Records from 1989 to 2019. Most recent: inspection, 6 November 2019.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 65
6 November 2019
Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6851047
7 June 2019
Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6706308
15 April 2019
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6663154
5 September 2018
Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6532359
5 April 2018
Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6385513
14 March 2018
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6371510
22 April 2017
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6130101
7 February 2017
Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6083730
8 December 2016
DAPI Audit
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6055022
8 December 2016
DAPI Audit · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6055727
7 November 2016
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6037227
18 December 2015
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 5784968
2 December 2011
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4201428
8 February 2011
Examination of Repairs
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 3941165
7 February 2011
Type not recorded
No type recorded · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 3986832
14 September 2010
DAPI Audit
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4110017
6 March 2010
Type not recorded
No type recorded · Maritime Safety & Security Team Honolulu (91107) · Activity 3697786
5 May 2009
Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 3479503
20 March 2009
Drydock Exam · Drydock Extension
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 3436794
3 March 2009
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 3426154
31 January 2008
Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 3138745
7 July 2006
Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 2704080
5 June 2006
Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 2670275
9 April 2006
Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 2620744
12 January 2006
Type not recorded
No type recorded · District 14 (OAX) · USCG Oceania District (CGD-O) · Activity 2565979
27 July 2005
Type not recorded
No type recorded · USCGC GALVESTON ISLAND (WPB 1349) · USCG Oceania District (CGD-O) · Activity 2458284
22 November 2004
Hull Examination · Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 2250103
5 December 2003
Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 1969863
5 December 2003
Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 2011929
6 July 2003
In-Service Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 1836145
25 November 2002
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 1710618
25 November 2002
Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 1819027
1 June 2002
Examination of Repairs
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 1624717
29 May 2002
Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 1624521
25 March 2002
Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 1598870
20 December 2001
COI Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 1474491
12 June 2001
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1070608
15 May 2001
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1064978
13 April 2001
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1370143
26 May 2000
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1049429
17 May 2000
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1049795
29 March 2000
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1047054
10 February 2000
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 814196
5 February 1999
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 794999
6 January 1999
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1365514
5 January 1999
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1368990
25 October 1998
Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1368936
30 March 1998
Administrative
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 787250
20 August 1997
Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1364321
22 August 1996
Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 844557
18 March 1996
Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1083973
13 July 1995
COI Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1083967
18 May 1995
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1184453
12 January 1995
Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1142224
26 July 1994
Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1180559
29 April 1994
Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 859719
26 July 1993
Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1153239
7 March 1993
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 833172
13 January 1993
Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 963080
23 July 1992
COI Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 951118
8 October 1991
Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 945606
27 September 1991
Administrative
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 934766
6 June 1991
Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1241838
14 December 1990
Drydock Extension · Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1227475
11 August 1989
Initial Certification · Initial Construction-Excluding Oversight · Plan Review "T" Boat · Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 900627
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 June 2019
Resolved
Fire hose on lower level has a leak and upstairs hose needs bronze nozzle. Replace lower level hose and purchase a bronze nozzle for the upstairs hose.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2019
Resolved 7 June 2019
Resolution: Replaced hose and noozle
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 7 June 2019
Resolved
Fuel Shutoff valve for port engine linkage cable is wasted and was held in place with zip ties and wires. Replace linkage cable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2019
Resolved 7 June 2019
Resolution: replaced cable
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 June 2019
Resolved
Vessel is required to have FCC Station License and FCC Safety Safety Radio Cert. Provide Proof of these documents.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2019
Resolved 31 October 2019
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 7 June 2019
Resolved
Provide updated copy of light list for local area.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2019
Resolved 26 June 2019
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 7 June 2019
Resolved
Provide emergency broadcast placard.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2019
Resolved 7 June 2019
Resolution: Provided placard
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 7 June 2019
Resolved
Provide Flares for the intended route. 3 red flares and 3 orange flares.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2019
Resolved 26 June 2019
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 7 June 2019
Resolved
Replace 03 lighting fixtures on lower level. Lighting did not have covers.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2019
Resolved 7 June 2019
Resolution: replaced lighting fixtures
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 June 2019
Resolved
Chemical Testing for the crew must be completed. Vessel has no proof of being in a consortium.
