LAKEBOUND is a 1990 passenger vessel (inspected). The Coast Guard has recorded 54 inspections since 1990, most recently in August 2026, along with 59 deficiencies and 1 casualty investigation in 2009.

Records from 1990 to 2026. Most recent: inspection, 22 August 2026.

Built
1990
Last inspected
22 August 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDJ4636
344243
Flag
UNITED STATES
367020040
Maury page id
psix-344243

Inspections, by type

…with no type recorded4
Years with a record 33 calendar years (1990–2026)
The 54 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)42.0 ft × 12.0 ft × 5.0 ft
Registered tonnagegross 16 / net 13
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderADAMS BOAT COMPANY, INC. · MADISON, IN, UNITED STATES · built 1990
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portPORT CLINTON, OH
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 10 March 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it16 - Simplified, Gross Ton
13 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDJ4636MMSI 367020040 · active · compulsorily equipped · granted 29 March 2017, expires 29 March 2027
WAJ6104MMSI 367020040 · cancelled · compulsorily equipped · granted 20 March 2015, cancelled 23 March 2017
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 54

22 August 2026 Type not recorded
No type recorded · Station Marblehead · USCG Great Lakes District (CGD-GL) · Activity 8470123
19 May 2026 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8376263
17 April 2026 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8350551
17 November 2025 Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8269869
10 July 2025 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8179011
7 January 2025 Drydock Exam · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8058898
26 August 2024 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7989608
31 May 2023 Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7703785
6 April 2023 COI Inspection · DAPI Audit · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7663991
16 May 2022 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7457488
5 May 2022 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7445325
2 May 2022 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7439860
19 April 2021 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7179642
5 May 2020 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6953021
19 November 2019 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6858543
29 April 2019 Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6672672
9 April 2018 COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6387784
20 April 2017 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6131172
15 September 2016 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6001412
10 May 2016 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5880331
13 July 2015 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5179649
20 January 2011 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3929673
16 December 2009 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3644541
24 July 2009 Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3547170
23 July 2009 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3571345
6 April 2009 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3444203
1 May 2008 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3196482
21 April 2008 COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3188630
29 March 2007 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2897682
7 April 2006 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2619176
20 March 2006 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2606056
11 April 2005 Hull Examination · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2250557
10 May 2004 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2053847
3 April 2003 COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1767675
1 October 2002 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1679262
25 September 2001 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1458929
25 September 2000 COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1417129
22 November 1999 Hull Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1388946
4 October 1999 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1460345
5 October 1998 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 801199
2 October 1997 COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1422919
25 March 1997 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1394676
25 March 1996 COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 886305
21 September 1995 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1371172
22 March 1995 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1394304
16 November 1994 Hull Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1163729
23 March 1994 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1472893
22 March 1993 COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1148543
13 August 1992 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 187911
23 March 1992 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 947648
20 March 1991 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 997148
23 March 1990 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1230181
12 March 1990 Initial Certification · Initial Construction-Excluding Oversight · Hull Examination · Plan Review "T" Boat
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 905199
12 March 1990 Hull Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1178266

