Records from 1990 to 1997. Most recent: inspection, 7 June 1997.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 16
7 June 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 404707
7 June 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 775123
2 September 1996
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 200739
2 September 1996
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 766065
7 March 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 388730
7 March 1996
Letter of Compliance (Initial/Renewal)
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 886295
21 October 1994
Type not recorded
No type recorded · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 501382
14 July 1994
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1177590
5 January 1994
Type not recorded
No type recorded · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 468926
5 January 1994
Certificate of Compliance · Letter of Compliance (Initial/Renewal)
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1458127
5 October 1993
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 849963
3 March 1993
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 839756
29 September 1992
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1268163
29 September 1991
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1249484
18 September 1990
Certificate of Compliance
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1238027
17 September 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 339347
Construction/Loadline › Markings › Load Line Mark
Issued 7 June 1997
Resolved
LOAD LINE NOT PAINTED IN CONTRASTING COLOR OF HULL. ILLC ANNEX I/8
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 June 1997
Resolved 1 June 2010
Resolution: Verified Painted Load Line Mark, vessel is going to drydock in July2010.
Fire Fighting
Issued 5 January 1994
Resolved
Renew expended BII portable fire extinguisher on station at cargo transfer manifold prior to transferring cargo.
Condition: Unknown
Due 5 January 1994
Resolved 6 January 1994
Lifesaving
Issued 5 January 1994
Resolved
Relocate portable household-type ladder presently stowed on starboard liferaft embarkation deck in such a manner so as to allow access to liferaft and embarkation deck.
Condition: Unknown
Due 5 January 1994
Resolved 6 January 1994
Documentation
Issued 5 January 1994
Resolved
Provide cognizant OCMI with copy of Class Society survey/report clearing outstanding requirement presently in force on Safety Equipment Certificate issued by DNV.
Condition: Unknown
Due 5 January 1994
Resolved 5 January 1994
Lifesaving
Issued 5 January 1994
Resolved
Properly attach float-free link arrangement on port liferaft painter prior to getting underway.
Condition: Unknown
Due 5 January 1994
Resolved 6 January 1994
Navigation
Issued 29 September 1992
Resolved
PROVE SATISFACTORY OPERATION OF INSTALLED TELEPHONE OR INTERCOM SYSTEM BETWEEN THE BRIDGE AND STEERING GEAR COMPARTMENT TO THE COGNIZANT OCMI AT THE NEXT U.S. PORT.
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Deck/Cargo
Issued 18 September 1990
Resolved
PROVIDE PROOF OF P/V VALVE SETTINGS TO COMPLY WITH 46CFR153.525 PRIOR TO THE NEXT U.S. PORTCALL.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Navigation
Issued 18 September 1990
Resolved
CALIBRATE AND PROVE ACCURACY OF RUDDER ANGLE INDICATOR ON BRIDGE PRIOR TO THE NEXT U.S. PORTCALL IN ACCORDANCE WITH 33CFR164.35(F).
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Navigation
Issued 18 September 1990
Resolved
PROVIDE NON-SKID, GRATING, OR OTHER NON-SLIP SURFACE AROUND STEERING GEAR IN ACCORDANCE WITH SOLAS CHAP. II-1, REG. 29.13 PRIOR TO THE NEXT U.S. PORTCALL.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Navigation
Issued 18 September 1990
Resolved
PROVIDE MANEUVERING INFORMATION ON BRIDGE IN ACCORDANCE WITH 33CFR164.35(G)PRIOR TO THE NEXT U.S. PORTCALL.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Documentation
Issued 18 September 1990
Resolved
PROVIDE A POLLUTION PLACARD IN ACCORDANCE WITH 33CFR155.450 PRIOR TO THE NEXT U.S. PORTCALL.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Documentation
Issued 18 September 1990
Resolved
PROVIDE APPROVED P&A MANUAL ON BOARD PRIOR TO THE NEXT U.S. PORTCALL IN ACCORDANCE WITH 46CFR153.490.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Documentation
Issued 18 September 1990
Resolved
PROVIDE COPIES OF 46 CFR PARTS 35, 150, AND 153 ON BOARD PRIOR TO THE NEXT U.S. PORTCALL IN ACCORDANCE WITH 46CFR153.905.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Deck/Cargo
Issued 18 September 1990
Resolved
REPAIR/CALIBRATE AND PROVE ACCURACY OF CLOSED GAUGING ON CARGO TANKS #2, #3, AND #9 PRIOR TO THE NEXT U.S. PORTCALL.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Accommodation/Occupational Safety
Issued 18 September 1990
Resolved
REPAIR AFT EMERGENCY SHOWER/EYEWASH STATION PRIOR TO THE NEXT U.S. PORTCALL IN ACCORDANCE WITH 46CFR153.216.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Deck/Cargo
Issued 18 September 1990
Resolved
PROVE PROPER OPERATION OF CARGO MONITOR AND CONTROL SYSTEM IN ACCORDANCE WITH 33CFR157.12 PRIOR TO THE NEXT U.S. VOYAGE.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Accommodation/Occupational Safety
Issued 18 September 1990
Resolved
LABEL EMERGENCY SHOWERS IN ACCORDANCE WITH 46CFR153.216 PRIOR TO THE NEXT U.S. VOYAGE.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Deck/Cargo
Issued 18 September 1990
Resolved
LABEL EMERGENCY SHUTDOWN STATIONS IN ACCORDANCE WITH 46CFR153.296 PRIOR TO THE NEXT U.S. PORTCALL.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Deck/Cargo
Issued 18 September 1990
Resolved
PROVIDE A SAFETY EQUIPMENT LOCKER ON CARGO DECK IN ACCORDANCE WITH 46CFR153.215 PRIOR TO THE NEXT U.S. PORTCALL.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Documentation
Issued 17 September 1990
Resolved
VESSEL DID NOT HAVE A POLLUTION PLACARD ON BOARD WHICH IS A VIOLATION OF 33CFR155.450.
Condition: Unknown
Due 17 September 1990
Resolved 17 September 1990
Documentation
Issued 17 September 1990
Resolved
THE VESSEL WAS FOUND CONDUCTING A LOADING OPERATION OF PARAFIN WAX(A GRADE D CARGO) AT EXXON REFINERY, BATON ROUGE WITHOUT A VALID CERTIFICATE OF COMPLIANCE WHICH IS A VIOLATION OF 46USC3711(B)(1)._x001C_ Auth: 46 USC 3711(a) Pen: 46 USC 3718(a)(2)
Condition: Unknown
Due 17 September 1990
Resolved 17 September 1990
Navigation
Issued 17 September 1990
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 17 September 1990
Resolved 17 September 1990
Navigation
Issued 17 September 1990
Resolved
THE VESSEL DID NOT HAVE ON BOARD CHART 11370. WHICH IS A VIOLATION OF 33CFR164.33(A)(1).
Condition: Unknown
Due 17 September 1990
Resolved 17 September 1990