MAURY USCG vessel records Sign in
← All vessels

PTARMIGAN

PTARMIGAN is a 1989 passenger vessel (inspected). The Coast Guard has recorded 60 inspections since 1989, most recently in May 2026, along with 73 deficiencies and 4 casualty investigations between 2008 and 2018.

Records from 1989 to 2026. Most recent: inspection, 12 May 2026.

Built
1989
Last inspected
12 May 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDG4884
333285
Flag
UNITED STATES
367420370, 368429680
Maury page id
psix-333285

Inspections, by type

…with no type recorded3
Years with a record 33 calendar years (1989–2026)
The 60 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)77.5 ft × 27.1 ft × 7.0 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGRAYLING INTERNATIONAL INC · PORTAGE, AK, UNITED STATES · built 1989
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORTAGE LAKE, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational, Registry
DocumentationValid · issued 11 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDQ4884MMSI 368429680 · active · compulsorily equipped · granted 10 July 2025, expires 10 July 2035
WDE9711MMSI 367420370 · active · compulsorily equipped · granted 24 May 2019, expires 29 July 2029
WCR3783MMSI not assigned · expired · compulsorily equipped · granted 4 May 1995, cancelled 9 July 2005
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 60

12 May 2026 Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8372016
9 April 2026 Administrative Inspection · Plan Review "T" Boat · Construction Oversight
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8347213
12 June 2025 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8153717
4 April 2025 Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8105339
4 April 2025 Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8105343
20 June 2024 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7937321
12 April 2024 Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7895788
17 March 2023 Administrative Inspection · Annual Inspection · In-Service Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7705007
20 September 2022 In-Service Inspection · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7567524
12 July 2022 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7504861
25 May 2022 Administrative Inspection · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7443380
9 July 2021 Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7257222
24 June 2021 Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7233902
16 July 2020 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7002888
18 June 2019 DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6717773
11 August 2018 Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6512274
11 August 2018 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6514051
21 June 2018 DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6404895
25 September 2017 Drydock Exam · Examination of Repairs · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6306247
11 July 2017 Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6208334
9 July 2017 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6510926
25 May 2017 Deficiency Check · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6154619
17 June 2016 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5953537
14 October 2014 Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5006418
17 June 2014 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4891732
25 May 2012 Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4318797
25 May 2012 MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4376734
4 August 2011 Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4112451
24 September 2008 Drydock Exam · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3328471
26 June 2008 Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3248747
6 June 2008 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3232128
6 June 2008 MTSA Verification · Annual Inspection · Deficiency Check · MARPOL Annex V Examination · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3292269
16 May 2008 Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3262641
17 January 2008 Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3132211
14 June 2007 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2961925
26 May 2007 MTSA Verification · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3023676
3 June 2006 MTSA Verification · MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2720366
23 May 2005 MTSA Verification · Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2409730
27 May 2004 Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2099837
24 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978923
19 September 2003 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1908731
29 May 2003 Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1825760
8 June 2001 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1456024
14 May 2000 Deficiency Check · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1420326
3 June 1999 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1369193
30 September 1998 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1433389
1 May 1998 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1129609
9 July 1997 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 780570
1 May 1997 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1378067
2 May 1996 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1419604
11 May 1995 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1220163
3 May 1994 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1169434
3 October 1993 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1180108
6 May 1993 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1132680
5 October 1992 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1247042
4 October 1991 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1246651
30 May 1991 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1217610
6 May 1991 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 913849
17 May 1990 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 915929
30 June 1989 Hull Examination · Initial Certification · Plan Review "T" Boat
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1003162

