Records from 2007 to 2023. Most recent: inspection, 15 May 2023.
Inspection history · 18
15 May 2023
COI Inspection · Construction Oversight · Internal Structural Exam · In-Service Inspection · Inclining Experiment · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7689106
10 May 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7683780
15 November 2022
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7571529
18 January 2022
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7382024
9 November 2021
Administrative Inspection · Examination of Repairs · Drydock Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7347893
19 August 2021
Examination of Repairs · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7294669
4 February 2021
Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7135996
14 January 2021
Examination of Repairs · Administrative Inspection · Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7125102
3 February 2020
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6901668
7 January 2020
Drydock Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6874676
6 May 2019
Administrative Inspection · Deficiency Check · Permit to Proceed · Examination of Repairs · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6678257
14 December 2018
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6597748
22 December 2017
Deficiency Check · Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6328017
28 November 2017
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6313957
24 October 2017
Administrative Inspection · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6294396
13 March 2017
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6103599
13 February 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6087190
11 April 2016
Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5847220
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 15 November 2022
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Emergency instructions not posted. Provide evidence of posted instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2022
Resolved 28 November 2022
Resolution: Received photo of mounted emergency instructions, see docs.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 15 November 2022
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. First aid kit expired. Provide proof of a valid first aid kit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2022
Resolved 5 December 2022
Resolution: Received photos of newly purchased first aid kit, see docs.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 15 November 2022
Resolved
At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create
a fire hazard, clog bilge pumping systems, or block emergency escapes. Excessive hazardous/flammable material found in forward compartment. Provide evidence of removed hazardous/flammable material or provide evidence of use and proper storage of items in an approved paint locker.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2022
Resolved 13 December 2022
Resolution: [name withheld] chose to remove all hazmat from the vessel. Received photos of all hazmat moved to his storage facility and photos of the now SAT storage space.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 November 2022
Resolved
Fuel lines must be annealed tubing of copper, nickel-copper, or copper-nickel having a minimum wall thickness of 0.9 millimeters (0.035 inch) except that:(i) Diesel fuel piping of other materials, such as seamless steel pipe or tubing, which provide equivalent safety may be used;(ii) Diesel fuel piping of aluminum is acceptable on aluminum hull vessels provided it is a minimum of Schedule 80 wall thickness; and(iii) when used, flexible hose must meet the requirements of § 182.720(e). Hose on generator of unapproved type and one hose on the main generator showing signs of wearing and needs replacement. Provide evidence of proper replacement with approved hoses.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2022
Resolved 17 November 2022
Resolution: Photos sent of sat hoses, see docs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 November 2022
Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). Unable to draw suction from voids 5 and 6. Provide evidence of functional bilge system prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 December 2022
Resolution: Videos of proper suction from voids 5 & 6 provided.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 November 2022
Resolved
Dead end wires are not permitted unless secured in a junction box. Provide evidence of proper stowage.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2022
Resolved 17 November 2022
Resolution: Received photos of dead end wires placed in junction box, see docs.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 20 January 2022
Resolved
Top deck not marked for Max Passengers. Maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 1 inch at the entranceway to that deck.
185.602(g)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 February 2022
Resolved 28 January 2022
Resolution: Labeled top deck for Max Passengers.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 January 2022
Resolved
Life jacket stowage area not labeled. Number and identification of items stowed inside and their sizes must be marked in clearly legible letters and numbers on each container for life jackets.
185.604(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 February 2022
Resolved 28 January 2022
Resolution: Labeled life jacket stowage area with number of Adult Life jackets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 February 2021
Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. The vessels generator experienced a casualty while conducting the inspection and was inoperable. Make generator operable and ready for inspection.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 February 2021
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 14 January 2021
Resolved
Stern light was inoperable, make operable and enclose exposed wires.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 19 February 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 February 2020
Resolved
Vessel's bilge system was inoperable in void spaces #2 and #4.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2020
Resolved 28 February 2020
Resolution: Vessel was able to take suction on bilge lines for void spaces #2 and #4.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 February 2020
Resolved
Vessels fuel vlave pull cable was not suffeciently attached.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2020
Resolved 28 February 2020
Resolution: Vessel better secured fuel shut off pull cable.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 February 2020
Resolved
Vessels port side nav light was inop.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 28 February 2020
Resolved 19 February 2020
Resolution: Vessel replaced bulb.
