Records from 1990 to 1995. Most recent: inspection, 12 July 1995.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 16
12 July 1995
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 884092
14 July 1994
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 865773
15 June 1994
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1327161
26 May 1994
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 860469
17 May 1994
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1170664
21 April 1994
Examination of Repairs
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1171628
21 April 1994
Examination of Repairs
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1370833
15 April 1994
Examination of Repairs
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1168144
22 February 1994
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 160189
2 November 1993
Damage Survey
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1470079
23 July 1993
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1156622
14 June 1993
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 960443
20 November 1991
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 832313
18 July 1991
Drydock Extension
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1254079
29 January 1991
Initial Certification
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 928789
22 January 1990
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 929467
Accommodation/Occupational Safety
Issued 17 May 1994
Resolved
INSTALL RIGID, FIREPROOF VENTILATION DUCTING IN THE ENGINEROOM AND GENERATOR SPACE.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Electrical
Issued 17 May 1994
Resolved
PROVIDE SPRAY PROTECTION FOR THE BREAKER PANEL IN THE ENGINEROOM.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Accommodation/Occupational Safety
Issued 17 May 1994
Resolved
INSTALL PROTECTIVE SCREENS OVER EXHAUST FANS IN ENGINEROOM AND GENERATOR SPACE.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Engineering
Issued 17 May 1994
Resolved
PROVIDE DOCUMENTATION THAT EXHAUST HOSES ARE SUITABLE FOR SERVICE INTENDED.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Electrical
Issued 17 May 1994
Resolved
REMOUNT THE AIR CONDITIONING CIRCULATION MOTOR ABOVE THE DECK IN THE GENERATOR ROOM.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Electrical
Issued 17 May 1994
Resolved
INSTALL AUTOMATICALLY ACTUATED EMERGENCY LIGHTING SYSTEM.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Lifesaving
Issued 17 May 1994
Resolved
PROPERLY INSTALL WEAKLINKS ON THE LIFEFLOATS.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Unknown
Issued 17 May 1994
Resolved
PROVIDE AT LEAST 24 HOURS NOTIFICATION TO COAST GUARD PRIOR TO NEXT FUELINGOPERATION.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Navigation
Issued 17 May 1994
Resolved
Demonstrate proper operation of auxiliary steering system.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Construction/Loadline
Issued 17 May 1994
Resolved
INSTALL/MAKE OPERABLE FIXED BILGE PUMPING SYSTEM.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Construction/Loadline
Issued 17 May 1994
Resolved
INSTALL PLUG ON VALVE ON STBD ENGINEROOM SEACHEST.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Construction/Loadline
Issued 17 May 1994
Resolved
INSTALL DOUBLE CLAMPS ON MSD SUCTION HOSE AT THE SEACHEST.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Construction/Loadline
Issued 17 May 1994
Resolved
INSTALL VALVE HANDLES ON ENGINEROOM SEACHEST VALVES.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Electrical
Issued 17 May 1994
Resolved
INSTALL AMMETER IN POWER GENERATION SYSTEM.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Navigation
Issued 17 May 1994
Resolved
DEMONSTRATE PROPER MANEUVERABILITY TO RETRIEVE PERSON OVERBOARD WITHOUT THEUSE OF A RESCUE BOAT.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Engineering
Issued 17 May 1994
Resolved
IDENTIFY AND MAKE OPERABLE FUEL SHUTOFF VALVES FOR MAIN PROPULSION ENGINE AND GENERATORS. VALVES ARE TO BE LOCATED AT TANK AND OPERATING EQUIPMENT.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Documentation
Issued 17 May 1994
Resolved
PROVIDE STABILITY LETTER.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Documentation
Issued 17 May 1994
Resolved
PROVIDE VALID FCC RADIOTELEPHONE CERTIFICATE.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Engineering
Issued 17 May 1994
Resolved
INSTALL LAGGING OVER TURBOCHARGER.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Engineering
Issued 17 May 1994
Resolved
PROVIDE DOCUMENTATION THAT FUEL HOSES MEET REQUIREMENTS OF 33CFR182.20 OR REPLACE HOSES.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Fire Fighting
Issued 17 May 1994
Resolved
PROVIDE PROPER NOZZLES FOR 2 FIRE HOSES.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Engineering
Issued 17 May 1994
Resolved
INSTALL GUARD OVER EXHAUST COOLING WATER PUMP.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Electrical
Issued 17 May 1994
Resolved
INSTALL DRIP PROOF COVERS OVER THE DISTRIBUTION AND BREAKER PANELS IN THE ENGINEROOM AND GENERATOR SPACE.
Condition: Unknown
Due 31 May 1994
Resolved 31 May 1994
Documentation
Issued 21 April 1994
Resolved
PROVIDE NEW SHAFT, RUDDER POST, AND BALLAST TANK DRAWINGS TO REFLECT NEW ARRANGEMENTS.
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Documentation
Issued 21 April 1994
Resolved
PROVIDE PROPELLER SHAFT, RUDDER POST AND BALLAST TANK PLANS TO SHOW CHANGES.
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Documentation
Issued 20 November 1991
Resolved
COMPLETE 40 ITEM WORKLIST DATED 20 AND 21 NOV 1991 PRIOR TO REISSUANCE OF CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 20 November 1991
Resolved 20 November 1991