USNS BIG HORN

USNS BIG HORN is a 1992 tank ship. The Coast Guard has recorded 135 inspections since 1992, most recently in May 2025, along with 143 deficiencies.

Records from 1992 to 2025. Most recent: inspection, 15 May 2025.

Built
1992
Last inspected
15 May 2025
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8812162 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
343917
Flag
UNITED STATES
—
Maury page id
psix-343917

Inspections, by type

…with no type recorded33
Years with a record 30 calendar years (1992–2025)
The 135 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it20706 - Regulatory (Subpart C or D), Gross Ton
25742 - Convention (Subpart B), Gross Ton
18987 - Regulatory (Subpart C or D), Net Ton
8992 - Convention (Subpart B), Net Ton
27671 - Dead Weight, Ton
42382 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

RFA ARGUS Public Vessel, Unclassified · MISLE 997197 · 16 July 2008 · activity 3381751

Inspection history · 135

15 May 2025 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8205342
24 September 2024 Administrative Inspection
Administrative · Activities Europe · Activity 8008348
22 March 2024 ACP Annual Oversight · Annual Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7876839
17 November 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7826278
31 October 2023 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7824362
5 September 2023 ACP Annual Oversight · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7752398
14 June 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7714659
28 February 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7642960
21 November 2022 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7597537
20 October 2022 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7580768
19 October 2022 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7608223
5 October 2022 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7571876
12 July 2022 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7506262
4 July 2022 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7498090
1 July 2022 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7547704
16 June 2022 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7478832
8 June 2022 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7471597
18 March 2022 Liferaft Servicing
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7413986
7 January 2022 ACP COI Oversight · ACP Drydock Oversight · Examination of Repairs · Re-Inspection · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7382787
10 December 2021 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7368273
30 November 2021 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7359159
20 November 2021 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7359971
11 September 2021 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7312640
10 September 2021 Deficiency Check · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7310058
10 September 2021 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7337468
28 July 2021 ACP Annual Oversight · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7271211
17 June 2021 Deficiency Check
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7227766
30 May 2021 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7211006
10 November 2020 Administrative Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7092676
6 February 2020 Deficiency Check · Annual Inspection · ACP Drydock Oversight · ACP Annual Oversight
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6903833
10 December 2019 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6870744
24 September 2019 Administrative Inspection
Administrative · Activities Europe · Activity 6824457
3 January 2019 Administrative Inspection · Deficiency Check · Examination of Repairs · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6625799
29 November 2018 Administrative Inspection
Administrative · Activities Europe · Activity 6588911
31 October 2018 Administrative Inspection
Administrative · Activities Europe · Activity 6574620
8 July 2018 Administrative Inspection
Administrative · Activities Europe · Activity 6471120
19 April 2018 Administrative Inspection · Damage Survey
Physical examination · Activities Europe · Activity 6394506
15 March 2018 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6372918
16 February 2018 Special · ACP Annual Oversight · Annual Inspection · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6378637
25 October 2017 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6295099
9 August 2017 In-Service Inspection
Physical examination · Activities Europe · Activity 6234932
26 June 2017 Administrative Inspection
Administrative · Activities Europe · Activity 6186871
17 June 2017 Type not recorded
No type recorded · Activities Europe · Activity 6182904
15 March 2017 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6105317
6 March 2017 Annual Inspection · ACP COI Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6099862
23 December 2016 Permit to Proceed
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6061742
22 August 2016 Administrative Inspection
Administrative · Activities Europe · Activity 5980469
4 January 2016 Administrative Inspection · MTSA Verification · ACP Annual Oversight
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5820294
30 December 2015 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5789243
3 August 2014 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5062968
6 March 2014 Administrative Inspection
Administrative · Activities Europe · Activity 4810877
21 May 2012 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4326874
3 January 2012 Administrative Inspection · ACP COI Oversight
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4217477
6 September 2011 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4139926
5 July 2011 Type not recorded
No type recorded · Activities Europe · Activity 4073919
20 October 2008 ACP Annual Oversight
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 3357781
21 July 2008 Administrative Inspection
Administrative · Activities Europe · Activity 3274683
16 July 2008 Type not recorded
No type recorded · Activities Europe · Activity 3381751
3 April 2008 ACP Annual Oversight
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 3143541
4 February 2008 Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3108585
16 July 2007 ACP Periodic Oversight
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 2997191
22 June 2007 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2973970
22 May 2007 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 2938037
9 May 2007 Type not recorded
No type recorded · Activities Europe · Activity 2954106
19 January 2007 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2858649
5 January 2007 COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2815949
15 March 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2603086
23 January 2006 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2571636
12 January 2006 Cargo Tank Internal · Annual Inspection · Internal Structural Exam · Hull Examination · MTSA/ISPS Verification
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2539920
17 February 2005 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2294184
28 December 2004 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2265584
21 October 2004 Periodic Inspection · MTSA/ISPS Verification
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2225226
22 June 2004 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 2107462
5 February 2004 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2001133
29 January 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1997044
14 January 2004 Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1956554
15 December 2003 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1965541
27 October 2003 Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1934625
17 November 2002 Annual Inspection · Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1691174
18 October 2002 Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1692263
20 March 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1495101
14 March 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1493670
8 March 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1493289
6 March 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1491831
5 February 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1483995
29 January 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1482391
14 January 2002 Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1478171
3 December 2001 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1076758
1 December 2001 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 772690
27 November 2001 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1075775
5 November 2001 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1429661
29 October 2001 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 772314
27 April 2001 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 217721
9 December 1999 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1440230
19 November 1999 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 59995
16 November 1999 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1455782
11 November 1999 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 139889
14 January 1999 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 786975