Deficiency record · 73

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2026 Resolved
Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. Marine Inspector observed cable going to black water pump was not supported by its metal supports. Metal support was broken. Affix new support bracket for cable support.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2026 Resolved
Electrical equipment on a vessel must be installed and maintained to: (b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Marine Inspector observed dead end wire at the transom in the overhead. Remove dead end wire.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 18 June 2026 Resolved
Batteries must be mounted in trays lined with, or constructed of, a material that is resistant to damage by the electrolyte. Marine Inspector found two spare batteries(engine room, space under bridge) that were not mounted in a tray or box. Remove spare batteries or mount in tray or box to protect against battery acid leakage and accidental contact across battery terminals.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 12 June 2025 Resolved
The bridge-to-bridge radiotelephone station will be inspected on vessels subject to regular inspections pursuant to the requirements of Parts II and III of Title III of the Communications Act. The Bridge to bridge and Safety radio telephony certificates had the wrong call sign on them. Provide new certificates with correct call sign.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 23 July 2025
Resolution: Received proof of radio safety telephony and bridge to bridge certificate.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 12 June 2025 Resolved
A hinged watertight bulkhead door must be fitted with a quick action closing devise operable from both sides of the door and indicator lights at the operating station showing whether the door is open or closed. The watertight door entering into the engine room needs to be adjusted to seal properly. Adjust dawgs on watertight door.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 16 June 2025
Resolution: WTD dawgs adjusted and tested.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 June 2025 Resolved
Waste receptacles. Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. The waste receptacle on the top deck was made of combustible material. Remove waste receptacle.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 16 June 2025
Resolution: Waste receptacle removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 June 2025 Resolved
Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be energized from two sources of electricity: (i) The vital systems listed in § 182.710 of this chapter. The #1 generator failed and could not provide electrical power to vital systems if required to.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 June 2025
Resolved 12 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 June 2025 Resolved
On a vessel more than 19.8 meters (65ft) in length, the minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. The vessel’s fire pump could only achieve 30 psi. Repair or renew fire pump to achieve 60 psi at pump outlet.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 June 2025
Resolved 16 June 2025
Resolution: Engine driven fire pump showed 60 psi on guage at the pump.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 12 June 2025 Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Due to material condition of vessel, vessel could not get underway to conduct drills. Conduct fire, MOB and abandon ship drills to the satisfaction of the attending coast guard marine inspector to receive credit for Annual inspection.
Action required: 705 - Other - as specified
Due 30 June 2025
Resolved 16 June 2025
Resolution: Drills completed onboard while underway.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 June 2025 Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). The engine driven fire/bilge pump failed only leaving one of the two required bilge pumps. Renew/replace fire/bilge pump and test it in the presence of the attending coast guard marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 June 2025
Resolved 13 June 2025
Resolution: Bilge pump repaired and tested by pumping out lazerette.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 12 June 2025 Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel except that a float-free link is not required if the vessel operates only on waters not as deep as the length of the painter. Painter was not connected to anything. Painter was connected to weak link.
Action required: 10 - Deficiency Rectified
Due 12 June 2025
Resolved 12 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 June 2025 Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942 (incorporated by reference; see 46 CFR 175.600) or be specifically approved by the Commandant. The lube oil, fuel oil and hydraulic oil nonmetallic hoses on the main engines do not meet SAE J-1942. Replace all the fuel oil, lube oil and hydraulic oil lines on both main engines and generators if it has them that do not meet the SAE J-1942 specs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 9 July 2025
Resolution: hoses replaced with approved hose and fittings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 June 2024 Resolved
Vessel is required to have 2 fixed power bilge pumps, of which one may serve as a fire/bilge pump. The fire pump must be capable of remote and local operation. Currently the fire pump is engine driven and the crew has to shut down the starboard main engine, install drive belts, actuate belt tensioner, and restart engine. Provide a means to ensure the fire pump is ready for operation at all times.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 June 2024 Resolved
Vital piping systems with flexible hose installed must meet the SAE J1942 standard. The bilge piping system has two sections of flexible hose installed that does not meet the J1942 standard. Provide metallic piping or approved SAE J1942 hoses for the bilge system.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024 Resolved
Piping that exceeds the temperature of 150 deg F much be suitably insulated. The dry engine exhaust manifolds for both main diesel engines exceed 150 deg F and do not have protective lagging. Provide protective exhaust lagging for both engine exhaust manifolds.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. The heating boiler has an exhaust leak, service and repair boiler.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 20 June 2024 Resolved
