved
Replace packing stbd raw water suction valve.
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 10 April 2003
Resolution: Replaced packing.
Electrical › Electric Generation Source (emergency)
Issued 10 March 2003 Resolved
Provide blocking for battery box.
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 10 April 2003
Resolution: Provided blocking.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 10 March 2003 Resolved
Install receptacle cover in DJ's box (main deck).
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 10 April 2003
Resolution: Installed cover.
Construction/Loadline
Issued 21 January 1999 Resolved
SUBMIT A WRITTEN PLAN TO PREVENT FURTHER HULL DETERIORATION.
Condition: Unknown
Due 21 January 1999
Resolved 21 January 1999
Construction/Loadline
Issued 21 January 1999 Resolved
REPAIR STABD SIDE SINK DRAIN IN MUFFLER ROOM.
Condition: Unknown
Due 21 January 1999
Resolved 21 January 1999
Construction/Loadline
Issued 4 September 1998 Resolved
PRIOR TO OPERATING WITH PASSENGERS ONBOARD, EFFECT TEMPORARY REPAIRS TO THEPIN HOLE LEAK IN WAY OF THE BOW THRUSTER PROPELLOR TUNNEL.
Condition: Unknown
Due 4 September 1998
Resolved 4 September 1998
Construction/Loadline
Issued 4 September 1998 Resolved
PRIOR TO CARRYING PASSENGERS AFTER 31JAN99, SUBMIT REPAIR PROPOSAL AND MAKEPERMANENT REPAIRS TO THE TEMPORAY PATCH IN WAY OF BOW PROPELLOR. THE ABOVETO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT [name withheld] 31JAN99.
Condition: Unknown
Due 4 September 1998
Resolved 4 September 1998
Construction/Loadline
Issued 4 September 1998 Resolved
PRIOR TO OPERATING THE BOW THRUSTER, PROVIDE A REPAIR PROPOSAL WITH APPROPRIATE SCANTLING AND GAUGING DOCUMENTATION TO THE OCMI FOR REVIEW. MAINTAIN CLOSE WATCH ON BILGE LEVELS AT ALL TIMES.
Condition: Unknown
Due 4 September 1998
Resolved 4 September 1998
Lifesaving
Issued 7 March 1996 Resolved
PROVIDE VESSEL WITH CREW TO CONDUCT UNDERWAY DRILLS.
Condition: Unknown
Due 15 March 1996
Resolved 18 March 1996
Engineering
Issued 7 March 1996 Resolved
DEMONSTRATE/TEST BOILER SHUTDOWNS OR PROVIDE SERVICING REPORT.
Condition: Unknown
Due 6 April 1996
Resolved 18 March 1996
Electrical
Issued 7 March 1996 Resolved
PROVIDE SERVICE REPORT ON #2 GENERATOR OVERSPEED SHUTDOWN, OR HAVE MARINE INSPECTOR WITNESS TEST.
Condition: Unknown
Due 6 April 1996
Resolved 15 April 1996
Navigation
Issued 7 March 1996 Resolved
DEMONSTRATE RELIEF VALVES IN ENGINE ROOM AND LAZARETTE.
Condition: Unknown
Due 7 March 1996
Resolved 7 March 1996
Lifesaving
Issued 24 March 1993 Resolved
PRIOR TO CARRYING PASSENGERS RENEW ONE (01) RING BUOY GRAB LINE
Condition: Unknown
Due 25 March 1993
Resolved 25 March 1993
Documentation
Issued 24 March 1993 Resolved
PROVIDE DOCUMENTATION OF COMPLIANCE WITH CHEMICAL DRUG TESTING PROCEDURES (CONDUCT CREWMEMBER/SUPERVISOR TRAINING) AS PER 46 CFR 16.401).
Condition: Unknown
Due 12 April 1993
Resolved 12 April 1993
Lifesaving
Issued 24 March 1993 Resolved
MAKE ACCESSIBLE THE ELECTRICAL CIRCUIT BREAKER PANELS LOCATED PORT FORWARD IN GALLEY STORES COMPARTMENT.
