Records from 1990 to 2026. Most recent: inspection, 12 February 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 112
12 February 2026
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 8309893
16 March 2025
In-Service Inspection · Plan Review (Other than "T") · COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8112945
7 January 2025
Underwater Inspection in lieu of Drydock · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8060025
16 July 2024
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7959878
4 April 2024
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7891592
27 March 2024
COI Inspection · MTSA/ISPS Verification · DAPI Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7885572
20 June 2023
Administrative Inspection
Administrative · Activities Europe · Activity 7719673
17 May 2023
Damage Survey
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7690357
15 March 2023
COI Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7651475
3 November 2022
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7591866
27 June 2022
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7488403
21 June 2022
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7495892
13 April 2022
DAPI Audit
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7430810
17 February 2022
MTSA/ISPS Verification · COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7397705
5 January 2022
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7380105
22 November 2021
Damage Survey
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7355487
19 October 2021
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7336381
3 May 2021
Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7187844
1 March 2021
MTSA/ISPS Verification · COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7148323
2 November 2020
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7088271
30 March 2020
COI Inspection · Underwater Inspection in lieu of Drydock · MARPOL Annex IV Survey · MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6933387
30 October 2019
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6846201
27 August 2019
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6796494
17 June 2019
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6812993
7 June 2019
Administrative Inspection
Administrative · Activities Europe · Activity 6717447
5 April 2019
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6659562
15 March 2019
MARPOL Annex IV Survey · MARPOL Annex I Examination · Examination of Repairs · MTSA/ISPS Verification · MARPOL Annex VI Survey · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6643141
27 August 2018
Damage Survey
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6524432
9 April 2018
Deficiency Check · MARPOL Annex I Examination · COI Inspection · DAPI Audit · MARPOL Annex IV Survey · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6387847
22 August 2017
Drydock Exam · Internal Structural Exam · Administrative Inspection · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6249631
28 July 2017
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6223622
25 July 2017
Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6220002
6 July 2017
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6214362
9 March 2017
MTSA/ISPS Verification · Examination of Repairs · COI Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6102391
29 July 2016
Administrative Inspection
Administrative · Activities Europe · Activity 5956461
25 July 2016
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5952714
15 July 2016
Type not recorded
No type recorded · Activities Europe · Activity 5941395
3 June 2016
Excursion Permit
Administrative · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 5899528
31 May 2016
Deficiency Check · In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5893060
19 May 2016
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 5881474
4 April 2016
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 5835103
30 December 2015
In-Service Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 5790313
12 August 2015
Underwater Inspection in lieu of Drydock · Internal Structural Exam
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 5215109
26 June 2014
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 4905414
29 May 2014
Excursion Permit
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 4873452
16 July 2012
Internal Structural Exam · Drydock Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4400199
7 September 2011
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 4138488
12 October 2010
In-Service Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3868907
23 September 2010
In-Service Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3855733
6 May 2009
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3469579
7 July 2008
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3261653
3 April 2008
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 3204612
1 April 2008
MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3168247
27 November 2007
Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3105731
12 July 2007
Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2992540
23 April 2007
Administrative Inspection · COI Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 2911776
22 April 2007
Drydock Extension
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 2919582
6 March 2007
Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 2882812
5 October 2006
In-Service Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 2798931
27 April 2006
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 2634648
10 March 2006
Internal Structural Exam · COI Inspection · Deficiency Check · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 2599918
2 May 2005
MTSA/ISPS Verification
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2347282
26 April 2005
Excursion Permit
Administrative · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2343139
12 April 2005
COI Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2331793
4 April 2005
Underwater Inspection in lieu of Drydock
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2327765
9 February 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2289340
31 January 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2283760
6 October 2004
Internal Structural Exam
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2214651
21 September 2004
Deficiency Check · In-Service Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2200819
24 June 2004
MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2109096
16 April 2004
COI Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2045431
19 March 2004
Excursion Permit
Administrative · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2027301
29 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1996773
8 October 2003
Internal Structural Exam
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1923647
11 May 2003
Type not recorded
No type recorded · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1809433
27 March 2003
COI Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1763923
9 January 2003
Administrative Inspection
Administrative · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1728169
11 July 2002
Internal Structural Exam · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1645459
3 July 2002
Security Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1640674
2 April 2002
COI Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1599885
12 September 2001
Type not recorded
No type recorded · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 34490
7 May 2001
COI Inspection · Drydock Extension
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1415598
10 October 2000
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 823064
2 August 2000
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1053519
12 June 2000
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 819664
3 May 2000
COI Inspection · Excursion Permit
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1379038
22 February 2000
Drydock Extension
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1418665
13 February 2000
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 814939
9 May 1999
Excursion Permit · COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1415159
20 June 1998
Type not recorded
No type recorded · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 163818
23 May 1998
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1429041
5 April 1998
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 790942
30 December 1997
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 215557
4 December 1997
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1386155
21 October 1997
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 780391
21 July 1997
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 779841
3 July 1997
Type not recorded
No type recorded · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 33611
18 June 1997
Examination of Repairs
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1467040
9 June 1997
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1402466
29 May 1997
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1371834
25 February 1994
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 853496
11 March 1993
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 841049
4 November 1992
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1134748
20 May 1992
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1259731
6 May 1992
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1258222
3 March 1992
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 134080
15 February 1992
Hull Examination · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1262515
9 August 1991
Permit to Proceed · Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1244524
22 February 1991
Excursion Permit
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 937286
21 February 1991
Excursion Permit
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 928346
28 August 1990
Hull Examination · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1216288
28 August 1990
Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1229208
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 9 October 2025
No resolution recorded
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification and periodic inspection, and shall include, as applicable, a demonstration of — (1) The proper condition and operation of the survival craft and rescue boat launching appliances at loads ranging from light load to full load. Multiple crew members were required to manipulate falls and remote brake release wires during lowering and retrieval of lifeboats #1 and #4. Additionally, lowering speed of lifeboats is in question which measured at approximately .03 meters per second (6 feet per minute). Demonstrate satisfactory tests of launching appliances to satisfaction of MI prior to vessel operations. 46 CFR 199.45(b), 705c
Action required: 705 - Other - as specified
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 10 July 2025
No resolution recorded
Acceptance of lifesaving appliances and arrangements will remain in effect unless—(1) The OCMI deems their condition to be unsatisfactory or unfit for the service intended. During follow-on inspection, lifeboat davits #2 and #3 were found with falls chaffing against the davit structure as a result of insufficient clearance at the davit pedestal on #2 and aft pad eye bracket where the falls terminate on #3. Due to the observed condition, the following restrictions are applied until repairs are made to the satisfaction of the OMCI:
- Vessel is required to lock/tag out davits #2 and #3 to prevent inadvertent use
- Vessel is limited to carry 186 total persons onboard (including crew)
46 CFR 199.40(f)(1)
Action required: 705 - Other - as specified
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 June 2025
Resolved
Electric installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. Shaft Alley Electric Panel PF411 was not properly secured. Repair to the satisfaction of the MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 10 July 2025
Resolution: Secured panel
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 June 2025
No resolution recorded
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Systems addressed must include fire detection and extinguishing, flooding safety, propulsion, maneuvering, electric power generation and distribution, and emergency internal communications. PSTPs did not match expected operation of the equipment. Update PSTPs and submit for approval within 90 days.