16 December 1998 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1442775
19 September 1998 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 224388
26 January 1998 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1116732
5 December 1997 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 777300
26 November 1997 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 775932
18 November 1997 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1394862
24 June 1997 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 773734
5 March 1997 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1089220
13 November 1996 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 863451
23 October 1996 Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1165699
22 October 1996 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 93925
18 October 1996 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1157461
19 September 1996 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1133520
29 August 1996 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1380643
30 July 1996 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 149781
7 June 1996 Administrative
Administrative · Activities Europe · Activity 873898
23 May 1996 Type not recorded
No type recorded · Activities Europe · Activity 1084578
20 May 1996 Deficiency Check
Physical examination · Activities Europe · Activity 1083838
22 March 1996 Re-Inspection
Physical examination · Activities Europe · Activity 1360454
4 March 1996 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 884672
31 October 1995 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1355501
24 February 1995 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1162082
15 February 1995 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1403898
4 January 1995 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 25982
5 December 1994 Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1080992
2 December 1994 Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 871087
20 September 1994 Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1179790
7 September 1994 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1179717
23 August 1994 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 113526
5 April 1994 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1458150
31 March 1994 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 855936
30 November 1993 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 848714
30 April 1993 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1148348
12 April 1993 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1148349
26 March 1993 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1147404
26 March 1993 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1148569
21 May 1992 Initial Certification · Hull Examination · Inclining Experiment
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1268287

Deficiency record · 143

07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 March 2024 Resolved
Fire-extinguishing appliances shall be kept in good order and be available for immediate use at all times. Vessel reported that two reserve Halon cylinders (01 for cargo pump room and 01 for paint locker) were low on nitrogen pressure. Additionally, vessel reported that six CO2 activation bottles for Halon system are overdue for hydrotest. Replace cylinders and provide report verifying satisfactory operation. 74 SOLAS 97 II-2/21
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 April 2024
Resolution: ABS surveyed vessel and provided report clearing the deficiencies.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 22 March 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Tank level indicator #3 is inoperable. Prove proper operation of TLI #3. 74 SOLAS 20 I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 April 2024
Resolved 9 April 2024
Resolution: ABS surveyed vessel and provided report clearing the deficiencies.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 6 September 2023 Resolved
Means shall be provided to close all openings which may admit air to or allow gas to escape from a protected space. Vent fire closure 06-104-4 does not have a gasket. Install gasket. SOLAS 97 II-2/5.1.4
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2023
Resolved 20 September 2023
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 September 2023 Resolved
Fire extinguishing appliances shall be kept in good order and be available for immediate use at all times. Vessel self-reported that multiple AFFF heads on the tank-top deck were blocked and inoperable. Clear AFFF heads. SOLAS 97 II-2/21
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2023
Resolved 20 September 2023
Resolution: Finding 1734.0 to be rectified by 20 December 2023.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 5 September 2023 Resolved
Where cables which are installed in hazardous areas introduce the risk of fire or explosion in the event of an electrical fault in such areas special precautions against such risks shall be taken. Attending MI noted that there were numerous electrical wires not properly terminated on the cargo deck. All wiring on the cargo deck shall ether be removed when not in service or by terminated in an appropriate junction box approved for use in cargo areas. Specific locations where this was noted Port aft deck near shore tie interface, and Centerline deck junction box in dead. SOLAS 97 II-1 45.5.4
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 September 2023
02 - Structural Conditions › N/A - No Subsystem › Cargo pumproom
Issued 5 September 2023 Resolved
In tankers, electrical equipment, cables and wiring shall not be installed in hazardous locations unless it conforms with standards not inferior to those acceptable to the Organization. Attending MI’s noted that there were two household/shop fans being utilized in the lower level of the Pump room. During the course of the inspection a third fan was added to the pump room. All equipment utilized in a hazardous locations shall be designated as such. Instructions and procedures to insure safe operation of ships and protection of the environment in compliance with relevant international and flag state legislation. Company shall develop, implement and maintain a safety management system that validates which equipment is safe for use within the cargo pump room and cargo deck. ABS shall verify implementation via limited scope internal audit.97 SOLAS II/1 45.11 / ISM Code 1.4.2
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 September 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 September 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The Emergency Bilge suction filter basket located within the engine room lower level was badly wasted. 97 SOLAS 1/11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 September 2023
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 6 July 2022 Resolved
Fire detection systems shall be kept in good order so as to ensure their required performance if a fire occurs. Fire detection panel is currently displaying an error and is unable to be reset.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 July 2022
Resolution: ABS report sent over attesting to repair and proper operation.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 April 2022 Resolved
Fixed fire extinguishing systems shall be installed having due regard to the fire growth potential of the protected spaces. During annual servicing and COI inspection of fixed firefighting of Halon system, Marine Inspectors and ABS identified multiple Halon bottles that are out of normal range. 74 SOLAS 1997 II-2/10.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 April 2022
Resolution: Accepted by Class as CoC; see document Preliminary Report WO# 5248288. Extend the due date to 26JUL22 per RO request.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 April 2022 Resolved
Where remote control of propulsion machinery from the navigation bridge is provided and the machinery spaces are intended to manned, the propulsion machinery orders from the navigation bridge shall be indicated in the main machinery control room or a the maneuvering platform as appropriate. During coordinated test of engine order telegraph (EOT) between bridge and engine control room (ECR), the port side bridge EOT alarm does not correspond to what the ECR indicator. 74 SOLAS 1997 II-1/31.2.4
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 April 2022
Resolution: Deficiency accepted by Class as CoC; see document Preliminary Report WO# 5248288. Extend the due date to 26JUL22 per RO request.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 10 August 2021 Resolved
Each tank vessel with a cargo capacity of 1,000 or more cubic meters of oil or residue must have an overfill device on each cargo tank that has independent high and overfill alarms. The high alarm on #10P cargo tank is in constant alarm and unable to reset. Effective repairs shall be made and satisfactory testing prior to carriage of cargo in the #10P cargo tank. 33 CFR 155.840(b)(1)
Action required: 703 - Prior to bunkering operations
Resolved 20 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 10 August 2021 Resolved
