Records from 1989 to 2005. Most recent: inspection, 19 January 2005.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 20
19 January 2005
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2280391
12 August 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2164455
6 August 2004
MTSA Verification
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2158251
22 June 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2106571
7 November 1996
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1172900
28 February 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1360395
24 February 1995
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1405662
3 December 1994
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1432857
20 October 1994
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1440875
1 March 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 855371
2 February 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1362917
16 December 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1417584
8 December 1992
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1139890
15 May 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 948643
29 January 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 665677
16 June 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1310039
6 December 1990
Administrative
Administrative · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 910810
20 December 1989
Initial Certification
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1222749
16 November 1989
Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 908188
16 November 1989
Inclining Experiment · Reflagging & Initial Certification
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 911341
Construction/Loadline
Issued 24 February 1995
Resolved
CROP AND RENEW WASTED THIRD LONGITUDINAL FROM BOTTOM PLATE ALONG SWASH BULKHEAD FIRST BAY FORWARD IN #8 STARBOARD VOID.
Condition: Unknown
Due 24 March 1995
Resolved 6 March 1995
Construction/Loadline
Issued 24 February 1995
Resolved
CROP AND RENEW WASTED LONGITUDINAL ALONG CENTER LINE BULKHEAD THIRD AND FOURTH BAY FROM FORWARD IN #8 STARBOARD VOID.
Condition: Unknown
Due 24 March 1995
Resolved 6 March 1995
Construction/Loadline
Issued 24 February 1995
Resolved
CROP AND RENEW TO GOOD METAL THREE WASTED FLAT BARS UNDER AFTER STRINGER TABLE IN #2 PORT VOID.
Condition: Unknown
Due 24 March 1995
Resolved 6 March 1995
Construction/Loadline
Issued 24 February 1995
Resolved
REPLACE BRACKET FORWARD OF AFTER LADDER IN #2 PORT VOID.
Condition: Unknown
Due 24 March 1995
Resolved 6 March 1995
Deck/Cargo
Issued 2 February 1994
Resolved
PROVE PROPER INSTALLATION AND CONDITION OF INSTALLED MISC CARGO GEAR I.A.W.46 CFR 91.37-1(d) AND 46 CFR 91.37-(a) or (b).
Condition: Unknown
Due 2 February 1994
Resolved 2 February 1994
Electrical
Issued 16 December 1993
Resolved
DEMONSTRATE PROPER OPERATION OF GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Documentation
Issued 16 December 1993
Resolved
PROVIDE EVIDENCE OF CRAIN CERTIFICATION 5000 EBI LBS ON STBD PORT SIDE AFT.
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Electrical
Issued 16 December 1993
Resolved
RENEW OR REPLACE SUPPORT BRACKETS ON ALL ELECTRICAL WIRING ON BOTH PORT ANDSTARBOARD SIDE LASH HOUSES AFT._x001C_
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Construction/Loadline
Issued 8 December 1992
Resolved
BRING VSL INTO COMPLIANCE WITH 33 CFR 155.420, SPECIFICALLY PUMPING, PIPINGAND DISCHARGE REQUIREMENTS FOR OCEAN GOING SHIPS OF 100 GROSS TONS AND ABOVE, BUT LESS THAN 400 GROSS TONS.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Lifesaving
Issued 16 June 1991
Resolved
PROVIDE ONE ADDITIONAL USCG APPROVED LIFEJACKET WITH LIGHT AND WHISTLE, ANDFOUR ADDITIONAL WHISTLES FOR LIFEJACKETS ALREADY ABOARD PRIOR TO OPERATION IN NO CASE LATER THAN 30JUN91.
Condition: Unknown
Due 24 September 1991
Resolved 24 September 1991
Documentation
Issued 16 June 1991
Resolved
MAKE PERMANENT BY MEANS OF WELDMENT OR PUNCHING EXISTING LOADLINE MARKINGS,OR PROVIDE EXEMPTION LETTER FROM COGNIZANT OFFICER IN CHARGE OF MARINE INSPECTION, USCG PRIOR TO OPERATION, AND IN NO CASE LATER THAN 21SEP91.
Condition: Unknown
Due 16 June 1991
Resolved 16 June 1991
Navigation
Issued 16 June 1991
Resolved
REPLACE EXISTING CRACKED CABLE STARBOARD RUNNING LIGHT PRIOR TO OPERATION AND IN NO CASE LATER THAN 15JUL91.
