Records from 2016 to 2026. Most recent: inspection, 11 June 2026.
Documentation record
Registered dimensions (L × B × D)73.8 ft × 20.0 ft × 2.8 ft
Registered tonnagegross 95 / net 87
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSKIPPERLINER/P. CALMENSON · LA CROSSE, WI, UNITED STATES · built 1989
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portMILWAUKEE, WI
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationValid · issued 6 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it95 - Regulatory (Subpart C or D), Gross Ton
87 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
11 June 2026
COI Inspection · Administrative Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 8404976
3 September 2025
Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 8225663
14 July 2025
In-Service Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 8174328
12 September 2024
Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 8001199
19 September 2023
Annual Inspection · In-Service Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7794871
13 January 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7623254
31 August 2022
Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7554404
26 May 2021
COI Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7208554
14 May 2020
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6953181
10 July 2018
DAPI Audit · Deficiency Check · Periodic Inspection · Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6491830
7 November 2017
Drydock Exam · Internal Structural Exam
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6303386
1 June 2017
Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6162888
14 June 2016
Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 5981288
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 11 June 2026
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. Inspect all spaces without working high water alarms before passengers embark and after passengers depart the vessel. Make proper repairs to ineffective high water alarms within 14 days.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 June 2026
Resolution: Operator showed proper operation of the high water alarm in compartment #1.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 3 September 2025
Resolved
A penetration in a watertight bulkhead must be watertight. Cable running through bulkhead is not watertight.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2025
Resolved 4 September 2025
Resolution: Installed caulk in penetrations
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 19 September 2023
Resolved
Ventilation damper/closure in pilothouse was unable to close. Prove proper operation of ventilation damper/closure
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 October 2023
Resolved 12 September 2024
Resolution: vessel installed new damper
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 13 January 2023
Resolved
Wasted and damaged structural members in fore peak and #2 void noted. Make permanent repairs to affected frames and associated members.
Action required: 10 - Deficiency Rectified
Due 10 August 2023
Resolved 3 August 2023
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 13 January 2023
Resolved
Wastage and corrosion noted on bottom plate, sideshell, and decks.
Crop and renew plating as identified port sideshell at waterline, port and stbd fwd deck interior in way of weather doors, and on stbd weather deck in way of stbd weather door, and bottom plate in way of #6 void
Action required: 17 - Rectify deficiencies prior to departure
Due 10 August 2023
Resolved 3 August 2023
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 May 2021
Resolved
Fire pump was not operable due to a broken fitting. Prove proper operation of fire pump.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2021
Resolved 3 June 2021
Resolution: Renewed sea suction valve.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 July 2018
Resolved
When the fuel tank fill flexible section is a nonconductor of electricity, the metallic sections of the fill pipe separated thereby must be joined by a conductor for protection against generation of a static charge when filling with fuel.
Due 1 August 2018
Resolved 31 July 2018
Communications › Alarms/Indicators › Bilge Alarm
Issued 7 November 2017
Resolved
Renew mounting bracket and float switch for bilge high level alarm in fore peak/thruster compartment.
Action required: 705 - Other - as specified
Due 31 March 2018
Resolved 31 July 2018
Engineering › Bilge Water Management System › Strainer
Issued 7 November 2017
Resolved
Renew bilge suction strainer for piping in compartment #2 (under pilot house)
Due 31 March 2018
Resolved 31 July 2018
Construction/Loadline › Structures › Transverse Bulkhead
Issued 7 November 2017
Resolved
Make openings watertight in subdivision bulkheads where previous penetrations exist (lifting eye screws etc)
Action required: 705 - Other - as specified
Due 31 March 2018
Resolved 15 March 2018
Construction/Loadline › Structures › Transverse Bulkhead
Issued 7 November 2017
Resolved
Complete weld in way of deck to subdivision bulkhead, forepeak to #2 compartment port side (under pilot house). Conduct watertight pressure test of weld.
Action required: 705 - Other - as specified
Due 31 March 2018
Resolved 15 March 2018
Construction/Loadline › Hull › Bottom Plating
Issued 7 November 2017
Resolved
Crop and renew bottom plate as orginal to good metal in way of fuel tank compartment,approximately 30 inches port and stbd outboard from keel and 6 ft fore and aft.
Due 31 March 2018
Resolved 11 June 2018
Stability › Intact Righting Energy › General
Issued 7 November 2017
Resolved
Position flotation material in compartments #2 & #8 as per approved installation plan in dwg 192-01 dated 4/25/12
Action required: 705 - Other - as specified
Due 31 March 2018
Resolved 31 July 2018
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 7 November 2017
Resolved
Renew (paint) draft marks forward and aft in accordance with 46 cfr 185.602(c)
Due 31 March 2018
Resolved 11 June 2018