Records from 1989 to 2026. Most recent: inspection, 12 August 2026.
Inspection history · 69
12 August 2026
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8461799
1 October 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8246911
5 July 2025
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8296449
1 May 2025
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8123159
14 May 2024
COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7911953
1 May 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7904754
2 October 2023
Drydock Exam · Administrative Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7801777
12 April 2023
In-Service Inspection · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7662388
4 May 2022
Administrative Inspection · Examination of Repairs · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7443631
26 March 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7419037
4 October 2021
Internal Structural Exam · Administrative Inspection · Drydock Exam · Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7371835
19 April 2021
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7178088
27 January 2020
DAPI Audit · In-Service Inspection · COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6893993
2 October 2019
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6826131
26 April 2019
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6670119
17 April 2019
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6664495
9 May 2018
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6409757
27 September 2017
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6275990
26 April 2017
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6132816
26 April 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5863087
10 September 2015
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5717657
24 June 2014
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 4898263
22 June 2014
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 4906076
6 March 2014
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 4811927
23 January 2012
DAPI Audit · Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 4230753
7 February 2011
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3940941
26 January 2011
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3933662
17 February 2010
Deficiency Check · Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3681069
18 March 2009
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3432222
1 September 2008
Hull Examination · Administrative Inspection · Drydock Exam
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3326218
3 March 2008
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3157486
26 January 2007
Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 2861632
23 October 2006
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 2806057
23 October 2006
Internal Structural Exam · Permit to Proceed · Hull Examination
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2806198
31 March 2006
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2613736
4 May 2005
Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2333104
13 April 2005
Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2340545
7 January 2004
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1977440
5 November 2003
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1942779
7 January 2003
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1733723
26 February 2002
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1489376
13 November 2001
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1465701
1 April 2001
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1467289
25 May 2000
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1424930
11 March 2000
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1430858
3 May 1999
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1437539
4 April 1998
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1426079
5 March 1998
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1463361
19 May 1997
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1099292
6 May 1997
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1390504
12 July 1996
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1090995
7 May 1996
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1385703
11 March 1996
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1400301
30 May 1995
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1186495
8 May 1995
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1398243
16 May 1994
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1387535
23 March 1994
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1374004
10 September 1993
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 831903
15 July 1993
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 842425
18 May 1993
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1151800
17 May 1993
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1151888
10 June 1992
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1258467
5 May 1992
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 60736
24 March 1992
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 944814
17 June 1991
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1352483
17 January 1991
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1226635
22 June 1990
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1214432
24 July 1989
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 898762
23 June 1989
COI Inspection · Hull Examination · Initial Construction-Excluding Oversight · Plan Review "T" Boat
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1208839
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 12 August 2026
Resolved
a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: A machinery space bilge... Bilge high level alarm in Engine Room compartment was not secured to the deck.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 August 2026
Resolved 12 August 2026
Resolution: High level alarm attached properly.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 August 2026
Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump outlet shall be fitted with a pressure gage. Fire pump did not have a gauge at the outlet.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2026
Resolved 13 August 2026
Resolution: Fire pump gauge installed.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 1 May 2025
Resolved
The following vessels must have on board a properly installed, operational Coast Guard type-approved AIS Class A device…A self-propelled vessel of 65 feet or more in length, engaged in commercial service. Vessel does not have AIS.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Installed AIS.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 1 May 2025
Resolved
Portable watertight containers for distress flares and smoke signals shall be of a bright color, and containers shall be clearly marked in legible contrasting letters at least 12.7 millimeters (0.5 inches) high: “DISTRESS SIGNALS”. Distress signals storage container is not properly labeled.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Properly labled container.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 1 May 2025
Resolved