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 June 2025
No resolution recorded
Machinery driving forced-draft and induced-draft fans, fuel-oil transfer pumps, fuel-oil unit and service pumps, and similar fuel-oil pumps must be fitted with remote controls from a readily accessible position outside the space concerned so that the fans or pumps may be stopped in case of fire in the compartment in which they are located. The controls must be suitably protected against accidental operation and against tampering and must be suitably marked. Fuel Oil Purifiers did not have remote stops. Add remote stops prior to credit drydock.
Action required: 705 - Other - as specified
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 June 2025
Resolved
The inspectors will examine all pumps, hose, and other fire apparatus and will see that the hose is subjected to a pressure of 100 pounds to the square inch at each annual inspection and that the hose couplings are securely fastened. Vessel’s emergency fire pump sea water suction remote control valve is inoperable. Repair to satisfaction of MI
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 August 2025
Resolution: Valve repaired
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 June 2025
Resolved
The inspectors will examine all pumps, hose, and other fire apparatus and will see that the hose is subjected to a pressure of 100 pounds to the square inch at each annual inspection and that the hose couplings are securely fastened. Vessel’s fire and general service pump discharge valve does not close due to “valve jamming” error. Repair to satisfaction of MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2025
Resolution: Actuator was replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 June 2025
Resolved
04 remote fuel shutoff valves did not properly close.
- SSDG DFM Day tank #1 High Suction (2-144-1)
- DFM Storage Tank - Transfer (5-47-1)
- HFO Settling Tank - Low Suction (3-144-1)
- HFO Storage Tank - Transfer (3-144-4)
Show proper operation to the attending MI. 46CFR61.20-3(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 June 2025
Resolution: Repaired valves
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 June 2025
Resolved
Life jackets are missing in ECR. Provide proper amount
and type life jackets in the ECR.
46CFR167.35-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 June 2025
Resolution: Lifesaving equipment onboard
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 June 2025
Resolved
During testing of machinery intermittent ground faults were found on 1S and 2S bus. Identify and correct ground faults to the satisfaction of the attending MI.
46CFR111.05-3
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 August 2025
Resolution: Ground discovered and repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 June 2025
Resolved
During M/E testing a cooling water leak was found on the #2 cylinder. Repair leak to the satisfaction of the attending MI.
46CFR58.05-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 June 2025
Resolution: Leak repaired
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 June 2025
Resolved
Space heater found through out the ship improperly wired. Remove all portable space heaters on board the vessel.
46CFR167.40-1(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 June 2025
Resolution: Heaters removed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 June 2025
Resolved
HFO slop pump and sentry alarm system found wired through extension cord to power outlet. Properly wire systems ensuring proper wiring and over current protection.
46CFR167.40-1(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 July 2025
Resolution: Installed wiring
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 June 2025
Resolved
Control light indicators at shaft alley control station do not work. Repair to the satisfaction of the attending MI.
46CFR167.40-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 August 2025
Resolution: Light replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 June 2025
Resolved
Main engine side local panel selector switch not properly labeled to determine local or remote controls selected. Properly label selector switch to the satisfaction of the attending MI.
46CFR167.15-20(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 July 2025
Resolution: Labels installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 June 2025
No resolution recorded
CPP OD box has small leaking coming from fwd and aft seals. Proper repairs to be completed prior to next credit dry dock. Due October 2027
46CFR167.15-25
Action required: 705 - Other - as specified
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 12 June 2025
Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification of the proper condition and operation of lifeboats and rescue boats. The following conditions were observed: Rescue boat #1 has two areas of exposed fiberglass on the hull from damage. Rescue boat #2 was found full of water in all compartments with water was seeping through cracks in the starboard side hull and a leaking sponson. Make authorized repairs to satisfaction of MI. 46 CFR 199.45(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 July 2025
Resolution: Repairs made to rescue boats and vessel found dry.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 12 June 2025
Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification of the proper condition and operation of the survival craft and rescue boat launching appliances. During lowering, lifeboat davits #1 & #3 were noted with seized sheeves on the davit arms. Lifeboat davit #2 was found with a frayed remote brake release wire. Additionally, all lifeboat davit falls and fittings need to be greased. Service launching appliances to satisfaction of MI. 46 CFR 199.45(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2025
Resolution: Davits have been serviced.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 12 June 2025
Resolved
Electric installations and electric equipment must be inspected at the inspection for certification and periodic inspection to determine mechanical and electrical condition and performance. Emergency lighting throughout accommodation spaces was found extinguished. Repair to satisfaction of MI. 46 CFR 110.30-5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 August 2025
Resolution: Bulbs replaced for extinguished emergency lighting.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 12 June 2025
Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification of the proper condition of flotation equipment such as lifebuoys, lifejackets, immersion suits, work vests, lifefloats, buoyant apparatus, and associated equipment. Immersion suits have not been maintained/pressure tested. Test or replace immersion suits to satisfaction of MI. 46 CFR 199.45(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 July 2025
Resolution: Immersion suits pressure tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 June 2025
Resolved
At each inspection for certification and periodic inspection the marine inspector must conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as they feel necessary to check safe operation. During testing, directional control valve for anchor windlass did not stay in the neutral position allowing unintended movement of the anchor with no valve manipulation. Repair to satisfaction of MI. 46 CFR 61.20-3(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 June 2025
Resolution: Witnessed satisfactory test of anchor windlass.
