MAURY USCG vessel records
← All vessels

PTARMIGAN

Built
1989
Last inspected
12 May 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 12 May 2026
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDG4884
333285
Flag
UNITED STATES
Maury page id
psix-333285

Documentation record

Registered dimensions (L × B × D)77.5 ft × 27.1 ft × 7.0 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGRAYLING INTERNATIONAL INC · PORTAGE, AK, UNITED STATES · built 1989
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPORTAGE LAKE, AK
Endorsements, as the file codes themcw_un, fi, rec, reg
DocumentationValid · issued 11 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 23 inspections, each with its date, unit and type; 28 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 23

12 May 2026 Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8372016
9 April 2026 Administrative Inspection · Plan Review "T" Boat · Construction Oversight
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8347213
12 June 2025 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8153717
4 April 2025 Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8105339
4 April 2025 Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8105343
20 June 2024 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7937321
12 April 2024 Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7895788
17 March 2023 Administrative Inspection · Annual Inspection · In-Service Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7705007
20 September 2022 In-Service Inspection · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7567524
12 July 2022 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7504861
25 May 2022 Administrative Inspection · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7443380
9 July 2021 Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7257222
24 June 2021 Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7233902
16 July 2020 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7002888
18 June 2019 DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6717773
11 August 2018 Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6512274
11 August 2018 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6514051
21 June 2018 DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6404895
25 September 2017 Drydock Exam · Examination of Repairs · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6306247
11 July 2017 Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6208334
9 July 2017 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6510926
25 May 2017 Deficiency Check · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6154619
17 June 2016 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5953537