Fuel filters fitted with bowls of other than steel construction must be approved by the Commandant and be protected from mechanical damage. Approval of bowls of other than steel construction will specify if a flame shield is required. Fuel filter on the generator was missing the flame protection bowl under the fuel filter glass.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Replaced fuel filter with metal spin on filter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 May 2025
Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a). L vessel (any number of passengers) over 65 feet 2 fixed power pumps, 50 gallons per minute. Vessel needs secondary pump.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Repaired bilge PTO and tested operation.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 1 May 2025
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Labeled valves with direction of operation.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 1 May 2025
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Emergency procedures need to be the most updated company version and posted in proper locations on vessel.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Emergency procedures updated.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 1 May 2025
Resolved
Waste receptacles. Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. Plastic trash cans need to be replaced with metal.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Plastic trash can replaced with metal.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 1 May 2025
Resolved
Each ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant. The arrangement of the retroreflective material applied after March 11, 1996, must be as specified by IMO Resolution A.658(16). Top side life buoy with light had wasted reflective tape.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Wasted reflective tape replaced.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 1 May 2025
Resolved
The owner, charterer, master or managing operator shall instruct each crew member, upon first being employed and prior to getting underway for the first time on a particular vessel and at least once every three months, as to the duties that the crew member is expected to perform in an emergency including, but not limited to, the emergency instructions listed on the emergency instruction placard required by § 185.510 of this part. Corrected on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 May 2025
Resolved 1 May 2025
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 1 May 2025
Resolved
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018 or other standard specified by the Commandant. The arrangement of the retroreflective material applied after March 11, 1996, must be as specified by IMO Resolution A.658(16) (incorporated by reference; see 46 CFR 175.600). Corrected on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 May 2025
Resolved 1 May 2025
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 1 May 2025
Resolved
The owner, managing operator, or a qualified servicing facility as applicable must conduct the following inspections and tests: (1) Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10. The bracket localed at the operating station needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Bracket replaced with new.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 1 May 2025
Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, as indicated by the vessel's stability letter, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 25 millimeters (1 inch) numbers and letters at the entranceway to that deck. Labeling missing on the starboard side of the upper deck.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Installed label for max persons on second deck.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 1 May 2025
Resolved
The pump outlet shall be fitted with a pressure gauge. The gauge at the fire pump was not operational.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 12 June 2025
Resolution: Gauge installed on fire pump.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 1 May 2025
Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 3 feet in length, but not more than 6 feet, securing the waterlight around the body of the ring life buoy. Corrected on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 May 2025
Resolved 1 May 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 May 2024
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual inspection within the periods specified in 176.500(b)(1) [annual inspection within 3 months before or after each anniversary date] and your Certificate of Inspection must be endorsed. Vessel is outside of three months window for Inspection and is not permitted to operate until annual inspection has been completed.
46 CFR 176.502
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 May 2024
Resolution: Renewal COI completed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 2 October 2023
Resolved
A hatch exposed to the weather must be watertight.
The aft weather deck hatch leading to steering gear needs to be watertight. Add proper gasket material and ensure hatch can be sealed when secured.
46 CFR 179.360(a)
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 October 2023
Resolved 17 May 2024
Resolution: sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 April 2023
Resolved
Exhaust piping shall be led to the point of escape with a minimum number or bends or elbows. It shall be gas tight throughout its length. MI identified exhaust leak in port side muffler. Replace with new.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2023
Resolved 28 April 2023
Resolution: Operator sent video evidence of new muffler satisfactoruly installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 May 2022
Resolved
Fuel leak on stbd and port engine. Clean and test to find fuel leak location.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 May 2022
Resolved 6 May 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 May 2022
Resolved
Oil leaks on port and stbd engines, clean excessive oil and test engines for oil leaks. Provide repair plan to the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2022
Resolved 6 May 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 May 2022
Resolved
Stbd exhuast is showing signs of water sipping through the muffler fiberglass. Space was filled with exhaust fumes while testing. Replace with new.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2022
Resolved 6 May 2022
Resolution: New Exhaust was installed
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 May 2022
Resolved
There are excess of cables with loose ends under the console. Remove all cable excess from under console.
Action required: 705 - Other - as specified
Due 4 June 2022
Resolved 14 May 2024
Resolution: All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 May 2022
Resolved
Remove all temporary extension cords and make permanent connections.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2022
Resolved 17 May 2024
Resolution: sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 May 2022
Resolved
Replace all missing and broken bilge strainers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2022
Resolved 18 May 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 May 2022
Resolved
Battery terminals were full of corrosion. Clean terminals and protect from future build up.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2022
Resolved 18 May 2022
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 4 May 2022
Resolved
Remove all corrosion from bilges and spaces. Clean and preserve all spaces.
