Records from 1990 to 2026. Most recent: inspection, 5 January 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 58
5 January 2026
Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8290261
24 February 2025
COI Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8060282
8 May 2024
Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7861559
27 December 2023
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7844196
11 May 2023
Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7685990
25 May 2022
Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7458985
8 December 2021
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7360844
19 April 2021
Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7175893
7 April 2020
Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6936268
3 February 2020
DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6894440
17 December 2019
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6875107
22 January 2019
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6613062
1 August 2018
Special · Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6506741
3 April 2018
Internal Structural Exam · Administrative Inspection · Annual Inspection · DAPI Audit · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6393333
3 May 2017
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6139586
17 May 2016
Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5879499
3 May 2016
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5863577
21 May 2012
Drydock Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4317323
7 December 2011
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4203606
12 February 2010
COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3679136
3 April 2009
Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3447430
11 February 2008
Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3159654
5 April 2007
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2902385
1 February 2007
Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2864757
2 February 2006
Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2578141
18 August 2005
Hull Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2490454
1 February 2005
COI Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2284249
3 February 2004
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1999375
19 August 2003
Hull Examination
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1880562
5 March 2003
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1752823
12 August 2002
Construction Oversight · Plan Review "T" Boat
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1660072
2 April 2002
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1600255
27 November 2001
Plan Review "T" Boat
Administrative · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 772175
11 September 2001
Hull Examination
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1433873
30 March 2001
Plan Review "T" Boat · Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1443161
5 October 2000
Plan Review "T" Boat
Administrative · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1417140
13 April 2000
COI Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1426374
24 January 2000
Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 815387
8 September 1999
Hull Examination · Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1411999
23 June 1999
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1454683
18 May 1998
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1125641
10 September 1997
Hull Examination
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1402523
1 May 1997
Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1104149
24 April 1997
COI Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1385976
25 April 1996
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1425735
7 September 1995
Hull Examination
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1374379
25 April 1995
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1353731
28 April 1994
COI Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1417638
2 September 1993
Hull Examination
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1439427
11 August 1993
Administrative
Administrative · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1155991
1 June 1993
Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1403633
25 May 1993
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1440699
2 September 1992
Hull Examination
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1459783
15 June 1992
Re-Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 946360
15 June 1992
Administrative
Administrative · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1248874
10 May 1991
Initial Certification
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 937671
26 April 1991
Hull Examination
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 937669
27 March 1990
Uninspected Other
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 919667
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 February 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to:
(b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock.
Vessels main engine battery switch was broken and had to be contorded to start the engines.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2025
Resolved 5 March 2025
Resolution: Battery switch was replaced and tested satisfactory.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 25 May 2022
Resolved
Provide a Communications Act, Safety Radiotelephony Certificate in accordance with 47 CFR 80.411 to the satisfaction of an attending Coast Guard Marine Inspector. The vessel will be restricted from carrying passengers after June 25th 2022 if the deficiency has not been corrected to the satisfaction of an attending Coast Guard Marine Inspector.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2022
Resolved 6 June 2022
Resolution: Received objective evidence of satisfactory docs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2022
Resolved
Vessel is utilizing unapproved pressure wire connectors on port side hydraulic pump lead and does not meet minimum standard of splices shall be made by a insulated pressure wire connector as required by 46CFR183.340 (g). Owner must repair ensure that it meets the provided regulation. The vessel will be restricted from carrying passengers after June 25th 2022 if the deficiency has not been corrected to the satisfaction of an attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2022
Resolved 26 May 2022
Resolution: Received objective evidence of satisfactory repairs.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 3 February 2020
Resolved
05199 Provide at least one crew-member that holds a Marine Radio Operators Permit as required by 47CFR80.159. The vessel will be only be allowed to carry passengers after 2 April 2020 when there is a crew members that holds a Marine Radio Operators Permit, to the satisfaction of an attending Coast Guard Marine Inspector
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2020
Resolved 7 April 2020
Resolution: Sat
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 28 January 2019
Resolved
Vessels starboard E/R hatch is seized and does not meet the standards of each hatch exposed to the weather must be watertight as required by 46CFR179.360(a). Vessel has 30 days to correct to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2019
Resolved 26 February 2019
02 - Structural Conditions › N/A - No Subsystem › Marking of IMO number
Issued 28 January 2019
Resolved
Vessels name in not marked on some clearly visible exterior of the Port and Starboard Bow as required by 46CFR 67.123(a). Must be no less than 4 inches. This deficiency must be corrected to the satisfaction of an attending Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2019
Resolved 26 February 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 January 2019
Resolved
Provide a Ring life bouy floating light lanyard between 3 ft and 6 feet in accordance with 46 CFR 180.70(d)(2).
