Records from 2001 to 2009. Most recent: inspection, 4 March 2009.
Inspection history · 14
4 March 2009
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3427357
22 March 2006
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2608730
11 November 2005
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2542523
26 August 2005
Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2475318
30 September 2004
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2208557
4 August 2004
In-Service Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2155769
25 August 2003
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1886301
3 August 2003
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1895368
9 October 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1687299
26 September 2002
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1680390
29 May 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1622625
29 May 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1622634
11 September 2001
Initial Certification
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1447145
16 August 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1373601
Engineering › Electric Propulsion System › Battery
Issued 22 March 2006
No resolution recorded
Complete removal of batteries and associated equipment.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 March 2006 — due date passed with no resolution recorded
Communications › Alarms/Indicators › Bilge Alarm
Issued 11 November 2005
No resolution recorded
Repair aft high water level alarm
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 November 2005 — due date passed with no resolution recorded
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 11 November 2005
No resolution recorded
Re-pack port stufing tube/packing gland
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 November 2005 — due date passed with no resolution recorded
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 24 August 2005
Resolved
Renew both propulsion shaft bearings.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 20 October 2005
Engineering › Sea-water System (primary cooling) › Valve
Issued 24 August 2005
Resolved
Present all Sea chest valves for inspection.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 20 October 2005
Engineering › Bilge Water Management System › Pump
Issued 24 August 2005
Resolved
Renew Bilge de-watering piping in Battery compartment and ensure proper operation of bilge de-watering system after repairs are completed.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 11 November 2005
Construction/Loadline › Penetrations › Valve Flange
Issued 24 August 2005
Resolved
Make proper repairs to multiple through hull penetrations that are no longer in use.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 11 November 2005
Construction/Loadline › Structures › Deck Plating
Issued 24 August 2005
Resolved
Make repairs to main deck starboard bow rub rail.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 26 August 2005
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 August 2005
Resolved
Repair hole at the base of the collision bulkhead.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 11 November 2005
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 August 2005
Resolved
Repair hole in the battery compartment forward bulkhead.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 11 November 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 August 2005
Resolved
Remove dead end wiring in the fuel tank compartment.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 20 October 2005
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 24 August 2005
Resolved
Properly mark all Life Jackets with vessel's name.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 11 November 2005
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 August 2005
Resolved
Return starboard Push Knee Brace and collision bulkhead to original CG approved configuration.
Action required: 705 - Other - as specified
Due 26 September 2005
Resolved 20 October 2005
Fire Fighting › Fire Pumps › Suction Valve
Issued 30 September 2004
Resolved
Properly replace brokern fire pump supply vavle.
Condition: Improper/Lack of Maintenance
Due 30 September 2004
Resolved 30 September 2004
Engineering › Bilge Water Management System › Valve
Issued 30 September 2004
Resolved
Properly install through hull valves to electric bilge pumps.
Condition: Placed in Improper Service
Due 30 October 2004
Resolved 11 November 2005
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 August 2004
Resolved
Vsl failed Simplifies Sub-division, provide a proposal to bring all the vessels in compliance. The proposal is due no later than 01 September 2004 for work to be completed on all vessels no later than 01 January 2005
Condition: Improper Installation
Due 1 September 2004
Resolved 20 October 2005
Stability › Watertight Integrity
Issued 26 September 2002
Resolved
Locate source of water in the bilge of tank compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 September 2002
Resolved 1 October 2002
Fire Fighting › Fixed Fire Detection System
Issued 26 September 2002
Resolved
Install smoke activated fire detection system I.A.W 177.410 (C) (3) in the battery compartment LEGACY COMPONENT DESC: Smoke Detectors
Due 5 October 2002
Resolved 4 December 2002
Electrical › Electrical Distribution System (service)
Issued 26 September 2002
Resolved
Provide 25 amp breakers in lieu of 30 amp breaker for battery charger I.A.W approved electrical plans LEGACY COMPONENT DESC: Circuit Breaker
Due 5 October 2002
Resolved 15 November 2002
Fire Fighting › Fire Pumps
Issued 26 September 2002
Resolved
Demonstrate fire pump discharge pressure is I.A.W. 46CFR 181.300 (b) LEGACY COMPONENT DESC: Pressure
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 September 2002
Resolved 1 October 2002
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 26 September 2002
Resolved
Repair or replace automatic engine shut-down for the fixed firefighting system
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 September 2002
Resolved 1 October 2002
Operations/Management › Drills/Instruction
Issued 26 September 2002
Resolved
Provide emergency firefighting procedures more suitable for unique electrical vessel systems
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 September 2002
Resolved 4 December 2002
Electrical › Electric Generation Source (service)
Issued 26 September 2002
Resolved
Provide generator with 50 deg Centergrade ambient temp rating or derate to 80% or demonstrate ambient temp does not exceed 40 deg Centergrade LEGACY COMPONENT DESC: Generator
Action required: 705 - Other - as specified
Due 15 October 2002
Resolved 4 December 2002
Resolution: Generator manufacturer provide additional ambient temperature rating specification information. Generator does meet required ambient temperature rating. New information plate reflecting this rating has been attached to generator.