Records from 2013 to 2025. Most recent: inspection, 5 November 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 25
5 November 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8264655
4 August 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8202024
7 March 2025
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8089948
7 January 2025
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8059651
4 June 2024
Periodic Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7927070
16 March 2023
Drydock Exam · Plan Review (Other than "T") · Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7720065
27 February 2023
Plan Review (Other than "T")
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7644975
14 December 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7612622
1 December 2022
Construction Oversight · In-Service Inspection · Plan Review (Other than "T")
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7602812
7 November 2022
Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7590690
6 June 2022
Construction Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7490931
11 April 2022
Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7428959
22 February 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7399799
30 December 2021
Hull Examination · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7373619
1 December 2021
Administrative Inspection · Plan Review (Other than "T")
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7360875
8 September 2021
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7307476
9 April 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7171997
13 January 2021
Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7123904
11 January 2021
Deficiency Check · Hull Examination · COI Inspection · MTSA Verification · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7122872
17 May 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6954755
3 July 2019
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6752074
16 April 2018
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6711148
6 April 2018
Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6622301
22 May 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6153614
24 June 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5913104
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 4 June 2024
Resolved
Each OSV must be provided with means for testing each visible and audible alarm. Lube oil pressure alarm for starboard main inoperable; To repair/ replace fuel sensor in order for lube oil sensor to work. To send third party tech report.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 August 2024
Resolution: sensor was replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 June 2024
Resolved
Each battery charger must have an ammeter connected in the charging circuit. Battery charger does not have ammeter; configure into circuit accordingly.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 August 2024
Resolution: amp meters we added to the battery chargers.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 June 2024
Resolved
Each distribution panel must be in a location as dry as practicable, accessible, adequately ventilated, and protected from falling debris and dripping or splashing water. Openings in distribution panel need blanks to protect the circuits.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 August 2024
Resolution: openings were sealed/plugged.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 July 2023
Resolved
STBD M/E remote trip would not operate iaw 46 CFR 96.03-1 & 46 CFR 61.20-3
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 August 2023
Resolved 14 July 2023
Resolution: Demonstrated proper operation of the remote trip for shutdown
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 July 2023
Resolved
Bilge pump did not draw adequate suction iaw 46 CFR 56.50.55
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 6 August 2023
Resolved 14 July 2023
Resolution: Observed proper operation of the bilge pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 November 2022
Resolved
Vessel suffered casualty to starboard generator. At least two power generating sets must be provided. MI's attended vessel for inspection of temporary repair. Vessel currently has a CG authorized generator installation on the liftboat deck. The temporary repair is authorized for 30 days and will expire 15DEC2022. 46 CFR 129.315
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 6 July 2023
Resolution: Generator was replaced in kind and MI observed operational test with Tech rep.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 November 2022
Resolved
If a vessel is to be repaired, the plans, information, and calculations required by this part must be submitted to the OCMI in the zone where the vessel is to be altered, or repaired; or to the Marine Safety Center. Vessel shall submit repair plans on starboard generator for review and approval prior to commencing work. 46 CFR 127.120
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 6 July 2023
Resolution: All repiar were made in accordance with plan submitted to the OCMI
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 July 2022
Resolved
MI observed a ground on a ground detection panel in the engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 August 2022
Resolved 6 July 2022
Resolution: vsl submit photos showing no ground on the ground detection panel.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 11 April 2022
Resolved
Life jack stowage locations missing appropriate donning placards, vessel shall display appropriate life jacket manufacture donning instructions.
46 CFR 199.80 (c)(5)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2022
Resolved 4 May 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 11 April 2022
Resolved
07 life jackets were missing light and /or whistle, vessel shall ensure life jackets are outfitted, vessel
restricted 07 persons till replaced.
46 CFR 199.70 (b)(4)
Action required: 705 - Other - as specified
Resolved 15 April 2022
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 April 2022
Resolved
Vessel paint locker doors missing gaskets, vessel shall ensure gaskets are replaced.
46 CFR 95.05-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 15 April 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 April 2022
Resolved
Vessel found with galley exhaust hood in covered in grease & oil & the # 2 SSDG radiator fan covered in oil, vessel shall limit fire hazards.
46 CFR 92.05-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 4 May 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 11 April 2022
Resolved
F/O tanks sight glasses are made of plastic tubing. Where liquid oil indicating devices are attached to the tank, they shall be of heat resistant materials adequately protected from mechanical damage and provided at the tank connections with devices which will automatically close in the event of rupture of the gage or gage lines.
46 CFR 58.50-10 (6)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 6 July 2023
Resolution: F/O tank sight glass made of glass. Mechanical valves are only opened by a crewmember to check the level in the tank and then closed. There is a daily log entry to ensure the valves are closed when not being check.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 11 April 2022
Resolved
Crane hydraulic oil sight glass leaking and made of plastic tubing, vessel shall ensure sight glass can withstand a flame of 1700 degrees F.
