Inspection history · 23
12 May 2026
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8372016
9 April 2026
Administrative Inspection · Plan Review "T" Boat · Construction Oversight
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8347213
12 June 2025
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8153717
4 April 2025
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8105339
4 April 2025
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8105343
20 June 2024
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7937321
12 April 2024
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7895788
17 March 2023
Administrative Inspection · Annual Inspection · In-Service Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7705007
20 September 2022
In-Service Inspection · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7567524
12 July 2022
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7504861
25 May 2022
Administrative Inspection · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7443380
9 July 2021
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7257222
24 June 2021
Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7233902
16 July 2020
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7002888
18 June 2019
DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6717773
11 August 2018
Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6512274
11 August 2018
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6514051
21 June 2018
DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6404895
25 September 2017
Drydock Exam · Examination of Repairs · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6306247
11 July 2017
Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6208334
9 July 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6510926
25 May 2017
Deficiency Check · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6154619
17 June 2016
Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5953537
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2026
Resolved
Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. Marine Inspector observed cable going to black water pump was not supported by its metal supports. Metal support was broken. Affix new support bracket for cable support.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to:
(b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Marine Inspector observed dead end wire at the transom in the overhead. Remove dead end wire.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 18 June 2026
Resolved
Batteries must be mounted in trays lined with, or constructed of, a material that is resistant to damage by the electrolyte. Marine Inspector found two spare batteries(engine room, space under bridge) that were not mounted in a tray or box. Remove spare batteries or mount in tray or box to protect against battery acid leakage and accidental contact across battery terminals.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 July 2026
Resolved 15 August 2026
Resolution: Received email from vessel rep with pictures of fix.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 12 June 2025
Resolved
The bridge-to-bridge radiotelephone station will be inspected on vessels subject to regular inspections pursuant to the requirements of Parts II and III of Title III of the Communications Act. The Bridge to bridge and Safety radio telephony certificates had the wrong call sign on them. Provide new certificates with correct call sign.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 23 July 2025
Resolution: Received proof of radio safety telephony and bridge to bridge certificate.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 12 June 2025
Resolved
A hinged watertight bulkhead door must be fitted with a quick action closing devise operable from both sides of the door and indicator lights at the operating station showing whether the door is open or closed. The watertight door entering into the engine room needs to be adjusted to seal properly. Adjust dawgs on watertight door.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 16 June 2025
Resolution: WTD dawgs adjusted and tested.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 June 2025
Resolved
Waste receptacles. Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. The waste receptacle on the top deck was made of combustible material. Remove waste receptacle.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 16 June 2025
Resolution: Waste receptacle removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 June 2025
Resolved
Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be energized from two sources of electricity: (i) The vital systems listed in § 182.710 of this chapter. The #1 generator failed and could not provide electrical power to vital systems if required to.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 June 2025
Resolved 12 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 June 2025
Resolved
On a vessel more than 19.8 meters (65ft) in length, the minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. The vessel’s fire pump could only achieve 30 psi. Repair or renew fire pump to achieve 60 psi at pump outlet.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 June 2025
Resolved 16 June 2025
Resolution: Engine driven fire pump showed 60 psi on guage at the pump.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 12 June 2025
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Due to material condition of vessel, vessel could not get underway to conduct drills. Conduct fire, MOB and abandon ship drills to the satisfaction of the attending coast guard marine inspector to receive credit for Annual inspection.
Action required: 705 - Other - as specified
Due 30 June 2025
Resolved 16 June 2025
Resolution: Drills completed onboard while underway.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 June 2025
Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). The engine driven fire/bilge pump failed only leaving one of the two required bilge pumps. Renew/replace fire/bilge pump and test it in the presence of the attending coast guard marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 June 2025
Resolved 13 June 2025
Resolution: Bilge pump repaired and tested by pumping out lazerette.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 12 June 2025
Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel except that a float-free link is not required if the vessel operates only on waters not as deep as the length of the painter. Painter was not connected to anything. Painter was connected to weak link.