The Condition of the ship shall be maintained fit to proceed to sea without danger to the ship or persons on board. Port main engine automation failure for LO, rocker arm LO, and FO pressure are maxed out and not accurately reading. STDBY pumps and alarms will not activate, local gauges and engine safety shutdowns are still functional. Require manned engine room watch when port main engine is operational. 74 SOLAS (2020) I/11(a) 705 - full machinery manning
Action required: 705 - Other - as specified
Resolved 11 August 2021
Resolution: Cleared to satisfaction of attending RO surveyor during annual survey.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 10 August 2021 Resolved
Incinerators onboard ships shall be provided with a manufacturer's operating manual and servicing provided by personnel responsible for its operation. Incinerator installed onboard was not operational, had an air leak from the sluice gate control line, had heat damage to cabling on the top of the sluice gate structure, and had 10+ active alarms in fault for the system. Satisfactory repairs and operation shall be witnessed by RO prior to use. 73/78 MARPOL (2017) 705 - prior to use
Action required: 705 - Other - as specified
Resolved 20 August 2021
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 August 2021 Resolved
Condition of the ship and its equipment shall be maintained so as to remain fit for the ship to proceed to sea without danger to the ship or persons onboard. Noted alarms on navigational light panel for both stern lights and one of the two forward mast head lights. Light operation and alarms shall be cleared to satisfaction of RO, ship limited to daylight ops. 74 SOLAS (2020) I/11(a) 705 - daylight ops only
Action required: 705 - Other - as specified
Resolved 20 August 2021
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 10 August 2021 Resolved
Purpose of this regulation is to contain a fire in the space of Origin. The fire integrity of the division shall be maintained at Openings and penetrations. Identified improper bulk head penetrations from ECR to main machinery space, MCT firestop was pulled out to allow new cable passage, additionally five new holes were drilled for cable penetrations without fire resistant insulation. Bulkhead and penetrations are required to be “A”60. 74 SOLAS(1997) II-2/9.1.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 12 August 2021
Resolution: Cleared to satisfaction of RO
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 August 2021 Resolved
Means shall be provided to control leaks of flammable liquids. Oil leaking from #1 & 3 SSDG turbo charger oil level gauge, STBD Main fuel return line IWO oil purification room. 74 SOLAS(1997) II-2/4.1.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 11 August 2021
Resolution: Cleared to satisfaction of attending RO surveyor during annual survey.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 August 2021 Resolved
The Condition of the ship shall be maintained fit to proceed to sea without danger to the ship or persons on board. Active Air leak from FO-PV015 IWO oil purification room. 74 SOLAS (2020) I-11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 12 August 2021
Resolution: Replaced PV and no leak observed by RO
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 10 August 2021 Resolved
Hydraulic power operated steering gear shall be provided with a low-level alarm for each hydraulic reservoir. STBD steering gear low lube alarm inoperable. Reservoir oil level to be checked on engineering rounds until repaired and operational. 74 SOLAS(1997) II-2/9.1.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 20 August 2021
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 10 August 2021 Resolved
The company should establish procedures to ensure the ship is maintained in conformity with the relevant rules and regulations. Company should ensure that inspections are held at appropriate intervals, any non-conformity is reported, and appropriate corrective action is taken. TANO alarm system is two years past scheduled maintenance and grooming , observed active alarms for incinerator smoke, aux boiler # 2 smoke, incinerator malfunction, feed and condensate sys dissolved solids high, refrigeration system #1 malfunction. Alarm grooming & servicing shall be completed within 60 days to the satisfaction of the RO. Required manned engine room watch until deficiency is cleared. 74 SOLAS(2020) IX/5 ISM CODE 10A
Action required: 705 - Other - as specified
Due 12 November 2021
Resolved 20 August 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 10 August 2021 Resolved
Lifeboats onboard shall be provided with a first aid kit in a waterproof case. The first aid kits currently onboard are expired. A new first aid kit shall be provided for each lifeboat onboard. 74 SOLAS (1997) III/41.8.20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2021
Resolved 11 August 2021
Resolution: Cleared to satisfaction of attending RO surveyor during annual survey.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 August 2021 Resolved
The Condition of the ship shall be maintained fit to proceed to sea without danger to the ship or persons on board. Noted two (02) corroded LP air pipes on cargo deck area leaking air. 1. IVO #4P WBT (U joint) 2. IVO Starboard Rescue Boat (Aft structure, deck fitting) Corroded pipes shall be replaced to satisfaction of RO. 74 SOLAS (2020) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2021
Resolved 20 August 2021
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 10 August 2021 Resolved
Fire~fighting systems and appliances shall be kept in good working order and readily available for immediate use. Found EDG halon time delay disconnected. Reconnected by servicing provider during inspection. 74 SOLAS (1997) 11-2/14.2.l.2
Action required: 10 - Deficiency Rectified
Resolved 10 August 2021
Resolution: Resolved during inspection
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 10 August 2021 Resolved
No less than 4 line throwing projectiles and 4 lines shall be provided on the ship for line-throwing appliances. Found only three (03) line-throwing appliances on board during inspection. An additional four (04) line-throwing appliances were supplied onboard during the inspection. 74 SOLAS (1997) III/49
Action required: 10 - Deficiency Rectified
Resolved 10 August 2021
Resolution: Resolved during inspection
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 10 August 2021 Resolved
A minimum of two (02) two-way portable radiotelephone apparatus shall be provided for each fire party for fire-fighter's communication. These devices shall be of an explosion-proof type or intrinsically safe. Ships constructed before 01JUL2014 shall comply with this no later than the first survey after 01JUL2018. Noted only 1 portable radiotelephone for fire team, and device was not intrinsically safe/explosion proof type. A minimum of 2 devices, in compliance with the requirements above, shall be provided at each fire locker within 30 days to the satisfaction of the RO.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2021
Resolved 11 August 2021
Resolution: Cleared to satisfaction of attending RO surveyor during annual survey.
11 - Life Saving Appliances › N/A - No Subsystem › Fast Rescue Boats
Issued 16 October 2020 Resolved
The starboard rescue boat is inoperable due to a failed transmission and has been out of commission for 6+ months. Obtain proper replacement parts, repair rescue boat, and prove ability to make 6 knots. 74 SOLAS (14) III/20.2
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 December 2020
Resolution: ABS opened a condition of class.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage of rescue boats
Issued 16 October 2020 Resolved
The starboard rescue boat is unable to be launched or recovered due to improper stowage arrangements and missing rigging. Replace improper length pendant, remove cargo straps securing boat to davit, and replace rigging and brake lines. Demonstrate launching and recovery of rescue boat. 74 SOLAS (14) III/20.2
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 December 2020
Resolution: ABS opened a condition of class.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 16 October 2020 Resolved
Overhead lighting in the EDG room is not secured and galley overhead lighting is missing shielding covers. 74 SOLAS (14) II-I/45.1.3
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 October 2020
Resolution: Corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 16 October 2020 Resolved
Lagging in missing in areas within the cargo pump rooms and machinery space. 74 SOLAS (14) II-I/26.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 October 2020
Resolution: Corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 16 October 2020 Resolved
Life boat No. 4 has an inoperable limit switch. 74 SOLAS (14) III/4.2.2
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 October 2020
Resolution: Corrected.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 October 2020 Resolved
The paint locker had spilt lineseed oil and haphazard stowage inside. 74 SOLAS (14) II-2/4.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 October 2020
Resolution: Corrected.
09 - Working and Living Conditions › 091 - Living Conditions › Laundry
Issued 16 October 2020 Resolved
Laundry room had bedding sheets and towels scattered throughout the space, creating a fire and tripping hazard. 74 SOLAS (14) 1/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 October 2020
Resolution: Corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 September 2019 Resolved
Stbd CPP hydraulic remote pitch control failed.