46 CFR 56.50-80(h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 6 July 2023
Resolution: Sight glasses repair and are made of glass iaw manfacture's recommendations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 April 2022
Resolved
#1 SSDG voltmeter was missing set-screw & reading incorrect voltage at 580V, each vessel generator switchboard must have a voltmeter with a selector switch.
46 CFR 111.30-25(b)(6)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 5 July 2022
Resolution: VSL installed a new meter, verify accuracy with a multi meter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 April 2022
Resolved
Vessel #1 SSDG switchboard power available light not operable. Vessel generator switchboard must have a pilot lamp connected between the generator and the circuit breaker.
46 CFR 111.30-25(b)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 4 May 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 April 2022
Resolved
#2 water heater relief valve not seating and constantly leaking water. Electric hot water supply boilers must have pressure and temperature relieving valves.
46 CFR 63.25-3 (h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 15 April 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 April 2022
Resolved
Flood lights on forward bridge catwalk electrical plugs, E-light on the flying bridge & speaker box main deck stbd side of the super structure.
46 CFR 111.81-3 (a-c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 4 May 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 April 2022
Resolved
Port side E/R battery box filled with fluid, ensure box is liquid free.
46 CFR 111.15-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 27 April 2022
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 April 2022
Resolved
Junction boxes were dangling not secured near; both SSDG’s, forward bridge catwalk, and battery boxes in the E/R. Each outlet in a junction box much be secured on its mount.
46 CFR 111.81-1(e).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 27 April 2022
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 11 April 2022
Resolved
Heat detector above the #1 SSDG had a hole in the side of the device, vessel shall ensure device is in original condition and operable.
46 CFR 113.10-3
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 April 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 April 2022
Resolved
Both air receiver data plates in the E/R were covered in paint and illegible, ensure plates are legible.
46 CFR 54.10-20 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2022
Resolved 15 April 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 8 September 2021
Resolved
Watertight gaskets were severely brittle, worn and cracked on 02 main deck hatches leading to the E/R. Replace all gaskets with approved material and adjust each hatch to ensure watertight prior to commercial operations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2021
Resolved 18 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 September 2021
Resolved
Cracked terminal on battery in E/R is held together with vice grip tool. Remove unapproved tool and replace battery with a new terminal.
46 CFR 111.01-1
Action required: 705 - Other - as specified
Due 8 September 2021
Resolved 5 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 February 2021
Resolved
Vessel shall maintain non-matelic fuel hoses in good condition IAW SAE J1942. Port main distel engine fuel oil hose is deterioriating. Vessel shall replace fuel hose IAW SAE J1942.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 March 2021
Resolved 24 February 2021
Resolution: Vessel replace F/O hose to the satisfaction of the MI.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 12 February 2021
Resolved
Vessel shall be fitted with a pressure gauge on the discharge side of the pump. Vessel's starboard fire pump pressure gauge was inoperatable at the time of inspection. Vessel Repaired or replaced the gauge.
Action required: 10 - Deficiency Rectified
Due 13 February 2021
Resolved 13 February 2021
Resolution: Vessel repaired or replaced the gauge for the fire pump.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 12 February 2021
Resolved
Vesel shall maintain fire estinguishers in good condition. Vessel has a cracked hose on the top paint locker from the fire estinguihser. Vessel replaced hose.
Action required: 10 - Deficiency Rectified
Due 13 February 2021
Resolved 13 February 2021
Resolution: Vessel replaced hose.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 12 February 2021
Resolved
Vessel shall maintain lifesaving equipment to be ready at all times. The line to the lifefloat from the weaklink was not secured. Vessel's crew secured the lifefloat line to the weaklink.
Action required: 10 - Deficiency Rectified
Due 13 February 2021
Resolved 13 February 2021
Resolution: Vessel's crew secured the lifefloat line properly to the weaklink.
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 24 June 2016
Resolved
3 heat detectors in the E/R are painted. Replace with new detectors and test prior to getting underway.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 24 June 2016
Resolved 24 June 2016
Resolution: Received pictures and report from 3rd party illustrating heat detectors were replaced and tested.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 24 June 2016
Resolved
Vessel is outfitted with plastic site glasses on all fuel and oil tanks. Replace with heat resistant material with a automatic closing valve.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 July 2016
Resolved 5 July 2016
Resolution: Received email from vessel rep with pictures illustrating that plastic sight have been replaced with glass ones and a automatically closing valve has been installed on all fuel tanks.
Engineering › Steering Gear System › Power Unit
Issued 24 June 2016
Resolved
Steering gear pump resivior has a leak. Find leak and repair.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 July 2016
Resolved 5 July 2016
Resolution: Received email from vessel rep illustrating that the steering pump resivior has been repired and no longer leaks.
Electrical › Lighting (service) › Conductor
Issued 24 June 2016
Resolved
Lighting in E/R is not hard wired. Hard wire all lighting in the E/R.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 24 July 2016
Resolved 27 June 2016
Resolution: Received pictures and report from a 3rd party that all lighting in the E/R has been hard wired.