Deficiency record · 59

11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 17 April 2026 Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Vessels EPIRB has an expired battery. Vessel is restricted to three miles from shore until EPIRB battery is replaced. Vessel is to ensure if EPIRB is replaced that it is properly registered with NOAA. 46 CFR 180.64
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 19 May 2026
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 17 April 2026 Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Vessel did not have emergency instructions posted. 46 CFR 185.510(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2026
Resolved 19 May 2026
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 17 April 2026 Resolved
The master of the vessel shall ensure that each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly, using the integrated test circuit and output indicator, to determine that it is operative. Vessel could not provide logs to show monthly tests where being completed. 46 CFR 185.728(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2026
Resolved 19 May 2026
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 17 April 2026 Resolved
Fire fighting and Abandon ship/man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information: Date of the drill and training; and General description of the drill scenario and training topics. Vessel could not provide logs to show drills were being completed.46 CFR 185.524(d) 46 CFR 185.520(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2026
Resolved 19 May 2026
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 17 April 2026 Resolved
Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew. Vessel could not provide logs to show monthly fire extinguisher inspections were being completed. 46 CFR 176.810(b)(ii)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2026
Resolved 19 May 2026
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 7 January 2025 Resolved
To ensure that the scantlings, materials, fastenings, workmanship and arrangement of each vessel are such as to provide for safe operation in accordance with the terms of its certificate of inspection. Vessel was found with substantial corrosion on the upper portion of the port chime and the forward bottom plating behind the forepeak void. Vessel shall conduct a gauging thickness test in the presence of a CG marine inspector and renew the plating to good metal if found to be wasted above 25%. Repair proposal shall be submitted to the local OCMI for review and approval prior conducting repairs. 46 CFR 177.01-5
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 August 2024 Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel lost boost pressure as a result of turbo o-ring failure. Vessel to have repairs made to the satisfaction of attended CG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 August 2024
Resolved 28 August 2024
Resolution: Conducted inspection and sea trials on vessel. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 May 2023 Resolved
INSTALLATION OF DIESEL ENGINE EXHAUST PIPE SHALL BE IN ACCORDANCE WITH 182.15-20. EXHAUST PIPING SHALL BE LED TO THE POINT OF ESCAPE WITH A MINIMUM NUMBER OF BENDS OR ELBOWS. IT SHALL BE GAS TIGHT THROUGHOUT ITS LENGTH AND SHALL BE PROPERLY SUPPORTED BY NON-COMBUSTIBLE HANGERS OR BLOCKS. THE VESSELS MDE EXHAUST PIPE WAS DAMAGED AT AN ELBOW IN THE ENGINE COMPARTMENT AND LEAKED EXHAUST GASES INTO THE COMPARTMENT. VESSEL MUST MAKE REPAIRS TO THE SATISFACTION OF THE [name withheld]. 46 CFR 182.20-20 "OLD T" 46 CFR 182.15-20 "OLD T"
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2023
Resolved 5 June 2023
Resolution: replaced piece of damaged exhaust pipe in kind.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 31 May 2023 Resolved
EACH PORTABLE FIRE EXTINGUISHER ON A VESSEL MUST BE OF AN APPROVED TYPE. THE MINIMUM NUMBER OF PORTABLE FIRE EXTINGUISHERS REQUIRED ON A VESSEL MUST BE ACCEPTABLE TO THE COGNIZANT [name withheld] MUST NOT BE FEWER THAN THE MINIMUM NUMBER REQUIRED BY TABLE 181.500(b) AND OTHER PROVISIONS OF THIS SECTION. THE VESSEL DISCHARGED ALL OF ITS PROVIDED PORTABLE EXTINGUISHERS AND CURRENTLY HAS 0 ON BOARD. VESSEL MUST PROVIDE THE APPROPRIATE NUMBER OF SERVICABLE FIRE EXTINGUISHERS PRIOR TO SAILING. 46 CFR 181.500
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2023
Resolved 5 June 2023
Resolution: portable fire extinguishers were serviced and placed on the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 11 April 2023 Resolved
EACH VESSEL SHALL CARRY ON BOARD A FIRST AID KIT APPROVED IN ACCORDANCE WITH 160.041 OF THIS PART. THE VESSEL HAD A FIRST AID KIT THAT DID NOT MEET THE REQUIREMENTS OF 160.041.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2023
Resolved 28 April 2023