Action required: 10 - Deficiency Rectified
Due 12 June 2025
Resolved 12 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 June 2025
Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942 (incorporated by reference; see 46 CFR 175.600) or be specifically approved by the Commandant. The lube oil, fuel oil and hydraulic oil nonmetallic hoses on the main engines do not meet SAE J-1942. Replace all the fuel oil, lube oil and hydraulic oil lines on both main engines and generators if it has them that do not meet the SAE J-1942 specs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 9 July 2025
Resolution: hoses replaced with approved hose and fittings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 June 2024
Resolved
Vessel is required to have 2 fixed power bilge pumps, of which one may serve as a fire/bilge pump. The fire pump must be capable of remote and local operation. Currently the fire pump is engine driven and the crew has to shut down the starboard main engine, install drive belts, actuate belt tensioner, and restart engine. Provide a means to ensure the fire pump is ready for operation at all times.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 June 2024
Resolved
Vital piping systems with flexible hose installed must meet the SAE J1942 standard. The bilge piping system has two sections of flexible hose installed that does not meet the J1942 standard. Provide metallic piping or approved SAE J1942 hoses for the bilge system.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024
Resolved
Piping that exceeds the temperature of 150 deg F much be
suitably insulated. The dry engine exhaust manifolds for both main diesel engines exceed 150 deg F and do not have protective lagging. Provide protective exhaust lagging for both engine exhaust manifolds.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery
failure, and personnel injury. The heating boiler has an
exhaust leak, service and repair boiler.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 20 June 2024
Resolved
The owner, charterer, master or managing operator shall instruct each crew member as to the duties they are expected to perform in an emergency. Provide training for deck hands in the operation of the bilge pumping and fire pump operations.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 June 2024
Resolved
Remote fuel shut off valves must be marked in clearly legible letters at least 1 inch high indicating purpose of the valve and direction of operation. The fuel valves are currently not marked.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 22 August 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2021
Resolved
Repair/replace 2 deck aft port life-ring buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2021
Resolution: ring has been replaced
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 June 2021
Resolved
Replace all plastic trash can with non-combustible ones.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2021
Resolution: trash cans have been replaced
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 25 June 2021
Resolved
Provide FCC operators license for all licenced masters.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 July 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 July 2020
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment under all practical conditions. Engine driven bilge/fire pump does not achieve pumping pressure (46 CFR 182.25).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 July 2020
Resolved 20 July 2020
Resolution: Rcvd email fm master w/ videos attached showing proper operation of engine driven bilge/fire pump, gauge showing 65 psi, & adequate stream from end of fire hose using engine driven bilge/pump.
Construction/Loadline › Hull › Keel
Issued 12 July 2017
Resolved
Make permanent repairs to the port main engine integral keel cooler.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 27 September 2017
Resolution: Examined new half pipe welded to hull & pressure test. All sat.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 26 May 2017
Resolved
Provide exhaust lagging for exposed portions of generator exhaust pipe.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2017
Resolved 7 September 2017
Resolution: Lagging installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 June 2016
Resolved
Power strip in wheelhouse wired as permanent. Remove power strip & make proper electrical J-Box/receptical installation (46CFR183.340(d)).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Power strip replaced w/ J-Box/receptical.
Lifesaving › Lifebuoys › Approval
Issued 18 June 2016
Resolved
Install retroreflective material to main deck port aft & 2nd deck port fwd ring life buoys (46CFR185.604(h)).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Retro applied to ring life buoys.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 June 2016
Resolved
Install guard for stbd main fuel pump drive shaft.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Guard installed.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 18 June 2016
Resolved
Install proper breaker tag out for water heater (46CFR183.01-15).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 19 July 2016
Resolution: Administratively cleared after rcpt of pic attached to email dtd 15Jul2016. Breaker tag out installed.