Deficiency record · 28

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2026 Resolved
Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. Marine Inspector observed cable going to black water pump was not supported by its metal supports. Metal support was broken. Affix new support bracket for cable support.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2026 Resolved
Electrical equipment on a vessel must be installed and maintained to: (b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Marine Inspector observed dead end wire at the transom in the overhead. Remove dead end wire.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 18 June 2026 Resolved
Batteries must be mounted in trays lined with, or constructed of, a material that is resistant to damage by the electrolyte. Marine Inspector found two spare batteries(engine room, space under bridge) that were not mounted in a tray or box. Remove spare batteries or mount in tray or box to protect against battery acid leakage and accidental contact across battery terminals.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 12 June 2025 Resolved
The bridge-to-bridge radiotelephone station will be inspected on vessels subject to regular inspections pursuant to the requirements of Parts II and III of Title III of the Communications Act. The Bridge to bridge and Safety radio telephony certificates had the wrong call sign on them. Provide new certificates with correct call sign.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 23 July 2025
Resolution: Received proof of radio safety telephony and bridge to bridge certificate.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 12 June 2025 Resolved
A hinged watertight bulkhead door must be fitted with a quick action closing devise operable from both sides of the door and indicator lights at the operating station showing whether the door is open or closed. The watertight door entering into the engine room needs to be adjusted to seal properly. Adjust dawgs on watertight door.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 16 June 2025
Resolution: WTD dawgs adjusted and tested.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 June 2025 Resolved
Waste receptacles. Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. The waste receptacle on the top deck was made of combustible material. Remove waste receptacle.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 16 June 2025
Resolution: Waste receptacle removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 June 2025 Resolved
Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be energized from two sources of electricity: (i) The vital systems listed in § 182.710 of this chapter. The #1 generator failed and could not provide electrical power to vital systems if required to.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 June 2025
Resolved 12 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 June 2025 Resolved
On a vessel more than 19.8 meters (65ft) in length, the minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. The vessel’s fire pump could only achieve 30 psi. Repair or renew fire pump to achieve 60 psi at pump outlet.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 June 2025
Resolved 16 June 2025
Resolution: Engine driven fire pump showed 60 psi on guage at the pump.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 12 June 2025 Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Due to material condition of vessel, vessel could not get underway to conduct drills. Conduct fire, MOB and abandon ship drills to the satisfaction of the attending coast guard marine inspector to receive credit for Annual inspection.
Action required: 705 - Other - as specified
Due 30 June 2025
Resolved 16 June 2025
Resolution: Drills completed onboard while underway.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 June 2025 Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). The engine driven fire/bilge pump failed only leaving one of the two required bilge pumps. Renew/replace fire/bilge pump and test it in the presence of the attending coast guard marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 June 2025
Resolved 13 June 2025
Resolution: Bilge pump repaired and tested by pumping out lazerette.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 12 June 2025 Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel except that a float-free link is not required if the vessel operates only on waters not as deep as the length of the painter. Painter was not connected to anything. Painter was connected to weak link.
Action required: 10 - Deficiency Rectified
Due 12 June 2025
Resolved 12 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 June 2025 Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942 (incorporated by reference; see 46 CFR 175.600) or be specifically approved by the Commandant. The lube oil, fuel oil and hydraulic oil nonmetallic hoses on the main engines do not meet SAE J-1942. Replace all the fuel oil, lube oil and hydraulic oil lines on both main engines and generators if it has them that do not meet the SAE J-1942 specs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 9 July 2025
Resolution: hoses replaced with approved hose and fittings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 June 2024 Resolved
Vessel is required to have 2 fixed power bilge pumps, of which one may serve as a fire/bilge pump. The fire pump must be capable of remote and local operation. Currently the fire pump is engine driven and the crew has to shut down the starboard main engine, install drive belts, actuate belt tensioner, and restart engine. Provide a means to ensure the fire pump is ready for operation at all times.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 June 2024 Resolved
Vital piping systems with flexible hose installed must meet the SAE J1942 standard. The bilge piping system has two sections of flexible hose installed that does not meet the J1942 standard. Provide metallic piping or approved SAE J1942 hoses for the bilge system.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024 Resolved
Piping that exceeds the temperature of 150 deg F much be suitably insulated. The dry engine exhaust manifolds for both main diesel engines exceed 150 deg F and do not have protective lagging. Provide protective exhaust lagging for both engine exhaust manifolds.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. The heating boiler has an exhaust leak, service and repair boiler.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 20 June 2024 Resolved
The owner, charterer, master or managing operator shall instruct each crew member as to the duties they are expected to perform in an emergency. Provide training for deck hands in the operation of the bilge pumping and fire pump operations.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 June 2024 Resolved
Remote fuel shut off valves must be marked in clearly legible letters at least 1 inch high indicating purpose of the valve and direction of operation. The fuel valves are currently not marked.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2021 Resolved
Repair/replace 2 deck aft port life-ring buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2021
Resolution: ring has been replaced
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 June 2021 Resolved
Replace all plastic trash can with non-combustible ones.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2021
Resolution: trash cans have been replaced
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 25 June 2021 Resolved
Provide FCC operators license for all licenced masters.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 July 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 July 2020 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment under all practical conditions. Engine driven bilge/fire pump does not achieve pumping pressure (46 CFR 182.25).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 July 2020
Resolved 20 July 2020
Resolution: Rcvd email fm master w/ videos attached showing proper operation of engine driven bilge/fire pump, gauge showing 65 psi, & adequate stream from end of fire hose using engine driven bilge/pump.
Construction/Loadline › Hull › Keel
Issued 12 July 2017 Resolved
Make permanent repairs to the port main engine integral keel cooler.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 27 September 2017
Resolution: Examined new half pipe welded to hull & pressure test. All sat.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 26 May 2017 Resolved
Provide exhaust lagging for exposed portions of generator exhaust pipe.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2017
Resolved 7 September 2017
Resolution: Lagging installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 June 2016 Resolved
Power strip in wheelhouse wired as permanent. Remove power strip & make proper electrical J-Box/receptical installation (46CFR183.340(d)).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Power strip replaced w/ J-Box/receptical.
Lifesaving › Lifebuoys › Approval
Issued 18 June 2016 Resolved
Install retroreflective material to main deck port aft & 2nd deck port fwd ring life buoys (46CFR185.604(h)).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Retro applied to ring life buoys.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 June 2016 Resolved
Install guard for stbd main fuel pump drive shaft.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Guard installed.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 18 June 2016 Resolved
Install proper breaker tag out for water heater (46CFR183.01-15).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Breaker tag out installed.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.