← All vessels
SILVER DISCOVERER
SILVER DISCOVERER is a 1989 passenger vessel (inspected). The Coast Guard has recorded 36 inspections since 1990, most recently in June 2017, along with 61 deficiencies and 1 operational control.
Records from 1990 to 2017. Most recent: inspection, 12 June 2017.
- Built
- 1989
- Last inspected
- 12 June 2017
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 61 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
8800195 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
C6OZ3
345371
Flag
JAPAN
—
Maury page id
psix-345371
Inspections, by type
…with no type recorded10
Years with a record
17 calendar years (1990–2017)
The 36 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 9 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Tonnage as PSIX records it3752 - Displacement, Ton
784 - Dead Weight, Ton
5218 - Convention (Subpart B), Gross Ton
1565 - Convention (Subpart B), Net Ton
784 - Dead Weight, Ton
5218 - Convention (Subpart B), Gross Ton
1565 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 36
12 June 2017
COC-CVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6170040
14 June 2016
Ballast Water Examination · ISPS II Exam · COC-CVE Annual
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 5906798
13 July 2015
ISPS II Exam · COC-CVE Annual · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 5183417
6 July 2009
ISPS II Exam · MARPOL Annex I Examination · COC-CVE Annual · PII Safety Exam · Ballast Water Examination · MARPOL Annex V Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3527461
24 April 2009
PII Safety Exam · ISPS III Exam · Ballast Water Examination · COC-CVE Quarterly
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3459418
24 October 2008
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3351046
3 July 2008
COC-CVE Annual · MARPOL Annex V Examination · Ballast Water Examination · ISPS II Exam · PII Safety Exam · MARPOL Annex I Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3248813
26 June 2007
MARPOL Annex V Examination · COC-CVE Annual · ISPS II Exam · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2977183
14 April 2006
COC-CVE Initial · ISPS II Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2616926
15 July 2005
Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2419963
12 April 2005
MARPOL Annex V Examination · ISPS II Exam · Ballast Water Examination · COC-CVE Annual
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2332629
31 July 2004
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2152422
31 July 2004
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2163581
24 July 2004
MARPOL Annex V Examination · COC-CVE Annual · ISPS II Exam
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2149555
8 August 2003
Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1870741
24 July 2003
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1863275
10 July 2003
Security Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1842515
2 July 2003
MARPOL Annex I Examination · Certificate of Compliance · MARPOL Annex V Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1833998
28 June 2003
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1832523
1 August 2002
Damage Survey
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1657131
31 July 2002
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1684463
28 July 2002
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1699764
15 July 2002
Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1646459
25 June 2002
Security Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1636266
20 June 2002
Control Verification · MARPOL Annex I Examination · MARPOL Annex V Examination · Security Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1633472
20 June 2002
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1698642
11 July 2001
Control Verification
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1376390
21 May 2001
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1362230
13 March 1997
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 401722
13 March 1997
Control Verification
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1095553
26 February 1996
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 645611
18 February 1996
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 388285
18 February 1996
Control Verification
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 884802
23 October 1995
Administrative
Administrative · Marine Safety Center (MSC) · Activity 1181408
14 January 1991
Control Verification
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1232188
12 January 1990
Certificate of Compliance
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 904746
Deficiency record · 61
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 13 June 2017
Resolved
A fixed detection system shall be provided. When testing fire smoke detection, the system did not alarm due to bad fuse. 10c
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 13 June 2017
Resolved
Fire safety objectives are to prevent the occurence of fire. Room 404 had electircal plug ins on floor with water puddled next to it.
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 13 June 2017
Resolved
Fire safety objectives are to prevent the occurence of fire. Room 304 had paint stored in it
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 13 June 2017
Resolved
Fixed fire fighting required in store rooms. AC3 room was being used as a storage room. Either remove combustible material or add fixed fire fighting.
Engineering › Sea-water System (primary cooling) › Pump
Issued 24 April 2009
Resolved
During machinery spase inspection marine inspector observedwater leaking fromvarious water pumps packing glands.Pumps are as followed:
#1 S/W Pump port main engine
#2 Auxiliary S/W pump cooling water
#1 & #2 auxiliary boiler feed pump
#2 A/C S/W cooling pump
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 15 March 2006
Resolved
33U.S.C.1321(j)(5)(G)-The vessel owner/operator has not provided certification ensuring that response resources are capable of responding to the maximum extent practicable, to a worst case discharge
Fire Fighting › Fire Hoses › Connections
Issued 12 April 2005
Resolved
Prior to scheduled departure, ensure all exterior fire hoses and nozzles are secured.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 12 April 2005
Resolved
Replace expired lights on life jackets(child sizes).
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 12 April 2005
Resolved
Change names of life jackets, "Oceanic Odyssey" to "Clipper Odyssey". Located in both tenders.
Fire Fighting › Fire Hoses › Connections
Issued 12 April 2005
Resolved
Prior to next arrival in U.S. port, ensure that all interior and exterior fire hose and nozzle connections are secured to satisfaction of class.
