Inspection history · 21
4 March 2026
COI Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8320080
22 October 2025
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8257242
7 April 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8105145
6 November 2024
Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8020955
15 April 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7894933
17 April 2023
In-Service Inspection · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7665850
12 December 2022
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7607960
9 November 2022
Internal Structural Exam · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7591430
28 March 2022
Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7417487
15 March 2021
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7154085
25 January 2021
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7420192
16 November 2020
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7095903
1 June 2020
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6957960
22 April 2019
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6664271
7 November 2018
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6574969
23 April 2018
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6397193
7 April 2017
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6119822
29 March 2017
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6113252
3 November 2016
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6023671
22 March 2016
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5843954
21 March 2016
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5831394
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 25 March 2026
Resolved
Each vessel constructed of a material other than wood certificated to operate on a coastwise route in cold water must be provided with life floats of an aggregate capacity that will accommodate at least 100% of the total number of persons permitted on board. Vessel had 02 50 passenger capacity life rafts, Passenger count reduce to 97 until new life raft arrives. 46 CFR 180.204(b)
Action required: 705 - Other - as specified
Resolved 3 April 2026
Resolution: Objective evidence sent in that the liferaft was delivered and installed.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 25 March 2026
Resolved
Shutoff valves,installed so as to close against the fuel flow, shall befitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment, preferably from an accessible position on the weather deck. shutoff valve cable broke upon actuation, repaired on the spot.
46 CFR 182.20-45 (3)
Action required: 10 - Deficiency Rectified
Resolved 25 March 2026
Resolution: rectified on spot.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 25 March 2026
Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. MI observed daylight penetrating on starboard forward bulkhead in steering room around pipe penetration.
46 CFR 179.320(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2026
Resolved 30 March 2026
Resolution: Received objective evidence through hole was repaired.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 25 March 2026
Resolved
All escape hatches and other emergency exits shall be marked on both sides using at least 1-inch letters:"Emergency Exit, Keep Clear", unless such markings are deemed unnecessary by the Officer in Charge, Marine Inspection. No emergency exit markings posted in cabin doors.
46 CFR 185.606
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 April 2026
Resolution: Received objective evidence that emergency exit markings was posted.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 25 March 2026
Resolved
A vessel with more than one passenger deck and a vessel with overnight accommodations must have the public address system operable from the operating station. speakers for PA system on second deck were not operational.
46 CFR 184.610(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2026
Resolved 30 March 2026
Resolution: Received objective evidence the speakers were reconnected and test satisfactorily.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 April 2025
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/or originating in electrical equipment, and reasonably safe from electrical shock of personnel.
MI discovered daisy chaining of extension cords to the ship's installed electrical outlet at port-side of bar area.
46 CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 April 2025
Resolved 17 April 2025
Resolution: Electrical cords were properly routed to permanently installed outlet.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 April 2025
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/or originating in electrical equipment, and reasonably safe from electrical shock of personnel.
MI discovered daisy chaining of fridge into a wall plug outlet extension that was plugged into the ship's installed electrical outlet at port-side of bar area.
46 CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 April 2025
Resolved 17 April 2025
Resolution: Electrical cords were properly routed to permanently installed outlet.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 April 2025
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/or originating in electrical equipment, and reasonably safe from electrical shock of personnel.
MI discovered daisy chaining of microwave to extension cord to ship's installed outlet at stbd-side bar area.
46 CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 April 2025
Resolved 17 April 2025
Resolution: Electrical cords were properly routed to permanently installed outlet.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 15 April 2024
Resolved
All emergency exits shall be marked on both sides using at least 1-inch letters: "Emergency Exit Keep Clear". Engine room hatches did not have Emergency Exit markings. 185.30-15(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2024
Resolved 24 April 2024
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 15 April 2024
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. Propulsion shafts in engine rooms did not have covers or guards. 177.35-15(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2024
Resolved 24 April 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 March 2022
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] mount is wasted through. 46CFR183.01-15 (a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2022
Resolved 12 April 2022
Resolution: O/O replaced the GENSET mount with new mount.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 28 March 2022
Resolved
Each rescue boat and ring life buoy must be marked with Type II retro-reflective material approved in accordance with 46CFR164.018 or other standard specified by the Commandant. Ring buoy near bridge does not have SOLAS retro-reflective tape.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 April 2022
Resolved 29 March 2022
Resolution: Placed reto-reflective tape on the ring life buoy IAW 46CFR164.018. Item is cleared.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 28 March 2022
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: charts of large enough scale to make ssafe navigation possible. Charts and publications are outdated.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 April 2022
Resolved 4 April 2022
Resolution: Replaced outdated charts and publications with current editions.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 November 2020
Resolved
Rub rails with running tust, water ingress- remove and reseal properly.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 November 2020
Resolved
Stbd forepeak has damaged glass and wood, provide repair plans as marked.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 November 2020
Resolved
Port foreward peak has damaged glass and wood two areas. Provide repairs plan.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 16 November 2020
Resolved
Port engine room, lower aft transverse frame is damaged and has broken glass, provide repiar plan.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 November 2020
Resolved
Replace air hose aft on aftercooler port engine room. Damaged.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 16 November 2020
Resolved
Port and stbd rudder room frames 1 & 2 are damaged and show signs of rot. Provide repair plan.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 16 November 2020
Resolved
Center rudder, transition between demi hulls has water. Remove determine source.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 November 2020
Resolved
Port rudder room has loose or missing grounding straps/wire. For rudder and strut
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 November 2020
Resolved
01 upper deck, stbd handrail cracked about mid ship.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 November 2020
Resolved
STBD void#2 FWD bulkhead to hull delamination on the tab. Sand, Inspect, and repair.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 November 2020
Resolved
Port void #2 FWD bulkhead to hull delamination on tab. Sand, inpect and repair.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 November 2020
Resolved
Port void #2 Aft bulkhead to hull delamination on tab to hull. Sand, inspect, and repair.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 November 2020
Resolved
Port void #3 delamination/ glass cracks in hull as marked. Fwd section and mid section inboard.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2020
Resolved 25 January 2021
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 1 June 2020
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Lifefloat found with fraying grab line and the interior of the lifefloat had damage to the exterior material.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2020
Resolved 4 June 2020
Resolution: Grab line was replaced with new line and damaged interior of lifefloat was patched appropriately.
Engineering › Fuel Oil Service System › Valve, Control
Issued 29 March 2017
Resolved
Replace port side fuel shuitoff wire within 30 days IAW 46 CFR 182.455.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 7 April 2017
Resolution: Vessel rep had replaced the port side fuel cutoff wire with a setup that meets the requirements of 46 CFR 182.455.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 21 March 2016
Resolved
Port generator doesn't shut down when pre-engineered fire extinguisher system is actuated. Repair and demonstrate to attending CG marine inspector of proper function.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2016