MAURY USCG vessel records Sign in
← All vessels

SNORKEL 2

SNORKEL 2 is a 1990 passenger vessel (inspected). The Coast Guard has recorded 56 inspections since 1991, most recently in July 2025, along with 70 deficiencies.

Records from 1991 to 2025. Most recent: inspection, 29 July 2025.

Built
1990
Last inspected
29 July 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCE7187
348255
Flag
UNITED STATES
366919910
Maury page id
psix-348255

Inspections, by type

…with no type recorded4
Years with a record 32 calendar years (1991–2025)
The 56 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)38.0 ft × 12.4 ft × 5.6 ft
Registered tonnagegross 17 / net 14
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDELTA BOATS INC · CAPE CANAVERAL, FL, UNITED STATES · built 1990
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portHONOLULU, HI
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 29 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it17 - Simplified, Gross Ton
14 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDP6236MMSI 366919910 · active · compulsorily equipped · granted 30 May 2024, expires 30 May 2034
WCE7187MMSI 366919910 · cancelled · compulsorily equipped · granted 20 March 2014, cancelled 1 May 2023 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 56

29 July 2025 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8191449
15 May 2025 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8136915
30 October 2024 Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8027440
16 April 2024 COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7896620
9 June 2023 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7710240
25 October 2022 Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7584298
13 September 2022 COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7558069
19 January 2022 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7412614
1 December 2021 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7359948
8 April 2021 Simplified Stability Test
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7174759
17 February 2021 Simplified Stability Test
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7141485
10 November 2020 Internal Structural Exam · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7090589
14 October 2020 Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7072936
22 October 2019 Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6839729
29 December 2018 DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6611277
10 October 2018 Drydock Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6560355
4 October 2017 Hull Examination · Administrative Inspection · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6267431
30 November 2016 Deficiency Check · Administrative Inspection · Annual Inspection · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6048589
29 September 2016 Administrative Inspection · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6068998
20 November 2015 Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5792955
23 October 2014 Administrative Inspection · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5015978
5 July 2011 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4070426
18 January 2011 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3928520
16 December 2010 Annual Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3912073
1 November 2010 Plan Review "T" Boat · Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3882845
9 December 2009 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3647427
21 March 2009 Type not recorded
No type recorded · USCGC KITTIWAKE (WPB 87316) · USCG Oceania District (CGD-O) · Activity 3441606
2 December 2008 DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3372253
21 October 2008 Internal Structural Exam · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3348329
14 November 2007 Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3098321
3 October 2006 Hull Examination · Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2880874
9 December 2005 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2549006
11 December 2004 Type not recorded
No type recorded · USCGC KISKA (WPB 1336) · USCG Oceania District (CGD-O) · Activity 2279569
22 October 2004 Annual Inspection · Deficiency Check · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2225843
3 December 2003 Deficiency Check · Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1958562
11 December 2002 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1705722
23 October 2002 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1695218
14 December 2001 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1482499
17 October 2000 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 823634
16 December 1999 COI Inspection · Hull Examination · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1376008
9 July 1999 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1092788
13 January 1999 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1388728
22 January 1998 Re-Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1390700
6 February 1997 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1357872
13 August 1996 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1090067
26 June 1996 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1407707
21 February 1996 Hull Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1359059
16 February 1995 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1363212
18 February 1994 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1362928
5 January 1994 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1379894
12 November 1992 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 961469
11 October 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 939519
13 September 1991 Hull Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1252739
25 June 1991 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 908332
19 February 1991 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 911596
