Records from 2016 to 2026. Most recent: inspection, 15 April 2026.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Professional
Detail on this page
17 inspections, each with its date, unit and type; 8 deficiencies with the resolution recorded against each; the documentation record, as PSIX holds it. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
Inspection history · 17
15 April 2026
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8350345
14 July 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8185778
29 July 2024
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7969398
27 June 2024
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7942389
6 July 2023
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7734895
7 July 2022
DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7490435
23 May 2022
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7457343
25 April 2022
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7437444
3 August 2021
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7272601
6 April 2021
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7164671
9 September 2020
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7054349
15 August 2019
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6769608
18 April 2019
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6652068
17 October 2018
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6562895
16 May 2018
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6395777
19 June 2017
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6180151
21 June 2016
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5907475
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 July 2024
Resolved
Life ring did not have retro reflective tape. Vessel rep had some on hand and corrected prior to our departure.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 29 August 2024
Resolved 29 July 2024
Resolution: Corrected on the spot.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 3 August 2021
Resolved
The PJYC has 03 vessels and they were not completing or logging abandon ship drills.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2021
Resolved 3 August 2021
Resolution: Completed drills during annual inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 August 2021
Resolved
The lifering is required to have a 60' lifeline attached. The vessel did not and only had about a 12' lifeline.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2021
Resolved 2 September 2021
Resolution: New life line and waterlight line puchased and installed correctly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 August 2021
Resolved
The vessel is required to have a 3-6 foot 5/8" (min) line attached to the waterlight and around the body of the lifering with a quick release clip. The vessel had a piece of string tied to the lifering and waterlight.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2021
Resolved 2 September 2021
Resolution: New life line and waterlight line puchased and installed correctly.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 9 September 2020
Resolved
Create individual note books IAW SLIS [name withheld] FOR VESSELS OPERATING AS LAUNCHES containing the following:
1. The Special Consideration's letter
2. The vessel's COI (Copy)
3. The vessel's state registration (Copy)
4. The Vessel's Stability Letter
5. Emergency procedures for man overboard and fire onboard
6. passenger safety orientation
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2020
Resolved 11 September 2020
Resolution: Notebooks to comform with SLIS [name withheld] FOR VESSELS OPERATING AS LAUNCHES created and checked out and placed on the vessel's while underway.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 September 2020
Resolved
Fire buckets were 5 gallon vs 2.5 gallon. Recommended vessel reps drill holes half through the buckets to reduce capacity to 2.5 gallons.
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 9 September 2020
Resolved 9 September 2020
Resolution: Holes drilled as recommended prior to the completion of the inspection.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 18 April 2019
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. When repairs are made during an emergency, the owner, managing operator, or master shall notify the OCMI as soon as practicable after such repairs or alternations are made. Vessel has unapproved FRP repair made to the hull in way of shaft log. Remove shaft, bearing and other associated equipment for further inspection by the attending marine inspector. 46 CFR 176.700
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 18 April 2019
Resolved 4 June 2019
Resolution: Attended vessel to inspect damage. Awaiting repair proposal.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 18 April 2019
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. When repairs are made during an emergency, the owner, managing operator, or master shall notify the OCMI as soon as practicable after such repairs or alternations are made. Vessel has unapproved FRP repairs made to the hull in way of stern tube/shaft log. Carefully remove stern tube completely for further inspection by the attending marine inspector. 46 CFR 176.700
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 26 April 2019
Resolved 11 September 2020
Resolution: Attended vessel and verified no further damamge. Approved repair. Witnessed sat. underway sea trails.