10 - Safety of Navigation › N/A - No Subsystem › Electronic charts (ECDIS)
Issued 12 June 2025
Resolved
No person may operate or cause the operation of a vessel unless the vessel has the marine charts, publications, and equipment as required by §§ 164.33 through 164.41 of this part. Vessel’s electronic charts and publications are not up-to-date. Update charts and publications to satisfaction of MI. 33 CFR 164.30
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2025
Resolution: Charts and pubs updated and loaded onto ECDIS
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 June 2025
Resolved
Piping systems must be installed so that under no condition will the operation of safety or relief valves be impaired. Port side fire main pressure relief valve is broken and a temporary cap/plug has been installed on the discharge piping. Repair valve to satisfaction of MI. 46 CFR 56.50-1(f)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2025
Resolution: Cap removed and new valve installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 12 June 2025
Resolved
Each lifeboat, rigid liferaft, and rescue boat, unless otherwise stated in this paragraph, must carry the equipment listed in this paragraph and specified for it in table 1 to this section under the vessel's category of service. Both rescue boats have expired medical kits. All four lifeboats have expired sea sickness pills. Lifeboat #4 has expired water. Replace expired items to satisfaction of MI. 46 CFR 199.175(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 August 2025
Resolution: Equipment replaced
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 8 May 2024
Resolved
Provide OEM report attesting to repairs of #4 davit, and satisfactory condition of davits 1,2, and 3 to include satisfactory light load testing in the presence of a Coast Guard Marine Inspector.
705: Vessel is restricted to operating on a Lakes, Bays, and Sounds route in the waters of Penobscot Bay.
Action required: 705 - Other - as specified
Due 8 June 2024
Resolved 28 May 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 8 May 2024
Resolved
Reeplace damaged tricing strap on #4 lifeboat.
705: Vessel is restricted to operating on a Lakes, Bays, and Sounds route in the waters of Penobscot Bay.
Action required: 705 - Other - as specified
Due 8 June 2024
Resolved 28 May 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 8 May 2024
Resolved
Provide assessment (OEM) of damage to #4 lifeboat or davit and make report of the same available to attending Marine Inspector.
705: Vessel is restricted to operating on a Lakes, Bays, and Sounds route in the waters of Penobscot Bay.
Action required: 705 - Other - as specified
Due 8 June 2024
Resolved 28 May 2024
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 March 2024
Resolved
Provide an "as built" drawing fire detection system as installed to the USCG Marine Safety Center for review and approval. The submittal shall include a one-line diagram of the detector layout showing the arrangement of all strings and/or loops in the system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2024
Resolved 12 April 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 May 2023
Resolved
At least two of the steering-gear power units on the vessel are in operation when such units are capable of simultaneous operation. Port Steering system failure alarm received on steering stand. Observed that rudder will only turn to starboard on from the steering stand while on port (#2) steering system. Diagnose, correct and test remote port steering system to ensure full operational status. Any movement of vessel crew must monitor the steering system from the local control station in addition to bridge control.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 17 May 2023
Resolved 18 May 2023
Resolution: Received class report attesting to proper repairs. See attached.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 5 April 2023
Resolved
Demonstrate satisfactory launching of the ship's lifeboats from the stowed position. The action shall be performed only by personnel in an assigned billet for that purpose. The lifeboats must be lowered safely and in a timely manner would support a 30 minute launch requirement from an abandon ship signal. Installed equipment must operate without failure and in a manner acceptable to the OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 May 2023
Resolved 10 May 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 5 April 2023
Resolved
Install adequate drain piping where temporary hose is currently installed for deck drains at the forward end of the aft superstructure, port and starboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 5 April 2023
Resolved
Prove operation of telephone in 02 Aft Lounge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 5 April 2023
Resolved
Repair exit light in 02 Aft Lounge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 April 2023
Resolved
Address exposed wiring in Fan room 02-68-0.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 5 April 2023
Resolved
Relocate plywood in focsle so that it does not obstruct access to forepeak access or electrical panels.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 5 April 2023
Resolved
Relocate sterno fuel in 1-60-0 to liquid flammable stores locker.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2023
Resolved 10 May 2023
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 April 2023
Resolved
Install firestop as needed in cableway, overhead in passage 1-75-0 IWO galley door.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 5 April 2023
Resolved
Secure CO2 cylinders in rack from transverse movement (laundry room).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
09 - Working and Living Conditions › 091 - Living Conditions › Furnishings
Issued 5 April 2023
Resolved
Repair broken sink in stateroom 02-118-2.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 5 April 2023
Resolved
Prove operation of damper 1-134-12 in fan room 2-124-2.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
08 - Alarms › N/A - No Subsystem › General alarm
Issued 5 April 2023
Resolved
Provide General Alarm placard in deck lab 2-160-2.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 April 2023
Resolved
Investigate/address unlabeled tagout in feeder panel 6L159 in passage outside stateroom 01-137-2.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 April 2023
Resolved 10 May 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2023
Resolved
Prove operation of followup control panel indicators on steering stand panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 5 April 2023
Resolved
Loosen/free up port side stanchion on 04 level liferaft.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 April 2023
Resolved
Provide Firestop in cable pass through, deck lab 1-160-2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 March 2023
Resolved
Label circuit breaker assignments on panel directory in chart room feeder panel 1L150.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 10 May 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 April 2022
Resolved
Marine Employers shall establish programs for random chemical testing for crew members listed in 46 CFR 16.230, notably those that perform duties and functions of patrolman or watchmen to meet the Coast Guard's 50% requirement. 46 CFR 16.107 allows for requesting a waiver that may lower this percentage for cadets. Initiate a plan for compliance within 30 days and show progress within 90 days to meet this requirement 12 months from the date of this inspection/audit.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2025
Resolved 19 May 2022
Resolution: Marine Employer is on track to meet the requirements for 2022-2023.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 April 2022
Resolved
Marine Employers must submit drug program data required by 49 CFR 40.26 and appendix H of 49 CFR part 40. The Management Information System (MIS) form can be downloaded from:
http://www.uscg.mil/hq/g-m/moa/dapip.htm
This form must be submitted by March 15 every year following the date of this inspection.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 16 August 2022
Resolution: Marine Employer has provided sufficient information to prove they will meet DAPI requirements for this period.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 22 November 2021
Resolved
The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of this chapter.
