Records from 1990 to 2016. Most recent: inspection, 22 February 2016.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 18
22 February 2016
ISPS II Exam · Ballast Water Examination · PII Safety Exam · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5815232
23 February 2011
PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3950617
25 January 2006
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2573052
12 January 2004
Ballast Water Examination · Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1981667
27 March 2002
Ballast Water Examination · Annual Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1598308
14 January 2002
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1478531
27 March 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 295899
20 August 2000
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 281254
19 March 1999
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 672154
18 March 1999
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 426667
17 January 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 411961
28 December 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 399018
6 December 1995
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 385628
25 April 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 366311
31 March 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 481367
2 January 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 516105
26 February 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 342140
2 March 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 335628
Documentation › Logs/Records › Ballast Water Logs/Records
Issued 22 February 2016
Resolved
Vessels with a ballast water capacity of 1500-5000 m3 constructed before December 1, 2013 are required to meet ballast water implementation schedule outlined in 33 CFR 151.2035 by the first scheduled drydock after January 1, 2014. This vessel was built in 1989 and with a ballast water capacity of 1725 m3.Vessel currently does not have a valid letter of extension.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 23 February 2016
Resolution: Recieved new extension letter from CG-OES.
Navigation › Piloting/Steering
Issued 12 January 2004
Resolved
VESSELS GRYRO REPEATER IS NOT COORLATING WITH THE MAIN GYRO COMPASS. VESSEL IS TO REPAIR AND PROVIDE TECHNICIAN REPORT PRIOR TO DEPARTURE. (33CFR 164.35(E). LEGACY COMPONENT DESC: Gryo Compass Repeater
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 12 January 2004
Resolved 13 January 2004
Resolution: RECEIVED TECHNICIAN REPORT. THE REPEATOR AMP WAS CHANGED AND GYRO IS SETTLING CORRECTLY AT THIS TIME.
Engineering › Generator (propulsion/auxiliary-electric) › Receptacle
Issued 12 January 2004
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 25 January 2006
Resolution: DEFICIENCY CLEARED TO THE SATISFACTION OF CLASS AND USCG MARINE INSPECTOR.
Fire Fighting
Issued 27 March 2001
Resolved
FIRE SPRINKLER SYSTEM LEAKING EXCESSIVELY IN PAINT LOCKER. CORRECT PRIOR TO NEXT U.S. PORT AFTER SAILING FOREIGN.
Condition: Unknown
Due 27 April 2001
Resolved 14 January 2002
Resolution: VERIFIED FIRE SPRINKLER SYSTEM LEAK HAS BEEN CORRECTED.
Lifesaving
Issued 27 March 2001
Resolved
READJUST STARBOARD LIFEBOAT REMOTE CONTROL RELEASING GEAR MECHANISM. CORRECT PRIOR TO NEXT U.S PORT AFTER SAILING FOREIGN.
Condition: Unknown
Due 27 April 2001
Resolved 14 January 2002
Resolution: VERIFIED STARBOARD LIFEBOAT RELEASE GEAR IS OPERATING PROPERLY.
Lifesaving
Issued 18 March 1999
Resolved
VESSELS REQUIRED 3 IMMERSION SUITS WERE UNSERVICEABLE DUE TO THE LINING FALLING APART.
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Navigation
Issued 18 March 1999
Resolved
VESSELS BRITISH ADMIRALTY CHART #899 WAS AN OUTDATED EDITION.
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999