Records from 1990 to 2005. Most recent: inspection, 26 May 2005.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 13
26 May 2005
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2369144
1 February 2005
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2284810
14 January 2005
COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2274780
22 September 1993
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1150671
3 April 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 444470
21 October 1992
Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 945417
31 August 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 352853
13 April 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 459604
24 October 1991
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1246657
21 October 1991
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 346835
21 October 1991
Certificate of Compliance
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 944137
15 January 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 501833
25 October 1990
Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1231738
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 January 2005
Resolved
Guards for emergency generator's fan and belts are missing.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 February 2005
Resolved 25 May 2005
Resolution: Class report states: Guards for emergency generator fan and belt fitted
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 14 January 2005
Resolved
Provide visual and audible cargo deck overfill alarm.
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 February 2005
Resolved 25 May 2005
Resolution: [name withheld] states: New Omnicrom high level and overfill alarm fitted for all cargo tanks, complete installation; including visual and audiable alarms tested and found in order
Engineering › Steam System (auxiliary) › Piping
Issued 14 January 2005
Resolved
Repair leaking steam line valve for cargo heating, located in engine room near cargo pumps.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2005
Resolved 25 May 2005
Resolution: [name withheld] states: Minor steam leaks of various valves repaired, all boiler valves brought ashore, overhauled and pressure tested.
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 14 January 2005
Resolved
Make permanent repairs to emergency fire pump strainer currently repaired by softpatch.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 February 2005
Resolved 25 May 2005
Resolution: [name withheld] states:Strainer box before emergency fire pump renewed.
Construction/Loadline › Structures › Scuttle
Issued 14 January 2005
Resolved
Make watertight hatch in overhead of steering gear room watertight
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 February 2005
Resolved 25 May 2005
Resolution: [name withheld] states:watertight hatch in steering gear compartment deckhead, new packing fitted and hatch verified watertight.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 14 January 2005
Resolved
Assess bulkhead corrison behind metal sheeting and insulation for fuel tank 20 iaw SOLAS II-1/3.1
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 February 2005
Resolved 25 May 2005
Resolution: [name withheld] states:As requested by master possible bulkhead corrosion of fuel tank no 20 investigated. After removing of insulation, bulkhead close up inspected and found in order.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 14 January 2005
Resolved
Provide class report attesting to repairs on deck water seal
Action required: 705 - Other - as specified
Due 1 February 2005
Resolved 25 May 2005
Resolution: Deck water seal opened up for inspection, temporarily repairs made permanent by inserts and local pits welded up, internally complete seal recoated after repair.
Deck/Cargo
Issued 21 October 1992
Resolved
PRIOR TO RETURNING TO U.S. WATERS, PROVIDE PROPER PROOF OF CARGO PIPE HYDROSTATIC TESTING IN ACCORDANCE WITH 33 CFR 156.170 AND STENCIL CARGO PIPING.
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Engineering
Issued 21 October 1991
Resolved
PROVE POPER OPERATION OF OIL WATER SEPERATOR ON ARRIVAL NEXT U.S. PORT
Condition: Unknown
Due 5 May 1992
Resolved 5 May 1992
Deck/Cargo
Issued 21 October 1991
Resolved
RENEW FLAME SCREENS FOR P.V. VALVES FOR TANKS #4 C.C.T. AND #3 C.C.T. TO BECOMPLETED ON ARRIVAL NEXT U.S. PORT.
Condition: Unknown
Due 5 May 1992
Resolved 5 May 1992
Deck/Cargo
Issued 21 October 1991
Resolved
RENEW FLAME SCREENS FOR P.V. VALVES FOR TANKS #4 C.C.T AND #3 C.C.T, TO BE COMPLETED ON ARRIVAL NEXT U.S. PORT.
Condition: Unknown
Due 21 October 1991
Resolved 21 October 1991
Engineering
Issued 21 October 1991
Resolved
PROVE PROPER OPERATION OF OIL WATER SEPERATOR ON ARRIVAL NEXT U.S. PORT.
Condition: Unknown
Due 21 October 1991
Resolved 21 October 1991