10 - Safety of Navigation › N/A - No Subsystem › Navigation records
Issued 19 February 2020
Resolved
Vessel was not logging pre-departure checks IAW 185.320
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2020
Resolved 6 April 2020
Resolution: Vessel sent in documentation showing pre departure checks being carried out.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 May 2019
Resolved
Main propulsion shaft broken.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2019
Resolution: Replace shaft and align. conducted sea trials.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 January 2019
Resolved
Main engine fuel shutoff valve at diesel tank was not stopping in the appropriate open and closed positions. Ensure stops for open and closed positions are functioning.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 24 January 2019
Resolved 15 January 2019
Resolution: Owner tighted valve operating handle so that it would hit the stops and only rotate 90 degrees.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 January 2019
Resolved
RAYCOR fuel filters on both the main engine and generator did not have appropriate flame shield and drain plug. Provide suitable flame shield and metallic drain plug.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 24 January 2019
Resolved 15 January 2019
Resolution: Owner provided photograph of newly installed flame shield and metallic drain plugs for both diesel engines.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 January 2019
Resolved
Fuel drain valve on diesel fuel tank is missing a drain plug. Provide metallic drain plug to prevent possible leaks.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 24 January 2019
Resolved 15 January 2019
Resolution: Owner provided metallic plug for fuel drain valve.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 January 2019
Resolved
Remove dead end wires on main engine, in generator room, and in fuel shutoff cabinet. Wire connections can be made or terminated in junction boxes or removed completely.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 January 2019
Resolved 15 January 2019
Resolution: Owner provide photograph showing that all dead end wires had been removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 10 January 2019
Resolved
Ammeter on switchboard was not properly functioning. Each generator over 50V must have a functioning voltmeteter and ammeter.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 January 2019
Resolved 22 January 2019
Resolution: Ammeter was shown to be in proper working order
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 10 January 2019
Resolved
Main engine exhaust was missing lagging to protect crew from hot piping.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 January 2019
Resolved 22 January 2019
Resolution: Owner provided photographs of newly installed exhaust lagging
Fire Fighting › Remote Fuel Shutoff › General
Issued 28 December 2017
Resolved
Fuel shut off valve for main engine does not shut all the way.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 January 2018
Resolution: New valve installed and tested.
Documentation › Certificates/Documents › Stability Letter
Issued 28 December 2017
Resolved
Needs valid stability letter onboard and posted.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 January 2018
Resolution: New stability letter was signed and delivered.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 28 December 2017
Resolved
Needs 17 additional PFD's to have enough for passenger count on COI.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: Life jackets were purchased and on board.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 28 December 2017
Resolved
Faded donning instructions and stowage lable on 2nd deck requires replacement.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: New donning instructions posted.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 28 December 2017
Resolved
Incorrect ring buoy light battery.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: Correct battery installed.
Engineering › Bilge Water Management System › Not Operational
Issued 28 December 2017
Resolved
A/C Pump room requires operational high water alarm.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: High water alarm repaired and working.
Engineering › Bilge Water Management System › Strainer
Issued 28 December 2017
Resolved
Wasted bilge suction basket in aft void requires replacement.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: New basket installed.
Engineering › Steering Gear System › Hydraulic Hose
Issued 28 December 2017
Resolved
Hydraulic line on steering system requires replacement due to worn and ripped outer shield. Must meet J-1942 hose type.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: New approved hose installed.
Documentation › Safety Management System › Emergency Drill/Exercise Programs
Issued 28 December 2017
Resolved
Post copy of emergency instructions in pilot house.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: Emergency instructions posted.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 28 December 2017
Resolved
Medical kit expired.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: New kit purchased.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 28 December 2017
Resolved
Master must complete DAPI supervisor training.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: DAPI supervisor training completed.
Communications › Radio Communications › VHF Radiotelephone
Issued 28 December 2017
Resolved
Radio requires MMSI and GPS for DSC.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: New radio purchased with GPS and MMIS number done.
Fire Fighting › Combustible Materials › Stowage
Issued 28 December 2017
Resolved
Clean engine room and remove PIG mats.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: Pig mats removed and engine room cleaned.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 28 December 2017
Resolved
Provide means to recover an unconscious survivor from the water.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 12 January 2018
Resolution: New way of removing PIW has been purchased and on board.
Communications › Radio Communications › VHF Radiotelephone
Issued 13 March 2017
Resolved
FCC license needs to be renewed.
Condition: Invalid
Action required: 705 - Other - as specified
Due 13 March 2017
Resolved 13 March 2017
Resolution: Application for FCC license was provided to MI.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 13 March 2017
Resolved
Alcohol test strips were out of date
Condition: Invalid
Action required: 705 - Other - as specified
Due 13 March 2017
Resolved 13 March 2017
Resolution: Alcohol test strips are ordered, vessel can meet the two hour requirement.
Stability › Intact Righting Energy › General
Issued 13 February 2017
Resolved
Waterballast was discovered during hull inspection, owner to remove water ballast and replace with led.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2017
Resolved 13 February 2017