Records from 1996 to 2001. Most recent: inspection, 6 September 2001.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 14
6 September 2001
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1443268
10 August 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1401294
18 June 2000
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1468138
1 November 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1131044
5 August 1999
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1361041
5 October 1998
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 802062
28 August 1998
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1460222
8 April 1998
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 788434
12 August 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1117680
27 August 1996
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 939578
27 August 1996
MARPOL Annex V Examination · Initial Certification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1424367
11 June 1996
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1431650
30 May 1996
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1086031
8 April 1996
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1078210
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder Liner
Issued 6 September 2001
Resolved
Repair engine oil leak to port main engine.
Condition: Unknown
Due 31 December 2001
Resolved 5 August 2002
Resolution: COI expired and def was never cleared.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 6 September 2001
Resolved
Service portable fire extinguishers. Servicing report will be aceptable proof of compliance.
Condition: Unknown
Due 31 December 2001
Resolved 5 August 2002
Resolution: COI expired and def was never cleared.
Construction/Loadline › Hull › Stiffener
Issued 6 September 2001
Resolved
Make repairs to galley overhead stiffeners, where fiberglass construction "hat" frame is delaminating from overhead.
Condition: Unknown
Due 31 December 2001
Resolved 5 August 2002
Resolution: COI expired and def was never cleared.
Electrical › Electrical Distribution System (service) › Wiring
Issued 6 September 2001
Resolved
Using electrical tape wrap wire nuts used to connect line to boiler controller in junction box and replace missing junction box cover.
Condition: Unknown
Due 31 December 2001
Resolved 5 August 2002
Resolution: COI expired and def was never cleared.
Lifesaving › Lifefloat › Paddle
Issued 6 September 2001
Resolved
Provide two 4' paddles for each life float and stencil with vessel's name.
Condition: Unknown
Due 31 December 2001
Resolved 5 August 2002
Resolution: COI expired and def was never cleared.
Fire Fighting
Issued 10 August 2000
Resolved
Provide a fixed gas fire extinguishing system in engine room in accordance with 46CFR181.400
Condition: Unknown
Due 10 August 2000
Resolved 10 August 2000
Construction/Loadline
Issued 18 June 2000
Resolved
Crop and renew areas identified on port side amidships.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Construction/Loadline
Issued 18 June 2000
Resolved
Crop and renew area of "thin" hull plate inboard of port shaft.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Construction/Loadline
Issued 18 June 2000
Resolved
Crop and renew bulkhead at base of engine room water tight door.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Construction/Loadline
Issued 18 June 2000
Resolved
Crop and renew framing in lazerette where missing/holed.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Construction/Loadline
Issued 18 June 2000
Resolved
Crop and renew "postage stamp" repair aft of aft main deck water tight hatch.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Construction/Loadline
Issued 18 June 2000
Resolved
V & weld aft main deck water tight hatch weld to aft deck.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Construction/Loadline
Issued 18 June 2000
Resolved
Provide a gauging report with a 3ft. x 3ft. grid minimum with additional readings in suspect areas, ie: around "postage stamp" inserts, around doublers, and in areas identified as "thin".
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Construction/Loadline
Issued 18 June 2000
Resolved
Crop and renew transverse frames and centerline longitudinal frame under forward crew berthing.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Accommodation/Occupational Safety
Issued 5 August 1999
Resolved
Make proper repairs at next dry to the emergency hatch on fwd deck and provide welders qualifiactions
Condition: Unknown
Due 5 August 1999
Resolved 5 August 1999
Engineering
Issued 5 August 1999
Resolved
Mount oil sensor as before.
Condition: Unknown
Due 7 August 1999
Resolved 7 August 1999
Documentation
Issued 5 August 1999
Resolved
Provide up to date light list.
Condition: Unknown
Due 3 September 1999
Resolved 3 September 1999
Construction/Loadline
Issued 5 August 1999
Resolved
Make proper repairs in next dry dock to aft engine room bulkhead to ensure it is water tight. (numerous holes and no stuffing tubes)
Condition: Unknown
Due 5 August 1999
Resolved 5 August 1999
Lifesaving
Issued 5 August 1999
Resolved
Provide 3 smoke flares.
Condition: Unknown
Due 3 September 1999
Resolved 3 September 1999
Engineering
Issued 5 August 1999
Resolved
provide a machinery guard for the stbd engine to cover the fwd pulley and belts.
Condition: Unknown
Due 5 August 1999
Resolved 5 August 1999
Construction/Loadline
Issued 5 August 1999
Resolved
Make proper repair at next dry dock to the fwd engine room bulkhead port side. Two hoses pass through a vent and bulkhead. Install stuffing tubes and ensure water tight fit.
Condition: Unknown
Due 5 August 1999
Resolved 5 August 1999
Electrical
Issued 5 August 1999
Resolved
Remove or properly install flood lights on port side of pilot house.
Condition: Unknown
Due 7 August 1999
Resolved 7 August 1999
Electrical
Issued 5 August 1999
Resolved
Remove or make proper repairs to light fixture cords in aft berthing.
Condition: Unknown
Due 3 September 1999
Resolved 3 September 1999
Electrical
Issued 28 August 1998
Resolved
Replace missing light globe in engine room.
Condition: Unknown
Due 28 August 1998
Resolved 28 August 1998
Lifesaving
Issued 28 August 1998
Resolved
Provide suitable rescue boat/prove proper launch & recovery.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Engineering
Issued 28 August 1998
Resolved
Provide double clamping for engine cooling hoses as needed.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Engineering
Issued 28 August 1998
Resolved
Provide flame impingement bowl for fuel filter for generator.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Lifesaving
Issued 28 August 1998
Resolved
Remove paint from accom space or place in fireproof locker.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Construction/Loadline
Issued 28 August 1998
Resolved
Provide secure attachment for forward escape hatch dogs. _x001C_ (Retention nuts loosen from normal operation)
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Engineering
Issued 28 August 1998
Resolved
Provide proper fuel tank vents IWO portside as per 46CFR182.450(c)(2)._x001C_ .75 inch O.D. w/ 30x30 mesh screen.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Lifesaving
Issued 28 August 1998
Resolved
Provide proper retroreflective tape for all liferings.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Fire Fighting
Issued 28 August 1998
Resolved
Provide proof of weight test for all portable fire extinguishers.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Lifesaving
Issued 28 August 1998
Resolved
Provide corrosion resistant clip for ring buoy.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Construction/Loadline
Issued 30 May 1996
Resolved
INSTALL CUT OFF VALVE FOR FORPEAK COMPARTMENT (COLLISION BULKHEAD).
Condition: Unknown
Due 25 June 1996
Resolved 21 June 1996