PTARMIGAN
Passenger (Inspected) · Passenger Ship class · Built 1980s · USCG Arctic District (CGD-A) · Other hulls named PTARMIGAN
PTARMIGAN is a 1989 passenger vessel (inspected). The Coast Guard has recorded 60 inspections since 1989, most recently in May 2026, along with 73 deficiencies and 4 casualty investigations between 2008 and 2018.
Records from 1989 to 2026. Most recent: inspection, 12 May 2026.
- Built
- 1989
- Last inspected
- 12 May 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 73 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 4 investigations · 2008–2018
Identity
951060
WDG4884
333285
Flag
UNITED STATES
367420370, 368429680
Maury page id
psix-333285
Inspections, by type
…with no type recorded3
Years with a record
33 calendar years (1989–2026)
The 60 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)77.5 ft × 27.1 ft × 7.0 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGRAYLING INTERNATIONAL INC · PORTAGE, AK, UNITED STATES · built 1989
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORTAGE LAKE, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational, Registry
DocumentationValid · issued 11 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDQ4884MMSI 368429680 · active · compulsorily equipped · granted 10 July 2025, expires 10 July 2035
WDE9711MMSI 367420370 · active · compulsorily equipped · granted 24 May 2019, expires 29 July 2029
WCR3783MMSI not assigned · expired · compulsorily equipped · granted 4 May 1995, cancelled 9 July 2005
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 60
12 May 2026
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8372016
9 April 2026
Administrative Inspection · Plan Review "T" Boat · Construction Oversight
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8347213
12 June 2025
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8153717
4 April 2025
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8105339
4 April 2025
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8105343
20 June 2024
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7937321
12 April 2024
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7895788
17 March 2023
Administrative Inspection · Annual Inspection · In-Service Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7705007
20 September 2022
In-Service Inspection · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7567524
12 July 2022
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7504861
25 May 2022
Administrative Inspection · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7443380
9 July 2021
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7257222
24 June 2021
Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7233902
16 July 2020
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7002888
18 June 2019
DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6717773
11 August 2018
Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6512274
11 August 2018
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6514051
21 June 2018
DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6404895
25 September 2017
Drydock Exam · Examination of Repairs · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6306247
11 July 2017
Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6208334
9 July 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6510926
25 May 2017
Deficiency Check · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6154619
17 June 2016
Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5953537
14 October 2014
Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5006418
17 June 2014
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4891732
25 May 2012
Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4318797
25 May 2012
MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4376734
4 August 2011
Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4112451
24 September 2008
Drydock Exam · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3328471
26 June 2008
Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3248747
6 June 2008
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3232128
6 June 2008
MTSA Verification · Annual Inspection · Deficiency Check · MARPOL Annex V Examination · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3292269
16 May 2008
Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3262641
17 January 2008
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3132211
14 June 2007
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2961925
26 May 2007
MTSA Verification · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3023676
3 June 2006
MTSA Verification · MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2720366
23 May 2005
MTSA Verification · Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2409730
27 May 2004
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2099837
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978923
19 September 2003
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1908731
29 May 2003
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1825760
8 June 2001
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1456024
14 May 2000
Deficiency Check · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1420326
3 June 1999
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1369193
30 September 1998
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1433389
1 May 1998
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1129609
9 July 1997
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 780570
1 May 1997
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1378067
2 May 1996
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1419604
11 May 1995
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1220163
3 May 1994
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1169434
3 October 1993
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1180108
6 May 1993
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1132680
5 October 1992
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1247042
4 October 1991
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1246651
30 May 1991
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1217610
6 May 1991
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 913849
17 May 1990
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 915929
30 June 1989
Hull Examination · Initial Certification · Plan Review "T" Boat
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1003162
Deficiency record · 73
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2026
Resolved
Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. Marine Inspector observed cable going to black water pump was not supported by its metal supports. Metal support was broken. Affix new support bracket for cable support.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to:
(b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Marine Inspector observed dead end wire at the transom in the overhead. Remove dead end wire.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 18 June 2026
Resolved
Batteries must be mounted in trays lined with, or constructed of, a material that is resistant to damage by the electrolyte. Marine Inspector found two spare batteries(engine room, space under bridge) that were not mounted in a tray or box. Remove spare batteries or mount in tray or box to protect against battery acid leakage and accidental contact across battery terminals.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 12 June 2025
Resolved