Vessel will use crew from another boat until this is complete
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2019
Resolved 26 June 2019
Engineering › Diesel Engine (propulsion-reduction gear) › Piston
Issued 5 April 2018
Resolved
STBD propulsion engine #1 Piston seized. Conduct repairs IAW engine manufacture instructions. No passenger carry until repairs are complete and attest by the attending CG marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2018
Resolution: STBD engine was replaced with in-kind cummings engine. Witnessed satisfactory sea trail.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 March 2018
Resolved
Navigation light must be in serviceable condition and operation as required by 46 CFR 183.420.Repair inoperable stern light.
Due 28 March 2018
Resolved 28 March 2018
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 14 March 2018
Resolved
deck rail must be in satisfactory condition as originally approved as required by 46 CFR 176.25-5. Repair damaged forward deck rail. No passenger allowed pass the forward main cabin.
Due 28 March 2018
Resolved 31 October 2019
Lifesaving › Lifebuoys › Serviceable
Issued 14 March 2018
Resolved
Ring buoy must be in good and serviceable condition as required by 46 CFR 180.30-1. Replace damaged ring buoy.
Due 28 March 2018
Resolved 28 March 2018
Fire Fighting › Nozzles › Type
Issued 14 March 2018
Resolved
Garden hose nozzle must be of good grade bronze or equivalent materials as required by 46 CFR 181.15-10. Replace wasted hose nozzle.
Due 28 March 2018
Resolved 28 March 2018
Communications › Radio Communications › VHF Radiotelephone
Issued 14 March 2018
Resolved
VHF must have DSC capability programed as required by 47 CFR 80. Install VHF with DSC programed into it.
Due 28 March 2018
Resolved 28 March 2018
Construction/Loadline › Hull › Bottom Plating
Issued 14 March 2018
Resolved
Hull structure and its appurtenance must be in satisfactory condition as required by 46 CFR 176.25-5. Found major steel wastage on bottom plates in all spaces. Provide hull gauging report to MSD Saipan office.
Action required: 705 - Other - as specified
Resolved 31 October 2019
Fire Fighting › Emergency Fire Pumps › Capacity
Issued 14 March 2018
Resolved
All vessel must have hand operated portable fire pump with at least 5 Gallons per minute as required by 46 CFR 181.10-5. Provide hand portable fire pump.
Due 28 March 2018
Resolved 28 March 2018
Documentation › Certificates/Documents › FCC SSL
Issued 14 March 2018
Resolved
VSL must have valid FCC Station license and safety certificates as required by 47CFR80. Provide proof of valid FCC Station license and safety certificate.
Due 28 March 2018
Resolved 28 March 2018
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 14 March 2018
Resolved
Machinery must be in proper operating conditions as required by 46 CFR 176.25-10. Repair water leaks on STBD engine exhaust pipe.
Due 28 March 2018
Resolved 28 March 2018
Engineering › Fuel Oil Service System › Hose
Issued 14 March 2018
Resolved
Fuel hoses must be in good and serviceable conditions as required by 46 CFR 182.40. Replace damaged (cracked outer layer) fuel hose on STBD engine.
Due 28 March 2018
Resolved 28 March 2018
Construction/Loadline › Structures › Superstructure
Issued 14 March 2018
Resolved
Superstructure must be ins good and serviceable conditions. Replace rot wood in wall lining aft STBD interior wall.
Due 28 March 2018
Resolved 28 March 2018
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 14 March 2018
Resolved
Vessel shall be equipped with suitable portable batter lights as required by 46 CFR 184.30-1. Provide portable battery operate lights.
Due 28 March 2018
Resolved 28 March 2018
Engineering › Reduction Gearing/Clutches › Pinion
Issued 7 February 2017
Resolved
VSL starboard reduction gear failed. Pinion gear sustained damaged to its gear teeth. Conduct repairs in accordance with manufacture instruction using in-kind parts. Inspection and testing to the satisfaction of the attending CG Marine Inspector as required by 46 CFR 176.700
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2017
Communications › Audible Communications › Horn/Whistle
Issued 9 December 2016
Resolved
Vessel must have whistle/horn produces an efficient sound signal as required by COLREGS 72. Repair inoperable ships whistle.