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 October 2019
Resolved 30 September 2019
Engineering › Sea-water System (primary cooling) › Piping
Issued 15 March 2018 Resolved
Salt water pipe to all three salt water service pumps currently has a crack and is leaking saltwater. If crack becomes worse there is potential to lose propulsion plant. Vessel is required to have tug escort from sea buoy to mooring. Tug escort shall be two tugs with an aggregate total horsepower of 9,000 or 90 ton bollard pull. Make repairs to satisfaction of classification society.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2018
Resolution: New pipe hanger was installed placing pipe into a neutral position. Fractured weld was excavated and re-welded. 6 inch line secured to new pipe hanger and the line was placed under hydrostatic head pressure test found sat to undersigned ABS surveyors.
Engineering › Diesel Engine (propulsion-electric) › Valve, Check (air start)
Issued 6 March 2014 Resolved
Port Main Engine air start distributor failed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2014
Resolution: overspeed and electronic govenor was replaced. Test witnessed by ABS.
Construction/Loadline › Hull › Hull Plating
Issued 21 July 2008 Resolved
Make permanent repairs to the damage IWO Frame 31-35 port side, Port side accommodation ladder, and frames 113–131 by the Helo Flight deck, 01 level. 23Jan09 recieved email from [name withheld] advising repairs have been completed and approved by an ABS Surveyor. Due date extended to next annual exam for confirmation.
Action required: 705 - Other - as specified
Due 5 April 2009
Resolved 18 February 2009
Resolution: Attending marine inspector wittnessed satisfactory repairs.
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 22 May 2007 Resolved
Conduct repairs to Starboard Shaft Control Pitch Propeller leakage.
Action required: 705 - Other - as specified
Due 22 June 2007
Resolved 22 June 2007
Resolution: Both port and starboard hubs changed out, renewed all blade and hub seals. Both port and starboard hubs were tested for leaks, all satisfactory.
Engineering › Generator (propulsion-electric) › Circuit Board
Issued 5 January 2007 Resolved
Demonstrate proper operation of #2 PTO generator in all modes.
Action required: 705 - Other - as specified
Due 5 February 2007
Resolved 12 February 2007
Resolution: Witnessed oprational tests of #2 PTO in modes 1, 2 &3. Condcted satisfactory test of reverse power relay, all sat.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 5 January 2007 Resolved
Provide proof of 3rd mates STCW endorcement for GMDSS, prior to 3rd mate standing Navigation watch.
Action required: 705 - Other - as specified
Resolved 12 February 2007
Resolution: Provided proof of STCW endorcemtent.
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 5 January 2007 Resolved
Provide proof of repair to Fire Alarm system.
Action required: 705 - Other - as specified
Due 19 January 2007
Resolved 12 February 2007
Resolution: Provided service report for Hiller Fire Systems.
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 5 January 2007 Resolved
Replace expired line throwing device.
Action required: 705 - Other - as specified
Due 19 January 2007
Resolved 12 February 2007
Electrical › Electric Generation Source (emergency) › Circuit Breaker
Issued 12 January 2006 Resolved
Prove proper operation of the emergency generator auto bus transfer.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 20 January 2006
Resolved 23 January 2006
Resolution: Emergency generator auto bus transfer proved satisfactory.
Electrical › Electric Generation Source (service) › Generator
Issued 12 January 2006 Resolved
Prove proper operation of #2 PTO generator in modes 2 and 3 and demonstrate reverse power relay trip
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 20 January 2006
Resolved 19 January 2006
Resolution: Witnessed proper operation of #2 PTO and reverse power relay, all sat.
Fire Fighting › Fixed Fire Detection System › Manually Operated Call Points
Issued 12 January 2006 Resolved
Correct all faulty manual pull stations identified by Hiller service report.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 January 2006
Resolved 3 February 2006
Resolution: Hiller Systems attended vessel and replaced manual fire pull boxes; witnessed by ABS surveyor [name withheld] all sat.
Engineering › Pressure Vessel › Relief Valve
Issued 22 November 2004 Resolved
Prove proper lift of the #1 & #2 Ship's Service Air and Start Air receiver relief valves as marked on the valve placard, not to exceed the MAWP of the receives NLT 30 days.
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 28 December 2004
Resolution: Verified documentation of satisfactory bench test of all PRV''s in question.
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 22 November 2004 Resolved
Repair exhaust leak on the #3 SSDG turbo charger.
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 28 December 2004
Resolution: Verified proper repairs on the exhaust leak on #3 SSDG turbo charger.
Communications › Audible Communications › Bell
Issued 22 November 2004 Resolved
Prove the audible alarm in the machinery spaces can be heard throughout the engine spaces.
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 28 December 2004
Resolution: Verified satisfactory test of audible alarms in engine spaces.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 22 November 2004 Resolved
Prove proper operation of automation test procedure 2-18, #5 to the satisfaction of the attending marine inspector NLT 30 days.
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 16 February 2005
Resolution: Test procedures amended (rev C) and approved by MSO San Diego for this class vessel.
Engineering › Diesel Engine (auxiliary) › Distributor (air start)
Issued 22 November 2004 Resolved
Prove proper operation of the EDG start accumulator bottles.
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 28 December 2004
Resolution: Verified proper operation of the EDG start accumulator bottles.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 22 November 2004 Resolved
Renew the flex couplings on both reefer units.
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 16 February 2005
Lifesaving › Lifeboat
Issued 14 January 2004 Resolved
Make proper repairs to the leaking sprinkler piping in the overhead behind the console in the #3 lifeboat.
Action required: 705 - Other - as specified
Due 14 February 2004
Resolved 5 February 2004
Resolution: Proper repairs were made to the #3 lifeboat sprinkler system. Test all sat.
Engineering
Issued 14 January 2004 Resolved
Prove proper operation of number one starting air receiver relief valve.
Action required: 705 - Other - as specified
Due 23 January 2004
Resolved 5 February 2004
Resolution: Tested number one starting air receiver. All satisfactory.
Engineering
Issued 14 January 2004 Resolved
Prove proper operation of ship's whistle relief valve.
Action required: 705 - Other - as specified
Due 23 January 2004
Resolved 5 February 2004
Resolution: Tested ship''s whistle relief valve. All satisfactory.
Engineering
Issued 14 January 2004 Resolved
Prove proper operation of watertight doors.
Action required: 705 - Other - as specified
Due 23 January 2004
Resolved 5 February 2004
Resolution: Watertight doors tested satisfactorily.
Fire Fighting
Issued 14 January 2004 Resolved
Ensure spanner wrenches are located at each machinery space fire station.
Action required: 705 - Other - as specified
Due 23 January 2004
Resolved 5 February 2004
Resolution: Spanner wrenches were located at each machinery fire station.
Electrical
Issued 14 January 2004 Resolved
Remove excess fuel, oil, and water from around Ship's Service Diesel Generators.