The owner, charterer, master or managing operator shall instruct each crew member as to the duties they are expected to perform in an emergency. Provide training for deck hands in the operation of the bilge pumping and fire pump operations.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 June 2024 Resolved
Remote fuel shut off valves must be marked in clearly legible letters at least 1 inch high indicating purpose of the valve and direction of operation. The fuel valves are currently not marked.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2021 Resolved
Repair/replace 2 deck aft port life-ring buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2021
Resolution: ring has been replaced
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 June 2021 Resolved
Replace all plastic trash can with non-combustible ones.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2021
Resolution: trash cans have been replaced
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 25 June 2021 Resolved
Provide FCC operators license for all licenced masters.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 July 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 July 2020 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment under all practical conditions. Engine driven bilge/fire pump does not achieve pumping pressure (46 CFR 182.25).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 July 2020
Resolved 20 July 2020
Resolution: Rcvd email fm master w/ videos attached showing proper operation of engine driven bilge/fire pump, gauge showing 65 psi, & adequate stream from end of fire hose using engine driven bilge/pump.
Construction/Loadline › Hull › Keel
Issued 12 July 2017 Resolved
Make permanent repairs to the port main engine integral keel cooler.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 27 September 2017
Resolution: Examined new half pipe welded to hull & pressure test. All sat.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 26 May 2017 Resolved
Provide exhaust lagging for exposed portions of generator exhaust pipe.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2017
Resolved 7 September 2017
Resolution: Lagging installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 June 2016 Resolved
Power strip in wheelhouse wired as permanent. Remove power strip & make proper electrical J-Box/receptical installation (46CFR183.340(d)).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Power strip replaced w/ J-Box/receptical.
Lifesaving › Lifebuoys › Approval
Issued 18 June 2016 Resolved
Install retroreflective material to main deck port aft & 2nd deck port fwd ring life buoys (46CFR185.604(h)).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Retro applied to ring life buoys.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 June 2016 Resolved
Install guard for stbd main fuel pump drive shaft.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Guard installed.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 18 June 2016 Resolved
Install proper breaker tag out for water heater (46CFR183.01-15).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Breaker tag out installed.
Fire Fighting › Fixed Halon Fire Extinguishing System › Control Valve
Issued 1 August 2014 Resolved
Move fixed fire extinguishing system controls to include stop valve, time delay, etc to outside the protected space (46CFR181.20-15, 46CFR181.410(b) by 30 Apr 2014 or prior to operating next year (whichever is later).
Action required: 705 - Other - as specified
Due 30 April 2015
Resolved 22 October 2014
Resolution: Inspected renovated piping and system controls. Re-piped system meets requirement above.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 17 June 2014 Resolved
Prove proper operation of fathometer.
Due 17 July 2014
Resolved 14 July 2014
Resolution: Rcvd e-mail fm port engineer indicating new fathometer was purchased, installed, & tested.
Stability › Weathertight Integrity › General
Issued 17 June 2014 Resolved
Replace broken window #5 port side numbered from bow.
Due 17 July 2014
Resolved 14 July 2014
Resolution: Rcvd e-mail fm Port Engineer indicating purchase and installation of windows #5 & #6.
Stability › Watertight Integrity › General
Issued 25 May 2012 Resolved
Make all void spaces available for inspection.
Action required: 705 - Other - as specified
Due 8 June 2012
Resolved 7 June 2012
Resolution: All voids were open and made available for inspection. All sat.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 25 May 2012 Resolved
Complete satisfactory man overboard and fire drill in the prescence of a marine inspector.
Action required: 705 - Other - as specified
Due 8 June 2012
Resolved 11 June 2012
Resolution: Observed satisfactory drills underway.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 25 May 2012 Resolved
Ensure proper operation of rudder angle indicator.
Action required: 705 - Other - as specified
Due 8 June 2012
Resolved 11 June 2012
Resolution: Noted design limitation of steering gear, verified rudder angle indicator is accurate.
Electrical › Electrical Distribution System (emergency) › Cable
Issued 25 May 2012 Resolved
Replace all welding cable used in battery installation with appropriate type cable.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2013
Resolved 15 October 2013
Resolution: Received documentation and pictures of replaced cable with proper battery cables.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 4 August 2011 Resolved
Provide manned engine room while underway with passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: Confirmed proper operation of propulsion and auxiliary machinery. Verified cause of excessive smoke buildup was due to the exhaust fan for the machinery space being switched off.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 24 September 2008 Resolved
Provide shaft bearing clearances along with manufacturers specs. or renew. Prior to credit dry-dock.
Action required: 705 - Other - as specified
Resolved 29 September 2008
Construction/Loadline › Hull › Hull Plating
Issued 24 September 2008 Resolved
Provide plate repair drawing of forward port repair. Prior to credit dry-dock.
Action required: 705 - Other - as specified
Resolved 25 September 2008
Construction/Loadline › Structures › Superstructure
Issued 6 June 2008 Resolved
Replace cracked windows in pilot house
Action required: 705 - Other - as specified
Resolved 8 June 2010
Resolution: windows replaced
