Records from 1990 to 2004. Most recent: inspection, 10 March 2004.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 33
10 March 2004
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2014343
26 August 2003
Administrative Inspection
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1896627
12 March 2003
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1739803
15 March 2002
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1494060
7 March 2002
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1487507
23 May 2001
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1066174
22 March 2001
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1460509
11 April 2000
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1048622
29 March 2000
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1372983
22 November 1999
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 810311
12 July 1999
Plan Review "T" Boat
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1094899
30 March 1999
Hull Examination · Deficiency Check · COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1397122
24 March 1998
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 788173
4 March 1998
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1469166
9 January 1998
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 785872
20 May 1997
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1107551
15 April 1997
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1102197
11 March 1997
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1374898
11 April 1996
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1080983
31 March 1996
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1398427
25 January 1996
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 875803
10 April 1995
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 851989
10 April 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1403876
4 April 1995
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1152356
17 November 1994
Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1179013
21 April 1994
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 856941
5 April 1994
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 856769
22 April 1993
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 827995
31 March 1993
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 834437
14 April 1992
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 958783
3 August 1991
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1249753
17 April 1991
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1307134
24 May 1990
Deficiency Check · Plan Review "T" Boat · Initial Certification · Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1229304
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 12 March 2003
Resolved
Replace Murphy valve for CO2 Fule shutoff system and retest. LEGACY COMPONENT DESC: Operating Controls
Condition: Unknown
Due 12 April 2003
Resolved 14 March 2003
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 12 March 2003
Resolved
Replace Battery in life ring light
Condition: Improper/Lack of Maintenance
Due 12 April 2003
Resolved 14 March 2003
Construction/Loadline › Structures
Issued 12 March 2003
Resolved
Repair soft spot on deck Behind engine compartment.
Condition: Improper/Lack of Maintenance
Due 12 April 2003
Resolved 14 March 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 7 March 2002
Resolved
Ensure proper operation of fixed fire fighting fuel shut down solenoid, prior to carrying passengers. LEGACY COMPONENT DESC: Operating Controls
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 March 2002
Accommodation/Occupational Safety › Medical/First Aid
Issued 7 March 2002
Resolved
Replace expired items located in first aid kit.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2002
Resolved 15 March 2002
Operations/Management › Drills/Instruction
Issued 7 March 2002
Resolved
Provide and log training as required by 46CFR199.180. Provide training to [name withheld] prior to carrying passengers and document the same.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 March 2002
Electrical
Issued 22 March 2001
Resolved
PROPERLY WIRE AND SECURE WIRES IN ENGINE ROOM UNDER OPERATORS SEAT.
Condition: Unknown
Due 22 March 2001
Resolved 22 March 2001
Engineering
Issued 22 March 2001
Resolved
INSTALL NATURAL AIR VENTS IN FWD VOID AND FUEL TANK COMPARTMENT
Condition: Unknown
Due 22 March 2001
Resolved 22 March 2001
Engineering
Issued 22 March 2001
Resolved
PROPERLY ADJUST FUEL SHUT OFF VALVE
Condition: Unknown
Due 22 March 2001
Resolved 22 March 2001
Lifesaving
Issued 22 March 2001
Resolved
CARRY ONLY 45 ADULTS UNTIL PFD'S ARE REPLACED
Condition: Unknown
Due 22 March 2001
Resolved 22 March 2001
Unknown
Issued 29 March 2000
Resolved
Install vent closures on engine room vent._x001C_
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Unknown
Issued 29 March 2000
Resolved
Install bilge pump (10gpm) in FWD and AFT compartment,s._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Lifesaving
Issued 29 March 2000
Resolved
Carry only 43 adult passengers until life jackets are replaced.
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Construction/Loadline
Issued 30 March 1999
Resolved
Properly repair 8 cracks/blisters in vessel hull.
Condition: Unknown
Due 20 April 1999
Resolved 20 April 1999
Fire Fighting
Issued 30 March 1999
Resolved
Install fixed fire fighting system.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Engineering
Issued 30 March 1999
Resolved
Prove proper operation of steering, propulsion, and MOB drill prior to carrying passengers.
Condition: Unknown
Due 20 April 1999
Resolved 20 April 1999
Electrical
Issued 30 March 1999
Resolved
Remove dead end wires and cover junction box in fwd void.
Condition: Unknown
Due 20 April 1999
Resolved 20 April 1999
Engineering
Issued 30 March 1999
Resolved
Label and adjust fuel shut off valve.