Resolution: First Aid kit updated.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 11 April 2023 Resolved
EACH VESSEL SHALL CARRY UPDATED CHARTS AND PUBLICATIONS. THE CHARTS, LIGHT LIST, TIDE TABLE, AND COAST PILOT WERE NOT UPDATED. *UPDATED LIGHT LIST ADDDED TO THE VESSEL PRIOR TO INSPECTION COMPLETION
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2023
Resolved 28 April 2023
Resolution: Owner provided updated Charts and pubs.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 6 April 2023 Resolved
VESSELS ON A GREAT LAKES ROUTE SHALL CARRY SIX HAND RED FLARES AND SIX HAND ORANGE SMOKE DISTRESS SIGNALS. VESSEL HAD 7 ORANGE SMOKE AND 3 RED FLARES.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2023
Resolved 28 April 2023
Resolution: Required Flares verified onboard vsl.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 6 April 2023 Resolved
A POWER-DRIVEN VESSEL UNDERWAY FROM SUNSET TO SUNRISE SHALL EXHIBIT A STERNLIGHT. VESSEL'S STERN LIGHT WAS INOPERABLE AT TIME OF INSEPCTION. STERN LIGHT MUST BE OPERATIONAL IF VESSEL INTENDS TO OPERATE BETWEEN SUNSET AND SUNRISE.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2023
Resolved 28 April 2023
Resolution: Stern light operation verified.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 6 April 2023 Resolved
EACH LIFE FLOAT MUST BE FITTED WITH A LIGHT. THE LIGHT ATTACHED TO THE LIFE FLOAT WAS INOPERABLE.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2023
Resolved 28 April 2023
Resolution: New light installed and operation verified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 April 2023 Resolved
SYSTEMS AND APPLICATIONS WHERE FLEXIBLE HOSES ARE PERMITTED TO BE CLAMPED, DOUBLE CLAMPING IS REQUIRED AT BOTH ENDS OF THE HOSE. INSPECTOR OBSERVED TWO DECK DRAIN HOSES SECURED BY SINGLE CLAMP.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2023
Resolved 28 April 2023
Resolution: All required hoses double clamped.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 6 April 2023 Resolved
A VESSEL OF AT LEAST 26-FEET IN LENGTH MUST HAVE AN AUDIBLE/VISUAL BILGE HIGH LEVEL ALARM PROVIDED AT THE OPERATING STATION. THE VISUAL BILGE HIGH LEVEL ALARM WAS INOPERABLE.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2023
Resolved 28 April 2023
Resolution: Bilge alarm tested and operating correctly.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 2 May 2022 Resolved
EPIRB hydrostatic release expired APR2022. Vessel is limited to operations inside 3 miles from shore until hydrostatic release unit is replaced per manufactures specifications.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2022
Resolved 5 May 2022
Resolution: Received photo of newly purchased/installed HRU.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 2 May 2022 Resolved
Retroreflective tape on Life Float and BA found deteriorated. Life Float and BA retroreflective tape needs to be replaced in accordance with Q Spec 160.027 and 160.10.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2022
Resolved 16 May 2022
Resolution: RETRO-REFLECTIVE TAPE WAS REPLACED.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 April 2021 Resolved
Identified 12 life jackets that were damaged/worn beyond service/repair. Operator must provide a life jacket for each person carried on board the vessel. Vessel is authorized to carry 32 total persons on board until new life jackets are placed in service.
Action required: 705 - Other - as specified
Resolved 21 April 2021
Resolution: Company has purchased new Type I PFD's, properly marked and placed on vessel.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 19 November 2019 Resolved
pitting in the hull plate in the area of the starboard side mid ship to the keel and continuing on to the port side near the through hull for the engine cooling water. Vessel is required to gauge area and send report to the CG inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 December 2019
Resolved 19 December 2019
Resolution: Vessel owner had areas of concern gauged. No areas to be cropped and renewed. Areas will be noted and inspected at next Dry Dock exam.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 29 April 2019 Resolved
Properly mark remote fuel shut-off valve for diesel fuel tank.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2019
Resolved 30 April 2019
Resolution: New stenciling installed by vessel rep.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 29 April 2019 Resolved
Webbing securing lifelines at three points around life float are torn and/or frayed. Properly repair life float or replace with functioning life float.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2019
Resolved 30 April 2019
Resolution: New Lifeline was installed on Life float.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 9 April 2018 Resolved
