Records from 1990 to 2020. Most recent: inspection, 7 November 2020.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 44
7 November 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7091225
28 February 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6917928
14 May 2012
Internal Structural Exam · Annual Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4311609
23 January 2012
Simplified Stability Test
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4231805
14 February 2011
Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3945183
8 February 2010
DAPI Audit
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3677625
24 February 2009
Internal Structural Exam · Hull Examination · COI Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3423125
24 April 2008
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3191518
6 February 2007
Hull Examination · Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2868038
22 July 2006
Type not recorded
No type recorded · Station Maui · USCG Oceania District (CGD-O) · Activity 2721319
8 February 2006
COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2581701
9 May 2005
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2353630
8 February 2005
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2290878
4 May 2004
Administrative Inspection
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2059266
2 February 2004
Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1998960
15 September 2003
Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1905871
18 February 2003
Hull Examination · Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1749425
4 March 2002
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1490983
22 March 2001
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1064641
20 February 2001
Hull Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1366190
27 July 2000
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 87129
10 March 2000
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1047396
29 February 2000
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1369554
15 April 1999
Plan Review "T" Boat
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 788487
1 March 1999
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1393158
1 March 1999
Re-Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1413499
4 March 1998
Hull Examination · COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1375297
16 May 1997
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1107155
14 April 1997
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1095933
7 March 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1368108
9 August 1996
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1090068
10 July 1996
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1088453
8 May 1996
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1453224
8 March 1996
Hull Examination · Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1355707
14 July 1995
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1449834
5 May 1995
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1374292
3 March 1995
COI Inspection · MARPOL Annex V Examination · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1371027
8 April 1994
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1356600
5 March 1993
Re-Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 837259
9 June 1992
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 945376
16 March 1992
COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1256354
4 March 1991
Hull Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1243360
14 May 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 901559
27 March 1990
Hull Examination · Initial Certification · Initial Construction-Excluding Oversight · Plan Review "T" Boat
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 908147
Engineering › Bilge Water Management System › Not Installed
Issued 24 February 2009
Resolved
Provide a bilge pump for the compartment aft of the collision bulkhead.
Action required: 705 - Other - as specified
Due 24 March 2009
Resolved 24 March 2009
Engineering › Bilge Water Management System › Valve
Issued 24 February 2009
Resolved
Provide positive shutoff valves at each hull penetration for the submersible bilge pump discharge hoses.
Action required: 705 - Other - as specified
Due 24 March 2009
Resolved 24 March 2009
Lifesaving › Buoyant Apparatus › Lifeline
Issued 24 February 2009
Resolved
Renew damaged lines on the buoyant apparatus as needed.
Action required: 705 - Other - as specified
Due 24 March 2009
Resolved 24 March 2009
Engineering › Fuel Oil Service System › Valve, Control
Issued 6 February 2007
Resolved
Prove Emergency fuel shut- off valves.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2007
Engineering › Fuel Oil Service System › Vent Pipe
Issued 6 February 2007
Resolved
Prove vents on fuel tanks. Hoses are crimped.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2007
Construction/Loadline › Hull › Bottom Plating
Issued 6 February 2007
Resolved
Re-new pitted huoll plate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2007
Stability › Unintentional Flooding › General
Issued 6 February 2007
Resolved
Make Water tight bulkheads water tight. Can see daylight around wire/wire penetrations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2007
Communications › Radio Communications › EPIRB
Issued 6 February 2007
Resolved
Re-new battery on EPIRB.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2007
Construction/Loadline › Hull › Hull Plating
Issued 8 February 2005
Resolved
Grind out and dye penetrant all pre-existing areas with excess weldment. Photograph these areas and present tp USCG Maui for review and authentication. Make no future hull repairs without approval by a USCG Marine Inspector NLT 08MAR2005. (Hull had numerous improper repairs that owner insists have been done many years ago, shortly after initial construction.)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 March 2005
Resolved 8 March 2005
Communications › Radio Communications › EPIRB
Issued 8 February 2005
Resolved
Replace broken EPIRB antenna.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 March 2005
Resolved 8 March 2005
Engineering › Fuel Oil Service System › Valve, Solenoid
Issued 8 February 2005
Resolved
Add ground wire to fuel fill hoses.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 March 2005
Resolved 8 March 2005
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 8 February 2005
Resolved
Retroreflective tape needed for life ring.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 March 2005
Resolved 8 March 2005
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 8 February 2005
Resolved
Seal engine room bulkhead penetrations.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 8 March 2005
Resolved 8 March 2005
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 2 February 2004
Resolved
Provide proper fuel hoses J-1942 with J-1475 fittings IAW 46CFR182.720(e).