Action required: 705 - Other - as specified
Due 4 June 2022
Resolved 17 May 2024
Resolution: Sat.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 26 March 2022
Resolved
Any vessel of at least 5 net tons engaging in coastwise trade must have a valid Certificate of Documentation. The vessel's Certificate of Documentation has expired. Renew Certificate of Documentation prior to the carriage of passengers.
46CFR176.502
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 April 2022
Resolution: Operator sent proof of certified copy of COD.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 19 April 2021
Resolved
Found extensive deck plate corrosion on 2nd deck around concession stand. Provide repair proposal.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2021
Resolution: Vessel approved to install 1/4" aluminum doubler plate over existing deck around concessioon stand on 2nd deck. Permanent repairs to be made at next dry dock in Sept 2021.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 April 2021
Resolved
Emergency fuel shut off valve broke at the valve handle on fuel tank side. Make proper repairs to emergency fuel shut off valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2021
Resolution: Installed new shutoff valve.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 19 April 2021
Resolved
Provide a valid Certificate of Documentation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 July 2021
Resolution: Provided proof of valid COD.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 April 2021
Resolved
Observed electrical wiring in engine room with missing metal support brackets. Properly install metal support brackets for electrical wiring.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 April 2021
Resolution: Installed new metal support brackets for electrical wiring.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 April 2021
Resolved
Bolts missing from main deck plate located in galley. Install bolts to ensure deck plate is secured to the deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 April 2021
Resolution: Replaced missing bolts.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 27 January 2020
Resolved
Two penetrations on watertight bulkhead connecting engine room to compartment 3 are not watertight. On port side and starboard side of the bulkhead corrosion has created additional non-watertight penetrations. Provide a repair proposal to make penetrations watertight or sealed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 19 April 2021
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 27 January 2020
Resolved
Fire main piping has a non-satisfactory temporary repair. Replace piping to be in accordance with good marine practice.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 February 2020
Resolved 12 February 2020
Resolution: All piping surronging temp repaire was properly replaced with new pipe.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 27 January 2020
Resolved
Lights list and tide tables are not up to date. Provide up to date lights lists and tide tables.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 February 2020
Resolution: Publications updated and placed onboard.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 27 January 2020
Resolved
Crew could not follow man overboard instructions of using the lifeline when recovering the man overboard. Life line is on the instructions but is not onboard.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 February 2020
Resolution: Life sling was placed on board.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 January 2020
Resolved
Dead end wiring was found in lazarette and engine compartment. Secure dead end wiring.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 February 2020
Resolution: Wiring was reconnected to the fuel sender and removed
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 2 October 2019
Resolved
Seal bulkhead penetration around A/C piping between compartments 3 and 4.
Action required: 705 - Other - as specified
Resolved 7 November 2019
Resolution: All bulkhead penetrations have been properly sealed.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 2 October 2019
Resolved
Crop and renew framing around pottable water tank in compartment 4.
Action required: 705 - Other - as specified
Resolved 7 November 2019
Resolution: all identified frames have been cropped an renewed as required.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 April 2019
Resolved
A vessel of more than 65 ft must carry a minimum of three life buoys of not less than 24 inches in diameter. Provide 2 properly marked and installed life buoys. Ring life buoy to be approved IAW 160.050, and marked IAW 185.604 - 46CFR180.70(a)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2019
Resolved 30 April 2019
Resolution: Vessel replaced 2 life buoys
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 26 April 2019
Resolved
At all inspections special attention shall be paid to insure that no fire hazards exist. The port main engine, ship service generator, and fire insulation i the overhead were found coated with engine oil. Vessel is to maintain regular rounds of the equipment while in operation to monitor for oil buildup on operating machinery. On 29 April 2019, the vessel is not authorized any passenger operations until all oil leaks are identified and corrected. 46CFR176.25-10(b)
Action required: 705 - Other - as specified
Resolved 30 April 2019
Resolution: Seals on generator and engine were replaced.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 27 September 2017
Resolved
Crop and renew wasted plate on port side aft 2 ft fwd and aft of bit above half round.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 6 October 2017
Resolved 6 October 2017
Resolution: Cropped and Renewed wasted plate on port side aft 2 ft fwd and aft of bit half round.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 24 June 2014
Resolved
Chip in stbd prop due to hitting submerged object.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 July 2014
Resolved 3 July 2014
Resolution: Reworked prop.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 24 June 2014
Resolved
Shaft bent at strut in two directions.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2014
Resolution: Replaced with new shaft.