15 January 1991 Hull Examination · Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 920535

Deficiency record · 70

10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 29 July 2025 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Vessel does not have an anchor light as prescribed by Navigation Rule 30(b). Provide an anchor light as prescribed by this rule to the satisfaction of the attending marine inspector. 46 CFR 183.420
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 July 2025
Resolution: Attended vessel and owner proved proper operation on the anchor light.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 29 July 2025 Resolved
Each vessel certificated to operate on a limited coastwise route within three miles of land in warm water must either have on board an FCC Type Accepted Category 1 406 MHz EPIRB, installed to automatically float free and activate, and not be required to carry survival craft. Vessel EPIRB hydrostatic release unit expired. Vessel is restricted to Lakes, Bays, and Sounds route until the hydrostatic EPIRB hydrostatic release unit is renewed to the satisfaction of the attending marine inspector. 46 CFR 180.205(e)
Action required: 705 - Other - as specified
Resolved 1 October 2025
Resolution: Attended vessel and sighted a valid EPIRB hydrostatic release unit. Vessel route restored.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 29 July 2025 Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. The EPIRB is installed under the Bimini top and is not float free. Vessel is restricted to Lakes, Bays, and Sounds route until the EPIRB is installed to automatically float free to the satisfaction of the attending marine inspector. 46 CFR 180.64
Action required: 705 - Other - as specified
Resolved 1 October 2025
Resolution: Atended vessel and sighted the EPIRB is now installed on the outside of the stbd flying bridge and the installation is now float free. Vessel route restored.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 29 July 2025 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Vessel exhibits an all-round white light mounted vertically on the port side flying bridge, which is not permitted under International Navigation Rule 23 (d)(iii). Arrange vessels navigation lights to meet prescribed lights under this rule to the satisfaction of the attending Marine Inspector. 46 CFR 183.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted the mast white all around light mounted center line of the vessel on the Bimini Top and just forward of the sidelights as prescribed by NAVRULE 23.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 29 July 2025 Resolved
Each floating electric water light shall meet the requirements of ANSI/UL 1196. Water light not in approved bracket. Mount water light in the approved bracket near the life ring buoy to the satisfaction of the attending marine inspector. 46 CFR 161.010-2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted the floating water light in an approved bracket.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 July 2025 Resolved
Each circuit breaker must meet UL 489 or other standard specified by the Commandant, and be of the manually reset type designed for: Inverse time delay; Instantaneous short circuit protection; and Switching duty if the breaker is used as a switch. Non UL 489 breakers found in tank space. Replace breaker with approved UL 489 breaker to the satisfaction of the attending marine inspector. 46 CFR 183.380(m)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted the non UL 489 breakers in the tank space were removed. The wires are now connected to the positive and negative bus bar.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 29 July 2025 Resolved
Where a flexible fill pipe section is necessary, suitable flexible tubing or hose having high resistance to salt water, petroleum oils, heat and vibration, may be used. Fuel fill flexible piping is deteriorated and beyond service life. Replace flexible pipe with approved piping in accordance with reference cite for measurements, and bonding requirements to the satisfaction of the attending marine inspector. 46 CFR 182.20-30(d) Old "T"
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted the fuel fill flexible flexible hose was renewed with the correct type and rated hose.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 29 July 2025 Resolved
A device must: Be designed to prevent the overboard discharge of treated or untreated sewage or any waste derived from sewage (Type III). The MSD system was not locked, nor handle removed. Remove handle in closed position or lock overboard discharge valve to prevent discharge of sewage into navigable waters to the satisfaction the attending marine inspector. 33 CFR 159.13(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted the MSD system ovbd valve handle was removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 July 2025 Resolved
When the flexible section is a nonconductor of electricity, the metallic sections of the filling pipe separated thereby shall be joined by a conductor for protection against static spark when filling. The metallic deck fill section of the filling pipe bonding cable is not joined to the tank fill connection and are separated. Connect bonding cable as described above to correctly bond fuel filling pipe to prevent against static charge to the satisfaction of the attending marine inspector. 46 CFR 182.445(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted a green bonding cable attached correctly to bond fuel fill deck fitting to the tank.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 July 2025 Resolved