The bridge-to-bridge radiotelephone station will be inspected on vessels subject to regular inspections pursuant to the requirements of Parts II and III of Title III of the Communications Act. The Bridge to bridge and Safety radio telephony certificates had the wrong call sign on them. Provide new certificates with correct call sign.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 12 June 2025
Resolved
A hinged watertight bulkhead door must be fitted with a quick action closing devise operable from both sides of the door and indicator lights at the operating station showing whether the door is open or closed. The watertight door entering into the engine room needs to be adjusted to seal properly. Adjust dawgs on watertight door.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 June 2025
Resolved
Waste receptacles. Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. The waste receptacle on the top deck was made of combustible material. Remove waste receptacle.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 June 2025
Resolved
Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be energized from two sources of electricity: (i) The vital systems listed in § 182.710 of this chapter. The #1 generator failed and could not provide electrical power to vital systems if required to.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 June 2025
Resolved
On a vessel more than 19.8 meters (65ft) in length, the minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. The vessel’s fire pump could only achieve 30 psi. Repair or renew fire pump to achieve 60 psi at pump outlet.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 12 June 2025
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Due to material condition of vessel, vessel could not get underway to conduct drills. Conduct fire, MOB and abandon ship drills to the satisfaction of the attending coast guard marine inspector to receive credit for Annual inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 June 2025
Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). The engine driven fire/bilge pump failed only leaving one of the two required bilge pumps. Renew/replace fire/bilge pump and test it in the presence of the attending coast guard marine inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 12 June 2025
Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel except that a float-free link is not required if the vessel operates only on waters not as deep as the length of the painter. Painter was not connected to anything. Painter was connected to weak link.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 June 2025
Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942 (incorporated by reference; see 46 CFR 175.600) or be specifically approved by the Commandant. The lube oil, fuel oil and hydraulic oil nonmetallic hoses on the main engines do not meet SAE J-1942. Replace all the fuel oil, lube oil and hydraulic oil lines on both main engines and generators if it has them that do not meet the SAE J-1942 specs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 June 2024
Resolved
Vessel is required to have 2 fixed power bilge pumps, of which one may serve as a fire/bilge pump. The fire pump must be capable of remote and local operation. Currently the fire pump is engine driven and the crew has to shut down the starboard main engine, install drive belts, actuate belt tensioner, and restart engine. Provide a means to ensure the fire pump is ready for operation at all times.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 June 2024
Resolved
Vital piping systems with flexible hose installed must meet the SAE J1942 standard. The bilge piping system has two sections of flexible hose installed that does not meet the J1942 standard. Provide metallic piping or approved SAE J1942 hoses for the bilge system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024
Resolved
Piping that exceeds the temperature of 150 deg F much be
suitably insulated. The dry engine exhaust manifolds for both main diesel engines exceed 150 deg F and do not have protective lagging. Provide protective exhaust lagging for both engine exhaust manifolds.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery
failure, and personnel injury. The heating boiler has an
exhaust leak, service and repair boiler.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 20 June 2024
Resolved
The owner, charterer, master or managing operator shall instruct each crew member as to the duties they are expected to perform in an emergency. Provide training for deck hands in the operation of the bilge pumping and fire pump operations.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 June 2024
Resolved
Remote fuel shut off valves must be marked in clearly legible letters at least 1 inch high indicating purpose of the valve and direction of operation. The fuel valves are currently not marked.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2021
Resolved
Repair/replace 2 deck aft port life-ring buoy.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 June 2021
Resolved
Replace all plastic trash can with non-combustible ones.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 25 June 2021
Resolved
Provide FCC operators license for all licenced masters.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 July 2020
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment under all practical conditions. Engine driven bilge/fire pump does not achieve pumping pressure (46 CFR 182.25).
Construction/Loadline › Hull › Keel
Issued 12 July 2017
Resolved
Make permanent repairs to the port main engine integral keel cooler.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 26 May 2017
Resolved
Provide exhaust lagging for exposed portions of generator exhaust pipe.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 June 2016
Resolved
Power strip in wheelhouse wired as permanent. Remove power strip & make proper electrical J-Box/receptical installation (46CFR183.340(d)).
Lifesaving › Lifebuoys › Approval
Issued 18 June 2016
Resolved
Install retroreflective material to main deck port aft & 2nd deck port fwd ring life buoys (46CFR185.604(h)).
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 June 2016
Resolved
Install guard for stbd main fuel pump drive shaft.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 18 June 2016
Resolved
Install proper breaker tag out for water heater (46CFR183.01-15).
Fire Fighting › Fixed Halon Fire Extinguishing System › Control Valve
Issued 1 August 2014
Resolved
Move fixed fire extinguishing system controls to include stop valve, time delay, etc to outside the protected space (46CFR181.20-15, 46CFR181.410(b) by 30 Apr 2014 or prior to operating next year (whichever is later).
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 17 June 2014
Resolved
Prove proper operation of fathometer.
Stability › Weathertight Integrity › General
Issued 17 June 2014
Resolved
Replace broken window #5 port side numbered from bow.
Stability › Watertight Integrity › General
Issued 25 May 2012
Resolved
Make all void spaces available for inspection.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 25 May 2012
Resolved
Complete satisfactory man overboard and fire drill in the prescence of a marine inspector.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 25 May 2012
Resolved
Ensure proper operation of rudder angle indicator.
Electrical › Electrical Distribution System (emergency) › Cable
Issued 25 May 2012
Resolved
Replace all welding cable used in battery installation with appropriate type cable.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 4 August 2011
Resolved
Provide manned engine room while underway with passengers.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 24 September 2008
Resolved
Provide shaft bearing clearances along with manufacturers specs. or renew. Prior to credit dry-dock.