Due 16 December 2016
Resolved 31 October 2019
Navigation › Piloting/Steering › Local Notices to Mariners
Issued 9 December 2016
Resolved
Vessel must have up-to-date charts and Pubs as required by 46 CFR 184.420. Provide missing pubs.
Due 16 December 2016
Resolved 31 October 2019
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 7 November 2016
Resolved
Installed in-kind engine must be tested and inspected by the attending Coast Guard Marine Inspector as required by 46 CFR 176.700. No passenger carry until engine installation is attest by the attending CG MI.
Due 15 November 2016
Resolved 8 November 2016
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 18 December 2015
Resolved
Counted 52 Adult lifejackets (type I). 158 totals persons on COI. Adult lifejackets must be provided fro each persons carried on board as required by 46+ CFR 180.25-5 (Old T). Maximum number of persons carried on board is 152 until additional (07) adult lifejackets are provided on board.
Due 20 May 2016
Resolved 20 January 2016
Resolution: Inspected new (7) additional adult lifejackets type I.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 18 December 2015
Resolved
Floating water light not operable. Vessel must carry one floating water light that meet standards in 46 CFR 161.010. As required by 46 CFR 180.30-1 (Old T). Show proper floating light operation.
Due 20 January 2016
Resolved 20 January 2016
Fire Fighting › Fire Hoses › Material
Issued 18 December 2015
Resolved
Found garden hose used as fire hose with collapsed inner material. Garden hose shall be a good commercial grade construction as required by (old T) 46 CFR 181.15-10. Replace damaged fire hose.
Due 20 January 2016
Resolved 20 January 2016
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 18 December 2015
Resolved
Port shaft packing gland leaks more than normal drops. Machinery shall be installed and maintained in such a way to protect machinery failure as required by 46 CFR 182.01-5 (old T). Repair port shaft packing gland IAW manufacture instruction.
Due 20 January 2016
Resolved 20 January 2016
Engineering › Freshwater System (jacketwater cooling) › Reciever
Issued 18 December 2015
Resolved
Broken support for STBD engine jacket water expansion tank. All machinery be installed and maintained in such a manner to protect against machinery failure as required by 46 CFR 182.01-5. Repair supporting bracket as per engine manufacture instruction.
Due 20 January 2016
Resolved 20 January 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder
Issued 18 December 2015
Resolved
Oil leaking from #1 valve cover missing gasket. All machinery shall be installed and maintained to protect from machinery failure as required by 46 CFR 182.01-5 (old T). Repair per engine manufacture instructions.
Due 20 January 2016
Resolved 20 January 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 18 December 2015
Resolved
Oil line to turbocharger is worn & damage around hose fitting. All machinery shall be installed and maintained to protect from machinery failure as required by 46 CFR 182.01-5. Repair as original.
Due 20 January 2016
Resolved 20 January 2016
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 18 December 2015
Resolved
Improper fuel tank vent pipe. Vent pipe shall terminated in U bends on the hull exterior as required by 46 CFR 182.20-35 (old T). Submit vent pipe modification to CG for review.
Due 20 May 2016
Resolved 20 January 2016
Engineering › Freshwater System (jacketwater cooling) › Valve, Relief
Issued 18 December 2015
Resolved
Jacket water leaking from engine block valve. All machinery shall be installed and maintained to protect from machinery failure as required by 46 CFR 182.01-5 (old T). Replace leaky valve.
Due 20 January 2016
Resolved 20 January 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 December 2015
Resolved
Dead end wire on Generator. Electrical installation shall be in reasonably safe from electrical shock of personnel as required by 46 CFR 183.01-5. Remove or properly seal dead end wires.
Due 18 December 2015
Resolved 20 January 2016
Electrical › Electric Generation Source (service) › Generator
Issued 18 December 2015
Resolved
Missing AM-meter. AM-meter and voltmeter shall be provide that can be used for measuring voltage and current as required by 46 CFR 183.100-5. Install ammeter (gauge).