Fuses must be of the cartridge type only and be listed by Underwriters Laboratories or another independent laboratory recognized by the Commandant. Blade type fuses installed under the flying bridge console and for the oil change pump. Replace those fuses identified with proper UL listed marine use cartridge type fuse to the satisfaction of the attending marine inspector. 46 CFR 183.380(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted the blade fuses replaced with approved UL cartridge fuses under the flying bridge console and for the oil change pump.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 29 July 2025 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. The first aid kid is missing iodine and aspirin. Provide aspirin and iodine to the satisfaction of the attending marine inspector. 46 CFR 184.710
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted the first aid kit with 100 aspirin and iodine.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 29 July 2025 Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturer's instructions. The engine space is not vapor tight. Seal the engine space openings to prevent fire extinguishing agent from escaping to the satisfaction of the attending marine inspector. 46 CFR 181.420(a)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted that the engine space openings were properly sealed with expanded foam to prevent fire extinguishing agent from escaping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 July 2025 Resolved
A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 65 feet in length carrying not more than 49 passengers, other than a ferry, provided that: The pump is listed by an independent laboratory as meeting the requirements in UL 1113. Bilge pump in forward space is not UL 1113 approved. Replace with a UL 1113 bilge pump to the satisfaction of the attending marine inspector. 46 CFR 182.520(e)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 30 July 2025
Resolution: Attended vessel and confirmed UL approved bilge pump installation and operation.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 July 2025 Resolved
Over current protection must be provided for each ungrounded conductor for the purpose of opening the electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the conductor or conductor insulation. Newly installed battery charger missing fuse(s) for each positive conductor from the charger to the battery/battery bank. Install the required cartridge type fuse(s) or UL 489 circuit breaker(s) as desribed by 46 CFR 183.380(m) of the appropriate size for the model of battery charger installed as per the manufacturers installation instructions; to the satisfaction of the attending marine inspector. 46 CFR 183.380(k)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted the newly installed battery charger with a UL 489 circuit breaker of the correct amperage from the charger to the battert IAW the manufacturers installation instructions.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 July 2025 Resolved
The discharge ends of vent pipes shall be fitted with removable flame screens or flame arresters. The flame screens shall consist of a single screen of corrosion resistant wire of at least 30 x 30 mesh. Fuel tank vent pipe missing required flame screen. 1) Replace fuel tank vent; or 2) Provide a screen for the fuel tank vent as described above to the satisfaction of the attending marine inspector. 46 CFR 182.20-35(d) Old "T"
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighted new stbd fuel tank vent installed with a single 30 x 30 mesh screen.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 July 2025 Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Found dead end wires under operating console. Terminate electrical wiring properly to prevent injury to the satisfaction of the attending marine inspector. 46 CFR 183.200(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and the found dead end wires under operating console were removed.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 29 July 2025 Resolved
It is further intended that all machinery be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure, and personnel injury. Starboard engine inboard forward and outboard aft engine mounts cushioned snubber are bottomed out indicating overloading. Adjust, repair, or replace engine mounts in accordance with [name withheld] manufacturer guidance to the satisfaction of the attending marine inspector. 46 CFR 182.01-05 Old “T”
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Attended vessel and sighte the engine mounts were renewed in-kind and properly loaded.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 July 2025 Resolved
An EAP training program must be conducted for the employer's crew members and supervisory personnel. The training program must include at least the following elements: the effects and consequences of drug and alcohol use on personal health, safety, and work environment; the manifestations and behavioral cues that may indicate drug and alcohol use and abuse; and documentation of training given to crew members and the employer's supervisory personnel. Supervisory personnel must receive at least 60 minutes of training. Crew and supervisory training documentation could not be provided. Provided objective evidence of crew and supervisory training to the satisfaction of the attending marine inspector. 46 CFR 401(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2025
Resolved 1 October 2025
Resolution: Satisfactory objective evidence of crew and supervisory training provided.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 21 May 2024 Resolved
A pre-engineered fixed gas fire extinguishing system must: Be installed in accordance with the manufacturer's instructions. Eight holes in the aft engine room bulkhead allow fixed fire extinguishing medium to communicate through bulkhead and into aft lazarette. Make vapor tight to ensure quantity of extinguisher is sufficient. 46 CFR 181.420 (a)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2024
Resolution: Engine compartment aft bulkhead was made vapor tight.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 21 May 2024 Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Missing double hose clamps on engine side of both sea water intakes for both engines. Ensure double clamps are in correct position on both sides of sea water hoses. 46 CFR 182.410(d)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2024