Construction/Loadline
Issued 11 July 2001
Resolved
Provide alarm bell for watertight door (WTD) in crew passageway at frame ?
Lifesaving
Issued 11 July 2001
Resolved
Replace light on lifebuoy for pilot station.
Lifesaving
Issued 11 July 2001
Resolved
Demonstrate Flag Approval or replace lights on crew and extra lifejackets, (approx. 50 lifejackets).
Fire Fighting
Issued 11 July 2001
Resolved
Provide placard/instructions describing operation of paint locker drencher system (Deck 7).
Engineering
Issued 11 July 2001
Resolved
Prove proper operation of Main Engine shutdowns.
Engineering
Issued 11 July 2001
Resolved
Place pollution placards at bunker stations and garbage storeroom.
Fire Fighting
Issued 11 July 2001
Resolved
Prove proper operation (release/closure/indication) of the following fire doors: Deck 6, Main S/W, Fwd; Deck 5, Main S/W, Fwd; Deck 3, Main S/W, Aft; Deck 3, Galley, Fwd-Stbd; Deck 2, Incinerator Room.
Electrical
Issued 11 July 2001
Resolved
Replace photoluminescent exit sign on the emergency exit from the auxiliarymachinery room.
Documentation
Issued 11 July 2001
Resolved
Provide COFR prior to entry into US waters.
Fire Fighting
Issued 11 July 2001
Resolved
Prove proper operation of smoke detection system. Several zones were inoperable at the time of the inspection. Smoke detection system should bespot checked when the system is fully operational.
Fire Fighting
Issued 11 July 2001
Resolved
Prove proper operation and automatic startup of the emergency fire pump.
Fire Fighting
Issued 11 July 2001
Resolved
Provide furniture and furnishing of restricted fire risk in the Back office(Deck 4, Frame 56 S).
Documentation
Issued 11 July 2001
Resolved
Provide Flag approved details & demonstrate proper modifications for category 13 cold garbage storeroom (Deck 3, fr 3 S).
Fire Fighting
Issued 11 July 2001
Resolved
Provide properly insulated A-class boundaries around category 13 dry stores(Deck 3, fr 7 P).
Documentation
Issued 11 July 2001
Resolved
16. Provide a min 4.5m^2 lobby for fire-fighting operations in way of the Hotel Mgr/[name withheld] and the Stairway (Deck 3, Frame 56 S). Lobby should be installed such that it does not form a new dead-end corridor. (Cont:)
Documentation
Issued 11 July 2001
Resolved
(Cont:) Further the lobby should either contain a fire hose station or otherwise be arranged such that f/f operations can take place in the lobby without compromising the stairway.
Fire Fighting
Issued 11 July 2001
Resolved
Install A-30 insulation on the overhead of decks 2 and 3 between the category 8 "Beauty Shop" (Deck 3, Fr 94 S) and the category 7 "Cabin" (Deck2 and 4, Fr 94 S).
Accommodation/Occupational Safety
Issued 11 July 2001
Resolved
Provide clean-out ports for main laundry dryer exhaust ducts and demonstrate proper cleaning and maintenance of dryer exhaust ducts.
Accommodation/Occupational Safety
Issued 11 July 2001
Resolved
Remove fire fighting equipment from deck on landing between decks 6 and 7 in the aft stairway. Note that this stairway is used as the means of escape for 79 persons during the day time condition.
Documentation
Issued 11 July 2001
Resolved
Provide Vessel Security Plan to USCG Marine Safety Center for review at _x001C_ least 3 mos prior to embarking passengers in the US.
Documentation
Issued 11 July 2001
Resolved
Provide Flag Approved updated revision to Fire Control Plan that accurately depicts the layout of the vessel and the location of fire-fighting equip. The revised Fire Control Plan shall be submitted to Marine Safety Center atleast 3 months prior to embarking passengers in the U.S.
Fire Fighting
Issued 11 July 2001
Resolved
Provide fire door indicators for internal stairway boundary doors in forward, main, and aft stairways (including toilet boundaries and doors leading from machinery/service space escape trunks/ladders) AND in all galley boundary doors. Only those internal doors which are normally(cont
Fire Fighting
Issued 11 July 2001
Resolved
(cont:) locked do not require fire door indicators.
Documentation
Issued 11 July 2001
Resolved
Provide Flag approved details & demonstrate proper modifications to change category 3 corridor (Deck 6, Fr 21) to category 7/13 storeroom as appropriate for size and location of space. Permanently remove direct access between this space and the stairway at frame 24. (cont:)
Documentation
Issued 11 July 2001
Resolved
(Cont:) . As an alternative, space may retain direct access to stairway provided that it is properly outfitted and used solely as a category 3 corridor.
Fire Fighting
Issued 11 July 2001
Resolved
Provide properly insulated A-class boundaries around category 13 locker (Deck 6, fr 30 S).