Due 20 January 2016
Resolved 20 January 2016
Electrical › Electrical Distribution System (service) › Switch
Issued 18 December 2015
Resolved
Unused non marine grade outlet and switch in Pilot house. Electrical installation and equipments shall be rsonably safe from electrical shock of personnel as required by 46 CFR 183.01-5. Properly remove old electrical switch in pilot house.
Due 20 January 2016
Resolved 20 January 2016
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 18 December 2015
Resolved
No first aid kit on board. First aid kit must be readily available as required by 46 CFR 160.041. Provide CG approved first aid kit with up-date contents.
Due 20 January 2016
Resolved 20 January 2016
Accommodation/Occupational Safety › Ventilation › General
Issued 18 December 2015
Resolved
Ventilation screen for several voids have be painted and modified thus preventing proper ventilation for the void. Each enclosed spaces within the vessel shall be properly vented or ventilated as required by 46 CFR 177.20-1. Repair in accordance with approved vessel plan.
Due 20 January 2016
Resolved 20 January 2016
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 18 December 2015
Resolved
Fractured welds, wasted and holed forward deck rail. Deck railing shall provide a safety for passengers and crew as required by 46 CFR 177.01-1. Repair damaged forward deck railing in accordance with the approved plan.
Due 20 January 2016
Resolved 20 January 2016
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 18 December 2015
Resolved
Anchor has been changed to a smaller anchor. Vessel shall be fitted with ground tackle and hawser as required by 46 CFR 184.10-1. Replace anchor with appropriate size anchor.
Due 20 January 2016
Resolved 20 January 2016
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 2 December 2011
Resolved
No personnel on board with FCC operator permit.
Due 12 December 2011
Resolved 14 December 2011
Communications › Public Address System › Loudspeaker
Issued 2 December 2011
Resolved
PA system on board is not operational.
Due 12 December 2011
Resolved 7 December 2011
Engineering › Diesel Engine (propulsion-reduction gear) › Injector (fuel injection)
Issued 2 December 2011
Resolved
Fuel leak on # 6 injector STBD propulsion engine.
Due 12 December 2011
Resolved 2 December 2011
Engineering › Sea-water System (primary cooling) › Piping
Issued 2 December 2011
Resolved
Salt water leaking on STBD propulsion engine heat exchanger.
Due 12 December 2011
Resolved 7 December 2011
Electrical › Electric Supply System (service) › Battery Conductor
Issued 2 December 2011
Resolved
Frayed negative cable on STBD engine main battery.
Due 12 December 2011
Resolved 7 December 2011
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 December 2011
Resolved
Improper wire connection (twisted conductor) STBD engine wire harness.
Due 12 December 2011
Resolved 7 December 2011
Electrical › Electrical Distribution System (service) › Switchboard
Issued 2 December 2011
Resolved
Missing drip shield on main switch board.
Due 12 December 2011
Resolved 7 December 2011
Accommodation/Occupational Safety › Ventilation › General
Issued 2 December 2011
Resolved
Disconnected ventilation ducts in engine room.
Due 12 December 2011
Resolved 14 December 2011
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 2 December 2011
Resolved
Rusted and holed vent pipe top of fuel tank.
Due 12 December 2011
Resolved 14 December 2011
Accommodation/Occupational Safety › Potable Water System › General
Issued 2 December 2011
Resolved
Rusted and holed fresh water tank fill pipe.
Due 12 December 2011
Resolved 14 December 2011
Fire Fighting › Fire Main › Condition
Issued 2 December 2011
Resolved
Re-route fire main pipe away from main electrical switch board.
Due 19 December 2011
Resolved 14 December 2011
Electrical › Lighting (service) › Lighting Fixture
Issued 2 December 2011
Resolved
Aft -port light fixture in main deck burned out.
Due 12 December 2011
Resolved 7 December 2011
Engineering › Sea-water System (primary cooling) › Piping
Issued 2 December 2011
Resolved
Salt water leaking on generator heat exchanger.
Due 12 December 2011
Resolved 7 December 2011
Stability › Weathertight Integrity › General
Issued 2 December 2011
Resolved
Cracked glass on aft captain station window.