Engineering › Bilge Water Management System › Not Operational
Issued 25 January 2012
Resolved
The primary bilge pump is driven by the port engine and worked properly when tested in the first hold, but failed to work after the first test. The secondary electric pump (fire/bilge) was utilized for the remaining spaces. Vessel is required to have 2 power-driven bilge pumps. Repair primary bilge pump to the satisfaction of attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 January 2012
Resolution: The electric switch for the primary bilge pump was replaced and satisfactorily operated to the satisfaction of the attending marine inspector prior to departing the vessel.
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 25 January 2012
Resolved
Low flow indicators on the bridge for the flow sensors for engine exhaust cooling system do not appear to be operational and the flow sensor on starboard engine is disconnected. Provide proof of proper operation of both the flow sensors & indicators for both diesel engines to the satisfaction of attending Coast Guard marine inspector.
Action required: 705 - Other - as specified
Due 8 February 2012
Resolved 1 March 2012
Resolution: Low flow sensors are both connected in the engine room and indicators on the bridge indicate satisfactory operation.
Electrical › Electric Supply System (service) › Battery Installation
Issued 25 January 2012
Resolved
Battery box on starboard engine has fluid in the bottom under the battery. Remove fluid from battery box to the satisfaction of attending Coast Guard marine inspector.
Action required: 705 - Other - as specified
Due 1 February 2012
Resolved 27 January 2012
Resolution: Fluid has been removed from bottom of battery box.
Engineering › Lubricating Oil Service System › Gauge
Issued 25 January 2012
Resolved
Gauges for RPM and Oil Pressure on port engine do not appear to be operating properly. RPM gauge runs a little high and the needle bounces a lot. Oil pressure gauge drops to "zero" for no apparent reason while engine is operating. Verify proper operation of gauges or replace to the satisfaction of attending Coast Guard marine inspector.
Action required: 705 - Other - as specified
Due 24 February 2012
Resolved 1 March 2012
Resolution: RPM and oil pressure gauges have been repaired. Oil pressure gauge is working but operator is looking for a new sending unit for port engine.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 25 January 2012
Resolved
Service on fire extinguishers is due in February 2012. Provide copy of servicing report or invoice to the attending Coast Guard marine inspector.
Action required: 705 - Other - as specified
Due 28 February 2012
Resolved 1 March 2012
Resolution: Operator provided proof of servicing for fire extinguishers.
Fire Fighting › Fire Pumps › Power Source
Issued 25 January 2012
Resolved
Vessel is required to have 1 power-driven fire pump and 1 hand-powered fire pump capable 5 GPM and equipped with suction & discharge hoses suitable for use in fire fighting. Vessel does not have a hand-powered fire pump. Provide a hand-powered fire pump or adequate alternative (i.e. fire buckets) acceptable to the local OCMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2012
Resolution: Vessel operator has three properly labeld, 2.5 gallon fire buckets with lanyards
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 25 January 2012
Resolved
Supervisory personnel must receive at least 60 minutes of documented Employee Assistance Program (EAP) training. Provide proof of training to attending USCG marine inspectors.
Action required: 705 - Other - as specified
Due 24 February 2012
Resolved 1 March 2012
Resolution: Operater provided proof of supervisor training.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 25 January 2012
Resolved
Vessel did not have current documentation for Abandon Ship and Man Overboard drills or Fire Fighting drills. Conduct all three types of drills and document the information. Information must be logged and contain at a minimum the date of drills and/or training and a general description. Provide proof of drills to the attending USCG marine inspectors.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2012
Resolution: Drills have been conducted for crew and properly logged.
Engineering › Fuel Oil Service System › Filter
Issued 17 February 2010
Resolved
A non-approved fuel filter was found on the ship’s service generator and replaced with an all metal type on-site.
Action required: 705 - Other - as specified
Resolved 17 February 2010
Resolution: Replaced with an all metal type on-site
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 17 February 2010
Resolved
No DAPI MIS report has been submitted for vessel. Educated owner and provided submittal instructions.