Condition: Improper Installation
Due 17 February 2004
Resolved 23 February 2004
Construction/Loadline › Hull › Hull Plating
Issued 2 February 2004
Resolved
Properly repair hole located forward sewage space. Small pinhole found.
Condition: Unknown
Due 17 February 2004
Resolved 23 February 2004
Construction/Loadline › Hull › Hull Plating
Issued 15 September 2003
Resolved
Found small hole located amidships located near stern in the engine room. Make proper repairs to satisfaction of marine inspector.
Condition: Improper/Lack of Maintenance
Due 15 September 2003
Resolved 15 September 2003
Construction/Loadline › Hull › Hull Plating
Issued 18 February 2003
Resolved
Vessel must submitt plans for repairs to hull IAW 46CFR176.700.
Condition: Unknown
Due 18 February 2003
Resolved 20 February 2003
Electrical › Electric Supply System (service)
Issued 4 March 2002
Resolved
Provide metal wire supports every 24 inches for loose wiring in fwd sewage tank space.. LEGACY COMPONENT DESC: Cable
Condition: Improper Installation
Due 4 March 2002
Resolved 4 March 2002
Resolution: Installed proper metal wire supports in fwd sewage tank space.
Navigation › Piloting/Steering
Issued 4 March 2002
Resolved
Provide U. S. Coast Pilot IAW 46CFR184.420. LEGACY COMPONENT DESC: US Coast Pilot
Condition: Unknown
Due 4 March 2002
Resolved 4 March 2002
Resolution: Provided U. S. Coast Pilot.
Fire Fighting
Issued 20 February 2001
Resolved
PROVE PROPER OPERATION OF NON-REQUIRED FIRE DETECTION SYSTEM OR REMOVE FROMVESSEL IAW 46CFR181.120 NLT 6MAR01.
Condition: Unknown
Due 20 February 2001
Resolved 20 February 2001
Fire Fighting
Issued 20 February 2001
Resolved
GAPS LOCATED IN WIRE RUNS OF BULKHEADS. MAKE ENGINE ROOM AND FUEL TANK SPACE VAPOR TIGHT IAW 46CFR181.410 NLT 6MAR01.
Condition: Unknown
Due 20 February 2001
Resolved 20 February 2001
Engineering
Issued 20 February 2001
Resolved
PROVE PROPER OPERATION OF PORT TACHOMETER IAW 46CFR182.100 NLT 6MAR01._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 February 2001
Resolved 20 February 2001
Documentation
Issued 20 February 2001
Resolved
FCC RADIO SAFETY CERTIFICATE EXPIRED. PROVIDE PROOF OF INSPECTION IAW 46CFR184.502 NLT 6MAR01._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 February 2001
Resolved 20 February 2001
Lifesaving
Issued 20 February 2001
Resolved
EPIRB HYDRO RELEASE EXPIRED. PROVIDE EPIRB IN A FLOAT FREE POSITION IAW 46CFR180.64 NLT 6MAR01.