Due 12 December 2011
Resolved 14 December 2011
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 8 February 2011
Resolved
Damaged starboard engine. Possible crank case explosion. Provide a plan for repair or replacement of the starboard engine.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 February 2011
Communications › Public Address System › Loudspeaker
Issued 2 March 2009
Resolved
Prove proper operation of public address system. 46CFR184.610
Action required: 705 - Other - as specified
Due 3 April 2009
Resolved 5 May 2009
Electrical › Electrical Distribution System (service) › Cable
Issued 2 March 2009
Resolved
Install metal clips/ties every 24 inches for cabling in engine and fuel compartments. 46CFR183.340(b)(4)
Action required: 705 - Other - as specified
Due 3 April 2009
Resolved 5 May 2009
Engineering › Bilge Water Management System › Piping
Issued 2 March 2009
Resolved
Install metal bracket on bilge/fire piping overboard discharge where held up by plastic ties.
Action required: 705 - Other - as specified
Due 3 April 2009
Resolved 5 May 2009
Personnel › Training › Fire Fighting Basic
Issued 2 March 2009
Resolved
Provide proof of designated senior deckhand in writing and trained IAW NVIC 1-91.
Action required: 705 - Other - as specified
Due 5 June 2009
Resolved 16 June 2009
Resolution: Vsl comply with senior deckhand requirements as per NVIC 1-91.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 2 March 2009
Resolved
Replace plastic tubing at fuel tank with tubular glass gauge IAW 46CFR182.440(a)(7).
Action required: 705 - Other - as specified
Due 5 June 2009
Resolved 16 June 2009
Resolution: Vsl installed sounding tube in place of sight glass.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 31 January 2008
Resolved
One dry chemical extinguisher needs to be serviced due to low pressure.
Action required: 705 - Other - as specified
Due 1 February 2008
Resolved 31 January 2008
Resolution: Vessel representative returned extinguisher to servicing company and company provided another extinguisher with proper pressure. Item corrected prior to completion of inspection.
Navigation › Piloting/Steering › Marine Charts
Issued 31 January 2008
Resolved
Place onboard current/ corrected charts for area vessel operates in.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 January 2008
Resolved 31 January 2008
Resolution: Current corrected chart placed on board prior to completion of inspection.
Electrical › Lighting (service) › Lighting Fixture
Issued 31 January 2008
Resolved
Install two (2) missing glass light fixture globes, one in engine room port side, one in steering compartment port side.
Action required: 705 - Other - as specified
Due 15 February 2008
Resolved 31 January 2008
Resolution: Globes replaced prior to completion of inspection.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 31 January 2008
Resolved
Replace two (2) burned out light bulbs, one in the engine room starboard side, one
Due 1 February 2008
Resolved 31 January 2008
Resolution: Both light bulbs replaced during the course of the inspection.
Navigation › Piloting/Steering › US Coast Pilot
Issued 11 April 2006
Resolved
Found navigation publications outdated. Prove that all publications are current.
Action required: 705 - Other - as specified
Due 11 May 2006
Resolved 7 July 2006
Deck/Cargo › Mooring/Anchoring › Mooring Line/Hawser
Issued 9 April 2006
Resolved
Found vessels springline to be worn and frayed. Replace springline.
Action required: 705 - Other - as specified
Due 11 May 2006
Resolved 5 June 2006
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 9 April 2006
Resolved
Found exhaust leak from starboard engine air filter. Repairs or replace air filter to correct exhaust leak.
Action required: 705 - Other - as specified
Due 11 May 2006
Resolved 5 June 2006
Engineering › Fuel Oil Service System › Valve, Control
Issued 9 April 2006
Resolved
Found no F/O shutoff valves in way of main engines. Prove vessel has emergency fuel oil shut downs for main engines.
Action required: 705 - Other - as specified
Due 11 May 2006
Resolved 7 July 2006
Electrical › Lighting (service) › Lighting Fixture
Issued 9 April 2006
Resolved
Found missing light bulbs. Replace missing light bulbs.
Action required: 705 - Other - as specified
Due 11 May 2006
Resolved 5 June 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 April 2006
Resolved
Found dead end wire located on upper deck. Repair or remove dead end wire.
Action required: 705 - Other - as specified
Due 11 May 2006
Resolved 5 June 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 April 2006
Resolved
Prove upper deck lighting cables meet marine grade standards.