Due 15 March 2010
Resolved 15 April 2010
Resolution: MIS report submitted and copy provided to MSD Nashville.
Fire Fighting › Fire Hoses › Condition
Issued 26 January 2007
Resolved
Stencil vessel name on fire hoses.
Action required: 705 - Other - as specified
Due 26 February 2007
Resolved 31 January 2007
Engineering › Bilge Water Management System › Pump
Issued 26 January 2007
Resolved
Repair/replace discharge pressure gauge for fire/bilge pump and prove proper operation.
Action required: 705 - Other - as specified
Due 26 February 2007
Resolved 31 January 2007
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 26 January 2007
Resolved
Identify and label PFD storage areas.
Action required: 705 - Other - as specified
Due 26 February 2007
Resolved 26 February 2007
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 26 January 2007
Resolved
Post PFD donning placard on main deck.
Action required: 705 - Other - as specified
Due 26 February 2007
Resolved 26 January 2007
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Approval
Issued 26 January 2007
Resolved
Replace B-II portable fire extinguishers from stations #2 and #4 with approved Marine Type portable extinguishers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 February 2007
Resolved 26 January 2007
Engineering › Fuel Oil Service System › Valve, Control
Issued 26 January 2007
Resolved
Prove proper operation of remote fuel shut-off.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 February 2007
Resolved 31 January 2007
Engineering › Sea-water System (primary cooling) › Piping
Issued 23 October 2006
Resolved
Replace raw water suction hose on SSG between strainer and r/w pump inlet.
Action required: 705 - Other - as specified
Due 30 January 2007
Resolved 31 December 2006
Resolution: renewed hose prior to departure.
Engineering › Bilge Water Management System › Hose
Issued 23 October 2006
Resolved
Replace deck drain hose located in engine room (existing hose style is "swimming pool" vacuum hose).
Action required: 705 - Other - as specified
Due 30 January 2007
Resolved 31 December 2006
Resolution: Renewed prior to departure
Engineering › Shafting/Propeller Arrangements › Stern Gland
Issued 23 October 2006
Resolved
During sea trial, stbd engine shaft packing overheated, repair or renew prior to departure
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 31 December 2006
Resolution: Old style shaft packing gland installed (flex ring type)
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 23 October 2006
Resolved
During sea trial port engine rear main seal leaking, renew prior to departure
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 31 December 2006
Resolution: Machanic replaced with new seal, test ran sat
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 23 October 2006
Resolved
Properley affix draft marks IAW stability ltr, prior to carrying passengers
Action required: 705 - Other - as specified
Due 30 January 2007
Resolved 31 December 2006
Resolution: Marks affixed (punched and painted)
Accommodation/Occupational Safety › Potable Water System › General
Issued 23 October 2006
Resolved
Fresh water filter missing hanging bracket (inboard side of filter).
Action required: 705 - Other - as specified
Due 30 January 2007
Resolved 31 December 2006
Resolution: Additional bracket installed prior to departure
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 23 October 2006
Resolved
Replace (2) cracked windows on main deck, fwd section of lounge, port side
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2007
Resolved 26 January 2007
Engineering › Bilge Water Management System › Manifold
Issued 23 October 2006
Resolved
Permanetly lable bilge manifold and firemain system valves. Temp lables were installed prior to departure MHC, NC.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2007
Resolved 26 January 2007
Fire Fighting › Fire Pumps › Pressure
Issued 23 October 2006
Resolved
Install new pressure gauge at discharge side of fire pump.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 31 December 2006
Resolution: New gauge installed and tested sat
Engineering › Freshwater System (jacketwater cooling) › Storage Tank
Issued 23 October 2006
Resolved
SSG missing upper mounting tab for Heat exchanger (holding tank). Tank currently has lower part of mount bolted and a hose clamp installed on upper section of tank around bracket. remove hose clamp and weld new mounting tab and bolt as original design.
Action required: 705 - Other - as specified
Due 30 January 2007
Resolved 26 January 2007
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 23 October 2006
Resolved
Conduct a satisfactory man overboard drill prior to carrying passengers
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 December 2006
Resolved 26 January 2007
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 23 October 2006
Resolved
Provide a documentation of satisfactory test on the following equipment prior to departure: 1) High level alarms, 2) Nav lights are properly installed and displaying the proper characteristics, 3) complete a sat radio test on installed VHF radios, 4) radar is properly operating, 5) install and test spot light.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 31 December 2006
Resolution: Vessel rep provided verbal report (followed by an email) all above test were completed by contract electrician with no discrepancies.