Condition: Unknown
Due 20 April 1999
Resolved 20 April 1999
Navigation
Issued 4 March 1998
Resolved
Cut emergency tiller to length for proper operation.
Condition: Unknown
Due 4 April 1998
Resolved 26 March 1998
Lifesaving
Issued 4 March 1998
Resolved
Remove and properly dispose of slop oil in bilge.
Condition: Unknown
Due 4 April 1998
Resolved 26 March 1998
Engineering
Issued 4 March 1998
Resolved
Repair or replace Tachometer.
Condition: Unknown
Due 4 April 1998
Resolved 26 March 1998
Lifesaving
Issued 4 March 1998
Resolved
Repair straps on two (2) adult life jackets. Replace retro on four (4) adult and three (3) child size life jackets.
Condition: Unknown
Due 4 April 1998
Resolved 26 March 1998
Lifesaving
Issued 4 March 1998
Resolved
Replace life line on life ring buoy.
Condition: Unknown
Due 4 April 1998
Resolved 26 March 1998
Lifesaving
Issued 4 March 1998
Resolved
Replace waterlight line.
Condition: Unknown
Due 4 April 1998
Resolved 26 March 1998
Construction/Loadline
Issued 11 March 1997
Resolved
Make permanent repairs to holes in hull IWO bow void space stbd side.
Condition: Unknown
Due 11 March 1997
Resolved 11 March 1997
Lifesaving
Issued 11 March 1997
Resolved
Limited to 46 passengers until 4 life jackets have proper reflective tape installed.
Condition: Unknown
Due 11 March 1997
Resolved 11 March 1997
Lifesaving
Issued 11 March 1997
Resolved
Provide approved life ring in accordance with 46CFR 160.050. Life ring shall be provided before passengers are allowed to board and get underway.
Condition: Unknown
Due 11 March 1997
Resolved 11 March 1997
Construction/Loadline
Issued 11 March 1997
Resolved
Remove oil slops from bilges and properly dispose.
Condition: Unknown
Due 11 March 1997
Resolved 11 March 1997
Lifesaving
Issued 31 March 1996
Resolved
Provide a total of 50 approved adult life preservers on board. Vessel restricted to 46 Adults on board until 4 defective life preservers replaced.
Condition: Unknown
Due 12 April 1996
Resolved 17 April 1996
Fire Fighting
Issued 4 April 1995
Resolved
PROVE PROPER OPERATION OF PTO FIRE PUMP ONCE VESSEL IS WATERBORNE.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Engineering
Issued 4 April 1995
Resolved
PROVE PROPER OPERATION OF PROPULSION MACHINERY AFTER TAILSHAFT REINSTALLED.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Engineering
Issued 5 April 1994
Resolved
RENEW WASTED PORT MUFFLER AND PROVE PROPER OPERATION OF PROPULSION PLANT AND PTO FIRE PUMP PRIOR TO PASSENGER CARRIAGE.
Condition: Unknown
Due 5 April 1994
Resolved 5 April 1994
Accommodation/Occupational Safety
Issued 31 March 1993
Resolved
POST EMERGENCY CHECK-OFF LIST, OIL AND GARBAGE POLLUTION PLACARDS ON BOARD.
Condition: Unknown
Due 31 March 1993
Resolved 31 March 1993
Lifesaving
Issued 31 March 1993
Resolved
MARK LOCATION AND OPERATION OF REMOTE FUEL SHUT-OFF VALVE.
Condition: Unknown
Due 31 March 1993
Resolved 31 March 1993
Engineering
Issued 31 March 1993
Resolved
PROVE PROPER OPERATION OF WET EXHAUST SYSTEM.
Condition: Unknown
Due 31 March 1993
Resolved 31 March 1993
Engineering
Issued 31 March 1993
Resolved
DOUBLE CLAMP FLEX FUEL LINE TO COPPER FUEL LINE.
Condition: Unknown
Due 31 March 1993
Resolved 31 March 1993
Lifesaving
Issued 24 May 1990
Resolved
PROVIDE ON BOARD 7 ADDITIONAL ADULT-SIZE LIFE PRESERVERS. MAXIMUM PERSONS ON BOARD REDUCED TO 43 UNTIL ADDITIONAL LIFE PRESERVERS ON BOARD.
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990
Construction/Loadline
Issued 24 May 1990
Resolved
SUMBIT FOR APPROVAL THE FOLLOWING PLANS: 1. ONE LINE ELECTRICAL DRAWING. 2. DECK LAYOUT WITH SEATING PLAN. 3. THRU HULL FITTING LOCATION AND SIZE.
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990