Drain piping from main deck scuttle drain found to have two small holes, resulting in an intake of water in unassigned space 2-104-1. One hole is located 12 inches above overboard penetration and the other located just below the same penetration at the weld.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2021
Resolved 8 February 2022
Resolution: Attended vessel. Witnessed and tested satisfactory repair of drain pipe.
10 - Safety of Navigation › N/A - No Subsystem › Speed and distance indicator
Issued 19 October 2021
Resolved
Make repairs to transducer and prove operation of the doppler speed log unit. Deficiency to be corrected not later than completion of the next credit Drydock.
Action required: 705 - Other - as specified
Due 28 February 2023
Resolved 3 April 2023
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 25 March 2021
Resolved
Swing Compass/Update deviation card.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2021
Resolved 3 May 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 March 2021
Resolved
Provide proper lock/tagout for CB10, fan room 02-68-0. Also, panel cover cannot be closed with that lock in place.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2021
Resolved 8 April 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 25 March 2021
Resolved
Repair delaminated seat on lifeboat #2.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2021
Resolved 14 April 2021
08 - Alarms › N/A - No Subsystem › Closing water-tight doors alarm
Issued 25 March 2021
Resolved
Prove operation of of fwd proximity switch on 2-86-0 (WTD alarm).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2021
Resolved 8 April 2021
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 25 March 2021
Resolved
Install missing bolts on manhole cover in storeroom 3-75-2 (Macerator Access).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2021
Resolved 8 April 2021
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 March 2021
Resolved
Provide clear access to exits from Coasl Room (locks, vidmar cabinet).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2021
Resolved 8 April 2021
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 August 2019
Resolved
The installed Fire Detection system is comprised of components from three different systems and is not installed IAW Type Approval Documents. Prove that the system is approved and complies with Type Approval Documentation. Any proposals for a new system or modfications to the existing system are to be reviewed and approved by Marine Safety Center. Deficiency is to be corrected no later than completion of the next credit drydock.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2022
Resolved 26 March 2024
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 7 June 2019
Resolved
the vessel's port steering system has experienced an episode of port rudder angle being applied without any helm command given.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2019
Resolved 20 June 2019
Resolution: ABS witnessed sat steering test after renewal of follow up amplifier board.
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (air motor)
Issued 25 July 2017
Resolved
Maine Engine Clutch is not engaging when prompted. Vessel system is being operated with a by-pass to the clutch and manual governer actuation.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 July 2017
Resolved 28 July 2017
Resolution: Vessel rep. repaired the air system feeding the M/E clutch. Clutch and air system satisfactory tested.
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 8 May 2017
Resolved
Test Exhaust Gas Boiler operation and safeties once the vsl goes u/w.
Action required: 705 - Other - as specified
Due 8 June 2017
Resolved 12 May 2017
Resolution: Boiler tested by the C/E, all SAT.
Operations/Management › Drug and Alcohol Testing › Testing, Serious Marine Incident
Issued 29 July 2016
Resolved
Conduct drug and alcohol program (DAPI) audit within 30 days of vessel return to homeport.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 October 2016
Resolved 29 August 2016
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder Head
Issued 31 May 2016
Resolved
See MISLE Act #5881474
Due 31 May 2016
Resolved 31 May 2016
Resolution: Rcvd ABS Class report. See attached documents.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder Head
Issued 19 May 2016
Resolved
Make repairs to the broken head bolt on the #4 main engine cylinder.
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 26 July 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 April 2016
Resolved
Repair cable sheathing on sideshell floodlights where needed.
Action required: 705 - Other - as specified
Due 9 June 2016
Resolved 16 May 2016
Resolution: Chief Mate provided photos of repaired cable sheathing.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 12 August 2015
Resolved
Make UWILD reference marks permanent either by stamping/punching or welding.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 24 June 2019
Construction/Loadline › Penetrations › Valve Flange
Issued 12 August 2015
Resolved
Provide a means to blank sea chest valves to allow for inspection during UWILD surveys.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 24 June 2019
Fire Fighting › Fire Main › Pressure
Issued 21 August 2012
Resolved
No operation of MSD tank wash system until Coast Guard Marine Inspector witnesses satisfactory fire main hose test w/ 2 hoses.
Action required: 705 - Other - as specified
Resolved 5 October 2012
Resolution: Completed operation test of tank washing system with fire main system and two hoses. Test satisfactory.
