AMERICAN STAR is a 1990 passenger vessel (inspected). The Coast Guard has recorded 21 inspections since 2016, most recently in April 2026, along with 68 deficiencies, 1 operational control and 1 casualty investigation in 2005.

Records from 2005 to 2026. Most recent: inspection, 20 April 2026.

Built
1990
Last inspected
20 April 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 20 April 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDN6115
343641
Flag
UNITED STATES
Maury page id
psix-343641

Documentation record

Registered dimensions (L × B × D)80.6 ft × 24.0 ft × 9.5 ft
Registered tonnagegross 94 / net 64
ITC dimensions (L × B × D)80.6 ft × 24.0 ft × 9.5 ft
ITC tonnagegross 132 / net 52
BuilderEQUITABLE SHIPYARDS INC · NEW ORLEANS, LA, UNITED STATES · built 1990
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portCAPE MAY, NJ
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational, Registry
DocumentationValid · issued 25 August 2025 · expires 31 August 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it132 - Convention (Subpart B), Gross Ton
94 - Regulatory (Subpart C or D), Gross Ton
52 - Convention (Subpart B), Net Ton
64 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 21

20 April 2026 Administrative Inspection · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8352599
23 February 2026 Drydock Exam · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8313707
8 April 2025 Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8107932
6 June 2024 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7927066
31 January 2024 Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7858665
2 August 2023 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7758782
9 May 2023 Internal Structural Exam · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7684654
7 February 2023 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7633231
27 June 2022 Internal Structural Exam · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7488435
23 February 2022 Internal Structural Exam · Deficiency Check · Drydock Exam · Plan Review "T" Boat
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7400083
5 April 2021 COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7169223
14 December 2020 Examination of Repairs · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7113784
7 April 2020 COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6936577
9 March 2020 Internal Structural Exam · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6922857
10 February 2020 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6906442
30 May 2019 Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6698507
1 May 2018 DAPI Audit · Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6397710
27 February 2018 Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6362317
18 May 2017 Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6144949
14 March 2016 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5833365
20 January 2016 Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5800677

