Records from 2016 to 2026. Most recent: inspection, 13 April 2026.
Inspection history · 25
13 April 2026
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8347158
14 May 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8136086
25 June 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7941632
1 April 2024
Deficiency Check · Plan Review (Other than "T") · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7888238
8 January 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7845376
11 May 2023
In-Service Inspection · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7683781
30 March 2023
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7651522
28 April 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7430356
18 April 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7433590
4 February 2022
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7391028
16 March 2021
Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7157306
28 July 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7018019
14 April 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6939007
22 January 2020
Hull Examination · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6894252
25 May 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6692884
24 May 2019
Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6692758
18 March 2019
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6644225
4 October 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6554668
5 February 2018
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6349475
19 January 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6344354
18 January 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6339510
11 January 2018
Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6336046
13 February 2017
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6087164
4 May 2016
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5868639
19 January 2016
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5893856
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 May 2025
Resolved
The means provided for pumping bilges shall be tested by operation. MIs were unable to witness operation of the bilge pumps. Allow MIs to verify bilge pump operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2025
Resolution: MIs witnessed successful bilge pump operation.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 14 May 2025
Resolved
The master shall conduct drills and give instructions as necessary to ensure that all crew members are familiar with their duties. Vessel crew struggled to operate their MOB ladder. Alter the ladder stowage so that the crew can more easily operate the device.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2025
Resolved 17 June 2025
Resolution: Black and tackle system provided.
09 - Working and Living Conditions › 091 - Living Conditions › Cleanliness
Issued 14 May 2025
Resolved
At each initial and subsequent inspection for certification and reinspection the marine inspector shall examine the passenger and crew quarters, toilet -and washing spaces, galleys, serving pantries, lockers, etc., to determine that they .are serviceable and in a sanitary condition. MIs found abundant mold and grease in the galley, especially in way of the grease extractor hood and sink. Steam clean the galley.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2025
Resolved 17 June 2025
Resolution: Galley professionally steam cleaned.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 June 2024
Resolved
46 CFR 147.65 (a) (1)
46 CFR 147.60
NFPA 10
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 July 2024
Resolution: Vessel has completed required service. This deficency has been resolved.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 June 2024
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Vessel has two broken windows on the main deck STBD side. Vessel shall repair two broken windows on STBD side.
46 CFR 115.830 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2024
Resolution: Vessel has replaced windows and resealed. This deficecny has been resolved.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 June 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, Inspection of all railings and bulwar and their attachment to the hull structure FWD port and STBD handrails on the main deck are cracked in several locations and are not in serviceable condition. Vessel shall provide repair proposal and repair handrails IAW approved repair proposal.
46 CFR 115.802 (a) (4)
Action required: 705 - Other - as specified
Resolved 17 October 2024
Resolution: Vessel has repaird handrails.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 June 2024
Resolved
All electrical equipment and circuits must be clearly marked and identified. Breaker panels throughout the vessel are not labeled properly. Vessel shall label all breaker panels accurately.
46 CFR 120.220 (d)
Action required: 705 - Other - as specified
Resolved 15 August 2024
Resolution: Vessel has re labelled all panels on vessel. This deficency has been resolved.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 April 2024
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel reported that while underway, the STBD transmission failed and requires re building. Submit technical report for rebuilt transmission/installation and perform satisfactory sea trial in the presence of CG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2024
Resolution: Sea Trial was succesfully performed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 March 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions.
Bus tie breaker is broken.
46CFR183.200
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2023
Resolved 8 May 2023
Resolution: Observed fabricated cover for bus tie. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 March 2023
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail.
STBD side generator is missing guard cover.
46CFR177.960
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2023
Resolved 1 May 2023
Resolution: Witnessed guard installed on both port and STBD gens. See documents for pictures.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 30 March 2023
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a protection against fire.
MI observed wire penetration on various locations, they were all corrected on the spot.
46CFR177.100
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 March 2023
Resolved 30 March 2023
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 March 2023
Resolved
A storage cylinder must be securely fastened, supported, and protected against damage.
MI observed two unsupported CO2 bottles at the bar on
the 3rd deck.
46CFR181.410(c)(4)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2023
Resolved 9 May 2023
Resolution: CO2 bottle was removed. A bracket will be welded, awaiting pictures.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 30 March 2023
Resolved
An existing vessel must comply with the subdivision, damage stability, and watertight integrity regulations which were applicable to the vessel on March 10, 1996, or, as an alternative, the vessel may comply with the regulations in this part.