Operations/Management › Vessel Safety Management › Safety/Environmental Protection Policy
Issued 23 April 2007
Resolved
Provide IMO Markings IAW 46 CFR199.178
Due 31 December 2007
Resolved 31 March 2009
Resolution: Placards have been posted throughout the ship.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 23 April 2007
Resolved
Replace corroded Flush deck hatch covers (2) on fantail.
Due 8 October 2007
Resolved 15 August 2007
Stability › Watertight Integrity › Weathertight Enclosure
Issued 23 April 2007
Resolved
Replace corroded flush deck scuttle hatch 01-13-2 / 01-45-2.
Due 8 October 2007
Resolved 15 August 2007
Navigation › Piloting/Steering › Magnetic Compass
Issued 23 April 2007
Resolved
Provide updated deviation table.
Due 8 October 2007
Resolved 27 November 2007
Resolution: Attended Vessel. Deviation table on board and updated.
Electrical › Electrical Distribution System (emergency) › Cable
Issued 23 April 2007
Resolved
Provide proper electrical connection for 24VDC radio charging installation in Nav room.
Due 8 October 2007
Resolved 15 August 2007
Deck/Cargo › Cargo Transfer (solid) › General
Issued 23 April 2007
Resolved
Provide static load test of stores handling gear.
Due 8 October 2007
Resolved 27 November 2007
Resolution: Attended vessel. Chief provided statement of fact that handling gear was tested.
Communications › Internal Communications System › Sound-powered Telephone
Issued 23 April 2007
Resolved
Mount SPP handset on stern.
Due 8 October 2007
Resolved 27 November 2007
Resolution: Attended vessel. SPP is mounted and was tested satisfcatory.
Electrical › Electrical Distribution System (service) › Wiring
Issued 23 April 2007
Resolved
Remove extension cord / Provide proper electrical box for medical ward freezer.
Due 8 October 2007
Resolved 15 August 2007
Engineering › Bilge Water Management System › Pump
Issued 23 April 2007
Resolved
Prove proper operation of the new OWS.
Due 31 December 2007
Resolved 1 May 2008
Resolution: New OWS is now fully operational and was tested satisfcatory.
Fire Fighting › Fire Pumps › Pressure
Issued 23 April 2007
Resolved
Provide suction/discharge pressure gauges at the local station for emergency fire pump.
Due 8 October 2007
Resolved 15 August 2007
Construction/Loadline › Hull › Stiffener
Issued 23 April 2007
Resolved
Replace expansion joints as needed in engine room.
Due 8 October 2007
Resolved 15 August 2007
Engineering › Steering Gear System › Valve
Issued 23 April 2007
Resolved
Replace/repair bottom sight glass valve on port steering reservoir.
Due 31 December 2007
Resolved 1 May 2008
Resolution: Sight glass is in place.
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 23 April 2007
Resolved
Tighten packing on emergency fire pump discharge valve.
Due 8 October 2007
Resolved 15 August 2007
Stability › Incline Test › General
Issued 10 March 2006
Resolved
Provide documentation of the changes of equipment, general arrangements, and added configurations that include estimated weight changes throughout the ship.
Condition: Unknown
Due 16 April 2007
Resolved 6 March 2007
Resolution: A comprehensive report has been received and all changes noted.
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 10 March 2006
Resolved
Prove proper operation of leaking steam line in engine lab 2-158-0 and replace missing SFP insulation.
Due 16 May 2006
Resolved 4 May 2006
Electrical › Lighting (service) › Lighting Fixture
Issued 10 March 2006
Resolved
Provide new cage and renew cracked glass on hazardous location light for below deck paint storage.
Condition: Improper Installation
Due 1 August 2006
Resolved 4 May 2006
Operations/Management › Ballast Water Managment › Mandatory Practices
Issued 10 March 2006
Resolved
Implement ballast water plan IAW NVIC 07-04
Action required: 705 - Other - as specified
Resolved 27 November 2007
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 10 March 2006
Resolved
Provide documentation proving proper operation of second (redundant) GE monitor in the EOS which showing alarms and indicators of auxiliary equipment in machinery spaces.
Action required: 705 - Other - as specified
Due 15 August 2006
Resolved 4 May 2006
Fire Fighting › Means of Escape › Doorways
Issued 12 April 2005
Resolved
Provide holdback for "Open in" entry door of Halon room.
Due 29 July 2005
Resolved 27 June 2005
Resolution: ok
Fire Fighting › Structural - A Class Divisions › Corridors
Issued 12 April 2005
Resolved
Repair frame on MVZ fire screen door on frame 1-120-0
Due 1 July 2005
Resolved 27 June 2005
Resolution: ok
Fire Fighting › Structural - A Class Divisions › Aux Spaces (little/no fire risk)
Issued 12 April 2005
Resolved
Repair fire stop in cable trunk run from 01 to 04 level in forward house.
Due 29 July 2005
Resolved 27 June 2005
Resolution: ok
Electrical › Lighting (emergency) › Lighting Fixture
Issued 12 April 2005
Resolved
Complete electrical worklist.
Due 29 July 2005
Resolved 27 June 2005
Resolution: ok
Pollution Prevention/Response › Response Equipment › Emulsifiers
Issued 12 April 2005
Resolved
Provide USCG approved vessel response plan.
Due 28 April 2006
Resolved 27 November 2007
Resolution: Attended vessel. Chief produced documentation that vessel is in compliance.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 16 April 2004
Resolved
INVESTIGATE REASON FOR NO EMERGENCY BATTERY LIGHTING IN LOWER ENGINE ROOM LEVEL.