Deficiency record · 68

07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 7 May 2026 Resolved
A vessel that has a power driven fire pump must have Piping, valves, and fittings in a fire main system must comply with subpart G, part 182, (46 CFR 182.710) of this chapter. A hole was found in the fire main in the lazarette serving the aft hydrants. Repair/replace and test to proper pressure the damaged section of fire main. 46 CFR 181.310(b)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2026
Resolved 8 May 2026
Resolution: Firemain pipe was repaired and tested to satisfaction of MI.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 7 May 2026 Resolved
On a vessel of more than 19.8 meters (65 feet) in length, each hose must (1) be lined commercial fire hose that conforms to UL 19;(2) be 150 feet in length & 1.5 inches in diameter; and(3) have fittings that comply with NFPA 1963 (e.g., brass). One length of hose at the aft station was holed. Remove damaged hose & replace w/ new hose. (Vsl has sufficient add'l length of hose from 3rd fire station to meet minimal requirements in interim).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 June 2026
Resolved 14 May 2026
Resolution: Rec'd photos of new compliant fire hose in place of condemned hose.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 May 2026 Resolved
A vessel of more than 65 feet in length, the minimum capacity of the fire pump must be 50 gal per minute at a pressure of not less than 60 psi at the pump outlet. The outlet must be fitted with a pressure gauge. The gauge was broken. Repair/replace outlet gauge.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 June 2026
Resolved 8 May 2026
Resolution: Gauge was replaced and pump tested to satisfaction of MI.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 23 February 2026 Resolved
Each vessel inspected and certificated under the provisions of this subchapter must, when any passengers are aboard during the tenure of the certificate, be in full compliance with the terms of the certificate. Vessel has missed their drydock deadline of 28FEB2026. Vessel is restricted from carrying passengers until drydock credit is given. 46 CFR 176.100(b)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2026
Resolution: Credit dry dock completed 16APR2026
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 8 April 2025 Resolved
All vessels except non-self-propelled vessels shall be provided with suitable steering apparatus. Steering gear ram in lazarette was missing a nut and unsecured on the starboard side. 46 CFR 182.30 Old T
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 April 2025
Resolution: Two nuts were affixed to port and starboard side of steering gear.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 April 2025 Resolved
The intent of this part is to ensure that each vessel is provided with safe readily available and sufficient firefighting equipment. The start button on the fire pump remote start stop switch at the aft and port side fire stations must be continuously held for the fire pump to run. 46 CFR 181.01-05 Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 6 May 2025
Resolution: Marine electrician rewired switches. Verified operation. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 April 2025 Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. The coolant hose on the port side generator was chaffed and severely deteriorated. 46 CFR 182.10 Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 16 April 2025
Resolution: Verified new hose installed on running generator.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 April 2025 Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard drill be held under simulated emergency conditions specified by the inspector. The rescue platform has too much play when deployed for rescue operations and recovery of man overboard. 46 CFR 176.808(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 16 April 2025
Resolution: Added chain clips to platform to be connected to vessels bulwark.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 8 April 2025 Resolved
A vessel must comply with the applicable requirements for any radio and EPIRB installation. The MMSI number on the VHF DSC did not match the EPRIP or FCC station license MMSI. 46 CFR 184.502
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 16 April 2025
Resolution: Vessel installed new VHF radio with proper MMSI number.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 8 April 2025 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Vessels charts were outdated and did not have chart for all intended routes. 46 CFR 184.420(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 16 April 2025
Resolution: Verified owner bought up to date chart.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 April 2025 Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge of Marine Inspections. Vessel had two outlet boxes beneath the operating station that were not mounted or secure. 46 CFR 183.01-15 Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 21 April 2025
Resolution: Outlets were mounted to deck beneath the operating station.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 April 2025 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places. Vessel had new life jackets different from the donning instructions already posted. Post life jacket placard for new life jackets. 46 CFR 185.516
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 16 April 2025
Resolution: Owner posted proper lifejacket placard.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 8 April 2025 Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights mus be located at the operating station. The vessel did not have a portable light at the operating station. 46 CFR 183.430
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 21 April 2025
Resolution: Portable flashlight was mounted at operating station.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 8 April 2025 Resolved
Vessel has lockable spaces but has no master key control system. 46 USC 3106