Stability › Watertight Integrity › General
Issued 3 April 2006
Resolved
Two thru hull penetrations need renewed on port side of aft section of forepeak.
Action required: 705 - Other - as specified
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Stability › Watertight Integrity › General
Issued 3 April 2006
Resolved
Replace the gaskets on the two forward hatch covers.
Action required: 705 - Other - as specified
Resolved 31 December 2006
Resolution: Gaskets renewed
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 April 2006
Resolved
Replace the four bottom longitudinal frames in the forepeak.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Construction/Loadline › Hull › Bracket
Issued 3 April 2006
Resolved
Replace wasted tripping brackets in the forepeak.
Action required: 705 - Other - as specified
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Construction/Loadline › Penetrations › Pipe Flange
Issued 3 April 2006
Resolved
Replace all wasted thru hull fittings.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 April 2006
Resolved
Replace the raw water cooling hose on port engine exhaust.
Action required: 705 - Other - as specified
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Engineering › Steering Gear System › Rudder Bearing
Issued 3 April 2006
Resolved
Replace packing gland/bearing in both rudder posts. Rudder posts have excessive play and evidence of water intrusion from inside lazarette.
Action required: 705 - Other - as specified
Resolved 31 December 2006
Resolution: Conducted sea trials, no excessive play or water intrusion noted.
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 April 2006
Resolved
Replace all wasted longitudinal frames in the lazarette.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Construction/Loadline › Hull › Bottom Plating
Issued 3 April 2006
Resolved
Renew several areas of holed hull plate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Construction/Loadline › Hull › Hull Plating
Issued 3 April 2006
Resolved
Repair or replace all excessively pitted hull plate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 3 April 2006
Resolved
Double clamp port engine exhaust hose.
Action required: 705 - Other - as specified
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Construction/Loadline › Structures › End Bulkhead
Issued 3 April 2006
Resolved
Replace cracked safety glass on main deck, port side, near dining room entry door.
Action required: 705 - Other - as specified
Resolved 31 December 2006
Resolution: Re-issued under Sec NC activity
Construction/Loadline › Structures › Superstructure
Issued 3 April 2006
Resolved
Renew wasted gunwhale on port side, across from dining room entry door.
Action required: 705 - Other - as specified
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Engineering › Bilge Water Management System › Pump
Issued 4 May 2005
Resolved
Replace belt for port engine driven bilge pump.
Due 4 June 2005
Resolved 31 December 2006
Resolution: Machanic inspected belts and renewed as needed, test ran sat
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 4 May 2005
Resolved
Provide proof of crew enrollment in USCG approved drug testing program.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 January 2007
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 4 May 2005
Resolved
Conduct satisfactory man overboard and fire drill in the presence of an attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 December 2006
Resolution: Re-issued under Sec NC activity
Construction/Loadline › Hull › Bottom Plating
Issued 4 May 2005
Resolved
Complete a credit drydock.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2006
Resolution: Vessel completed Credit Drydock, Radio Island NC.
Lifesaving › Lifebuoys
Issued 5 January 2004
Resolved
Provide 2 ring lifebuoys.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 February 2004
Resolved 22 January 2004
Engineering › Bilge Water Management System
Issued 26 February 2002
Resolved
Install high level alarm connections in an enclosure in # 2 hold compartment, and label alarms on bridge.
Action required: 705 - Other - as specified
Due 26 March 2002
Resolved 7 January 2003
Stability
Issued 26 February 2002
Resolved
Change upper deck capacity label to read 63 total persons.
