Records from 2013 to 2026. Most recent: inspection, 10 February 2026.
Inspection history · 15
10 February 2026
Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8308849
1 December 2025
Administrative Inspection · Deficiency Check · Annual Inspection · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8275930
8 November 2024
Administrative Inspection · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8033777
30 August 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7992703
30 August 2024
Deficiency Check · Administrative Inspection · Drydock Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8003228
24 August 2023
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7776079
29 March 2023
Type not recorded
No type recorded · Station Grand Isle · USCG Heartland District (CGD-H) · Activity 7660035
15 May 2022
Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7451734
19 April 2022
Internal Structural Exam · Cargo Tank Internal · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7433719
26 August 2021
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7318025
1 July 2020
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6997994
22 July 2019
In-Service Inspection · COI Inspection · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6783440
14 May 2019
COI Inspection · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6684197
15 March 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6105420
2 June 2016
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5887571
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 December 2025
Resolved
Inspection for certification is made by a marine inspector to determine whether the vessel Main and auxiliary machinery is in a safe condition. Both MDE's leaking excessive quantities of oil creating pollution hazard in bilge and slips trips and falls hazard in engine room decks plates.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2026
Resolved 29 January 2026
Resolution: New gaskets installed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 1 December 2025
Resolved
Inspection for certification is made by a marine inspector to determine whether the vessel piping is in a safe condition. Fuel oil transfer pump found excessively leaking.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2026
Resolved 19 December 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 December 2025
Resolved
Inspection for certification is made by a marine inspector to determine whether the vessel electrical is in a safe condition. F/O transfer motor controller missing reset button leaving open panel and Steering controller missing lights and exposed bulb sockets.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2026
Resolved 8 December 2025
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 1 December 2025
Resolved
Suitable hand covers, guards, or rails must be installed on each exposed and dangerous place, such as gears of rotating machinery, and hot surfaces. Guard on bow thruster engine improperly installed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2026
Resolved 8 December 2025
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 November 2024
Resolved
In a vessel of 12 meters or more in length but less than 50 meters in length port and starboard sidelight with a visible range of 2 miles is required. Marine inspector found that one of the starboard sidelights was not properly operating.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 November 2024
Resolved 10 February 2026
Resolution: Cleared via documentary evidence of proper operation
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 30 August 2024
Resolved
Vessel is overdue for COI and restricted from leaving Sector Mobile OCMI zone untul COI is satisfactorily completed.
46 CFR 126.210
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2024
Resolution: Completed COI Exam
08 - Alarms › N/A - No Subsystem › General alarm
Issued 24 August 2023
Resolved
Each vsl must be fitted w/ a GA complying w/ 113.25 of 46 CFR; GA did not work on e-power.
46 CFR 129.530
46 CFR 113.25-6
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 August 2023
Resolution: GA operational on e-power
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 August 2023
Resolved
Inflatable liferaft must be serviced no later than the month and year on the servicing sticker hich may be delayed to align w/ next inspection; liferaft on the bow had not been serviced.
46 CFR 131.580
Action required: 10 - Deficiency Rectified
Resolved 24 August 2023
Resolution: Liferaft replaced.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 24 August 2023
Resolved
Each vsl must comply w/ 47 CFR part 80 as applicable; following items were not in compliance: 1) captain did not have marine radio operator permit; 2) GPS was not tied into VHF; and 3) Bridge-to-bridge and safety radiotelephony certs were expired.
46 CFR 130.210
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 August 2023
Resolution: MROP applied for and captain has temp cert; GPS tied into VHF; certs renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 August 2023
Resolved
Steering systems shall comply w/ subchapter F of 46 CFR; stbd outboard hydraulic ram was leaking.
46 CFR 96.03-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 September 2023
Resolution: Ram serviced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 August 2023
Resolved
Rudder angle indicator systems shall comply w/ 46 CFR subchapter J; forward port RAI did not accurately reflect rudder positioning.
46 CFR 96.05-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 September 2023
Resolved 21 September 2023
Resolution: RAI operational
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 August 2023
Resolved
Power distribution systems shall comply w/ 46 CFR subchapter J; Phase B bulbs were inop @ main switchboard.
46 CFR 96.05-1
Action required: 10 - Deficiency Rectified
Resolved 24 August 2023
Resolution: Bulb operational.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 August 2023
Resolved
Vsl must have adequate e-lighting fitted along the line of escape; two (02) lights were inop in accommodation spaces and two (02) embarkation lights were inop
46 CFR 129.440
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2023
Resolved 25 August 2023
Resolution: Lights appropriately operational.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 August 2023
Resolved
Electrical installations must minimize accidental personal contact with energized parts; missing blank.