Action required: 705 - Other - as specified
Due 11 May 2006
Resolved 5 June 2006
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 9 April 2006
Resolved
Found engine compartment bilge high level alarm operating intermittently. Prove proper operation of alarm.
Action required: 705 - Other - as specified
Due 11 May 2006
Resolved 5 June 2006
Lifesaving › Lifebuoys › Serviceable
Issued 22 November 2004
Resolved
Lifebuoy is gouged. Repair or Replce.
Condition: Improper/Lack of Maintenance
Due 10 March 2005
Resolved 24 March 2005
Resolution: Cleared.
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 22 November 2004
Resolved
Station Bill missing. Post onboard and indoctrinate crew.
Condition: Improper/Lack of Maintenance
Due 10 February 2005
Resolved 24 March 2005
Resolution: Cleared.
Stability › Watertight Integrity › General
Issued 22 November 2004
Resolved
Through hull cooling penetration sealed with cap. Replace with equivalent material as piping and hull.
Condition: Improper Installation
Due 10 February 2005
Resolved 24 March 2005
Resolution: Cleared.
Engineering › Fuel Oil Service System › Piping
Issued 22 November 2004
Resolved
Suction and discharge lines of #1 SSGD sealed with rubber hose and hose clamp. Cap with equivalent materiual as fuel oil service system piping and fititings.
Condition: Improper Installation
Due 10 February 2005
Resolved 24 March 2005
Resolution: Cleared.
Engineering › Bilge Water Management System › Valve
Issued 5 December 2003
Resolved
VERIFY BILGE STRAINER CHECK VALVE AT NEXT HULL OR INTERNAL STRUCTURAL EXAMINATION
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 December 2004
Resolved 29 November 2004
Resolution: COMPLETED.
Lifesaving › Lifejacket/PFD (General)
Issued 6 July 2003
Resolved
Vsl has 155 adult & 14 child PFDs in lieu of the quantities specified on the vsl's COI (158 & 16). Until such time that additional PFDs place onboard to the satisfaction of the attending USCG Marine Inspector, not more than 155 total persons may be aboard of which not more than 14 may be children.
Action required: 705 - Other - as specified
Due 5 December 2003
Resolved 5 December 2003
Resolution: Completed Activity 1969863 dated 12/5/2003.
Electrical › Lighting (service)
Issued 6 July 2003
Resolved
Electrical lights on upper deck light covers fractured/holed creating increased risk of electrical shock hazard. Fractured/holed light covers shall be replaced in kind with new covers not later than 20 July 2003.
Due 20 July 2003
Resolved 5 December 2003
Resolution: Completed Activity 1969863 dated 12/5/2003.
Documentation › Certificates/Documents
Issued 6 July 2003
Resolved
Certificate of Documentation shall be placed aboard vessel not later than 20 July 2003. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Due 20 July 2003
Resolved 5 December 2003
Lifesaving
Issued 6 July 2003
Resolved
Ring life buoy in way of centerline bow is blocked by rescue ladder, impeding its use in an emergency. Ring buoy shall be relocated on the main deck such that it is readily accessible to crewmembers and readily deployable in an emergency not later than 20 July 2003. Satisfactory bracket required.
Due 20 July 2003
Resolved 5 December 2003
Resolution: Completed Activity 1969863 dated 12/5/2003.
Construction/Loadline › Hull
Issued 1 June 2002
Resolved
Port fwd cutlass bearing unsatisfactory creating vibration. Deficiency discovered by o/o and voluntarily corrected. LEGACY COMPONENT DESC: Port fwd cutlass bearing
Condition: Unknown
Due 1 June 2002
Resolved 1 June 2002
Resolution: Corrected.
Lifesaving › Lifejacket/PFD (Type I)
Issued 20 December 2001
Resolved
Vessel has only 101 satisfactory adult lifejackets and 11 satisfactory child lifejackets. 50+ adult lifejackets deteriorated due to UV exposure and failed the fingertip test described in NVIC 2-63. Vessel may only carry persons aboard for which there are proper sized lifejackets. LEGACY COMPONENT DESC: Condition
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Corrected.