Action required: 705 - Other - as specified
Due 23 January 2004
Resolved 5 February 2004
Resolution: Excess fuel, oil and water have been removed from SSDG''s.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 14 January 2004 Resolved
Demonstrate proper operation and calibration of the cargo discharge oil content meter.
Action required: 705 - Other - as specified
Due 14 February 2004
Resolved 5 February 2004
Resolution: Vessel representative proved proper operation of the cargo discharge oil content monitor.
Engineering
Issued 14 January 2004 Resolved
Replace burnt-out bulbs in all flashing lights in machinery spaces.
Action required: 705 - Other - as specified
Due 23 January 2004
Resolved 5 February 2004
Resolution: All burnt out bulbs have been replaced in flashing lights in machinery spaces.
Electrical › Electric Generation Source (service) › Generator
Issued 1 December 2003 Resolved
Install/prove operation of P.T.O. (port)(pony generator).
Action required: 705 - Other - as specified
Due 14 November 2004
Resolved 22 November 2004
Lifesaving › Rescue Boat › Construction
Issued 17 November 2002 Resolved
make repairs to port inflatable pontoon that has pulled free of inner fiberglass hul.
Condition: Unknown
Due 11 December 2002
Resolved 11 December 2002
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 17 November 2002 Resolved
Renew all failed battery E-lights prior to sailing
Condition: Unknown
Due 11 December 2002
Resolved 11 December 2002
Electrical › Electrical Distribution System (service) › Cable
Issued 17 October 2002 Resolved
Re strap overhead cable runs in and around machinery spaces
Condition: Improper Installation
Due 11 December 2002
Resolved 11 December 2002
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 17 October 2002 Resolved
Low L/O shutdown on #4 generator failed
Due 11 December 2002
Resolved 11 December 2002
Documentation › Logs/Records
Issued 8 March 2002 Resolved
PROVIDE DOCUMENTATION OF C.G. OR ABS APPROVED WELDERS QUALIFICATIONS I.A.W. 46 CFR PART 57 & ASME CODE SECTION IX.
Action required: 705 - Other - as specified
Due 19 March 2002
Resolved 18 March 2002
Resolution: RECEIVED DOCUMENTS.
Documentation
Issued 8 March 2002 Resolved
PROVIDE APPROVED C.G. OR ABS PLANS (UNDER NVIC 10-82) TO INDICATE REPAIRS & MODIFICATIONS TO NO.6 & 7 KING POSTS. LEGACY COMPONENT DESC: APPROVED REPAIR PLANS
Action required: 705 - Other - as specified
Due 19 March 2002
Resolved 11 March 2002
Resolution: RECEIVED FAX COPY OF ABS APPROVAL OF DWG NO. 600-7373410 REV A. RAS & FAS KINGPOST SUPPORT BRACKETS UNDER NVIC 10-82 BUT THE WORKMANSHIP WAS NOT AUTHORIZED TO BE REVIEWED BY ABS UNDER NVIC 10-82..
Documentation
Issued 8 March 2002 Resolved
PROVIDE APPROVED WELDING PROCEDURES FOR THE AREAS BEING REPAIRED/MODIFIED TO NO.6 & 7 KING POSTS. LEGACY COMPONENT DESC: APPROVED WELDING PROCEDURES
Action required: 705 - Other - as specified
Due 19 March 2002
Resolved 14 March 2002
Documentation
Issued 8 March 2002 Resolved
PROVIDE WRITTEN DOCUMENTATION OF WELDERS PERFORMING REPAIRS/MODIFICATIONS TO NO.6 & 7 KING POSTS TO INDICATE WHICH WELDERS CONDUCTED WELDING TO NO.6 & NO.7 KING POSTS AND THE SPECIFIC LOCATION OF THE AREA WELDED. LEGACY COMPONENT DESC: WRITTEN STATEMENT OF FACT
Action required: 705 - Other - as specified
Due 19 March 2002
Resolved 18 March 2002
Resolution: RECEIVED DOCUMENTS.
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 8 March 2002 Resolved
PROVIDE REPAIR DATA PLATE TO NO.1 AUXILIARY BOILER I.A.W. NATIONAL BOARD INSPECTION CODE. LEGACY COMPONENT DESC: DATA REPAIR PLATE
Action required: 705 - Other - as specified
Due 19 March 2002
Resolved 11 March 2002
Resolution: CONDUCTED RESEARCH AND REPAIRS CONDUCTED TO THE OUTER CASING OF THE NO.1 AUXILIARY BOILER DO NOT REQUIRE A DATA PLATE INDICATING REPAIR STAMP AND WORK ORDER NUMBER. REQUIREMENT RESCINDED.
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 8 March 2002 Resolved
CONDUCT HYDROSTATIC TEST TO 1.25 X MAWP TO NO.1 AUXILIARY BOILER. LEGACY COMPONENT DESC: HYDROSTATIC TESTING
Action required: 705 - Other - as specified
Due 8 March 2002
Resolved 11 March 2002
Resolution: WITNESSED SAT HYDROSTATIC TEST OF NO. 1 AUXILIARY BOILER.
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 1 February 2002 Resolved
CONDUCT REPAIRS TO THE NO.1 AUXILIARY BOILER (S/N N-22631) TO FRONT CASING AREA WHERE WASTAGE & CRACKS ARE EVIDENT I.A.W. 46 CFR 59.10 & ASME CODE STANDARDS. LEGACY COMPONENT DESC: Combustion Chamber
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 March 2002
Resolved 6 March 2002
Resolution: REPAIRS COMPLETED. SAT.
Documentation › Certificates/Documents
Issued 1 February 2002 Resolved
PROVIDE REPAIR PROPOSAL & WELDING QUALIFICATIONS FOR C.G. REVIEW & APPROVAL TO REPAIR NO.1 AUXILIARY BOILER CASING.
Action required: 705 - Other - as specified
Due 1 March 2002
Resolved 6 March 2002
Resolution: CORRECTED.
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 1 February 2002 Resolved
NO. 1 AUXILIARY BOILER TO BE KEPT OUT OF SERVICE UNTIL FINAL REPAIRS ARE COMPLETED AND A FUNCTION TEST IS COMPLETED TO THE SATISFACTION OF ATTENDING COAST GUARD MARINE INSPECTOR.
Due 1 March 2002
Resolved 14 March 2002
Resolution: REPAIRS & FUNCTION TEST COMPLETED.
