Records from 1990 to 2026. Most recent: inspection, 5 August 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 59
5 August 2026
Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8456365
13 September 2025
Type not recorded
No type recorded · USCGC JOHN WITHERSPOON (WPC 1158) CREW · USCG Arctic District (CGD-A) · Activity 8233959
19 May 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8140153
23 April 2025
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8118202
29 May 2024
Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7922866
26 April 2023
Annual Inspection · Administrative Inspection · Hull Examination · Internal Structural Exam · Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7666233
9 May 2022
COI Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7447278
12 June 2021
Type not recorded
No type recorded · USCGC BAILEY T. BARCO (WPC 1122) · USCG Arctic District (CGD-A) · Activity 7243676
11 May 2021
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7194878
28 April 2021
Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7195684
27 May 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6966426
6 June 2019
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6706156
2 May 2019
Deficiency Check · Drydock Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6885699
18 May 2018
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6406101
1 May 2018
Examination of Repairs · Hull Examination · Internal Structural Exam · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6400076
5 December 2017
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6342504
11 September 2017
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6308966
4 May 2017
COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6133219
7 April 2017
Liferaft Servicing
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6139946
7 April 2017
Liferaft Servicing
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6139959
16 May 2016
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5886904
12 May 2016
Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5878608
28 May 2014
Administrative Inspection · Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4946399
6 May 2014
Drydock Exam · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4863541
21 May 2012
Deficiency Check · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4317667
31 January 2012
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4235625
7 May 2009
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3470042
8 May 2008
DAPI Audit · MARPOL Annex V Examination · Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3260697
1 April 2008
Internal Structural Exam · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3176538
14 June 2007
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2961930
14 May 2007
Type not recorded
No type recorded · USCGC MUSTANG (WPB 1310) · USCG Arctic District (CGD-A) · Activity 2952167
3 May 2007
COI Inspection · Administrative Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2917070
17 May 2006
MARPOL Annex V Examination · Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2681759
19 April 2006
Hull Examination · Internal Structural Exam
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2632603
25 July 2005
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2439542
3 May 2004
Hull Examination · Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2058165
25 April 2003
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1810692
3 May 2002
Hull Examination · COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1687597
1 May 2001
Deficiency Check · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1370317
18 April 2000
Deficiency Check · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1421845
28 February 2000
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 816208
16 September 1999
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 797050
22 April 1999
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1360823
22 April 1998
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1430536
15 April 1998
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1375351
3 August 1997
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 67369
18 April 1997
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1374951
27 March 1997
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1097037
22 April 1996
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1463233
6 April 1995
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1153014
20 March 1995
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 832122
20 April 1994
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1367025
17 July 1993
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 43982
21 April 1993
Hull Examination · COI Inspection · MARPOL Annex V Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1142496
11 May 1992
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1264711
27 April 1992
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 953383
19 April 1991
Re-Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1213493
25 July 1990
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1234360
25 April 1990
Hull Examination · Initial Construction-Excluding Oversight · Initial Certification · Plan Review "T" Boat
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 928871
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 19 May 2025
Resolved
Machinery spaces protected by a fixed fire system must be vapor tight. The forward engine room bulkhead wire runs on the port and stbd side, along with hose penetrations must be made vapor tight.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 28 May 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 May 2025