Condition: Unknown
Due 20 February 2001
Resolved 20 February 2001
Lifesaving
Issued 20 February 2001
Resolved
SURVIVAL CRAFT STRAPPED DOWN. PROVIDE IN A FLOAT FREE POSITION IAW 46CFR180.130(a)(2) NLT 6MAR01._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 February 2001
Resolved 20 February 2001
Construction/Loadline
Issued 29 February 2000
Resolved
Provide audible and visual bilge high level alarm IAW 46CFR182.530 NLT 7MAR00.
Condition: Unknown
Due 29 February 2000
Resolved 29 February 2000
Construction/Loadline
Issued 29 February 2000
Resolved
Effect proper repair to 1/2 inch weld fracture, port side midship, in way of chine NLT 7MAR00 IAW 46CFR57.02-4 and 46CFR176.802.
Condition: Unknown
Due 29 February 2000
Resolved 29 February 2000
Navigation
Issued 1 March 1999
Resolved
Provide all required publications in accordance with 46 CFR 184.420.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Unknown
Issued 1 March 1999
Resolved
Provide proof of complete drug testing program and employee assistance program in accordance with 46 CFR 16.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Navigation
Issued 1 March 1999
Resolved
Prove proper operation of illuminating compass as required by 46 CFR 184.402(c).
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Fire Fighting
Issued 7 March 1997
Resolved
Prove proper operation of the fixed fire detection system discharge alarm for the engine space and the fuel tank space.
Condition: Unknown
Due 7 March 1997
Resolved 7 March 1997
Construction/Loadline
Issued 10 July 1996
Resolved
In the presence of a CG marine inspector, demonstrate that the forward hatch assembly and deck penetrations made to secure the anchor rode storagebox are water tight.
Condition: Unknown
Due 10 July 1996
Resolved 10 July 1996
Documentation
Issued 8 May 1996
Resolved
SUBMIT FOR APPROVAL, PLANS FOR MODIFICATIONS MADE TO THE FORWARD HATCH ASSEMBLY AND PLANS FOR THE RELOCATION OF THE ANCHOR CHAIN.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE PERMANENT REPAIRS TO THE HULL: PORT AND STB CHINES FORWARD OF PREVIOUS REPAIRS, & AT THE TOP OF THE FWD STBD VERTICAL KEEL TO CHINE WELD.
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Navigation
Issued 8 May 1996
Resolved
REPOSITION THE SIDE LIGHTS AS HIGH AS PRACTICABLE IN ORDER TO AVOID INTERFERENCE OF SIDE RAILS. (ANNEX I 72COLREGS)
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
INSTALL AN APPROVED WATERTIGHT HATCH ASSEMBLY ON THE FORWARD VOID OR INSTALL A 12 INCH COAMING ON THE EXISTING HATCH ASSEMBLY. UPON COMPLETION DEMONSTRATE WATERTIGHT OR WEATHERTIGHT INTEGRITY AS REQUIRED. (46 CFR 171.124)
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 March 1996
Resolved
Prior to carrying passengers, make permanent repairs to the two 4 inch cracks located in the bottm shell midship just below the chine on the port and starboard sides.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Lifesaving
Issued 8 March 1996
Resolved
Prior to carrying passengers repair or renew the buoyant apparatus.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Construction/Loadline
Issued 8 March 1996
Resolved
Prior to carrying passengers make permanent repairs to the holes drilled inthe side shell in the fuel tank compartment in way of the blower motor installation.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Deck/Cargo
Issued 8 March 1996
Resolved
Properly mouse the anchor chain.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Construction/Loadline
Issued 8 March 1996
Resolved
Make all hatch covers to the hull watertight by providing proper gaskets.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Documentation
Issued 8 March 1996
Resolved
Prior to carrying passengers, provide proof of a valid drug testing program.