Resolution: Double hose clamps were installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 May 2024 Resolved
The requirements for machinery and boilers for steam and electrically propelled vessels are contained in applicable regulations in Subchapter F of this chapter. Gears, couplings, flywheels and all machinery capable of injuring personnel shall be provided with adequate covers or guards. Rotating belts for both engines are missing guards. Installed guards to the satisfaction of attending marine inspector. 46 CFR 182.05-5(b) 46 CFR 58.01-20
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2024
Resolution: Guards were installed on both engine.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 21 May 2024 Resolved
Except as provided in 80.13(c), stations must have an authorization granted by the Federal Communications Commission. Vessel's Radio Station Authorization has expired. Provide current an updated FCC license with new vessel name within two weeks. 47CFR80.405(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2024
Resolution: New Radio Station Authorization was issued.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 April 2024 Resolved
To maintain a valid Certificate of Inspection, you must complete your annual inspection within the periods specified in § 176.500(b)(1) and your Certificate of Inspection must be endorsed. Vessel shall not carry passengers until an renewal COI inspection have been satisfactorily completed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 May 2024
Resolution: COI renewal was completed to satisfaction of attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 17 April 2024 Resolved
For fixed-gas fire extinguishing systems, the inspections and tests required by Table 176.810(b) of this section, in addition to the tests required by 46 CFR 147.60 and 147.65. The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. Vessel representative reported that vessel's Fireboy system failed inspection by servicing company. 46 CFR 176.810(b)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 May 2024
Resolution: Fireboy system was tested satisfactory by attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 10 November 2020 Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. The port and starboard engine room ventilation dampeners do not seal. Provide proper closure devices for port and starboard engine room vents.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 April 2021
Resolution: The vessel's port and stbd dampeners seal & close the engine room's ventilation.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 30 November 2016 Resolved
Vessels pre-engineered fire extinguishing unit needs to be capable of shutting down the vessels propulsion engines. 46 CFR 181.420
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2016
Resolved 1 December 2016
Resolution: Conducted an operational test of the vessels pre-engineered fire extinguishing system. Propulsion engines shutdown as intended during op test. All sat.
Operations/Management › Drills/Instruction › Not Conducted
Issued 30 November 2016 Resolved
Vessel needs to conduct satisfactory sea trials and perform the required drills. 46 CFR 176.808 & 46 CFR 176.802
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2016
Resolved 1 December 2016
Resolution: Conducted operational sea trials and performed all required drills. All sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 30 November 2016 Resolved
Vessel needs to have visual indicators to show discharge of the pre-engineered fire extinguishing unit. 46 CFR 181.420 (b)(1)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 December 2016
Resolved 1 December 2016
Resolution: Visual indicators show discharge of the pre-engineered fire extinguishing unit. All sat.
Communications › Alarms/Indicators › Bilge Alarm
Issued 22 December 2010 Resolved
Install bilge high level alarm in way of lazarrette as required by 46 CFR 182.530.
Due 22 January 2011
Resolved 18 January 2011
Construction/Loadline › Hull › Side Shell
Issued 8 November 2010 Resolved
Identified total of 31 blisters on port and starboard side of hull above and below waterline.. Grind out and make available for inspection and renew damaged area prior to receiving credit drydock.
Action required: 705 - Other - as specified
Due 30 November 2010
Resolved 9 November 2010
Construction/Loadline › Hull › Transverse Frame
Issued 8 November 2010 Resolved
Found areas in the forward and aft bulkheads of the engine room with holes; compromising the vapor tight integrity of the compartment. Make engine room vapor tight by securing all holes in the forward and aft bulkheads.
Action required: 705 - Other - as specified
Due 30 November 2010
Resolved 9 November 2010
Construction/Loadline › Hull › Hull Plating
Issued 1 November 2010 Resolved
Renew delaminated fiberglass in way of port forward fuel tank space.
Due 8 November 2010
Resolved 9 November 2010
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 9 December 2009 Resolved
Replace retroreflective tape on all the "JimBouy" life jackets.
Action required: 705 - Other - as specified
Due 23 December 2009
Resolved 28 December 2009
Operations/Management › Equipment Service/Testing › EPIRB
Issued 9 December 2009 Resolved
Provide a certified EPIRB i.a.w. 46CFR180.64
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2009
Lifesaving › Hand Flares › Expired
Issued 9 December 2009 Resolved
Provide four additional red hand flares i.a.w. 46CFR180.68(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 December 2009
Resolution: Received call and receipt via fax confirming purchase of flares.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 December 2009 Resolved
Provide a complete and up-to-date first aid kit.
Action required: 705 - Other - as specified
Due 23 December 2009
Resolved 9 December 2009
Resolution: Corrected on the spot.