Resolved
Each life ring buoy must be clearly marked with the vessels name. Mark life buoys with vessels name.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 28 May 2025
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 19 May 2025
Resolved
Remote ventilation shutddowns must be marked in letters atleast 1 inch high. Mark emergency ventilation closure device located in restroom.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 28 May 2025
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 9 May 2022
Resolved
Engine room fixed fire system last service was April 2021. Provide proof of satisfactory annual servicing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 May 2022
Resolution: O/O provided service report for fire boy system.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 May 2022
Resolved
Each lifejacket carried on board a vessel on an oceans or coastwise route, must have a life jacket light. Replace two inoperable lifejacket lights.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 9 May 2022
Resolution: Corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 May 2022
Resolved
Forward emergency escape hatch markings have partially worn off. Properly relable emergency escape hatch.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2022
Resolved 13 May 2022
Resolution: Corrected.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 May 2022
Resolved
Found only two fire buckets on board. Provide one additional fire bucket.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 9 May 2022
Resolution: Corrected on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 May 2022
Resolved
Generator installations must be in accordance with regulation. Existing generator was replaced with exact same make/model of generator however installation is not complete and has not been verified by [name withheld] generator installation and make available for inspection by an attending CG Marine Inspector.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2022
Resolved 13 May 2022
Resolution: Installation completed, witnessed operational test of generator and satisfactory installation.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 27 May 2020
Resolved
Aft "swim" platform hatch gasket needs to be repaired and secured in place.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2020
Resolved 27 May 2020
Resolution: Repaired gasket
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 May 2020
Resolved
All bilge pumps need to be properly installed/secured to the deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2020
Resolved 27 May 2020
Resolution: Properly secured pumps.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 27 May 2020
Resolved
Replace expired items in the first aid kit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2020
Resolved 27 May 2020
Resolution: Repalced expired items.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 May 2020
Resolved
Properly label life rings with vessel name.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2020
Resolved 27 May 2020
Resolution: Labeled liferings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 May 2020
Resolved
Overboard bilge pump discharges have a fixed thru hole fitting followed by a flexible piping, then hard piping, followed by more flexiable piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2020
Resolved 27 May 2020
Resolution: Removed small unneeded flexiable piping.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 27 May 2020
Resolved
Repair broken step going into foreward cabin.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2020
Resolved 27 May 2020
Resolution: Repaired broken step.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 16 May 2016
Resolved
Prove proper operation of the stern light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 20 May 2016
Resolution: New light installed.
Navigation › Piloting/Steering › US Coast Pilot
Issued 16 May 2016
Resolved
Provide current coast pilot.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 20 May 2016
Resolution: New coast pilot onboard.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 12 May 2016
Resolved
Fire-protected engine room space has a large opening going to the next space forward. Pre-engineered Fireboy system is only designed to protect the engine room space. Provide Sector Anchorage drawings/plans for alterations that will allow for engine room to remain gas-tight during a fire.
Due 12 June 2016
Resolved 24 August 2016
Resolution: Vessel installed a remotely-operated flapper system to separate the engine room and generator space during a fire.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 28 May 2014
Resolved
Prove proper operation of pre-engineered fire fighting system shut-down
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 August 2014
Resolution: System re-testeed and working properly.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 28 May 2014
Resolved
Eight PFDs placed out of service. Lowered passenger count 19 until eight Type-I PFDs are provided.
Action required: 705 - Other - as specified
Resolved 28 May 2014
Resolution: New PFDs provided
Construction/Loadline › Penetrations › Valve Flange
Issued 6 May 2014
Resolved
Replace valve on port side in the engine room.
Action required: 705 - Other - as specified
Due 20 May 2014
Resolved 9 May 2014
Resolution: Valve was replaced.
Fire Fighting › Ventilation Systems › Ducts
Issued 21 May 2012
Resolved
Prove proper operation of generator room vent closure device. Route heater hoses outside of vent duct.
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 June 2012
Resolved 21 May 2012
Resolution: Hoses properly routed and closure device operational.