Navigation › Piloting/Steering
Issued 20 December 2001
Resolved
Compass light not present/inoperable in non-adherence with 46 CFR 184.402.
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Corrected.
Navigation › Piloting/Steering
Issued 20 December 2001
Resolved
Charts and publications not currently corrected/available in non-adherence with 46 CFR 184.420. LEGACY COMPONENT DESC: Marine Charts
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Corrected.
Fire Fighting › Emergency Fire Pumps
Issued 20 December 2001
Resolved
Fire pump inoperable in non-adherence with 46 CFR 181.300.
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Corrected.
Construction/Loadline › Hull
Issued 20 December 2001
Resolved
Forepeak scuttle seal deteriorated allowing water into the forepeak during normal operations.
Action required: 705 - Other - as specified
Due 25 April 2002
Resolved 29 May 2002
Resolution: Corrected.
Electrical › Lighting (service)
Issued 20 December 2001
Resolved
Port and starboard bow deck lighting, necessary to assure safe embarkation of passengers, inoperable LEGACY COMPONENT DESC: Lighting Fixture
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Corrected.
Accommodation/Occupational Safety › Potable Water System
Issued 20 December 2001
Resolved
Water cooler not secured. During rough sea conditions the cooler is not prevented from falling and may create electrical shock hazard to passengers.
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Corrected.
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 20 December 2001
Resolved
Upper deck passenger limit not marked in non-adherence with 46 CFR 185.602.
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Corrected.
Lifesaving › Lifejacket/PFD (Type I)
Issued 20 December 2001
Resolved
All adult lifejackets stowed on second deck, and inaccessible to passengers located on main deck in non-adherence with 46 CFR 180.78. Lifejackets shall be restowed such that they are readilyt accessible to passengers on both decks. LEGACY COMPONENT DESC: Storage
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Some lifejackets restowed on lower deck.
Operations/Management › Casualty Reporting/Post-Casualty Actions
Issued 20 December 2001
Resolved
Company failed to report verbally and in writing inoperable fire pump to the USCG in non-adherence with 46 CFR 4.05. LEGACY COMPONENT DESC: Notice of Marine Casualty
Action required: 705 - Other - as specified
Due 4 January 2002
Resolved 25 March 2002
Resolution: Corrected.
Construction/Loadline
Issued 15 May 2001
Resolved
Attach latching devices on all hatch covers.
Condition: Unknown
Due 15 May 2001
Resolved 15 May 2001
Lifesaving
Issued 15 May 2001
Resolved
Electrical connect the vessel's public address system to the vessel's emergency power distribution panel.
Condition: Unknown
Due 15 May 2001
Resolved 15 May 2001
Construction/Loadline
Issued 13 April 2001
Resolved
Outline or make clearly visible the location of all hatch covers that are no visible over the non-skid tiling.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 13 April 2001
Resolved
Seal all holes on the main deck.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 13 April 2001
Resolved
Prove the operation of the steering compartment high level bilge alarm.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 13 April 2001
Resolved
Prove the operation of the fire/bilge pump indicator light at the helm and control panel.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 13 April 2001
Resolved
Prove the operation of the fore peak hatch cover.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 13 April 2001
Resolved
Install gaskets, retaining, and securing devices on all hatches.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Engineering
Issued 13 April 2001
Resolved
Install CG approved/authorized flexible hose on the intake water lines for all engines.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Navigation
Issued 13 April 2001
Resolved
Proved a copy of the 1972 Collision Regulations (Rules of the Road pub) forthe vessel.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Lifesaving
Issued 13 April 2001
Resolved
Provide fourteen adult lifejackets. Vessel is restricted to the carriage of 134 persons until completion.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Lifesaving
Issued 13 April 2001
Resolved
Conduct man-overboard and fire drills in the presence of the attending USCGmarine inspector.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Unknown
Issued 13 April 2001
Resolved
Install a public announcement system audible in both decks.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Navigation
Issued 13 April 2001
Resolved
Prove the operation of the navigation horn.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Electrical
Issued 13 April 2001
Resolved
Properly secure the generator and main engine starting batteries.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 13 April 2001
Resolved