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2025
Resolved 21 April 2025
Resolution: Vessel has master key control log with list of all persons with access to master key.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 6 June 2024 Resolved
The minimum capacity of a fire pump must be 50 gallons per minute at a pressure not less than 60 PSI. The pump shall be outfitted with a pressure gauge. Pressure gauge was only reading 20PSI. Adjust or replace gauge. 46CFR 181.10 (Old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2024
Resolved 1 July 2024
Resolution: Verified fire hose could reach adeqaute pressure.Cleared def.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 9 May 2023 Resolved
Each buoyant apparatus must be fitted with a lifeline, pendants, a painter, and a light. Vessel was unable to determine expiration dates of batteries for 6 buoyant apparatus's. Replace batteries or provide expiration dates from manufacturer to the satisfaction of a CG marine inspector. 46 CFR 180.175(e)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2023
Resolved 16 May 2023
Resolution: Identified expiration dates from manufacturer. All lights are within expiration dates and operable.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 June 2022 Resolved
REMOVE THE (2) TWO POWER STRIPS CHAINED TOGETHER UNDER THE HELM, RELOCATING THE PLUGGED IN ITEMS TO A DEDICATED OUTLET AND DIRECTLY HARD-WIRE THE BOAT CABLE POWERING THE CHILLER UNIT IN THE MAIN SALON INTO A DEDICATED CIRCUIT.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 July 2022
Resolved 28 July 2022
Resolution: Cleared via emailed photos (uploaded as PDF)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 June 2022 Resolved
REPLACE THE LIGHT, GLOBE, AND CAGE FOR THE STARBOARD SIDE OVERHEAD LIGHT IN THE LAZARETTE.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 27 June 2022
Resolved 28 June 2022
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 27 June 2022 Resolved
THE NUT SECURING THE STARBOARD STEERING QUADRANT WAS MISSING. REPLACE THE NUT TO ENSURE THE RAM IS SECURELY ATTACHED TO THE STEERING.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 27 June 2022
Resolved 27 June 2022
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 27 June 2022 Resolved
THE PORT SIDE REMOTE PULL FOR FUEL SHUT OFF DOES NOT OPERATE SMOOTHLY, MAKING IT DIFFICULT TO FULLY SHUT OFF FUEL SUPPLY. REPAIR REMOTE PULL SO THAT IT OPERATES SMOOTHLY AND THE OPERATOR CAN POSITIVELY CONFIRM FULL CLOSURE OF THE FUEL VALVE.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 July 2022
Resolved 28 July 2022
Resolution: Cleared via emailed video for Acty 7488435
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 5 April 2021 Resolved
Liferafts are arranged so that when they float free, they will get caught in mast. Reroute life float painters to avoid being snagged through the mast support as currently arranged.46 CFR 180.130(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 April 2021
Resolution: Master provides photos of properly rigged life floats.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 April 2021 Resolved
Outlet, next to water tank between fuel tanks, hot and neutral are reversed. Reverse wires to rectify. (OLD "T") 46 CFR 183.01-15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2021
Resolved 4 May 2021
Resolution: Master provided photo showing plugged in outlet tool showing "Correct" lights.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 April 2021 Resolved
Lazarette space, forward bulkhead, starboard side, hot an neutral are reversed. Reverse wires to rectify. (OLD "T") 46 CFR 183.01-15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2021
Resolved 4 May 2021
Resolution: Master provided photo showing plugged in outlet tool showing "Correct" lights.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 April 2021 Resolved
Engine room, forward bulkhead, port side, outlet below battery charger, open ground is shown. Locate and repair open ground. (OLD "T") 46 CFR 183.01-15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2021
Resolved 4 May 2021
Resolution: Master provided photo showing plugged in outlet tool showing "Correct" lights.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 April 2021 Resolved
Engine room, forward bulkhead, port side, next to battery charger is a temporary splice of two conductors Make connection in a permanent enclosure. (OLD "T") 46 CFR 183.01-15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2021
Resolved 4 May 2021
Resolution: Master provided photo of proper enclosure.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 5 April 2021 Resolved
Black "primary" VHF with DSC capability needs to be on it's own dedicated electrical circuit in addition to being connected with a 3 hour battery back up. Currently the white "back up" VHF (without DSC capability) is connected to the same electrical circuit but the VHF without DSC capability is currently wired to the battery backup. Re-arrange so that VHF with DSC capability (black "primary" one) has it's own dedicated circuit that connects to the 3 hour battery back up. VHF that does not have DSC capability should have it's own dedicated circuit as well. (OLD "T")46 CFR 183.05-25(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2021
Resolved 4 May 2021
Resolution: Master provided photos showing that radios were placed on their own dedicated circuit that was wired to battery back ups.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 5 April 2021 Resolved
Replace PVC plug cap on fire main piping in collision bulkhead space with metallic threaded plug. (OLD "T")46 CFR 181.15-5 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2021
Resolved 4 May 2021
Resolution: Master provided photo of stainless steel cap installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 April 2021 Resolved
Port M/E 120 volt oil heater plug is leaking oil. Remove and reseal heater plug. (OLD "T")46 CFR 176.25-10(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2021
Resolved 4 May 2021