Personnel › Training › First Aid/CPR
Issued 9 December 2009 Resolved
Provide proof that 50% of crew hold current First Aid/CPR certification. (NVIC 1-91)
Action required: 705 - Other - as specified
Due 23 December 2009
Resolved 28 December 2009
Navigation › Piloting/Steering › Marine Charts
Issued 9 December 2009 Resolved
Provide nautical chart for operating area i.a.w. 46CFR184.420
Action required: 705 - Other - as specified
Due 23 December 2009
Resolved 28 December 2009
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 9 December 2009 Resolved
Provide copy of Inland Navigation Rules.
Action required: 705 - Other - as specified
Due 23 December 2009
Resolved 28 December 2009
Engineering › Fuel Oil Service System › Filter
Issued 4 December 2008 Resolved
The racor filters for both engines are missing heat shields. Install heat shields for filters.
Action required: 705 - Other - as specified
Due 18 December 2008
Resolved 18 December 2008
Fire Fighting › Fire Bucket › Quantity
Issued 2 December 2008 Resolved
Provide three 2 1/2 gallon fire buckets with markings and lanyards.
Action required: 705 - Other - as specified
Due 18 December 2008
Resolved 18 December 2008
Engineering › Fuel Oil Service System › Hose
Issued 2 December 2008 Resolved
Change out fuel line (leaking) on starboard engine.
Action required: 705 - Other - as specified
Due 18 December 2008
Resolved 18 December 2008
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 2 December 2008 Resolved
Repair broken cables for ventilation covers to the engine compartment.
Action required: 705 - Other - as specified
Due 18 December 2008
Resolved 18 December 2008
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 2 December 2008 Resolved
Provide proof of boat crew enrollment for Drug and Alcohol Testing.
Action required: 705 - Other - as specified
Due 18 December 2008
Resolved 18 December 2008
Construction/Loadline › Structures › Transverse Bulkhead
Issued 21 October 2008 Resolved
Found several holes within the forward and aft bulkheads in the engine room compromising the affectiveness of the fixed fire fighting agent. Make engine room vapor tight by securing all holes in the fore and aft bulkheads.
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 October 2008
Resolved 24 October 2008
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 October 2008 Resolved
Found several dead end wires in engine room leading to no sources. Remove all dead end wires in engine room.
Action required: 705 - Other - as specified
Due 24 October 2008
Resolved 24 October 2008
Engineering › Fuel Oil Service System › Filter
Issued 21 October 2008 Resolved
Found both starboard and port racor filters for the main engines are missing heat shield bowl. Properly install racor filters for both main engines.
Action required: 705 - Other - as specified
Due 24 October 2008
Resolved 21 October 2008
Deck/Cargo › Holds/Tanks › Hatch
Issued 21 October 2008 Resolved
Replace deteriorated gasket for engine compartment hatch.
Action required: 705 - Other - as specified
Due 24 October 2008
Resolved 24 October 2008
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 21 October 2008 Resolved
Remove angel hair from under deck longitudinal located on port side in way of transom.
Action required: 705 - Other - as specified
Due 24 October 2008
Resolved 24 October 2008
Construction/Loadline › Structures › Deck Plating
Issued 21 October 2008 Resolved
Remove rotted/wet wood from swim step and reglass as original.
Action required: 705 - Other - as specified
Due 24 October 2008
Resolved 24 October 2008
Lifesaving › Buoyant Apparatus › Pendant
Issued 14 November 2007 Resolved
Replace lanyard on light float attached to lifefloat.
Condition: Unknown
Due 14 November 2007
Resolved 19 November 2007
Lifesaving › Buoyant Apparatus › Lifeline
Issued 14 November 2007 Resolved
Replace or renew ring buoy and line.
Condition: Unknown
Due 14 November 2007
Resolved 19 November 2007
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 14 November 2007 Resolved
Found dead wires in the engine room compartment. Fix/remove dead end wires.
Condition: Unknown
Due 14 November 2007
Resolved 19 November 2007
Operations/Management › Equipment Service/Testing › EPIRB
Issued 14 November 2007 Resolved
Replace EPIRB battery and provide proper operation of EPIRB.