Vessels EPIRB was found to have an expired HRU.
Action required: 10 - Deficiency Rectified
Due 18 April 2018
Resolved 18 April 2018
Resolution: HRU was replaced on the spot.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 10 May 2016 Resolved
The lanyard for the lifefloat waterlight is deteriorated. Replace lanyard IAW 46 CFR 180.175.
Action required: 705 - Other - as specified
Due 24 May 2016
Resolved 15 September 2016
Communications › Radio Communications › EPIRB
Issued 10 May 2016 Resolved
The hydrostatic release unit (HRU) for the EPIRB is not marked for expiration. Mark expiration 2 years from date of installation IAW 46 CFR 185.740.
Action required: 705 - Other - as specified
Due 24 May 2016
Resolved 15 September 2016
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 10 May 2016 Resolved
The buoyant lifeline for the ring lifebuoy is deteriorated. Replace lifeline IAW 46 CFR 180.70.
Action required: 705 - Other - as specified
Due 24 May 2016
Resolved 15 September 2016
Communications › Alarms/Indicators › Bilge Alarm
Issued 13 July 2015 Resolved
Vessel's bilge high level alarm is not functioning. Make functional bilge high level alarm IAW 46 CFR 182.530.
Action required: 705 - Other - as specified
Due 28 July 2015
Resolved 17 August 2015
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure Gauge
Issued 13 July 2015 Resolved
A portable B-II dry-chemical fire extinguisher located on the fwd-stbd exterior bulkhead of the men's lavatory indicates that it is in need of re-charge on its pressure gauge. Properly service or replace portable fire extinguisher IAW 46 CFR 181.500.
Action required: 705 - Other - as specified
Due 21 July 2015
Resolved 17 August 2015
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 April 2008 Resolved
Electrical supply wiring from batteries in engine compartment and fuse panel in pilothouse (approx 30 feet) do not have circuit protection in accordance with 46 CFR 183.05-15. Install circuit protection as required.
Action required: 705 - Other - as specified
Due 23 April 2009
Resolved 21 April 2009
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 April 2008 Resolved
Forward bilge pump in way of engine compartment needs switch or fuse near power source in accordance 46 CFR 183-05-15.
Action required: 705 - Other - as specified
Due 1 May 2008
Resolved 1 May 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 21 April 2008 Resolved
The engine exhaust piping just aft of turbocharger is supported by nylon line. Install proper non-combustable bracket in accordance with 46 CFR 182.15-20.
Action required: 705 - Other - as specified
Due 1 May 2008
Resolved 1 May 2008
Stability › Unintentional Flooding › General
Issued 21 April 2008 Resolved
Deck drain hose for engine hatch is in direct contact with engine exhaust piping. Re-route hose to eliminate this contact as prescribed by 46 CFR 182-15-20.
Action required: 705 - Other - as specified
Due 1 May 2008
Resolved 1 May 2008
Engineering › Steering Gear System › Pin
Issued 29 March 2007 Resolved
Crew unable to utilize the emergency steering tiller due to steering ram is hard bolted to the rudder post, need to install a quick release pin.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 29 March 2007
Resolution: Crew replaced steering hardware with a quick release pin. Tetsed all sat.
Navigation › Collision/Grounding Avoidance › Radar
Issued 20 March 2006 Resolved
Prove proper operation of radar
Action required: 705 - Other - as specified
Due 11 April 2006
Resolved 11 April 2006
Resolution: Tested radar with sat results, Tech rep repaired the radar''s cannon plug.
Communications › Radio Communications › VHF Radiotelephone
Issued 20 March 2006 Resolved
Provide a current Great Lakes Agreement.
Due 24 March 2006
Resolved 7 April 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 March 2006 Resolved
Provide metal bundling/hangars for wires above starboard side of main engine.
Due 21 April 2006
Resolved 11 April 2006
Resolution: Inspected with sat results.
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 11 April 2005 Resolved
Install flame screen on fuel tank vent.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 May 2005
Resolved 11 April 2005
Resolution: Flame screen was intalled before inspection was complete.
Engineering › Fuel Oil Service System › Hose
Issued 11 April 2005 Resolved
Secure fuel line with metal clamps.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 11 May 2005
Resolved 12 May 2005
Resolution: Fuel line secured with metal clamps.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 April 2005 Resolved
Replace cracked stbd and port house window glass.
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 May 2005
Resolved 13 April 2005
Resolution: Replaced stbd and port house window glass.
Engineering › Bilge Water Management System › Hose