Resolution: Master provided photo of block heater that was re-sealed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 April 2021 Resolved
Submit electrical plan for microwave (900 W)/ hotdog roller (900W)/ dual toaster oven (1800 W) power arrangement by upcoming drydock in March 2022. Current arrangement using outlet multiplier on starboard side outlet has caused melting and light damage to begin at the outlet and prongs. Either reduce the potential electrical loads at damaged outlet with new, remove outlet multiplier and directly plug in microwave/ hot dog roller into the new outlet and relocate hand held radio chargers to separate circuit. Do not plug both toaster ovens into the same circuit as this overloads the circuit, remove or relocate one of the toaster ovens to another circuit. Code 705, by next drydock. 46 CFR 183.220(b)
Action required: 705 - Other - as specified
Resolved 4 May 2021
Resolution: Master provided email that stated that all the outlets in the cooking area were on their own circuits. Master provided video showing the high output devices distributed evenly between outlets
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 5 April 2021 Resolved
Engine room, midship, outboard of port M/E, re-weld broken deck vertical support to bottom support. 705, by next drydock. (OLD "T")46 CFR 176.25-1(a)
Action required: 705 - Other - as specified
Resolved 24 March 2022
Resolution: Reattended vessel. Vertical support to bottom support rewelded satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 5 April 2021 Resolved
Repair forward starboard hydraulic ram steering assist mount to starboard rudder tiller. Bolt hole has worn considerably and there is a 1/2"+ gap causing the bolt connections to slam back and forth when actuated by helm controls. Vessel has two additional hydraulic assist rams to assist, so issue can be addressed at next drydock. Code 705, by next drydock. (OLD "T")46 CFR 182.30-1
Action required: 705 - Other - as specified
Resolved 19 April 2022
Resolution: Viewed satisfactory repair of bolt hole with new bushing.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 9 March 2020 Resolved
Repair 3 pits on sewage tank with approved epoxy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2020
Resolved 11 March 2020
Resolution: Vessel wire wheeled the affected area and applied expoy.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 9 March 2020 Resolved
Replace ball valve on sewage tank.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2020
Resolved 11 March 2020
Resolution: Vessel replaced the ball valve on the sewage line with a new one.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 March 2020 Resolved
Make weld continuous around port side strut where it meets the hull.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2020
Resolved 11 March 2020
Resolution: Shipyard welded the strut so it's now continuous where it meets the hull.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 February 2020 Resolved
Vessel has passed the date for required drydocking as per the certificate of inspection. Make vessel available for drydock inspection prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 March 2020
Resolution: the vessel has since conducted and been given credit for DD on 11MAR2020 (#6922857)
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 May 2019 Resolved
Replace identified fire hose. 46 CFR 181.15-10(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 30 May 2019
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 30 May 2019 Resolved
Replace pressure gauge on fire pump. 46 CFR 181.10-1(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 July 2019
Resolution: Received email showing a new gauge was installed on their fire pump.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 30 May 2019 Resolved
Replace grab line on lifering. 46 CFR 180.70(b)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 July 2019
Resolution: Received email showing vessel purchased a new life ring.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 May 2019 Resolved
Remove dead end wiring in the engine room, located port side forward of the port engine. 46 CFR 183.200(c)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 July 2019
Resolution: Received email showing vessel removed the dead end wiring in the engine room, located port side forward of the port engine.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 May 2019 Resolved
Remove electrical splice on the starboard engine. 46 CFR 183.340(m)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 July 2019
Resolution: Received email showing vessel removed spliced wire.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 May 2019 Resolved
Prove completion of DAPI supervisory training. 46 CFR 16.401(b)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 July 2019
Resolution: Received email attesting that Captains attended DAPI training.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 May 2019 Resolved
Maintain DAPI test results for 1 year. 46 CFR 16.206(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 July 2019
Resolution: Vessel stated they will retain DAPI test results for 1 year.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 30 May 2019 Resolved
Provide updated charts for areas where operations are conducted. 46 CFR 184.420(a)(1)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 July 2019
Resolution: Vessel purchased new charts.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 May 2019 Resolved
Replace fire pump electrical box. 46 CFR 183.210(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 July 2019
Resolution: Received email showing vessel replaced fire pump electrical box.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 May 2019 Resolved
Remove string from stbd fuel shutoff. 46 CFR 182.20-40(b)(3)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 30 May 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 May 2019 Resolved
Replace navigation batteries. 46 CFR 183.200
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 30 May 2019
