Records from 2016 to 2026. Most recent: inspection, 12 May 2026.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 18
12 May 2026
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8372466
12 August 2025
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8208711
10 March 2025
Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8091483
5 August 2024
Type not recorded
No type recorded · Maritime Safety & Security Team Seattle (91101) · Activity 7975861
8 July 2024
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7953473
1 August 2023
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7758082
25 July 2023
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7752178
28 March 2023
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7658113
17 May 2022
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7467171
6 April 2022
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7426175
17 May 2021
Annual Inspection · Administrative Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7205779
23 April 2021
Internal Structural Exam · Drydock Exam · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7205904
29 April 2020
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6950552
19 June 2019
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6696798
11 April 2019
Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6659974
6 July 2018
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6469623
11 April 2017
Drydock Exam · Internal Structural Exam · COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6117660
24 May 2016
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6069979
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 April 2022
Resolved
Prove proper operation of fixed bilge system pumping out fish hold.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 April 2022
Resolution: corrected
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 April 2022
Resolved
Ensure bracket holding stbd bilge pump is secured.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 April 2022
Resolution: corrected
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 17 May 2021
Resolved
VESSEL HAD 76 OF 86 ADULT LIFEJACKETS ONBOARD. PASSENGER CARRIAGE HAS BEEN REDUCED TO NOT MORE THAN 76 ADULT PASSENGERS ONBOARD.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 May 2021
Resolved 18 May 2021
Resolution: replaced
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 17 May 2021
Resolved
THE DISTRESS SIGNALS SHALL BE KEPT IN A BRIGHT WATERTIGHT CONTAINER THAT IS PROPERLY LABELED AS "DISTRESS SIGNALS"
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 17 May 2021
Resolution: CONTAINER PURCHASED
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 May 2021
Resolved
REPLACE 01 LENGTH OF 50' GARDEN HOSE ON THE AFT FIRE HOSE STATION.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 17 May 2021
Resolution: HOSE REPLACED
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 May 2021
Resolved
REPLACE WASTED SECTION OF FLEXABLEHOSE ON THE STARBOARD ENGINE RAW WATER SYSTEM.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 18 May 2021
Resolution: replaced
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 19 June 2019
Resolved
Replace expired hydrostatic relase on port liferaft
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 June 2019
Resolved 19 June 2019
Resolution: Hydrostatic release for port liferaft was replaced with a new unit.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 19 June 2019
Resolved
Conduct emergency drills with regular crewmembers
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2019
Resolved 1 July 2019
Resolution: Observed satisfactory fire drill in vessel's engine room, abandon ship drill that included a simulated launch of both IBAs, and man overboard drill using the vessel's life ring as the man overboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 June 2019
Resolved
Install metal supports spaced every 24 inches on wire & cable in engine room
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 July 2019
Resolved 1 July 2019
Resolution: Suitable metal supports were installed every 24 inches on all wires in engine room overhead.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 June 2019
Resolved
Label breaker panel in engine room on foward bulkhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 July 2019
Resolved 1 July 2019
Resolution: Breaker panel labelled.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 June 2019
Resolved
Oily waster rages in engine room must be stowed in a proper container to prevent a fire hazard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2019
Resolved 1 July 2019
Resolution: Oily rags are now stored in a metal can with a metal lid and emptied regularly.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 19 June 2019
Resolved
Ventilation closures in engine room are not operating as intended.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2019
Resolved 1 July 2019
Resolution: Both engine room ventilation covers tested satisfactory.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 19 June 2019
Resolved
Charts must be updated (paper or electronic)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 July 2019
Resolved 1 July 2019
Resolution: Electronic charts updated by a servicing technician ashore.
01 - Certificates & Documentation › 013 - Documents › Ship specific plans for the recovery of persons from the water
Issued 6 July 2018
Resolved
Vesse;'s EPIRB registration listed individual who would not know or have information about the vessel's operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 July 2018
Resolution: Vessel showed new registration with vessel rep info.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 6 July 2018
Resolved
Vessels stbd nav light was extinguished.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 July 2018
Resolution: Vessel replaced stbd nav light prior to MI departing inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 July 2018
Resolved
Vessel's lifebuoy light was worn and battery was expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 July 2018
Resolution: Vessel replaced lifebuoy light and battery.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 July 2018
Resolved
Vessel had dead end wires under bridge console.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 July 2018
Resolution: Vessel removed dead end wires.
Engineering › Bilge Water Management System › Pump
Issued 11 April 2017
Resolved
Remount bilge float in E/R.
Action required: 705 - Other - as specified
Due 11 May 2017
Resolved 1 June 2017
Engineering › Bilge Water Management System › Pump
Issued 11 April 2017
Resolved
Mount bilge pump in lazarette.
Action required: 705 - Other - as specified
Due 11 May 2017
Resolved 1 June 2017
Communications › Alarms/Indicators › Bilge Alarm
Issued 11 April 2017
Resolved
Make repairs to lazarette bilge alarm.
Action required: 705 - Other - as specified
Due 11 May 2017
Resolved 1 June 2017
Personnel › Training › Familiarization Training
Issued 11 April 2017
Resolved
Perform MOB and fire drills.
Action required: 705 - Other - as specified
Due 11 May 2017
Resolved 1 June 2017
Navigation › Piloting/Steering › US Coast Pilot
Issued 24 May 2016
Resolved
Update all required nav pubs.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 1 June 2016
Engineering › Sea-water System (primary cooling) › Piping
Issued 24 May 2016
Resolved
Replace raw water cooling hose for the portside shaft.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 1 June 2016
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 24 May 2016
Resolved
Provide employee assistance drug and alcohol hot line phone number.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 1 June 2016
Fire Fighting › Fire Pumps › Arrangement
Issued 24 May 2016
Resolved
Remount fire/water pump.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 1 June 2016
Communications › Alarms/Indicators › Bilge Alarm
Issued 24 May 2016
Resolved
Make repairs to bilge alarms located on bridge.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 June 2016