Condition: Unknown
Due 24 September 1991
Resolved 24 September 1991
Deck/Cargo
Issued 16 June 1991
Resolved
PROVE PROPER OPERATION OF THE FOREWARD ANCHOR GEAR TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR. TO BE COMPLETED NOT LATER 21SEP91.
Condition: Unknown
Due 16 June 1991
Resolved 16 June 1991
Electrical
Issued 16 June 1991
Resolved
PROVIDE SUITABLE BATTERIES FOR FOREWARD GENERATOR DIESEL LOCATED IN AFTERHOUSE - PORT. TO BE COMPLETED NOT LATER THAN 15JUL91.
Condition: Unknown
Due 24 September 1991
Resolved 24 September 1991
Accommodation/Occupational Safety
Issued 16 June 1991
Resolved
REPAIR OR REPLACE WINDOW BROKEN INBOARD WINDOW STARBOARD ACCOMODATION SPACEAFT PRIOR TO OPERATION AND IN NO CASE LATER THAN 15JUL91.
Condition: Unknown
Due 24 September 1991
Resolved 24 September 1991
Electrical
Issued 20 December 1989
Resolved
UPON APPROVAL OF FUEL OIL DAY TANK CONTROL ELEC DWG, INSTALL CONTROL SYSTEMAS PER APPROVED DWG.
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Accommodation/Occupational Safety
Issued 20 December 1989
Resolved
REMOVE NON APPROVED ACCOMODATIONS CONTAINER FROM VESSEL ( IF APPROVED WIRING AND INSULATION ARE INSTALLED THIS MAY BE RESCINDED)
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Electrical
Issued 20 December 1989
Resolved
PROVIDE INFO AS REQUESTED BY MSC LTR E-90589 14 DEC 89 ITEM #1 (SUBMIT) MFG INFO GEN/SETS- AND HAVE INFO APPROVED. PROVIDE APPROVED RESULTS TO MSO CHARLESTON
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Electrical
Issued 20 December 1989
Resolved
PROVIDE SHORT CIRCUIT CALCULATIONS AS REQUIRED BY MSC LTR E-90589, 14DEC89 ITEM #9- AND PROVIDE APPROVED RESULTS TO MSO CHARLESTON.
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Construction/Loadline
Issued 20 December 1989
Resolved
PROVIDE INFORMATION FOR APPROVAL TO MSC (CG) AS PER LTR M-90858 ITEMS 1,2,3 AND 6 TO SATISFY VALVE AND PIPING PLAN REVIEW AND PFROVIDE RESULTS TO MSO CHARLESTON
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Electrical
Issued 20 December 1989
Resolved
PROVIDE APPROVED ELEC DWG L-5100-16 AS BUILT. WHEN APPROVED BY (CG) MSC, SUBMIT TO MSO CHARLESTON FOR CONFIRMATION OF PLANS.
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Electrical
Issued 20 December 1989
Resolved
PROVIDE DRAIN/INSPECTION HOLES IN BOTH ENDS OF 4" PIPE BUSS TIE ON MAIN DECK AS PER MSCLTR E-90589 ITEM #12
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Electrical
Issued 20 December 1989
Resolved
PROVIDE 75 AMP-ERE CIRCUIT BREAKER FOR FTHE 40KW FWD GENERATOR TO MAIN SWBD AS FREQUIRED BY MSC LTR E-90589 14 DEC89
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Documentation
Issued 20 December 1989
Resolved
RESUBMIT STABILITY CALCULATIONS WITH ACCOM CONTAINER REMOVED. (MAY BE RESCINDED IF ACCOM BECOMES APPROVED)
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Documentation
Issued 20 December 1989
Resolved
RECALULATE GROSS AND NET TONS OF VESSEL WITHOUT ACCOMODATIONS CONTAINER (THIS MAY BE RESCINDED IF CONTAINER IS APPROVED)
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Electrical
Issued 20 December 1989
Resolved
CHANGE CRANE CONTROLLER TO SIZE 3 FOR THE 30 H.P. MOTOR
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Electrical
Issued 20 December 1989
Resolved
PROVIDE ELEC DWG OF THE FUEL OIL DAY TANK CONTROL SYSTEM SHOWING SWITCHES, WIRING, FUSES, CONTACTOR AND PROPER FLOAT SWITCHES. SUBMIT TO MSO CHARLESTON FOR APPROVAL.
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989