Issued 11 April 2005 Resolved
Repair leaking discharge hose on forward bilge pump.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 April 2005
Resolved 12 April 2005
Resolution: Leaking discharge hose repaired on forward bilge pump.
Engineering › Fuel Oil Service System › Valve
Issued 14 December 2004 Resolved
Fuel oil shut off valve not installed near the main diesel engine.
Condition: Improper Installation
Due 31 March 2005
Resolved 18 March 2005
Electrical › Electric Generation Source (service) › Generator
Issued 14 December 2004 Resolved
Alternator belt is missing a guard for the v-belts. And v-belt needs to be replaced due to stretching and loose.
Condition: Improper Installation
Due 31 March 2005
Resolved 18 March 2005
Electrical › Electrical Distribution System (service) › Cable
Issued 14 December 2004 Resolved
Wire run from the bow section (anchor locker) not water tight going through the collision bulked.
Condition: Improper/Lack of Maintenance
Due 31 March 2005
Resolved 18 March 2005
Engineering › Sea-water System (primary cooling) › Piping
Issued 14 December 2004 Resolved
Raw water suction hose to the ITT pump (raw water pump) is cracked and in need of replacement. From the sea strainers to the pump.
Condition: Unknown
Due 31 March 2005
Resolved 18 March 2005
Construction/Loadline › Hull › Hull Plating
Issued 14 December 2004 Resolved
Found fracture on the inside of the engine room stbd side behind the rub-rail, believed to have hit the pier with great force causing internal hull fracture.
Condition: Unknown
Due 31 March 2005
Resolved 18 March 2005
Construction/Loadline › Hull › Hull Plating
Issued 14 December 2004 Resolved
Found minor pitting on the transom area around the water line.
Condition: Improper/Lack of Maintenance
Due 31 March 2005
Resolved 18 March 2005
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 14 December 2004 Resolved
Bilge pump in the forward anchor locker is not secured down properly.
Condition: Improper Installation
Due 31 March 2005
Resolved 18 March 2005
Lifesaving
Issued 10 May 2004 Resolved
Prior to carrying passengers, replace expired EPIRB hydrostatic release. LEGACY COMPONENT DESC: EPIRB
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 May 2004
Resolved 14 May 2004
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 10 May 2004 Resolved
Prior to carrying passengers, Prove proper service of engineroom portable fire extinguisher. LEGACY COMPONENT DESC: Condition
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 May 2004
Resolved 14 May 2004
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 10 May 2004 Resolved
Prior to 30DEC04(drydock), properly insulate exhaust elbow. LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Placed in Improper Service
Due 30 December 2004
Resolved 12 April 2005
Resolution: Replaced lagging on elbow, looks sat!
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 10 May 2004 Resolved
Prior to 30DEC04(drydock), Install engine pulley guard. LEGACY COMPONENT DESC: Exposed pulleys
Condition: Placed in Improper Service
Due 30 December 2004
Resolved 12 April 2005
Resolution: Installed a new pulley gaurd with sat results.
Lifesaving › Lifejacket/PFD (General)
Issued 3 April 2003 Resolved
Discovered small tear in child life jacket
Due 3 April 2003
Resolved 3 April 2003
Electrical › Lighting (emergency)
Issued 3 April 2003 Resolved
Replace auto bilge pump indicator light
Due 3 April 2003
Resolved 3 April 2003
Engineering › Freshwater System (jacketwater cooling)
Issued 3 April 2003 Resolved
Replace raw water hose from the strainer to the engine.
Due 3 April 2003
Resolved 3 April 2003
Fire Fighting › Miscellaneous Items
Issued 1 October 2002 Resolved
NEED TO ENSURE VESSEL HAS REQUIRED PORTABLE FIRE EXTINGUISHERS ONBOARD.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2002
Engineering › Bilge Water Management System
Issued 1 October 2002 Resolved
PROPERLY INSTALL ALL BILGE PUMPS AND PROVE PROPER OPERATION. LEGACY COMPONENT DESC: Pump
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2002
Construction/Loadline › Penetrations
Issued 1 October 2002 Resolved
ENSURE FWD BULKHEAD IS WATERTIGHT.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2002
Lifesaving › Buoyant Apparatus
Issued 1 October 2002 Resolved
PROPERLY LABEL B/A.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2002
Documentation
Issued 12 March 1990 Resolved
PASSENGERS SHALL NOT BE CARRIED UNTIL A RADIOTELEPHONE SAFETY CERTIFICATIONHAS BEEN ISSUED TO THE VESSEL BY THE FEDERAL COMMUNICATIONS COMMISSION. REQUIREMENT TO BE COMPLETED PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 12 March 1990
Resolved 12 March 1990

Casualty record · 1

23 July 2009Routine · role: Involved in a Marine Casualty · activity 3571345
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.