Action required: 705 - Other - as specified
Due 26 March 2002
Resolved 7 January 2003
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 26 February 2002
Resolved
Tighten fire extinguisher bracket at entrance to engine compartment. LEGACY COMPONENT DESC: Mounting Bracket
Action required: 705 - Other - as specified
Due 26 March 2002
Resolved 7 January 2003
Electrical › Electrical Distribution System (service)
Issued 26 February 2002
Resolved
Properly connect cable into stuffing box packing on A/C sea water pump. LEGACY COMPONENT DESC: Cable
Action required: 705 - Other - as specified
Due 26 March 2002
Resolved 7 January 2003
Engineering › Sea-water System (primary cooling)
Issued 26 February 2002
Resolved
Double-clamp all raw water piping and exhaust piping in engine room. LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 26 March 2002
Resolved 7 January 2003
Electrical › Electric Generation Source (service)
Issued 26 February 2002
Resolved
Install insulation on generator engine exhaust riser to the point of raw-water injection.
Action required: 705 - Other - as specified
Due 26 March 2002
Resolved 7 January 2003
Engineering › Fuel Oil Service System
Issued 26 February 2002
Resolved
Free-up operation of emergency fuel shutoff valve. LEGACY COMPONENT DESC: Valve
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 March 2002
Resolved 7 January 2003
Lifesaving
Issued 3 May 1999
Resolved
POST PFD DONNING PLACARD.
Condition: Unknown
Due 17 May 1999
Resolved 17 May 1999
Lifesaving
Issued 3 May 1999
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 17 May 1999
Resolved 17 May 1999
Engineering
Issued 6 May 1997
Resolved
REPAIR OR REPLACE COOLANT OVERFLOW TANK ON PORT MAIN ENGINE._x001C_
Condition: Unknown
Due 6 May 1997
Resolved 6 May 1997
Electrical
Issued 7 May 1996
Resolved
REPLACE PORT & STARBOARD PLASTIC SECURING STRAPS WITH REQUIRED METAL STRAPSIWO UPPER DECK LIGHTING WIRE RUNS.
Condition: Unknown
Due 7 May 1996
Resolved 7 May 1996
Electrical
Issued 7 May 1996
Resolved
REPLACE WIRENUTS IWO PORT AND STARBOARD LIGHT FIXTURE WIRING ON UPPER DECK.
Condition: Unknown
Due 7 May 1996
Resolved 7 May 1996
Construction/Loadline
Issued 7 May 1996
Resolved
STENCIL NAME OF VESSEL ON BOW.
Condition: Unknown
Due 7 May 1996
Resolved 7 May 1996
Lifesaving
Issued 8 May 1995
Resolved
CONDUCT SATISFACTORY FIRE AND MAN OVERBOARD DRILL.
Condition: Unknown
Due 2 June 1995
Resolved 2 June 1995
Documentation
Issued 8 May 1995
Resolved
POST PLACARD RESTRICTING TOTAL PASSENGERS ON UPPER DECK TO 63.
Condition: Unknown
Due 2 June 1995
Resolved 2 June 1995
Fire Fighting
Issued 17 May 1993
Resolved
REPLACE ONE (1) 1.5" DIA. 50FT FIRE HOSE. TO BE COMPLETED PRIOR TO CARRYINGPASSENGERS BUT NOT LATER THAN 22 MAY 93.
Condition: Unknown
Due 22 May 1993
Resolved 18 May 1993
Accommodation/Occupational Safety
Issued 17 May 1993
Resolved
REPAIR OR REPLACE DAMAGED SECTION OF GLASS LOCATED ON STBD SIDE FWD AT PASSENGER EMBARKATION AREA._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 May 1993
Resolved 17 May 1993
Electrical
Issued 17 June 1991
Resolved
PROVIDE EMERGENCY SWITCH FOR BATTERIES FOR BOTH MAIN DIESEL ENGINES AND GENERATOR IN ACCORDANCE WITH 46 CFR 183.05-10(F) FOR SYSTEMS OF LESS THAN 50 VOLTS.
Condition: Unknown
Due 17 June 1991
Resolved 17 June 1991
Electrical
Issued 17 June 1991
Resolved
REPLACE OR REPAIR NO-FLOW RELAY VACCUUM SWITCH FOR GENERATOR.
Condition: Unknown
Due 17 June 1991
Resolved 17 June 1991
Documentation
Issued 23 June 1989
Resolved
NO STABILITY LETTER HAS BEEN ISSUED. NO PASSENGERS ALLOWED ON VESSEL UNTIL THE VESSEL HAS VALID STABILITY LETTER.
Condition: Unknown
Due 23 June 1989
Resolved 23 June 1989