Communications › Alarms/Indicators
Issued 27 November 2001 Resolved
CONDUCT REPAIRS TO THE FOLLOWING GENERAL ALARM BELLS: 1. LOWER LEVEL ENGINE ROOM FORWARD OF MAIN DIESEL ENGINES. 2. ELECTRICIAN SHOP ATOP OF BOOK SHELF. 3. GENERAL ALARM BELL BETWEEN STATEROOMS 04-90-3 & 04-94-3. LEGACY COMPONENT DESC: General Alarm
Condition: Improper/Lack of Maintenance
Due 27 December 2001
Resolved 29 January 2002
Resolution: ITEM CLEARED 13DEC01 FROM PREVIOUS MSIS CASE.
Construction/Loadline
Issued 5 November 2001 Resolved
PROVE PROPER OPERATION OF STEERING ROOM PORT SIDE WATER TIGHT DOOR TO CLOSEBETWEEN 20-40 SECONDS.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Lifesaving
Issued 5 November 2001 Resolved
PROVE PROPER OPERATION OF ALL LIFEBOAT BILGE PUMPS.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Fire Fighting › Ventilation Systems › Fans
Issued 5 November 2001 Resolved
COMPLETE VENTILATION MODS FOR INCINERATOR ROOM TO ALLOW FOR THE FIRE DOOR CLOSURE TO CLOSE DOOR. A LIVE WATCH MUST BE MAINTAINED WHILE INCINERATOR IS IN OPERATION.
Condition: Design Flaw
Due 31 January 2002
Resolved 29 January 2002
Resolution: REPLACED VENTILATION MOTOR WITH A HIGHER HORSE POWER RATING TO DECREASE VACCUM PRESSURE AGAINST ENTRANCE DOOR, THEREBY ALLOWING THE DOOR TO BE OPENED FROM THE INSIDE OF THE SPACE DURING OPERATION OF THE INCINERATOR.
Lifesaving
Issued 5 November 2001 Resolved
RENEW LIGHTS ON LIFEJACKETS AND EMERSION SUITS WITH COAST GUARD/SOLAS APPROVED LIGHTS.
Condition: Unknown
Due 19 November 2001
Resolved 30 November 2001
Engineering
Issued 5 November 2001 Resolved
REPAIR RIGID OIL LINES TO OVERHEAD CAM VALVE COVERS TO NO. 4 SSDG TO B2 ANDB5 COVERS.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Electrical
Issued 5 November 2001 Resolved
REPAIR EMERGENCY DIESEL GENERATOR MONITORING PANEL TO PRE-LUBE SYSTEM.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Accommodation/Occupational Safety › Occupational Safety
Issued 5 November 2001 Resolved
REPAIR EYE WASH STATION IN FRONT NO. 3 SSDG.
Condition: Placed in Improper Service
Due 5 December 2001
Resolved 29 January 2002
Resolution: CORRECTED
Electrical
Issued 5 November 2001 Resolved
REPAIR OILY WATER SEPARATOR REMOTE CONTROL IN MCR CONSOLE.
Condition: Unknown
Due 5 December 2001
Resolved 14 January 2002
Documentation
Issued 5 November 2001 Resolved
PROVIDE PROPER STCW ENDORSEMENTS FOR ALL ABS PRIOR TO ASSIGNING TO WATCHSTANDING DUTIES.
Condition: Unknown
Due 5 December 2001
Resolved 14 January 2002
Resolution: CORRECTED.
Lifesaving
Issued 5 November 2001 Resolved
DEMONSTRATE LIFEBOAT NUMBER 3, 2, 4 SPRAY WASHDOWN SYSTEM.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Electrical
Issued 5 November 2001 Resolved
PROPERLY HARDWIRE OR REMOVE AMA-OIL INJECTION PUMP AFT OF NO.1 EVAPORATOR.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Electrical
Issued 5 November 2001 Resolved
PROPERLY LABEL C.B. PANEL "ENG. ROOM MOV POWER PANEL" WITH DIRECTORY LIST OF C.B. SWITCHES POSITIONS.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Engineering
Issued 5 November 2001 Resolved
REPAIR STIFF OPERATION OF EMERGENCY SHUTDOWN CABLE TO NO.3 SSDG.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Engineering › Sea-water System (primary cooling)
Issued 5 November 2001 Resolved
REPAIR NO. 1 SALT WATER CIRCULATING PUMP SEAL. LEGACY COMPONENT DESC: Pump
Condition: Unknown
Due 31 January 2002
Resolved 6 March 2002
Resolution: REPAIRS COMPLETE. TESTED SAT.
Lifesaving
Issued 5 November 2001 Resolved
MAKE REPAIRS TO GENERAL ALARM BELLS THROUGH OUT THE SHIP.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Lifesaving
Issued 5 November 2001 Resolved
RENEW ALL FOUR LINE THROWING DEVICES WHICH HAVE EXPIRED.
Condition: Unknown
Due 19 November 2001
Resolved 30 November 2001
Lifesaving
Issued 5 November 2001 Resolved
REPAIR SEARCH LIGHT OUTLET FOR NO.1 LIFEBOAT.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Electrical
Issued 5 November 2001 Resolved
PROPERLY LABLE EMERGENCY LIGHTS THROUGHOUT THE VESSEL.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Lifesaving
Issued 5 November 2001 Resolved
PROVIDE SOLAS APPROVED WEIGHTED LIFE RINGS FOR BRIDGE WING QUICK RELEASE.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Lifesaving
Issued 5 November 2001 Resolved
REPAIR/REPLACE AIR SUPPLY HOSES IN ALL LIFEBOATS DUE TO AIR LEAKS.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Construction/Loadline
Issued 5 November 2001 Resolved
PROPERLY MAKE THE OPERATION HANDLE FOR STEERING GEAR ROOM STARBOARD WTD TO OPERATE IN THE DIRECTION OF THE DOOR MOVEMENT.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Construction/Loadline
Issued 5 November 2001 Resolved
PROPERLY LABLE ALL WATERTIGHT DOOR ACTUATORS WITH THE DIRECTION OF_x001C_ OPERATION.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Construction/Loadline
Issued 5 November 2001 Resolved
REPAIR HYDRAULIC LEAK ON ENGINE CONTROL ROOM WATERTIGHT DOOR.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Construction/Loadline
Issued 5 November 2001 Resolved
PROVE PROPER OPERATION OF THE 5-10 SECOND DELAY ALARMS FOR SLIDING WATERTIGHT DOORS AS REQUIRED BY ASTM 1197.
Condition: Unknown
Due 5 December 2001
Resolved 5 February 2004
Resolution: Tested 5-10 second delays on all mechanical sliding watertight doors. All satisfactory.
Lifesaving
Issued 5 November 2001 Resolved
CLEAN CARPENTER SHOP TO COMPLY WITH GENERAL HOUSE KEEPING STANDARDS.