Prove the operation of the operating indicator for the engine room auto bilgle pump.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Lifesaving
Issued 17 May 2000
Resolved
Provide 1 additional child and 1 additional adult lifejacket for the vessel. Passenger capacity is limited to 148 of which no more than 15 may be children.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 17 May 2000
Resolved
Properly label the amount and location of lifejackets on the upper deck.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 17 May 2000
Resolved
Properly stow the childern lifejackets on the main deck in a location readily accessible to crew and passengers.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 17 May 2000
Resolved
Conduct required safety orientation briefing to passengers prior to departure of the vessel from the dock.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Electrical
Issued 17 May 2000
Resolved
Install blank breaker on the operating station's electrical distribution panel.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Unknown
Issued 17 May 2000
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Engineering
Issued 6 January 1999
Resolved
Prove the operation of the remote fuel shut-off valves.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Lifesaving
Issued 6 January 1999
Resolved
Update the Emergency Broadcast placard to reflect the vessel's new call sign.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Construction/Loadline
Issued 6 January 1999
Resolved
Seal all side shell openings on the port and stbd side, in way of the rub rail mounts, in all compartments.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Unknown
Issued 6 January 1999
Resolved
Renew the wasted mounts for the air receiver and prove the operation of therelief valve.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Electrical
Issued 6 January 1999
Resolved
Prove the operation of the aft generator.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Navigation
Issued 6 January 1999
Resolved
Prove the operation of the anchor light.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Construction/Loadline
Issued 6 January 1999
Resolved
Prove the operation of the visual indicators for the high level bilge alarms.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Lifesaving
Issued 6 January 1999
Resolved
Implement passenger safety orientation brief in accordance with requirements of 46 CFR 185.506.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Engineering
Issued 6 January 1999
Resolved
Make permanent repairs to the port main engine muffler.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Construction/Loadline
Issued 6 January 1999
Resolved
Seal all openings on the main deck.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Construction/Loadline
Issued 6 January 1999
Resolved
Seal the aft cableway in the electrical panel space.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Construction/Loadline
Issued 6 January 1999
Resolved
Renew the wasted transverse beam at frame 4, compartment 2 at next drydock.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Navigation
Issued 6 January 1999
Resolved
Provide a navigation bell and mounting bracket for the vessel. The bell shall be no smaller than 8 inches at its mouth.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Lifesaving
Issued 6 January 1999
Resolved
Provide 3 Adult and 3 child lifejackets for the vessel.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Documentation
Issued 5 January 1999
Resolved
Porvide and post valid FCC Station License.
Condition: Unknown
Due 5 January 1999
Resolved 5 January 1999
Documentation
Issued 5 January 1999
Resolved
All operators of vessel must have valid FCC operators permit.
Condition: Unknown
Due 5 January 1999
Resolved 5 January 1999
Lifesaving
Issued 5 January 1999
Resolved
Properly mark stowage areas for adult and child life jackets.
Condition: Unknown
Due 5 January 1999
Resolved 5 January 1999
Lifesaving
Issued 5 January 1999
Resolved
Provide passenger safety orientation to passengers as per 46 CFR 185.506.
Condition: Unknown
Due 5 January 1999
Resolved 5 January 1999
Unknown
Issued 5 January 1999
Resolved
Repair public address system.
Condition: Unknown
Due 5 January 1999
Resolved 5 January 1999
Fire Fighting
Issued 5 January 1999
Resolved
Provide closures for E/R ventilation system.
Condition: Unknown
Due 5 January 1999
Resolved 5 January 1999
Construction/Loadline
Issued 5 January 1999
Resolved
Repair/replace bilge alarm for engine room & steering space.
Condition: Unknown
Due 5 January 1999
Resolved 5 January 1999
Fire Fighting
Issued 5 January 1999
Resolved
Replace current 30 inch section of hose in firemain with J1942 type hose.
Condition: Unknown
Due 5 January 1999
Resolved 5 January 1999
Construction/Loadline
Issued 13 January 1993
Resolved
REPLACE OR MAKE PERMANENT REPAIRS TO WATERTIGHT HATCH ON BOW.
Condition: Unknown
Due 13 January 1993
Resolved 13 January 1993