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 6 June 2008 Resolved
Remove excess water from bilges in vessel compartments
Action required: 705 - Other - as specified
Due 6 July 2008
Resolved 26 June 2008
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 6 June 2008 Resolved
Remove excess oil & water from eng room bilges
Action required: 705 - Other - as specified
Due 6 July 2008
Resolved 26 June 2008
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 6 June 2008 Resolved
Install cover on 110 electrical outlet on eng room distribution panel
Action required: 705 - Other - as specified
Due 6 July 2008
Resolved 26 June 2008
Construction/Loadline › Hull › Hull Plating
Issued 16 May 2008 Resolved
Crop & Renew inset on bow/ STBD bow at next dry dock in Sept 2009.
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 16 October 2008
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 3 June 2006 Resolved
Provide proof of documentation.
Due 3 July 2006
Resolved 17 May 2007
Resolution: Received fax of vessels current documentation.
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2005 Resolved
Crop and renew improper inserts in starboard side shell, void #3 approx 5 feet above waterline. Submit repair proposal for approval and have fit up and final repair inspected by an attending marine inspector.
Due 1 June 2005
Resolved 1 June 2005
Lifesaving
Issued 1 May 1997 Resolved
Conduct underway operational drills in the presence of a marine inspector_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 May 1997
Resolved 1 May 1997
Navigation
Issued 1 May 1997 Resolved
Prove proper operation of Electronic and Navigation equipment.
Condition: Unknown
Due 1 May 1997
Resolved 1 May 1997
Construction/Loadline
Issued 1 May 1997 Resolved
Remove petroleum product/residue from engineroom bilge and deck plates.
Condition: Unknown
Due 2 June 1997
Resolved 2 June 1997
Engineering
Issued 11 May 1995 Resolved
Provide keeper for starboard main engine hydraulic power take off actuatingcylinder clevis.
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Documentation
Issued 11 May 1995 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Engineering
Issued 11 May 1995 Resolved
Repair starboard main engine and reduction gear mounts. Vessel is not to beoperated with passengers aboard until this item is repaired to the satisfaction of the cognizant OCMI.
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Engineering
Issued 11 May 1995 Resolved
Provide evidence of annual boiler certification or test boiler to the satisfaction of an attending CG Marine Inspector.
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Engineering
Issued 11 May 1995 Resolved
Provide adequate lagging on boiler exhaust pipe.
Condition: Unknown
Due 11 June 1995
Resolved 16 May 1995
Fire Fighting
Issued 11 May 1995 Resolved
Provide operable pressure gauge in fire main system at pump.
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Construction/Loadline
Issued 11 May 1995 Resolved
Demonstrate bilge alarms in all compartments. Vessel is not to board passengers until this requirement is corrected to the satisfaction of the cognizant OCMI.
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Engineering
Issued 11 May 1995 Resolved
Demonstrate operation of relief valve on engineroom air receiver.
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Construction/Loadline
Issued 11 May 1995 Resolved
Demonstrate bilge pumping system. Vessel may not board passengers until system is proven operable to the satisfaction of the cognizant OCMI.
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Electrical
Issued 3 May 1994 Resolved
Install permanent electical supply to vessel's control air system drier.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Electrical
Issued 3 May 1994 Resolved
Route and install wire hangars for lazarette rudder angle system.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Fire Fighting
Issued 3 May 1994 Resolved
Repair split fire main piping system.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Lifesaving
Issued 3 May 1994 Resolved
Get vessel underway and demonstrate emergency drills.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Documentation
Issued 3 May 1994 Resolved
Provide stability letter.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Electrical
Issued 3 May 1994 Resolved
Submit electrical plans for davit electric electric winch system. Do not operate electic winch until plans have been approved.
Condition: Unknown
Due 3 May 1994
Resolved 3 May 1994
Construction/Loadline
Issued 3 May 1994 Resolved
Demonstrate bilge alarm system.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Electrical
Issued 3 May 1994 Resolved
Remove man overboard electric winch temporary wiring system.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Navigation
Issued 3 May 1994 Resolved
Repair leaking hydraulic piping to bow thruster.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Engineering
Issued 3 May 1994 Resolved
Repair port main engine lube oil pressure and jacket water temperature gauges.
Condition: Unknown
Due 3 May 1994
Resolved 3 May 1994
Electrical
Issued 3 May 1994 Resolved
Repair electrical wiring to telephone call light(blue light) in engine room.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Engineering
Issued 3 May 1994 Resolved
Install machinery guards on forward end of port main diesel engine.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Fire Fighting
Issued 3 May 1994 Resolved
Repair starboard main diesel engine fire pump drive clutch.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Engineering
Issued 3 May 1994 Resolved
Repair clevis pin retainer on starboard control pitch propellor actuator.
Condition: Unknown
Due 3 June 1994
Resolved 13 May 1994
Accommodation/Occupational Safety
Issued 6 May 1991 Resolved
PROVE PROPER OPERATION OF SMALL PACKAGE BOILER/HOT WATER HEATER.
Condition: Unknown
Due 6 May 1991
Resolved 6 May 1991
Accommodation/Occupational Safety
Issued 30 June 1989 Resolved
PROVE PROPER OPERATION AND INSTALLATION OF HOT WATER HEATING SYSTEM
Condition: Unknown
Due 30 June 1989
Resolved 30 June 1989

Casualty record · 4

6 June 2008Routine · role: Involved in a Marine Casualty · 3 injured · activity 3232128
23 August 2012Routine · role: Involved in a Marine Casualty · activity 4431973
9 July 2017Routine · role: Involved in a Marine Casualty · activity 6510926
11 August 2018Routine · role: Involved in a Marine Casualty · activity 6514051
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.