Condition: Unknown
Due 15 November 2001
Resolved 30 November 2001
Electrical
Issued 5 November 2001 Resolved
CONDUCT TEST OF PITCH FAILURE ALARM AS PER PG 2-20 AT LECS OF APPROVED AUTOMATION PROCEDURES.
Condition: Unknown
Due 28 February 2002
Resolved 14 March 2002
Resolution: REPAIRS AND UPDATED MODIFICATIONS COMPLETED ANDTESTED. SAT.
Unknown
Issued 5 November 2001 Resolved
HYDRO STATIC TEST TO BE CONDUCTED TO OXYGEN BOTTLES IN HOSPITAL SPACE.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Engineering
Issued 5 November 2001 Resolved
REPAIR RIGID OIL LINES TO OVERHEAD CAM VALVE COVERS TO NO. 3 SSDG TO A3 COVER.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Lifesaving
Issued 5 November 2001 Resolved
PROVIDE AUXILIARY LINE (1500 FEET) FOR LINE THROWING GUN.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 5 November 2001 Resolved
PROVIDE CONDITION REPORT OF REPAIRS/STATUS OF PORT MAIN ENGINE STARBOARD AIR HORN HOUSING CRACKS. EXTENSION GRANTED.
Condition: Unknown
Due 15 March 2002
Resolved 18 March 2002
Resolution: REPORT RECEIVED.
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 5 November 2001 Resolved
CONDUCT REPAIRS TO NO.2 PTO GENERATOR REVERSE POWER RELAY AND TEST TO SATISFACTION OF C.G. INSPECTOR.
Condition: Unknown
Due 28 February 2002
Resolved 1 February 2002
Resolution: REPLACED REVERSE POWER RELAY BREAKER. TESTED SAT.
Electrical
Issued 5 November 2001 Resolved
PROVE PROPER OPERATION OF PTO GENERATOR IN GENERATOR MODE NO. 2 VERIFY GENERATOR RPM SUSTAIN FULL LOAD OVER FULL RANGE OF THROTTLE LEVER POSITION I.A.W. PG 2-7 OF APPROVED AUTOMATION PROCEDURES. PROVIDE WRITTEN DOCUMENTATION FROM CHIEF ENGINEER.
Condition: Unknown
Due 28 February 2002
Resolved 6 March 2002
Resolution: PROVIDED DOCUMENTATION.
Electrical
Issued 5 November 2001 Resolved
PROVE PROPER OPERATION OF PTO GENERATORS TO INDICATE THROTTLE LEVER AHEAD AND ASTERN TO SHOW ENGINE SPEED INCREASE AND PITCH MOVEMENT I.A.W. PG 2-6 OF APPROVED AUTOMATION PROCEDURES. PROVIDE WRITTEN DOCUMENTATION FROM CHIEFENGINEER WITH COPY OF MARINERS LICENSE.
Condition: Unknown
Due 28 February 2002
Resolved 6 March 2002
Resolution: PROVIDED DOCUMENTATION.
Fire Fighting
Issued 5 November 2001 Resolved
DEMONSTRATE SPRINKLER SYSTEM FOR JUNGLE DECK.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Electrical › Electric Generation Source (service)
Issued 5 November 2001 Resolved
CONDUCT REPAIRS TO NO.2 PTO SYNCRO-COMPENSATOR MOTOR AND CONDUCT FULL FUNCTION TEST OF SYSTEM I.A.W. APPROVED PROCEDURES IN THE PRESCENCE OF A C.G. MARINE INSPECTOR.
Condition: Unknown
Due 28 February 2002
Resolved 1 February 2002
Resolution: REPAIRS COMPLETED. TESTED SAT.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 5 November 2001 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 28 February 2002
Resolved 6 March 2002
Resolution: DOCUMENTATION PROVIDED.
Fire Fighting
Issued 5 November 2001 Resolved
REPAIR LEAKS TO FIRE HYDRANT VALVES STEMS TO F/S 100, F/S 27, F/S 18, F/S 7.
Condition: Unknown
Due 5 December 2001
Resolved 30 November 2001
Documentation
Issued 29 October 2001 Resolved
PROVIDE COPY OF SAFETY RELIEF VALVE TESTING REPORT.
Condition: Unknown
Due 21 December 2001
Resolved 21 December 2001
Engineering › Compressed Air System (control)
Issued 29 October 2001 Resolved
REPLACE THE FOLLOWING SAFETY RELIEF VALVES: FAS NO.8, FAS NO.6, FAS NO.2, RAS NO.3, FAS NO.8, NO.1 MOISTURE SEPARATOR AND RESERVE AIR FLASK. LEGACY COMPONENT DESC: Valve
Condition: Unknown
Due 29 January 2002
Resolved 29 January 2002
Resolution: CORRECTED.
Lifesaving
Issued 29 October 2001 Resolved
PROVIDE DOCUMENTATION THAT ALL FAS SAFETY RELIEF VALVES MEET MIL SPEC REQUIREMENTS.
Condition: Unknown
Due 29 January 2002
Resolved 29 January 2002
Navigation
Issued 16 November 1999 Resolved
PROVE PROPER INSTALLATION AND OPERATION OF RADARS TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 18 December 1999
Resolved 13 December 1999
Engineering
Issued 16 November 1999 Resolved
PROVIDE COPY OF FUEL OIL TRANSFER PROCEDURES IAW 33 CFR 155.
Condition: Unknown
Due 18 December 1999
Resolved 13 December 1999
Engineering
Issued 16 November 1999 Resolved
PROVE PROPER OPERATION OF MDES' AUTOMATION ALARMS AND SHUTDOWNS.
Condition: Unknown
Due 18 December 1999
Resolved 13 December 1999
Lifesaving
Issued 16 November 1999 Resolved
DEMOSTRATE WEIGHT TEST OF #1 AND #4 LIFEBOAT DAVITS PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 18 December 1999
Resolved 13 December 1999
Electrical
Issued 16 November 1999 Resolved
RENEW ALL FUEL OIL AND LUBE OIL FLEXIBLE HOSES ON EMERGENCY GENERATOR _x001C_ WITH APPROVED FIRE RESISTENT MARINE HOSES.
Condition: Unknown
Due 18 December 1999
Resolved 13 December 1999
Construction/Loadline
Issued 16 November 1999 Resolved
INSTALL USCG APPROVED "FIRE STOP" IN ELECTRICAL CABLE RUN ABOVE WATERTIGHT DOOR STBD SIDE STEERING FLAT.
Condition: Unknown
Due 18 December 1999
Resolved 13 December 1999
Unknown
Issued 16 November 1999 Resolved
REPAIR CHEMICAL TREATMENT TANK FOR MSD.