MI observed the muffler room hatch is severely deteriorated.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 April 2023
Resolved 4 May 2023
Resolution: Inspected new hatch. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 April 2022
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire. Excessive oil leaking from generator.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 March 2023
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 April 2022
Resolved
A device must be provided to automatically shut down engines prior to the release of agent. STBD engine did not shut down during test.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 March 2023
Resolution: Tested stbd engine shutdown.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 28 April 2022
Resolved
A hatch exposed to the weather must be watertight.Lazarette hatch deteriorated and does not meet water tight interigty.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 May 2023
Resolution: New hatch and knife edge area installed. Completed satistactory final weld/air lance test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2021
Resolved
Marine Inspector shall examine and test the main and auxiliary steering apparatus to determine that its condition is satisfactory and is fit for the service intended. The main steering pump is inoperable. 46 CFR 176.25-35 (OLD T)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 March 2021
Resolved 17 March 2021
Resolution: Steering pump required new fuse, replaced and tested satisfactory on board.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 March 2021
Resolved
The fire detection system must be so arranged and installed that the presence of a fire in any of the protected spaces will automatically register visibly and audibly in the pilothouse. Pilot house fire detection panel is not providing an audible alarm when heat detectors are activated under battery power mode. 46 CFR 76.27(b)
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 26 March 2021
Resolution: Received report from vessel representative attesting third party company re-programmed fire detection equipment and conducted operational test.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 16 March 2021
Resolved
Transmitters of any ship station must be performed by a person holding a commercial radio operator license. Radio operator did possess license or permit at time of inspection. 47 CFR 80.155 16
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 29 March 2021
Resolution: Master of vessel provided photo copy of radio operator permit.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 March 2021
Resolved
All electrical installations shall be to the satisfaction of the USCG. Exposed and dead end wires were found under the DJ booth on main and second deck, required to be removed or terminated in a junction box. Secondly, an outlet junction box under DJ booth on second deck is loose and needs to be tightened. Lastly, there needs to be a blank inserted in open space of electric panel aft in engine room.46 CFR 183.01-15
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2021
Resolved 31 March 2021
Resolution: Recevied pictures via email of the wires corrected under the DJ booths
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 April 2020
Resolved
705 - Vessel inspection deferred till (10JUL2020). Vessel authorized to operate until (10JUL2020).
Action required: 705 - Other - as specified
Due 10 July 2020
Resolved 29 July 2020
Resolution: Conducted satisfactory annual inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 May 2019
Resolved
Vessel reported mechanical failure of port engine rendering propulsion machinery inoperable. IAW 46 CFR 119.200, propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel must make permanent repairs to port engine and complete successful sea trials prior to carrying passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 June 2019
Resolution: The engine was removed and new engine was installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 March 2019
Resolved
Observed leak in main generator exhaust line located in the lazarette. Make proper repairs to exhaust leak within 5 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 March 2019
Resolved 27 March 2019
Resolution: Conducted weld work on exhaust pipes to fix leak.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 March 2019
Resolved
Observed corrosion on sewage piping located in the engine room. Provide plan for replacing sewage piping in the engine room prior to next dry dock.
Action required: 705 - Other - as specified
Resolved 29 July 2020
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 March 2019
Resolved
Observed leak in gray water piping located in the engine room. Gray water piping from galley and wet bar located up above the engine room compartment. Make proper repairs to leaking gray water piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 April 2019
Resolved 27 March 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 18 March 2019
Resolved
Found broken gauges on generators in the engine room. Replace all broken gauges.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 March 2019
Resolution: Replaced broken gauges.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Install junction boxes to house electrical connections found in void spaces, above high water alarms.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 March 2019
Resolution: Installed junction boxes.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Properly wire-clamp all dead end wires under bridge console and in engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 March 2019
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 4 October 2018
Resolved
Vsl is broadcasting invalid IMO #, Vsl is broadcasting Invalid Call Sign, Vsl is broadcasting incorrect Name and Vsl is broadcasting greater than expected vessel length
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 18 March 2019
Resolution: Verified AIS is broadcasting correct information.
Engineering › Bilge Water Management System › Valve
Issued 11 January 2018
Resolved
BILGE PIPING IS REQUIRED TO HAVE CHECK VALVES IN SYSTEM.
Due 9 February 2018
Resolved 9 February 2018
Resolution: Recieved picture proving installation of check valve in bilge system.
Engineering › Pressure Vessel › Relief Valve
Issued 11 January 2018
Resolved
INSTALL PRESSURE RELIEF VALVE ON HYDROPNEUMATIC TANK IN GALLEY IAW MANUFACTURER'S INSTRUCTIONS.
Due 9 February 2018
Resolved 9 February 2018
Resolution: recieved picture proving installation of relief valve.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 11 January 2018
Resolved
INSTALL MOMENTARY PUSH BUTTON FOR TESTING GROUND DETECTION METER.
Due 9 February 2018
Resolved 9 February 2018
Resolution: Received video proving installtion of push button.
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 11 January 2018
Resolved
ISOLATE/CLEAR 1.5 AMP GROUND.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 January 2018
Resolution: VESSEL TESTED GROUND DETECTION METER AND PROVED METER WAS IMPROPERLY CALIBRATED.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 11 January 2018
Resolved
PROVIDE ADDITIONAL 28 PFD'S. RESTRICTED TO 467 TOTAL PERSONS ONBOARD.
Due 16 February 2018
Resolved 9 February 2018
Resolution: Recieved invoice proving purchase of required PFDs.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 4 May 2016
Resolved
Vessel had numerous lifejackets whose retro reflective tape was no longer in serviceable condiciton. Vessel is to replace retro tape on lifejackets and provide proper documentation to the attending marine inspector. 46 CFR 18.25(a)
Action required: 705 - Other - as specified
Due 18 May 2016
Resolved 25 May 2016
Resolution: Vessel added new retro reflective tape to lifejackets that required it.
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 4 May 2016
Resolved
Vessel's heat detector in the galley is inoperable. Vesel is to replace heat detector and prove proper operation of the same to the attending marine inspector. 46 CFR 181.05-5(a)
Action required: 705 - Other - as specified
Due 18 May 2016
Resolved 25 May 2016
Resolution: Vessel replaced heat detector in galley with a new one.