Condition: Unknown
Due 14 November 2007
Resolved 19 November 2007
Navigation › Piloting/Steering › US Coast Pilot
Issued 13 December 2006 Resolved
Have copy of Coast Pilot onboard
Due 13 January 2007
Resolved 19 December 2006
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 3 October 2006 Resolved
Provide fire fighting equipment service receipt
Due 13 January 2007
Resolved 19 December 2006
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 December 2005 Resolved
Replace ammonia inhalants, antiseptic, and eyewash to first aid.
Due 9 January 2006
Resolved 13 December 2005
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 9 December 2005 Resolved
Have hotline numbers available to employees
Due 9 December 2005
Resolved 13 December 2005
Communications › Radio Communications
Issued 3 December 2003 Resolved
Repair vessel's EPIRB. Provide a loaner EPIRB prior to carrying passengers. LEGACY COMPONENT DESC: EPIRB
Action required: 705 - Other - as specified
Due 3 January 2004
Resolved 15 March 2004
Engineering › Bilge Water Management System
Issued 3 December 2003 Resolved
Provide a bilge high water alarm for the forward compartment.
Action required: 705 - Other - as specified
Due 3 January 2004
Resolved 22 December 2003
Navigation
Issued 13 January 1999 Resolved
Stbd nav light inoperable. Repaired before completion of inspection.
Condition: Unknown
Due 15 February 1999
Resolved 15 February 1999
Navigation
Issued 13 January 1999 Resolved
Required a more current chart of operating area be provided for vsl. Requirement met before completion of inspection.
Condition: Unknown
Due 15 February 1999
Resolved 15 February 1999
Documentation
Issued 26 June 1996 Resolved
Remove Bimini Top from vessel.Stability of the SEA WIFE II was based on thestability test of its sister vessel, the SPIRIT OF CALYPSO, O.N. 930905. The SPIRIT OF CALYPSO failed its stab.test with the Bimini Top installed and the SEA WIFE II&SPIRIT OF CALYPSO are not permitted a Bimini Top.
Condition: Unknown
Due 26 June 1996
Resolved 26 June 1996
Electrical
Issued 13 September 1991 Resolved
INSTALL A FUSE (55 AMP OR LESS) IN THE MAIN POWER LEAD BEFORE IT LEAVES THEENGINE ROOM.
Condition: Unknown
Due 11 October 1991
Resolved 11 October 1991
Documentation
Issued 13 September 1991 Resolved
PROVIDE ABOARD THE VESSEL A VALID FCC FORM 824. VESSEL IS RESTRICTED TO OPERATIONS WITHIN 1000 FT OF SHORE UNTIL THIS ITEM IS COMPLETED.
Condition: Unknown
Due 17 September 1991
Resolved 17 September 1991
Construction/Loadline
Issued 13 September 1991 Resolved
ATTACH TETHER LINES TO ALL DECK HATCHES AND COVERS.
Condition: Unknown
Due 11 October 1991
Resolved 11 October 1991
Engineering
Issued 13 September 1991 Resolved
MAKE ADEQUATE HOLES FOR VENTALATION IN THE FUEL TANK COMPARTMENT.
Condition: Unknown
Due 11 October 1991
Resolved 11 October 1991
Documentation
Issued 15 January 1991 Resolved
PROVIDE THE FOLLOWING VALID FCC DOCUMENTATION. A. RADIO COMMUNICATIONS ACT SAFETY CERT, B. RADIO STATION LIC, C. MARINE RADIO OPERATORS PERMIT, AND D. COPY OF PART 80 CFR "FCC RULES".
Condition: Unknown
Due 15 January 1991
Resolved 15 January 1991
Unknown
Issued 15 January 1991 Resolved
THE OWNER OR OPERATOR OF VESSEL IS TO NOTIFY THE OFFICER IN CHARGE OF MARINE INSPECTION, HONOLULU, HAWAII. PRIOR TO OPERATING THE VESSEL OR CARRYING PASSENGERS FOR HIRE.
Condition: Unknown
Due 15 January 1991
Resolved 15 January 1991
Navigation
Issued 15 January 1991 Resolved
PROVIDE PUBS, NAVIGATION CHARTS FOR VESSELS AREA OF OPERATION, AND A COPY OF CHAP "T".
Condition: Unknown
Due 15 January 1991
Resolved 15 January 1991

Ownership record