Condition: Unknown
Due 18 December 1999
Resolved 13 December 1999
Engineering
Issued 16 November 1999 Resolved
REPAIR WRONG DIRECTIONAL ALARM ON EOT LOCATED IN MAIN CONTROL.
Condition: Unknown
Due 18 December 1999
Resolved 13 December 1999
Lifesaving
Issued 5 December 1997 Resolved
REPLACE EXISTING LIFTING PENDANTS AND ASSOCIATED HARDWARE AS ORIGINAL ON BOTH PORT AND STARBOARD RESCUE BOATS; CONDUCT WEIGHT TEST IN PRESENCE OF COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 5 December 1997
Resolved 5 December 1997
Fire Fighting
Issued 18 November 1997 Resolved
UPDATE FIRE CONTROL PLAN TO INDICATE PROPER TYPE, AMOUNT AND LOCATION OF FIREFIGHTING EQUIPMENT.
Condition: Unknown
Due 1 December 1997
Resolved 1 December 1997
Deck/Cargo
Issued 18 November 1997 Resolved
PROVIDE PROPER OPERATION OF OIL DISCHARGE MONITOR PRIOR TO DEPARTURE FROM THE PORT OF HAMPTON ROADS.
Condition: Unknown
Due 10 December 1997
Resolved 10 December 1997
Lifesaving
Issued 18 November 1997 Resolved
PRIOR TO LOADING CARGO PROVE PROPER OPERATION OF SPRINKLER SYSTEM ON LIFEBOAT NO. 3.
Condition: Unknown
Due 1 December 1997
Resolved 1 December 1997
Engineering
Issued 13 November 1996 Resolved
MAKE PROPER REPAIRS AND DEMONSTRATE PROPER OPERATION OF PORT MAIN DIESEL ENGINE.
Condition: Unknown
Due 13 November 1996
Resolved 13 November 1996
Engineering
Issued 23 October 1996 Resolved
MAKE PROPER REPAIRS TO PORT MAIN DIESEL ENGINE CRANKSHAFT PRIOR TO DEPARTURE PORT OF HAMPTON ROADS.
Condition: Unknown
Due 23 October 1996
Resolved 23 October 1996
Engineering
Issued 22 October 1996 Resolved
CONNECTING ROD FOR PISTON BROKE. THIS CAUSED DAMAGE TO SURROUNDING PARTS.
Condition: Unknown
Due 11 January 2002
Resolved 14 January 2002
Engineering
Issued 29 August 1996 Resolved
Demonstrate proper operation of both starting air receiver relief valves.
Condition: Unknown
Due 29 August 1996
Resolved 29 August 1996
Engineering
Issued 29 August 1996 Resolved
Provide properly rated pressure gauge in way of #2 auxiliary boiler with a mid-range deflection of 200 psi.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Lifesaving
Issued 29 August 1996 Resolved
Make permanent repairs to minor interior leak in way of #4 lifeboat sprinkler system.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Engineering
Issued 22 March 1996 Resolved
REPAIR STBD REDUCTION GEAR AFT PINION BEARING TEMPERATURE SENSOR. MAINTAIN A LIVE WATCH ON BEARING UNTIL SENSOR IS OPERATIONAL.
Condition: Unknown
Due 22 March 1996
Resolved 22 March 1996
Lifesaving
Issued 22 March 1996 Resolved
RENEW THE HYDROSTATIC RELEASE ON THE EPIRB.
Condition: Unknown
Due 22 March 1996
Resolved 22 March 1996
Fire Fighting
Issued 15 February 1995 Resolved
PERFORM SATISFACTORY OPERATIONAL TEST OF CARGO DECK SPRINKLER SYSTEM.
Condition: Unknown
Due 24 February 1995
Resolved 24 February 1995
Fire Fighting
Issued 15 February 1995 Resolved
PROVIDE COPY OF FOAM ANALYSIS.
Condition: Unknown
Due 24 February 1995
Resolved 24 February 1995
Fire Fighting
Issued 15 February 1995 Resolved
INSTALL DOOR KNOB IN FIRE SCREEN DOOR AT 05 LEVEL OF STAIRWELL.
Condition: Unknown
Due 24 February 1995
Resolved 24 February 1995
Construction/Loadline
Issued 26 March 1993 Resolved
REPAIR STBD CARGO DOOR AND CONDUCT A SATISFACTORY HOSE TEST
Condition: Unknown
Due 15 April 1993
Resolved 23 June 1993
Lifesaving
Issued 26 March 1993 Resolved
REPAIR STBD ACCESS DOOR GASKET FOR #4 LIFEBOAT
Condition: Unknown
Due 15 April 1993
Resolved 23 June 1993
Lifesaving
Issued 26 March 1993 Resolved
REPAIR CABLE STUFFING TUBE IN ENGINE COMPARTMENT FOR #4 LIFEBOAT
Condition: Unknown
Due 15 April 1993
Resolved 23 June 1993
Fire Fighting
Issued 26 March 1993 Resolved
INSTALL PRESSURE RELIEF VALVE AFTER FIREPUMP AND BEFORE THE DISCHARGE VALVEAS PER 46 CFR 34.10-5(d)
Condition: Unknown
Due 15 April 1993
Resolved 23 June 1993
Engineering
Issued 26 March 1993 Resolved
REPAIR/REPLACE SHIP SERVICE AIR RELIEF VALVE AND TEST FOR PORPER OPERATION
Condition: Unknown
Due 15 April 1993
Resolved 23 June 1993
Electrical
Issued 26 March 1993 Resolved
REPAIR/REPLACE EMERGENCY LIGHTING AS NECESSARY AND CONDUCT A SATISFACTORY TEST.
Condition: Unknown
Due 15 April 1993
Resolved 23 June 1993
Lifesaving
Issued 26 March 1993 Resolved
INSTALL INSULATION AROUND GALVANIZED EXHAUST PIPE AS PER MANUFACTURES REP FOR ALL LIFEBOATS
Condition: Unknown
Due 15 April 1993
Resolved 23 June 1993
Deck/Cargo
Issued 21 May 1992 Resolved
PROVIDE APPROVED PLANS FOR HIGH PRESSURE AIR SYSTEM (3000 PSIG) (ASI#C8-27549-01-10) WITH SPECIFIC ACCEPTANCE FOR USE OF THE 6 CU. FT. HP AIR RECEIVERIN HPAC RM MANUFACTURED IAW MIL-F-22606B AS NOTED IN ABS LTR P-321183, L-O-40641 DTD 23APR90.
Condition: Unknown
Due 18 June 1992
Resolved 18 June 1992

Ownership record