Condition: Unknown
Due 25 March 1993
Resolved 25 March 1993
Fire Fighting
Issued 27 March 1992 Resolved
DEMONSTRATE COMPLETE OPERATION OF THE VESSEL'S FIXED FIRE DETECTION SYSTEM.
Condition: Unknown
Due 3 April 1992
Resolved 22 April 1992
Lifesaving
Issued 27 March 1991 Resolved
THE LINE AROUND ONE LIFERING IS WORN AND FRAYED, AND REQUIRES REPLACEMENT._x001C__x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Accommodation/Occupational Safety
Issued 27 March 1991 Resolved
MACHINERY SPACE VENTILATION DAMPERS AT MAIN DECK LEVEL DO NOT SEAT_x001C_ PROPERLY. THE HOLD BACK CHAIN FALLS BETWEEN THE DAMPER AND THE DECK,_x001C_ PREVENTING PROPER CLOSURE WHEN THE EMERGENCY RELEASE IS PULLED.
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Lifesaving
Issued 27 March 1991 Resolved
PLACARDS MARKING LIFEJACKET STOWAGE ARE MISSING ON THE MAIN DECK FOR _x001C_ CHILDREN'S JACKETS AND SECOND DECK FOR ADULT JACKETS.
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Fire Fighting
Issued 10 April 1990 Resolved
DEMONSTRATE OPERATION OF THE AUTOMATIC FIRE DOOR, AMIDSHIPS, FROM MAIN DECKTO SECOND DECK.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Accommodation/Occupational Safety
Issued 10 April 1990 Resolved
MARK OR STENCIL THE REMOTE CONTROL SWITCH FOR THE FORCED VINTILATION FANS ON THE MAIN DECK IN WAY OF THE GALLEY, WHERE MISSING.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Documentation
Issued 10 April 1990 Resolved
PROVIDE A VALID MARINE RADIO OPERATOR'S LICENSE.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Unknown
Issued 10 June 1989 Resolved
THE SPIRIT OF PHILADELPHIA IS RESTRICTED TO THE WATERS OF THE DELAWARE RIVER AND ITS TRIBUTARIES NOT MORE THAN A MILE FROM SHORE BETWEEN REEDY POINT DELAWARE AND TRENTON, NJ UNDER REASONABLE OPERATING CONDITIONS UNTIL THE BOYANT APPARATUS COMPLIMENT MEETS THE REQUIREMENT OF 46CFR180-10-20.
Condition: Unknown
Due 10 June 1989
Resolved 10 June 1989
Unknown
Issued 10 June 1989 Resolved
PROVIDE REPAIRS IN WAY OF HEAVY WEATHER DAMAGE IN WAY OF STERN ANCHOR LIGHT MAST PRIOR TO NIGHT OPERATIONS.
Condition: Unknown
Due 10 June 1989
Resolved 10 June 1989

Casualty record · 17

1 January 2009Routine · role: Involved in a Marine Casualty · activity 3389047
18 April 2010Routine · role: Involved in a Marine Casualty · activity 3720242
26 March 2011Routine · role: Involved in a Marine Casualty · activity 3974171
14 April 2011Routine · role: Involved in a Marine Casualty · activity 3987044
2 December 2011Routine · role: Involved in a Marine Investigation (non-casualty) · 1 dead · activity 4202845
30 August 2013Routine · role: Involved in a Marine Casualty · 1 injured · activity 4745316
5 October 2013Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4738435
11 February 2014Routine · role: Involved in a Marine Casualty · activity 4797925
16 May 2014Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4873224
20 September 2014Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4990830
13 June 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6294988
17 June 2017Routine · role: Involved in a Marine Casualty · activity 6194105
9 August 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6235016
19 November 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6350801
10 August 2019Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6791301
18 December 2024Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 8083821
26 January 2025Routine · role: Involved in a Marine Casualty · activity 8085013
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.