Records from 1989 to 1990. Most recent: inspection, 21 December 1990.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 6
21 December 1990
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 903740
29 May 1990
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 534472
22 January 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 931437
3 October 1989
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1341097
28 September 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 332878
28 September 1989
Certificate of Compliance
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1004210
Documentation
Issued 28 September 1989
Resolved
33 CFR 157.140 CSL FOUNS OPERATING IN U.S. WATER WITHOUT A VALID TANK VSL EXAM LETTER. THEVSL WAS DISCHARGING GAS OIL AT EXXON CO., BATON ROUGE, LA. AUTH: 33 USC 1231 33 USC 1232
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Deck/Cargo
Issued 28 September 1989
Resolved
PROVIDE AN OPERABLE PORTABLE OXYGEN METER AND SPAN GAS FOR TESTING THE COMBUSTIBLE GAS METER PRIOR TO THE NEXT U.S. VOYAGE AND THE CARRIAGE OF OTHER THAN GRADE "E" CARGOES.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Deck/Cargo
Issued 28 September 1989
Resolved
INSTALL PROPER SIZE FLAME SCREENS (30X30 MESH) IN ALL CARGO TANK P/V VALVESPRIOR TO THE NEXT U.S. PORT.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Engineering
Issued 28 September 1989
Resolved
INSTALL PROPER SIZE FLAME SCREENS (30X30 MESH) IN ALL DECK FUEL AND LUBE OIL TANK VENTS PRIOR TO THE NEXT U.S. PORT.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Deck/Cargo
Issued 28 September 1989
Resolved
OVERHAUL AND PROVE SATISFACTORY OPERATION OF THE P/V VALVES ON THE NO.2 CENTER, NO.3 CENTER, AND NO.5 PORT CARGO TANKS PRIOR TO THE NEXT U.S. VOYAGE.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Deck/Cargo
Issued 28 September 1989
Resolved
REMOVE ALL PAINT/FLAMMABLE LIQUID FROM THE FORWARD DECK STORE AND PLACE IN A DESIGNATED PAINT LOCKER PRIOR TO THE NEXT U.S. VOYAGE.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Deck/Cargo
Issued 28 September 1989
Resolved
EFFECT REPAIRS AND PROVE PROPER OPERATION OF THE INERT GAS SYSTEM OXYGEN ANALYZER AND HIGH OXYGEN ALARM PRIOR TO THE NEXT U.S. VOYAGE. VESSEL MAY ONLY CARRY GRADE "E" CARGOES UNTIL COMPLETED.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Deck/Cargo
Issued 28 September 1989
Resolved
EFFECT REPAIRS AND PROVE PROPER OPERATION OF THE DECK WATER SEAL DRAIN (AUTOMATIC) PRIOR TO THE NEXT U.S. VOYAGE. VESSEL MAYCARRY ONLY GRADE "E" CARGOES UNTIL COMPLETED.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Documentation
Issued 28 September 1989
Resolved
PROVIDE COMPLETE OIL TRANSFER PROCEDURES FOR BUNKERING OPERATIONS IN ACCORDANCE WITH 33CFR155.750 PRIOR TO THE NEXT U.S. PORTCALL
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Deck/Cargo
Issued 28 September 1989
Resolved
INSTALL INERT GAS SYSTEM ALARMS IN THE ENGINE CONTROL ROOM IAW THE REQUIREMENTS OF 46 CFR 32.53-70 PRIOR TO THE NEXT U.S. VOYAGE.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Deck/Cargo
Issued 28 September 1989
Resolved
EFFECT REPAIRS AND PROVE PROPER OPERATION OF THE INERT GAS FIXED OXYGEN/ PRESSURE RECORDERS PRIOR TO THE NEXT U.S. VOYAGE. VESSEL MAY CARRY ONLY GRADE "E" CARGOES UNTIL CORRECTED.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989
Fire Fighting
Issued 28 September 1989
Resolved
PROVIDE (2)TWO ADDITIONAL SCBA'S. EFFECT REPAIRS/PROFESSIONALLY SERVICE ANDPROVE SATISFACTORY OPERATION OF THE TWO SCBA'S ONBOARD. PROVIDE (1)ONE PAIRGLOVES. A TOTAL OF FOUR "COMPLETE" FIREMANS OUTFITS ARE TO BE MAINTAINED ONBOARD, PRIOR TO THE NEXT U.S. VOYAGE.
Condition: Unknown
Due 28 September 1989
Resolved 28 September 1989