Action required: 705 - Other - as specified
Due 10 July 2004
Resolved 20 September 2004
Electrical › Lighting (emergency) › Lighting Fixture
Issued 16 April 2004
Resolved
MAKE OPERABLE THE FOLLOWING EMERGENCY LIGHTS: 2-87-1, 2-95-1, 2-94-0, 2-88-0 (MISSING), 3-97-2, 3-91-2 (OVERHEAD LIGHT), 4-75-01 (EXIT), 3-76-0 (EXIT), 2 YELLOW LIGHTS IN WEIGHT ROOM.
Action required: 705 - Other - as specified
Due 10 July 2004
Resolved 20 September 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 April 2004
Resolved
HARD-WIRE DECK CRANE, IN DIESEL FILTER INTAKE ROOM.
Action required: 705 - Other - as specified
Due 10 July 2004
Resolved 20 September 2004
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 16 April 2004
Resolved
MAKE OPERABLE ELECTRIC FIRE DAMPER CKT C-SH51 NEAR STAIR TOWER #1 DOOR 1-55-0.
Action required: 705 - Other - as specified
Resolved 20 September 2004
Electrical › Electrical Distribution System (service) › Panelboard
Issued 16 April 2004
Resolved
DEVELOP A MAIN SWITCHBOARD ELECTRICAL SHUTDOWN PROCEDURE FOR SHIPBOARD GENERAL EMERGENCIES.
Action required: 705 - Other - as specified
Due 10 July 2004
Resolved 20 September 2004
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 2 April 2002
Resolved
Corrected during the inspection.
Condition: Unknown
Due 19 April 2002
Resolved 19 April 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 2 April 2002
Resolved
Visual alarm indicator in the machinery spaces was not operational. Corrected during the inspection. LEGACY COMPONENT DESC: Alarms
Condition: Unknown
Due 19 April 2002
Resolved 19 April 2002
Engineering › Pressure Vessel › Relief Valve
Issued 2 April 2002
Resolved
Service air relief valve was not properly set to the MAWP of the air receiver. Corrected during the inspection.
Due 19 April 2002
Resolved 19 April 2002
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 2 April 2002
Resolved
Small sections of SFP insulation missing in machinery space overhead to facilitate hoisting equipment. Corrected during the inspection.
Condition: Damaged By Earlier Event
Due 19 April 2002
Resolved 19 April 2002
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 2 April 2002
Resolved
One set of automatic louver vent closures were not operatble in the emergengcy generator space. Corrected during the inspection.
Condition: Improper/Lack of Maintenance
Due 19 April 2002
Resolved 19 April 2002
Fire Fighting › Fire Pumps
Issued 2 April 2002
Resolved
Fire pump pressure indicator in main control, fire control and bridge were not operating properly. Corrected during the inspection. LEGACY COMPONENT DESC: Pressure indicator
Condition: Unknown
Due 19 April 2002
Resolved 19 April 2002
Engineering
Issued 10 October 2000
Resolved
REPAIR THE LOCAL LUBE OIL TEMPERTURE GAUGE ON THE #1 SSDG.
Condition: Unknown
Due 10 October 2000
Resolved 10 October 2000
Electrical
Issued 2 August 2000
Resolved
Repair the local lube oil temperature gauge on the #1 SSDG.
Condition: Unknown
Due 2 August 2000
Resolved 2 August 2000
Engineering
Issued 12 June 2000
Resolved
MAKE PERMANENT REPAIRS TO MDE FUEL SYSTEMS.
Condition: Unknown
Due 12 July 2000
Resolved 12 July 2000
Engineering
Issued 3 May 2000
Resolved
Update procedure MEP-111 and E109, provide change.
Condition: Unknown
Due 7 May 2000
Resolved 3 May 2000
Electrical
Issued 3 May 2000
Resolved
#1SSG: install a latch on the protective cover, repair the local lube oil temp gauge, install glass on the cover's gauge.
Condition: Unknown
Due 3 May 2000
Resolved 3 May 2000
Electrical
Issued 3 May 2000
Resolved
label all ssdg local panel "emergency stops"
Condition: Unknown
Due 7 May 2000
Resolved 10 May 2000
Navigation
Issued 3 May 2000
Resolved
repair steering system alarm system.
Condition: Unknown
Due 7 May 2000
Resolved 3 May 2000
Engineering
Issued 3 May 2000
Resolved
Investigate use of password to protect console operating system.
Condition: Unknown
Due 7 May 2000
Resolved 3 May 2000
Engineering
Issued 3 May 2000
Resolved
Fix auxialiary boiler hand relief gear.
Condition: Unknown
Due 3 May 2000
Resolved 3 May 2000
Engineering
Issued 3 May 2000
Resolved
repair Siemens GUI/operating system problems with MDE.
Condition: Unknown
Due 7 May 2000
Resolved 10 May 2000
Engineering
Issued 3 May 2000
Resolved
renew bolts on air flask relief valves with ASTM A307 or equivalent. will require written spec or proof that these bolts meet or exceed this spec.
Condition: Unknown
Due 7 May 2000
Resolved 3 May 2000
Engineering
Issued 3 May 2000
Resolved
fix auxiliary boiler low and low\low water alarms.
Condition: Unknown
Due 7 May 2000
Resolved 3 May 2000
Engineering
Issued 3 May 2000
Resolved
repair fuel shutdown valves, mde supply daytank and 2-144-3 daytank valve.
Condition: Unknown
Due 7 May 2000
Resolved 3 May 2000
Accommodation/Occupational Safety
Issued 9 May 1999
Resolved
Mount special tool box to deck.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Engineering
Issued 9 May 1999
Resolved
Attach correct flanges to MDE jacket water lines.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Accommodation/Occupational Safety
Issued 9 May 1999
Resolved
Stow all loose equipment (missile hazards).