Action required: 10 - Deficiency Rectified
Resolved 28 January 2019
Resolution: On the spot correction
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 1 August 2018
Resolved
Vessel does not have a collision bulkhead in accordance with 46 CFR 171.040(b)(1) due to the fact that your vessel is over 40 feet in length and operates on a Partially Protected
route.
Action required: 705 - Other - as specified
Due 1 December 2018
Resolved 4 December 2018
Resolution: Owner decided restrict route to a protected route vice adding a collision bulkhead. Routes and conditions are updated to reflect protected route.
Construction/Loadline › Hull › Bottom Plating
Issued 24 April 2018
Resolved
Evaluate the area of delamination identified on the port side bottom just of the garboard strake in way of the grounding plate and thru hull for the wash down pump. Provide a repair proposal, listing the materials, procedures and layup intended for repairs that is acceptable to this office. An attending Coast Guard Marine Inspector will evaluate the progress of the repairs as necessary.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2018
Resolved 31 May 2018
Construction/Loadline › Hull › Bottom Plating
Issued 24 April 2018
Resolved
Evaluate the area of delamination and weeping identified on the starboard side bottom just of the garboard strake in way of the transducer for the speed log. Provide a repair proposal, listing the materials, procedures and layup intended for repairs that is acceptable to this office. An attending Coast Guard Marine Inspector will evaluate the progress of the repairs as necessary.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2018
Resolved 31 May 2018
Construction/Loadline › Hull › Bottom Plating
Issued 24 April 2018
Resolved
Evaluate the area that is holed and weeping identified at the keel where the shaft penetrates the hull. Provide a repair proposal, listing the materials, procedures and layup intended for repairs that is acceptable to this office. An attending Coast Guard Marine Inspector will evaluate the progress of the repairs as necessary.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2018
Resolved 31 May 2018
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 24 April 2018
Resolved
Replace both worn cutlass bearings in way of the forward and aft shaft struts.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2018
Resolved 31 May 2018
Construction/Loadline › Hull › Hull Plating
Issued 24 April 2018
Resolved
Fair/smooth down areas identified below and make necessary repairs to the satisfaction of an attending Coast Guard Marine Inspectors. The following areas were identified, marked and discussed with the vessel Master and shipyard personnel.
1. Transom in way of the zinc on the port side
2. Transom in way of the letter “D” in the word ISLAND
3. Transom in way of the letter “D” in the word DAWG
4. Side shell on the starboard side forward just below the chine
5. Bottom section forward at the start of the keel
6. Bottom keel amidships as marked.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2018
Resolved 31 May 2018
Engineering › Sea-water System (primary cooling) › Valve
Issued 24 April 2018
Resolved
Permanently cap off two (02) thru hull fittings that are no longer in service. Both thru hulls are located in the portside forward space and port side in the generator space.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2018
Resolved 31 May 2018
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 3 May 2017
Resolved
Provide a Marine Radio Operators Permit (MROP)or higher class license for all persons who operate the vessel in accordance with 47 CFR 80.159(e)(1)
(EXTENDED UNTIL JUNE 9, 2017)
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 18 May 2017
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 3 May 2017
Resolved
Provide emergency instructions that meet the contents of 46 CFR 185.512.
Action required: 705 - Other - as specified
Due 2 June 2017
Resolved 5 May 2017
Resolution: Received photographic evidence that the emergency instructions were posted at the operating station.
Communications › Radio Communications › EPIRB
Issued 3 May 2016
Resolved
Provide servicing for the Category I, 406 MHz EPIRB. The battery for the unit expired in September 2014 and needs to be replaced at a servicing facility.
Action required: 705 - Other - as specified
Due 10 May 2016
Resolved 17 May 2016
Resolution: Corrected, new EPIRB.
Lifesaving › Visual Distress Signals (General) › Quantity
Issued 3 May 2016
Resolved
Provide two (02) additional red hand flares to make a total of six (06) red hand Flares and six (06) orange smoke in accordance with 46 CFR 180.68.
Action required: 705 - Other - as specified
Due 10 May 2016
Resolved 20 May 2016
Resolution: six (06) new hand flares were placed on board the vessel and there was a sufficient quantity for the intended route and service.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 12 February 2010
Resolved
Emergency air shutdown is not working as designed. Engine continues to run after shutdown is engaged. Provide proof of proper operation.