Communications › Radio Communications › VHF Radiotelephone
Issued 8 May 2008
Resolved
Provide copy of FCC operators permit
Action required: 705 - Other - as specified
Due 8 June 2008
Resolved 12 May 2008
Fire Fighting › Remote Fuel Shutoff › General
Issued 8 May 2008
Resolved
Prove proper operation of port emergency fuel shut-off
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 3 May 2007
Resolved
Prove proper shut-down of fire boy fire ext shut-down of MDE
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2007
Resolved 8 May 2007
Communications › Radio Communications › EPIRB
Issued 3 May 2007
Resolved
Move EPIRB to a float free location
Action required: 705 - Other - as specified
Due 3 June 2007
Resolved 5 June 2007
Deck/Cargo › Mooring/Anchoring
Issued 25 April 2003
Resolved
Provide anchor. LEGACY COMPONENT DESC: Anchor
Action required: 705 - Other - as specified
Due 25 May 2003
Resolved 1 May 2003
Resolution: Anchor on board.
Electrical
Issued 1 May 2001
Resolved
REPAIR STBD MDE WIRING HARNESS
Condition: Unknown
Due 1 June 2001
Resolved 3 August 2001
Lifesaving
Issued 1 May 2001
Resolved
RELABEL VESSEL NAME ON PFD'S
Condition: Unknown
Due 1 June 2001
Resolved 3 August 2001
Construction/Loadline
Issued 1 May 2001
Resolved
RELABEL WATERTIGHT HATCHES AND FO SHUT-OFF VALVES
Condition: Unknown
Due 1 June 2001
Resolved 3 August 2001
Construction/Loadline › Penetrations › Gasket
Issued 1 May 2001
Resolved
REPLACE 3 E/R HATCH COVER HOLD-DOWN DEVICES
Condition: Unknown
Due 1 June 2001
Resolved 5 May 2005
Lifesaving
Issued 1 May 2001
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 1 May 2001
Resolved 3 August 2001
Lifesaving
Issued 1 May 2001
Resolved
POST LIFE JACKET DONNING INSTRUCTION
Condition: Unknown
Due 1 June 2001
Resolved 3 August 2001
Lifesaving
Issued 1 May 2001
Resolved
REPLACE PML BATTERIES ON PFD'S
Condition: Unknown
Due 11 July 2001
Resolved 3 August 2001
Navigation
Issued 1 May 2001
Resolved
REPAIR STERN LIGHT
Condition: Unknown
Due 1 June 2001
Resolved 3 August 2001
Lifesaving
Issued 1 May 2001
Resolved
POST SURVIVAL CRAFT INSTRUCTIONS
Condition: Unknown
Due 1 June 2001
Resolved 3 August 2001
Fire Fighting
Issued 1 May 2001
Resolved
REPLACE FIREHOSE AND NOZZLE
Condition: Unknown
Due 1 June 2001
Resolved 3 August 2001
Documentation
Issued 18 April 2000
Resolved
RENEW EXPIRED FCC RADIOTELEPHONY CERTIFICATE
Condition: Unknown
Due 18 April 2000
Resolved 18 April 2000
Lifesaving
Issued 18 April 2000
Resolved
REPLACE 9 ADULT AND I CHILD LIFE JACKET. PASSENGERS REDUCED UNTIL CORRECTED.
Condition: Unknown
Due 26 April 2000
Resolved 2 May 2000
Construction/Loadline
Issued 18 April 2000
Resolved
ATTACH KEEPER CHAIN TO LAZARETTE HATCH
Condition: Unknown
Due 26 April 2000
Resolved 2 May 2000
Engineering
Issued 18 April 2000
Resolved
REPAIR PORT F/O SHUT-OFF VALVE.
Condition: Unknown
Due 26 April 2000
Resolved 2 May 2000
Lifesaving
Issued 18 April 2000
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 18 April 2000
Resolved 18 April 2000
Accommodation/Occupational Safety
Issued 18 April 2000
Resolved
POST EMERGENCY ESCAPE PLACARD ABOVE STEPS & AGAINST FWD BULKHEAD BELOW HATCH.
