Records from 2016 to 2026. Most recent: inspection, 2 June 2026.
Documentation record
Registered dimensions (L × B × D)95.8 ft × 37.0 ft × 6.5 ft
Registered tonnagegross 97 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPETERSON BUILDERS · STURGEON BAY, WI, UNITED STATES · built 1989
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portWASHINGTON ISLAND, WI
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 16 December 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it66 - Regulatory (Subpart C or D), Net Ton
97 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
2 June 2026
Administrative Inspection · Annual Inspection · Vessel Attendance
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8405542
20 May 2025
Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8140227
6 June 2024
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7930232
6 June 2023
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7705047
9 August 2022
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7528796
17 May 2022
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7453206
21 April 2022
Drydock Exam · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7453136
25 May 2021
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7206874
2 September 2020
Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7048507
10 December 2019
Deficiency Check
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6871482
5 June 2019
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6704954
3 December 2018
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6591268
29 November 2018
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6589045
11 June 2018
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6442114
5 June 2017
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6165989
3 April 2017
Examination of Repairs · Internal Structural Exam · Drydock Exam · Plan Review "T" Boat
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6165947
24 May 2016
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5886740
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 June 2024
Resolved
The plugs on three ring buoys are cracked wich will lead to water intrusion. Renew life rings.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2024
Resolved 2 July 2024
Resolution: Verified 3 life rings have been renewed.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 19 May 2022
Resolved
Observed several items in the first aid kit were expired. Replace expired items iaw 46 CFR 184.710. To be resolved in 30 days.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2022
Resolved 15 June 2022
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 19 May 2022
Resolved
Three Life Jacket donning placards were recently removed. Replace missing placards iaw 46 CFR 185.516. To be resolved before passengers are carried.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2022
Resolved 15 June 2022
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 19 May 2022
Resolved
Crew not present during CG MI attendance. Unable to witness crew drills; Fire, Man Overboard and Abandon Ship drills. Crew drills to be witnessed by CG MI iaw 46CFR185.520 &.524. To be resolved in 30 days.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2022
Resolved 15 June 2022
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 19 May 2022
Resolved
Unable to witness operation of the vehicle decks sprinkler system. Demo operation in the presence of an attending CG [name withheld] 46 CFR 181.300. To be resolved in 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2022
Resolved 15 June 2022
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 19 May 2022
Resolved
Vessel recently made changes in way of the vehicle decks centerline passageway and head configurations. USCG MSC stability review is pending. Vessel is imposed a 10% reduction in load. Restriction imposed until stability review complete as required by 46 CFR 176.306. To be resolved within 14 days.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2022
Resolved 6 June 2022
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 May 2021
Resolved
Each hatch used as a means of escape must be capable of being opened by one person from wither side. Emergency escape hatch from the LAZ/ER cannot be opened from inside the space; rectify with handle or new scuttle cover.
46 CFR 177.500(h)
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2021
Resolved 11 June 2021
Resolution: fitted with prybar that is permanently attached at the scuttle exit.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 September 2020
Resolved
Each vessel must carry one floating light that is approved IAW 46CFR160.110. The tether attaching the floating light to the ring buoy was dry rotted.
46CFR180.70(d)(1)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 September 2020
Resolution: Vessel rep sent pictures of new tether.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 September 2020
Resolved
Fire hoses must be conform to UL19. Fire hose onboard had a hole in it.
46CFR181.320(b)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 September 2020
Resolution: Replaced fire hose with new one.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 2 September 2020
Resolved
Shutoff valves are to be fitted in the fuel supply line as close to the tank as possible. The shut off valve was siezed and could not be operated.
46CFR182.455(b)(4)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 2 September 2020
Resolution: crew performed maintenance and was able to actuate the valve.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 June 2019
Resolved
Observed reflective retro worn on several life jackets. Condition of all life jackets reflective retro shall be checked. All worn reflective retro tape is to be renewed. Company rep to provide attending CG Marine Inspector a statement when all checked and verified.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 June 2019
Resolved 10 December 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 June 2019
Resolved
Observed several items within the first aid kit were expired. Renew all expired items.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 June 2019
Resolved 10 June 2019
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 6 June 2017
Resolved
Name of vessel is faded and barley readable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 8 June 2017
Resolution: Vsl name has been renewed on all lifebuoys.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 5 June 2017
Resolved
Retroreflective material is worn on several PFD's: renew as needed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 19 June 2017
Resolution: Company replaced reflective SOLAS tape on 43 Adult jackets and 7 Child Jackets
Engineering › Fuel Oil Service System › Valve, Control
Issued 24 May 2016
Resolved
The remote fuel valve shut down assembly did not consistently function and was hanging up. Repair or replace remote fuel valve shut down assembly. Prove proper and consistent operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 June 2016
Resolved 13 June 2016
Resolution: [name withheld] attended vessel and verified new remote pull cable installation. Tested remote pull and fuel shut off valve. All sat.
Fire Fighting › Nozzles › Approval
Issued 24 May 2016
Resolved
Fire hose nozzles were plastic and not an approved type. Current nozzles are servicable but require replacement with approve type. Replace all unapproved installations with ASTM F 1546, 162.027 approved nozzles.-
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 June 2016
Resolved 26 May 2016
Resolution: Four new brass fire hose nozzles were purchased and installed.