Action required: 705 - Other - as specified
Due 18 March 2010
Resolved 9 April 2010
Resolution: Received notice that a new gasket was installed on the flapper valve and is working properly.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 12 February 2010
Resolved
Guard for generator belt drive is missing. Re-attach cover to provide safety.
Action required: 705 - Other - as specified
Due 18 March 2010
Resolved 9 April 2010
Resolution: Belt guard was repaired and installed
Lifesaving › Lifefloat › Serviceable
Issued 3 April 2009
Resolved
The grab line attachments were deteriorated and tore when the pulled. Vessel's route reduced to L, B, & S until corrected.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 September 2009
Resolved 16 February 2010
Resolution: Raft has not been repaired or replaced. COI has been changed to LBS pending replacement.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 3 April 2009
Resolved
The hydrostatic release for the vessel's EPIRB was out of date. Vessel's route was reduced to L,B & S until corrected.
Action required: 705 - Other - as specified
Due 3 May 2009
Resolved 15 April 2009
Resolution: Received pictures of new EPIRB hydrostatic release installed.
Lifesaving › Lifefloat › Lifeline
Issued 11 February 2008
Resolved
The life line on the life float was deteriorated from the sun and needed to be replaced. Vessels route limited until item corrected.
Condition: Unknown
Action required: 705 - Other - as specified
Due 18 March 2008
Resolved 12 February 2008
Resolution: The life lines on the float were replaced.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 1 February 2005
Resolved
Hydrostatically test the 15# CO2 bottle onboard vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 February 2005
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 1 February 2005
Resolved
Fire servicing company failed to test generator fixed FE-241 system during service visit. Have generator system serviced.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 February 2005
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 1 February 2005
Resolved
Procure & install the approved mounting brkt for the lifefloat wateright.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 February 2005
Lifesaving › Visual Distress Signals (General) › Expired
Issued 1 February 2005
Resolved
Renew Hanmar hydrostatic release for the EPIRB.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 February 2005
Engineering › Bilge Water Management System
Issued 2 April 2002
Resolved
Individual bilge high level alarm indicators missing. LEGACY COMPONENT DESC: Interface Detector
Due 3 May 2002
Resolved 15 April 2002
Resolution: Installed three indicator lights at the helm station for each bilge high water alarm.
Fire Fighting
Issued 30 March 2001
Resolved
PROVE PROPER OPERATION OF THE GENERATOR SPACE ELECTRICAL FAN IN THAT IT SHUTS DOWN WHEN THE ENGINE ROOM FFES IS ACTIVIATED.
Condition: Unknown
Due 30 April 2001
Resolved 26 April 2001
Documentation
Issued 8 September 1999
Resolved
PROVIDE PROOF THAT APPLICATION WAS MADE FOR DOCUMENTING THE VESSEL.
Condition: Unknown
Due 8 September 1999
Resolved 8 September 1999
Lifesaving
Issued 23 June 1999
Resolved
ATTACH RETROREFLECTIVE TAPE TO THE RING BUOYS (TWO).
Condition: Unknown
Due 30 June 1999
Resolved 8 September 1999
Documentation
Issued 23 June 1999
Resolved
PROVIDE LOG(S) FOR TRAINING, LIFESAVING EQUIPMENT, FIRE FIGHTING EQUIPMENT AND DRILLS.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Electrical
Issued 23 June 1999
Resolved
PROVIDE WIRING DIAGRAM FOR GENERATOR INSTALLATION.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Lifesaving
Issued 18 May 1998
Resolved
Provide first aid kit as required by 46 CFR 184.710.
Condition: Unknown
Due 1 June 1998
Resolved 19 May 1998
Fire Fighting
Issued 18 May 1998
Resolved
Provide three (3) 2-1/2 gallon fire buckets as required by 46 CFR 181.610.
Condition: Unknown
Due 1 June 1998
Resolved 19 May 1998
Lifesaving
Issued 24 April 1997
Resolved
Provide an emergency broadcast placard.
Condition: Unknown
Due 24 April 1997
Resolved 24 April 1997
Documentation
Issued 25 May 1993
Resolved
PROVIDE DRUG TESTING PLAN AS REQUIRED BY 46 CFR PART 16.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Lifesaving
Issued 25 May 1993
Resolved
PROVIDE VESSEL WITH CREW FOR UNDERWAY DRILLS.
Condition: Unknown
Due 10 June 1993
Resolved 1 June 1993
Engineering
Issued 25 May 1993
Resolved
PROVIDE FLAME GUARD ON INSTALLED RACOR FUEL FILTER.
Condition: Unknown
Due 25 June 1993
Resolved 1 June 1993