46 CFR 129.200
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 September 2023
Resolved 21 September 2023
Resolution: Blank added.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 August 2023
Resolved
Each panelboard must have a description of the load of each circuit; 460V panel did not have load description.
46 CFR 111.40-11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 September 2023
Resolved 21 September 2023
Resolution: Load description penned in.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 August 2023
Resolved
Vsl must minimize fire hazards; liquid mud buildup found on outside of pipe. Clean & repair leak if found to be present prior to carriage of liquid mud.
46 CFR 127.220
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2026
Resolution: Cleared via documentary evidence of proper cleanliness/maintenance. Liquid mud system is currently not in use due to wind farm operations.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 24 August 2023
Resolved
Class-1 door may be installed if there is visual indicator on pilothouse; indicators tied back to prevent showing open/closed.
46 CFR 174.210
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 August 2023
Resolution: Indicators appropriately functioning.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 August 2023
Resolved
Pressure indicating gages shall be chosen to be compatible w/ pressure to be indicated, with a range of 1.2-2x the pressure of the relieving device; gages were not in this range.
46 CFR 54.15-5
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 September 2023
Resolved 21 September 2023
Resolution: Pressure gage replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 24 August 2023
Resolved
Rescue boat engine must be run for 3 minutes weekly; engine inop.
46 CFR 131.560
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 August 2023
Resolution: Rescue boat operational
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 August 2023
Resolved
Rescue boat must be ready for launching in not more than 5 minutes; during MOB drill, far exceeded this time. Drill to be re-run.
46 CFR 133.140
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 June 2022
Resolved
All pressure vessels must be provided with protective devices. Both air receivers in the engine room do not have relief valves.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2022
Resolution: Marine inspector verified relief valve installation.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 23 June 2022
Resolved
Watertight doors must withstand a head of water from the sill to the bulkhead deck. The watertight door aft in the engine room and the watertight door leading into the bow thruster room do not seal.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2022
Resolution: Inspector verified doors were in proper order.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 23 June 2022
Resolved
Boundary bulkheads separating accommodations from machinery spaces shall be of “A” Class construction. The bow thruster exhaust duct does not have any fire protection insulation/fire stop installed.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 June 2022
Resolved
Emergency lighting shall be installed in passageways, stairways, crew quarters, machinery spaces sufficient to allow passengers/crew to find their way to open decks. The emergency lighting in the engine room, engine room passageway and engine room stairway did not work in sufficient capacity.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 June 2022
Resolution: Lights were verified to operate sufficiently for an emergency situation.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 16 May 2022
Resolved
Vessel did not have a valid COD matching vessel's name. All other documents were not in accordance with vessel's current name as a result. All documents must match the COD and have the vessel's current name.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2026
Resolution: Company provided copy of up to date COD.
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 16 May 2022
Resolved
Each watertight door is required to have an audible and visual alarm. Alarms were not operable for the vessel in the operating station. Vessel must have operable alarms for the WTD's.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 June 2022
Resolution: Alarms were verified by the attending marine inspector.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 16 May 2022
Resolved
An emergency broadcast placard must be onboard the vessel in order to call out in distress. Vessel did not have a placard available.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 June 2022
Resolution: Placard was verified by the attending marine inspector.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 16 May 2022
Resolved
Each vessel must be equipped with an electronic position-fixing device satisfactory for the area in which the vessel operates. The vessel could not display an electronic chart with a GPS feed. This is required during the follow on inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 June 2022
Resolution: GPS was verified by the attending marine inspector.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 16 May 2022
Resolved
General alarm was not operable on backup power. The general alarms must be able to operate on backup power in the case of a ship casualty that removes the ability of the generators to operate.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 June 2022
Resolution: General alarm was verified by the attending marine inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 16 May 2022
Resolved
The vessel must meet sub chapter "I" requirements which require adherence with sub-chapter "W". This requires liferafts to be carried with an aggregate capacity sufficient to accommodate 150 percent of the total number of persons on board on each side. The vessel did not meet this requirement and must meet this in order to conduct operations as a multi-certificated vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 June 2022
Resolution: Inflatable liferafts were verified by the attending marine inspector and COI was amended to meet regulatory standard for "I" and "L" vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 16 May 2022
Resolved
Each vessel must carry at least one rescue boat. The vessel's rescue boat was not labeled with the vessels name and did not operate when placed in the water. Rescue boat must operate and be capable of maneuvering to recover a person in the water.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2022
Resolution: Rescue boat was able to be launched by the vessel. Retro reflective tape was added to the vessel to meet standard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 July 2020
Resolved
Fluid conditioners shall pass a fire test of 1700 degrees. Vessel has 3 plastic fluid conditioners with aluminum flame shields.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2020
Resolved 22 July 2020
Resolution: New flame shields have been replaced.