Condition: Unknown
Due 18 April 2000
Resolved 18 April 2000
Lifesaving
Issued 18 April 2000
Resolved
REPLACE EPIRB BATTERY AND REGISTER WITH NOAA
Condition: Unknown
Due 26 April 2000
Resolved 2 May 2000
Lifesaving
Issued 22 April 1999
Resolved
Provide 1 adult type I PFD. Vessel passenger allowance decreased 1 until replaced.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Documentation
Issued 22 April 1999
Resolved
Provide current light list.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Construction/Loadline
Issued 22 April 1999
Resolved
Install and prove operation of bilge alarms in aft 4 spaces.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Fire Fighting
Issued 22 April 1999
Resolved
Install and prove operation of fixed extinguishing system.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Fire Fighting
Issued 15 April 1998
Resolved
Properly service all fire extinguishers._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 April 1998
Resolved 22 April 1998
Lifesaving
Issued 18 April 1997
Resolved
Procure and install a new EPIRB hydrostatic release.
Condition: Unknown
Due 27 May 1997
Resolved 27 May 1997
Lifesaving
Issued 18 April 1997
Resolved
Procure/provide (1) one Type I Adult life jacket. The vessel is restricted to carrying a maximum of 29 persons until replacement life jacket is on board.
Condition: Unknown
Due 27 May 1997
Resolved 27 May 1997
Construction/Loadline
Issued 6 April 1995
Resolved
INSTALL WATERTIGHT CLOSURE DEVICE TO MAKE CENTER ENGINE HATCH WATERTIGHT IAW 46 CFR 171.124.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Engineering
Issued 6 April 1995
Resolved
REPAIR REPLACE HANDWHEEL TO PORT EMERGENCY FUEL SHUT-OFF VALVE.
Condition: Unknown
Due 6 April 1995
Resolved 8 April 1995
Navigation
Issued 6 April 1995
Resolved
TIGHTEN/REPAIR STEERING GEAR LINKAGE AS NECESSARY. THIS ITEM TO BE COMPLETED PRIOR TO NEXT VOYAGE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 April 1995
Resolved 8 April 1995
Navigation
Issued 6 April 1995
Resolved
PROVIDE DEVIATION TABLE FOR MAGNETIC COMPASS.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Lifesaving
Issued 20 April 1994
Resolved
Missing emergency checkoff list.
Condition: Unknown
Due 20 April 1994
Resolved 20 April 1994
Lifesaving
Issued 20 April 1994
Resolved
Missing compass deviation table.
Condition: Unknown
Due 20 April 1994
Resolved 20 April 1994
Lifesaving
Issued 20 April 1994
Resolved
EPIRB not marked with vessel's name.
Condition: Unknown
Due 20 April 1994
Resolved 20 April 1994
Lifesaving
Issued 20 April 1994
Resolved
Hydrostatic release (Hammer) for EPIRB was not dated and assumed to be outdated because of date of installation.
Condition: Unknown
Due 20 April 1994
Resolved 20 April 1994
Engineering
Issued 21 April 1993
Resolved
PROVIDE GUARDS OVER BELTS ON BOTH ENGINES.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Documentation
Issued 19 April 1991
Resolved
PROVIDE A FCC CERTIFICATE FOR THE VESSEL.
Condition: Unknown
Due 19 April 1991
Resolved 19 April 1991
Electrical
Issued 19 April 1991
Resolved
INSTALL AN AMPERE GUAGE FOR THE GENERATOR.
Condition: Unknown
Due 19 April 1991
Resolved 19 April 1991
Documentation
Issued 19 April 1991
Resolved
SUBMIT A DECKHAND QUALIFICATION PLAN FOR REVIEW TO MSO ANCHORAGE.
Condition: Unknown
Due 19 April 1991
Resolved 19 April 1991
Documentation
Issued 25 April 1990
Resolved
POST MASTER'S LICENSE ON BOARD.
Condition: Unknown
Due 25 April 1990
Resolved 25 April 1990
Documentation
Issued 25 April 1990
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, PROVIDE ON ONBOARD THE VESSEL'S DOCUMENT.
Condition: Unknown
Due 25 April 1990
Resolved 25 April 1990