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Engineering
Issued 9 May 1999
Resolved
Submit report on relief pressure test of exhaust boiler and hand relieving gear.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 9 May 1999
Resolved
Provide required lifeboat provisions.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 9 May 1999
Resolved
Renew EPIRB batteries.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 9 May 1999
Resolved
Renew EPIRB hydrostatic releases.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Fire Fighting
Issued 9 May 1999
Resolved
Provide results of foam test.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 9 May 1999
Resolved
Renew SART batteries.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Fire Fighting
Issued 9 May 1999
Resolved
Prove proper operation of main Halon time delay.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Fire Fighting
Issued 9 May 1999
Resolved
Provide full Halon bottle for main system.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Navigation
Issued 9 May 1999
Resolved
Prove proper operation of starboard searchlight.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Construction/Loadline
Issued 9 May 1999
Resolved
Make all watertight doors watertight.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Navigation
Issued 9 May 1999
Resolved
Prove proper operation of range light.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 9 May 1999
Resolved
Conduct weight test on lifeboats #2, #3, #4.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Electrical
Issued 9 May 1999
Resolved
Correct incorrect relay identified in test procedure E409.
Condition: Unknown
Due 9 June 1999
Resolved 21 June 1999
Fire Fighting
Issued 9 May 1999
Resolved
Service fire extinguishers in DC lockers.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Fire Fighting
Issued 9 May 1999
Resolved
Renew lights on panels in fire control room.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Navigation
Issued 9 May 1999
Resolved
Correct charts and pubs.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Fire Fighting
Issued 9 May 1999
Resolved
Provide evidence that all fire stations have been tested.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Accommodation/Occupational Safety
Issued 9 May 1999
Resolved
Replace light in 4-47-0 trunk.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Electrical
Issued 9 May 1999
Resolved
Remove dead ended wires in mission wireway.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Accommodation/Occupational Safety
Issued 9 May 1999
Resolved
Provide emergency exits from ship's sotrerrom and classrom 3075-1. Spaces may not be used by shp's personnel until cleared.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Electrical
Issued 9 May 1999
Resolved
Prove proper operation of emergency light (2-87-1).
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Electrical
Issued 9 May 1999
Resolved
Prove proper operation of emergency exit sign between 2-75-0 and 2-79-1.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Fire Fighting
Issued 9 May 1999
Resolved
Prove operation of remote ventilation shutdowns.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Accommodation/Occupational Safety
Issued 9 May 1999
Resolved
Install /repair laggin at evap #10 steam station, HFO heating units and piping, MDE stack and hotwell for the boiler.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Engineering
Issued 9 May 1999
Resolved
Prove proper operation of boiler hand relieving gear.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Electrical
Issued 9 May 1999
Resolved
Prove operation of SSDG reverse power relays.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Accommodation/Occupational Safety
Issued 9 May 1999
Resolved
Mount #1 evap to deck.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 23 May 1998
Resolved
Conduct fire and boat drill in presence of USCG marine inpsector.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Lifesaving
Issued 23 May 1998
Resolved
Prove proper operation of motor lifeboats, fire doors, power operated WTD's, emergency lighting, steering gear, and anchoring equipment.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Lifesaving
Issued 23 May 1998
Resolved
Conduct maximum weight test of port side lifeboat releasing gear.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Fire Fighting
Issued 23 May 1998
Resolved
Remove loose gear/combustibles from fan rooms.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Accommodation/Occupational Safety
Issued 23 May 1998
Resolved
Clean lint from laundry room screens.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Engineering
Issued 23 May 1998
Resolved
Repair aux s/w cooling pump and prove operation.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Engineering
Issued 23 May 1998
Resolved
Repair air leak emergency fuel shutdown 3-116-1.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Accommodation/Occupational Safety
Issued 23 May 1998
Resolved
Repair bent elbow reefer recovery unit s/w cooling inlet.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Deck/Cargo
Issued 23 May 1998
Resolved
Immobilize and repair engine room overhead crane.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Fire Fighting
Issued 23 May 1998
Resolved
provide proper extinguisher or bracket for fe103 4-109-2.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Lifesaving
Issued 23 May 1998
Resolved
Remove all paint and hazmat from repair shop.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Engineering
Issued 23 May 1998
Resolved
test relief valves 02 air flasks on lower level.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Accommodation/Occupational Safety
Issued 23 May 1998
Resolved
Install rail behind #2 lp air compressor.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Lifesaving
Issued 23 May 1998
Resolved
Install guards both sanitary salt water pumps.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Engineering
Issued 23 May 1998
Resolved
Test both steam relief valves. Notify CWO whitten of waste heat relief and reset pressure.
Condition: Unknown
Due 23 May 1998
Resolved 18 November 1998
Lifesaving
Issued 23 May 1998
Resolved
Prove proper operation of limit switch on boat #3.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Construction/Loadline
Issued 23 May 1998
Resolved
Prove proper operation of watertight doors #2-75-2 and engine room on deck.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Engineering
Issued 23 May 1998
Resolved
Renew flame screen on starboard fuel oil vent header.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Electrical
Issued 23 May 1998
Resolved
Secure electrical outlet in engineering lab space, #2 deck.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Lifesaving
Issued 23 May 1998
Resolved
Provide liferaft certificates.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Documentation
Issued 23 May 1998
Resolved
Provide valid loadline certificate.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Fire Fighting
Issued 23 May 1998
Resolved
Replace 60 second time delay on main halon system.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Fire Fighting
Issued 23 May 1998
Resolved
Prove proper operation of fire dampers 1-135-3, 2-62-0.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Accommodation/Occupational Safety
Issued 23 May 1998
Resolved
Repair leaking valve in electrical room, 1-81-1.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Lifesaving
Issued 23 May 1998
Resolved
Provide TPA's for 288 persons.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Fire Fighting
Issued 4 December 1997
Resolved
renew seal on main fire and ballast pump.
Condition: Unknown
Due 29 December 1997
Resolved 26 December 1997
Engineering
Issued 4 December 1997
Resolved
prove proper operation of main motor speed control from the bridge.