Condition: Unknown
Due 19 March 1996
Resolved 19 March 1996
Lifesaving
Issued 8 March 1996
Resolved
Provide proper weak link for the buoyant apparatus.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Navigation
Issued 8 March 1996
Resolved
Prior to operation during periods of restricted visibility, make permanent repairs to the side lights.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Lifesaving
Issued 8 March 1996
Resolved
Renew all relflective tape on all PFDs.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Navigation
Issued 8 March 1996
Resolved
Prove operation of the compass light.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Lifesaving
Issued 8 March 1996
Resolved
Replace the ring buoy.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Electrical
Issued 8 March 1996
Resolved
Provide cover for the port battery.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Fire Fighting
Issued 8 March 1996
Resolved
Re-attach the engineroom exhaust duct.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Accommodation/Occupational Safety
Issued 8 March 1996
Resolved
Replace the cracked forward port window.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Documentation
Issued 8 March 1996
Resolved
Correct the discrepancy between the vessel's official number on the hull_x001C_ and that which is indicated on the vessel's certificate of documentation. Hull number is marked 758406 and the docmentation indicates 958406.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Construction/Loadline
Issued 5 May 1995
Resolved
PROVE OPERATION OF THE HIGH WATER BILGE ALARMS TO THE ATTENDING COAST GUARDINSPECTOR.
Condition: Unknown
Due 5 May 1995
Resolved 5 May 1995
Electrical
Issued 3 March 1995
Resolved
MAKE ELECTRICAL CONNECTION OR POWER VENTILATION INTRINSICALLY SAFE.
Condition: Unknown
Due 3 March 1995
Resolved 3 March 1995
Construction/Loadline
Issued 3 March 1995
Resolved
SUBMIT BILGE SYSTEM PLANS FOR APPROVAL IN ACCORDANCE WITH 46 CFR 182.25-5.
Condition: Unknown
Due 3 March 1995
Resolved 3 March 1995
Accommodation/Occupational Safety
Issued 3 March 1995
Resolved
PROVIDE VENTILATION CLOSURES FOR ENGINE ROOM AND VOID VENTS.
Condition: Unknown
Due 3 March 1995
Resolved 3 March 1995
Lifesaving
Issued 3 March 1995
Resolved
PROVIDE TWO PADDLES FOR ONE LIFE FLOAT IN ACCORDANCE WITH 46 CFR 180.15-1.
Condition: Unknown
Due 3 March 1995
Resolved 3 March 1995
Lifesaving
Issued 3 March 1995
Resolved
PROVIDE 60 FEET OF LINE FOR LIFE RING BUOY IN ACCORDANCE WITH 46 CFR 180.30-10.
Condition: Unknown
Due 3 March 1995
Resolved 3 March 1995
Fire Fighting
Issued 3 March 1995
Resolved
PROVE PROPER OPERATION OF HALON SYSTEM, TO INCLUDE VENTS AND ALARMS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 3 March 1995
Resolved 3 March 1995
Engineering
Issued 16 March 1992
Resolved
PROVIDE GUARDS FOR MACHINERY IN ENGINE ROOM (FAN BELTS).
Condition: Unknown
Due 16 March 1992
Resolved 16 March 1992
Lifesaving
Issued 14 May 1990
Resolved
PROVIDE WATERLIGHT FOR LIFERING BUOY.
Condition: Unknown
Due 14 May 1990
Resolved 14 May 1990
Fire Fighting
Issued 14 May 1990
Resolved
PROVIDE PORTABLE HAND FIRE/BILGE PUMP.
Condition: Unknown
Due 14 May 1990
Resolved 14 May 1990
Documentation
Issued 14 May 1990
Resolved
PROVIDE PERMANENT STABILITY LETTER.
Condition: Unknown
Due 14 May 1990
Resolved 14 May 1990
Documentation
Issued 27 March 1990
Resolved
VESSEL TO BE MADE ABAILABLE TO AN ATTENDING MARINE INSPECTOR FROM MSO HONOLULU FOR INSPECTION, PRIOR TO THE CARRAIGE OF PASSENGERS
Condition: Unknown
Due 27 March 1990
Resolved 27 March 1990