Documentation
Issued 11 July 2001
Resolved
Provide Flag approved details & demonstrate proper modifications (SFP, smoke detection, etc.) to change portion of category 10 A/C room into a category 13 storeroom (Deck 6, fr 55 S).
Documentation
Issued 11 July 2001
Resolved
Provide Flag approved details & demonstrate proper modifications to cat. 9pantry (Deck 6, fr 90 S). Specifically it was understood at the inspectionthat this space would be converted into a cat. 7 locker and a cat. 9 pantryand that proper boundaries would be fitted between the spaces
Documentation
Issued 11 July 2001
Resolved
Permanently remove direct access between the "Radio Office" (Deck 6, Fr 96S) and the stairway. Means of escape from the Radio Office shall be to thesatisfaction of the vessel's Flag state.
Documentation
Issued 11 July 2001
Resolved
Permanently remove direct access between the "Dirty Linen Chute" (Deck 6, Fr 99 S) and the stairway.
Documentation
Issued 11 July 2001
Resolved
Permanently remove electricians workshop from category 10 Electrical locker(Deck 5, fr 62 S).
Fire Fighting
Issued 11 July 2001
Resolved
Provide fire restricted furnishings and demonstrate F/F capability for Officer's Mess (Deck 5, Fr 54 and 59) that is independent of the main stairway.
Fire Fighting
Issued 11 July 2001
Resolved
Install a B-15 boundary between the category 8 "Main Lounge" (Deck 4, Fr 40) and the category 8 "Library" (Deck 4, Fr 15).
Lifesaving
Issued 11 July 2001
Resolved
Conduct fire and boat drill at first US Port.
Construction/Loadline
Issued 11 July 2001
Resolved
Provide proper A-class cable/wire penetration for aft galley bulkhead in way of galley door.
Lifesaving
Issued 11 July 2001
Resolved
Provide arrows indicating proper direction of escape from the Deck 3 forward corridor.
Lifesaving
Issued 11 July 2001
Resolved
Provide Exit Signage for escape door aft of galley on deck 3 (door is currently labeled "do not open")
Deck/Cargo
Issued 11 July 2001
Resolved
Prove proper operation of forward crew lift under emergency power.
Lifesaving
Issued 11 July 2001
Resolved
Prove proper operation and deployment of lifeboats and liferafts.
Electrical
Issued 11 July 2001
Resolved
Prove proper operation of emergency lighting in day lounge and down corridors on decks 5 & 6. (Exit lights adequate, no overhead E-lighting due to work being performed in overhead.)
Documentation
Issued 11 July 2001
Resolved
Demonstrate proper manning certificates and crew licenses to USCG inspectors at first U.S. port.
Documentation
Issued 11 July 2001
Resolved
Demonstrate proper pollution records and logging at first US port.
Navigation
Issued 11 July 2001
Resolved
Demonstrate proper operation of Navigation Safety Equipment (Charts, Publications, RADARS, Compasses, Communications, etc.) at first US Port.
Fire Fighting
Issued 11 July 2001
Resolved
Effect repairs and prove proper operation to list of fire dampers as annotated by USCG.
Fire Fighting
Issued 11 July 2001
Resolved
Install smoke detectors in the following spaces (as annotated on the Fire Control Plan): SCG Space, Deck 5 Fr 25 P; CS Space, Deck 5, Fr 27 P.
Fire Fighting
Issued 11 July 2001
Resolved
Prove proper operation of 3 electric fire dampers in galley ventilation hood system.
Electrical
Issued 11 July 2001
Resolved
Low Level Lighting: Add additional arrows to existing photoluminescent strips indicating main evacuation routes in cabin corridors, stairtowers, and crew spaces, 1 metre spacing or less, as per IMO Res A.752.
Fire Fighting
Issued 11 July 2001
Resolved
Prove proper operation of automatic fire dampers in stack fan rooms P & S side, deck 7.
Documentation
Issued 13 March 1997
Resolved
A lightweight survey had not been completed on the vessel. The vessels tonnage certificate was issued 17MAR89 and was not current. Also, there were no records indicating that such surveys had been performed or waived by class society. SOLAS 74 Amended II-1/22.3
Documentation
Issued 18 February 1996
Resolved
WHILE CONDUCTING A PASSENGER EXAM OF THE VESSEL IT WAS FOUND THAT THE VESSELS OIL TRANSFER PROCEDURES WERE NOT COMPLETE. THE VESSEL WAS SCHEDULED TO BUNKER THAT SAME DAY. THE CHIEF ENGINEER COMPLETED A COMPLETE COPY OF OIL TRANSFER PROCEDURES
Construction/Loadline
Issued 12 January 1990
Resolved
COMPLY WITH THE REQUIREMENTS OF COAST GUARD ITRS H2-91089 OF 30OCT89 AND 16211/OCEANIC GRACE OF 13DEC89 AND SHOWA LINE PROPOSAL OF MODIFICATION OF 05DEC89 AND ATTACHMENT TO CONTROL VERIFICATION.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.