Condition: Unknown
Due 29 December 1997
Resolved 26 December 1997
Engineering
Issued 18 June 1997
Resolved
conduct repairs to main diesel engine to satisfaction of attending marine inspector and in compliance MSO Portland COTP order 08-97.
Condition: Unknown
Due 9 July 1997
Resolved 24 October 1997
Unknown
Issued 9 June 1997
Resolved
SATISFY ALL REQUIREMENTS CONTAINED IN PARAGRAPHS 3 AND 6 OF ABS LETTER DATED 10 JUN 1997 ADDRESSED TO [name withheld] ROADS.
Condition: Unknown
Due 9 June 1997
Resolved 9 June 1997
Navigation
Issued 29 May 1997
Resolved
PROVIDE ONBOARD A CURRENT MAGNETIC COMPASS DEVIATION CARD IAW 33 CFR 164.35.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Navigation
Issued 29 May 1997
Resolved
PROVE PROPER OPERATION OF GYRO REPEATER IN STEERING GEAR ROOM IAW 46 CFR 58.25-25(a).
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Lifesaving
Issued 29 May 1997
Resolved
PROVIDE NON-PERMANENT ONLY MEANS OF PRESSURIZING THE HYDROPNEUMATIC TANK INWAY OF BATTERY ROOM IAW 46 CFR 54.01-15(a)(1).
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Fire Fighting
Issued 29 May 1997
Resolved
PRIOR TO SAILING ON A SCHEDULED UNDERGRADUATE CRUISE, ITEMS "K" & "L" OF PARAGRAPH 4 OF ABS LETTER "MODIFICATION PROJECT AT COLONNA'S SHIPYARD" DATED 28MAY97 MUST BE CORRECTED.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Engineering
Issued 29 May 1997
Resolved
DURING SEA TRIALS, SET SAFETIES ON NEW WASTE HEAT BOILER, & RECORD THE SET & RESEAT PRESSURES IN THE MACHINERY LOG. MAKE LOG AVAILABLE TO MARINE INSPECTORS UPON ARRIVAL AT CASTINE, ME FOR PURPOSES OF SEALING THE SAFETIES.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Documentation
Issued 29 May 1997
Resolved
PROVIDE ONBOARD OIL TRANSFER PROCEDURES IAW 33 CFR 155.750.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Electrical
Issued 29 May 1997
Resolved
PROVIDE EMERGENCY LIGHT IN WAY OF MAIN DIESEL ENGINE LOCAL CONTROL STATION IAW 46 CFR 111.75-15(b).
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Fire Fighting
Issued 29 May 1997
Resolved
CORRECT DEFICIENCES & PROVE PROPER OPERATION OF PYROTRONICS FIRE & SMOKE DETECTOR PANEL IN WHEELHOUSE.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Documentation
Issued 29 May 1997
Resolved
RESOLVE ALL COMMENTS IN ABS LETTER DTD 28MAY97 "MODIFICATION PROJECT AT COLONNA'S SHIPYARD", PARAGRAPH 3 TO THE SATISFACTION OF THE OCMI.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Documentation
Issued 29 May 1997
Resolved
SATISFY ALL REQUIREMENTS IN PARAGRAPH 4 OF ABS LETTER DTD 28MAY97 "MODIFICATION PROJECT AT COLONNA'S SHIPYARD" TO THE SATISFACTION OF THE OCMI.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Accommodation/Occupational Safety
Issued 29 May 1997
Resolved
BERTHING AREA 2-75-4 MAY NOT BE USED UNTIL ITEM #2 OF ABS LETTER 555- 6251442 DATED 22MAY97 IS RESOLVED.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Navigation
Issued 29 May 1997
Resolved
PROVIDE ONBOARD A CURRENT MANEUVERING INFORMATION FACT SHEET IAW 33 CFR 164.35.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Documentation
Issued 11 March 1993
Resolved
SUBMIT FOR USCG APPROVAL ALL REQUIRED PLANS IAW 46 CFR 189.55-5 AND PROVIDESAME ONBOARD.
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Documentation
Issued 11 March 1993
Resolved
PROVIDE ONBOARD VALID FCC RADIO STATION LICENSE.
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Engineering
Issued 11 March 1993
Resolved
PROVE PROPER OPERATION OF AUXILLARY BOILER LOW LOW WATER SHUTDOWN, RESULTS OF TEST, COPY OF LOG ENTRY, [name withheld] WILL CLEAR THISITEM. SIGNED STATEMENT BY MASTER WILL CLEAR ITEMS 1-5. SUBMIT TO MARINE INSPECTION OFFICE NEW YORK.
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Lifesaving
Issued 11 March 1993
Resolved
PROVIDE REPLACEMENT LIFEBOAT MILK FOR ALL LIFEBOATS PRIOR TO SAILING.
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Construction/Loadline
Issued 11 March 1993
Resolved
COMPLETE INSTALLATION OF WATERTIGHT DOORS ON UPPER DECK HOUSE PRIOR TO SAILING.
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Lifesaving
Issued 11 March 1993
Resolved
PROVIDE REPLACEMENT LIFEBOAT WATER FOR UNSATISFACTORY CANS OF WATER BUT LEAVE EXISTING CANS OF WATER ONBOARD LIFEBOAT UNTIL ACTUALLY REPLACED.
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Documentation
Issued 15 February 1992
Resolved
PROVIDE MSO MOBILE WITH AN APPROVED DRAWING FOR CO2 SYSTEM INSTALLATION IN AFT HAZARDOUS MATERIAL LOCKER._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 February 1992
Resolved 15 February 1992
Engineering
Issued 9 August 1991
Resolved
SUBMIT FOR REVIEW A DETAILED SURVEY OF ALL RELATED FIRE DAMAGE TO ENGINE ROOM INCONJUNCTION WITH AREPAIR PROPOSAL.
Condition: Unknown
Due 9 August 1991
Resolved 9 August 1991