Construction/Loadline › Hull › Hull Plating
Issued 24 September 2008
Resolved
Provide plate repair drawing of forward port repair. Prior to credit dry-dock.
Construction/Loadline › Structures › Superstructure
Issued 6 June 2008
Resolved
Replace cracked windows in pilot house
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 6 June 2008
Resolved
Remove excess water from bilges in vessel compartments
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 6 June 2008
Resolved
Remove excess oil & water from eng room bilges
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 6 June 2008
Resolved
Install cover on 110 electrical outlet on eng room distribution panel
Construction/Loadline › Hull › Hull Plating
Issued 16 May 2008
Resolved
Crop & Renew inset on bow/ STBD bow at next dry dock in Sept 2009.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 3 June 2006
Resolved
Provide proof of documentation.
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2005
Resolved
Crop and renew improper inserts in starboard side shell, void #3 approx 5 feet above waterline. Submit repair proposal for approval and have fit up and final repair inspected by an attending marine inspector.
Lifesaving
Issued 1 May 1997
Resolved
Conduct underway operational drills in the presence of a marine inspector_x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 1 May 1997
Resolved
Prove proper operation of Electronic and Navigation equipment.
Construction/Loadline
Issued 1 May 1997
Resolved
Remove petroleum product/residue from engineroom bilge and deck plates.
Engineering
Issued 11 May 1995
Resolved
Provide keeper for starboard main engine hydraulic power take off actuatingcylinder clevis.
Documentation
Issued 11 May 1995
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Engineering
Issued 11 May 1995
Resolved
Repair starboard main engine and reduction gear mounts. Vessel is not to beoperated with passengers aboard until this item is repaired to the satisfaction of the cognizant OCMI.
Engineering
Issued 11 May 1995
Resolved
Provide evidence of annual boiler certification or test boiler to the satisfaction of an attending CG Marine Inspector.
Engineering
Issued 11 May 1995
Resolved
Provide adequate lagging on boiler exhaust pipe.
Fire Fighting
Issued 11 May 1995
Resolved
Provide operable pressure gauge in fire main system at pump.
Construction/Loadline
Issued 11 May 1995
Resolved
Demonstrate bilge alarms in all compartments. Vessel is not to board passengers until this requirement is corrected to the satisfaction of the cognizant OCMI.
Engineering
Issued 11 May 1995
Resolved
Demonstrate operation of relief valve on engineroom air receiver.
Construction/Loadline
Issued 11 May 1995
Resolved
Demonstrate bilge pumping system. Vessel may not board passengers until system is proven operable to the satisfaction of the cognizant OCMI.
Electrical
Issued 3 May 1994
Resolved
Install permanent electical supply to vessel's control air system drier.
Electrical
Issued 3 May 1994
Resolved
Route and install wire hangars for lazarette rudder angle system.
Fire Fighting
Issued 3 May 1994
Resolved
Repair split fire main piping system.
Lifesaving
Issued 3 May 1994
Resolved
Get vessel underway and demonstrate emergency drills.
Documentation
Issued 3 May 1994
Resolved
Provide stability letter.
Electrical
Issued 3 May 1994
Resolved
Submit electrical plans for davit electric electric winch system. Do not operate electic winch until plans have been approved.
Construction/Loadline
Issued 3 May 1994
Resolved
Demonstrate bilge alarm system.
Electrical
Issued 3 May 1994
Resolved
Remove man overboard electric winch temporary wiring system.
Navigation
Issued 3 May 1994
Resolved
Repair leaking hydraulic piping to bow thruster.
Engineering
Issued 3 May 1994
Resolved
Repair port main engine lube oil pressure and jacket water temperature gauges.
Electrical
Issued 3 May 1994
Resolved
Repair electrical wiring to telephone call light(blue light) in engine room.
Engineering
Issued 3 May 1994
Resolved
Install machinery guards on forward end of port main diesel engine.
Fire Fighting
Issued 3 May 1994
Resolved
Repair starboard main diesel engine fire pump drive clutch.
Engineering
Issued 3 May 1994
Resolved
Repair clevis pin retainer on starboard control pitch propellor actuator.
Accommodation/Occupational Safety
Issued 6 May 1991
Resolved
PROVE PROPER OPERATION OF SMALL PACKAGE BOILER/HOT WATER HEATER.
Accommodation/Occupational Safety
Issued 30 June 1989
Resolved
PROVE PROPER OPERATION AND INSTALLATION OF HOT WATER HEATING SYSTEM
Casualty record · 4
6 June 2008Routine · role: Involved in a Marine Casualty · 3 injured · activity 3232128
23 August 2012Routine · role: Involved in a Marine Casualty · activity 4431973
9 July 2017Routine · role: Involved in a Marine Casualty · activity 6510926
11 August 2018Routine · role: Involved in a Marine Casualty · activity 6514051
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.