Engineering › Bilge Water Management System › Not Operational
Issued 1 May 2018 Resolved
No bilge suction in the first space aft of the forepeak. Prove proper operation of bilge suction from space prior to carrying passengers
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 May 2018
Resolution: Crew cleared clog in bilge line. MI witnessed satisfactory operation of bilge suction in space.
Lifesaving › Lifefloat › Paddle
Issued 1 May 2018 Resolved
For both port and stbd life floats, have paddles properly lashed to their respective life floats.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: Verified paddles for both life floats are lashed to their respective life floats.
Lifesaving › Lifefloat › Retroreflective Material
Issued 1 May 2018 Resolved
For the port lifefloat, replace deteriorated retro reflective tape.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: Retro for port life float replaced.
Lifesaving › Lifefloat › Painter
Issued 1 May 2018 Resolved
For stbd lifefloat, ensure proper connection to painter. Lifefloat is currently tied to the port lifefloat. Current configuration is not adequate. Attach individually to painter.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: Painter re-attached in an approved configuration.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 1 May 2018 Resolved
Ensure sewage discharge valve is locked to prevent tampering.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: lock installed to prevent tampering
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.3-Comprehensive Annual Inspections
Issued 1 May 2018 Resolved
Provide VGP plan for vessel including inspection procedures referenced in annual inspection sheet.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: Verified presence of inspection procedures in VGP
Fire Fighting › Fire Pumps › Pressure
Issued 1 May 2018 Resolved
Install pressure gauge at discharge of fire pump
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: pressure gauge installed at discharge, near port side engine.
Construction/Loadline › Hull › Weld
Issued 1 May 2018 Resolved
Re-weld cracked welds as marked in fore peak and first space behind the fore peak.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: Verified re-welded cracks in fore peak and 1st space aft of fore peak.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 May 2018 Resolved
Identified loose wire in run penetrating watertight bulkheads between 1st space aft of fore peak, 2nd space aft of forepeak, and engine room. Bundle wire and make pulkhead penetrations watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: Penetrations sealed through all bulkheads the wire passes through.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 1 May 2018 Resolved
Cover missing for junction box in 2nd space aft of forepeak, near fresh water pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: Cover placed on junction box.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 1 May 2018 Resolved
Provide adequate potection for fuel tank sight gauge.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2018
Resolution: Plexiglass panel added to front of fuel tank sight guage.
Communications › Radio Communications › EPIRB
Issued 18 May 2017 Resolved
Provide EPIRB registration.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 25 May 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 May 2017 Resolved
Permanently wire in freezers in compartment #2.
Action required: 705 - Other - as specified
Due 17 June 2017
Resolved 25 May 2017
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 14 March 2016 Resolved
DC02:Provide DAPI Crew List and prove program compliance.
Condition: Improper/Lack of Maintenance
Due 1 April 2016
Resolved 28 March 2016
Resolution: Company provided updated crew list, and proof of program compliance.
Lifesaving › Lifefloat › Markings
Issued 14 March 2016 Resolved
DC03:Clean/re-paint (IAW Jim-Bouy instructions) port life float.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 28 March 2016
Resolution: Vessel repainted life float.
Communications › Audible Communications › SPD (Other)
Issued 14 March 2016 Resolved
DC04:Remove wire nuts on PA system wiring and replace with acceptable connector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 28 March 2016
Resolution: Wire nuts on the PA system were removed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 March 2016 Resolved
DC05:Remove plug connectors on bilge high level alarms and replace with acceptable connector
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 28 March 2016
Resolution: Plug connectors were replaced with permenant type.
Stability › Unintentional Flooding › General
Issued 14 March 2016 Resolved
DC06:Plug hole in aft side of E/R vent housing.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 28 March 2016
Resolution: Plugged hole, and welded shut.
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 March 2016 Resolved
Remove dead end wires in E/R on aft bulkhead
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 28 March 2016
Resolution: Dead end wiring was removed.
Lifesaving › Lifebuoys › Serviceable
Issued 14 March 2016 Resolved
Repair/Replace first deck aft lifering(Tape, tears, line)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 28 March 2016
Resolution: Vessel purchased new lifering.
Documentation › Logs/Records › Logbook (official)
Issued 14 March 2016 Resolved
DC09:Provide lifesaving inspection Logs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 28 March 2016
Resolution: Vessel has started new life saving log.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 14 March 2016 Resolved
DC10:Conduct MOB drills.
Condition: Improper/Lack of Maintenance
Due 28 March 2016
Resolved 28 March 2016
Resolution: Drills were conducted at sea, all sat.

Casualty record · 1

17 June 2005Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2466142
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

FJORDLAND (2005). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.