Records from 2005 to 2026. Most recent: inspection, 8 January 2026.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 January 2026
Resolved
Independent fuel tanks must be designed and constructed as to meet material and construction standards. MI observed fuel tank in bow thruster room containing diesel without documentation specifying the standard to which the tank meets. Provide evidence of the standard for the fuel tank.
46CFR182.440(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2026
Resolved 29 April 2026
Resolution: New tank installed to the satisfaction of USCG Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 8 January 2026
Resolved
Each floating waterlight must be approved in accordance with subchapter Q. MI observed floating waterlight attached to ring buoy with unapproved battery installation. Unapproved Alkaline batteries must be removed and the specified Lithium Batteries must be installed.
46CFR180.70(d)(1)
Action required: 10 - Deficiency Rectified
Resolved 8 January 2026
Resolution: Batteries replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 January 2026
Resolved
Electrical equipment must be installed and maintained to Protect passengers, crew, other persons, and the vessel from electrical hazards. MI observed stbd fwd deck light on top of pilot house allowing water intrusion affecting wiring inside junction box.
46CFR183.200
Action required: 10 - Deficiency Rectified
Resolved 8 January 2026
Resolution: Replaced light.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 8 January 2026
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. MI observed raw water leak on No. 2 generator. Repair leak.
46CFR182.100
Action required: 10 - Deficiency Rectified
Resolved 8 January 2026
Resolution: Tightened bleed screw.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 8 January 2026
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. MI observed oil leak on Stbd engine at oil filters. Repair leak.
46CFR182.100
Action required: 10 - Deficiency Rectified
Resolved 8 January 2026
Resolution: Replaced filters.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 8 January 2026
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. MI observed fuel leak on Port engine. Repair leak.
46CFR182.100
Action required: 10 - Deficiency Rectified
Resolved 8 January 2026
Resolution: Tightened nut.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 January 2025
Resolved
46CFR185.604(h)
705 c
Each life jacket must be marked with Type I retro reflective material approved in 46 CFR 164.018. Inspector observed 6 adult and 01 child life jackets not sufficiently marked with retro reflective tape. Passenger count reduced until resolved.
Action required: 705 - Other - as specified
Due 15 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 January 2025
Resolved
46CFR176.808(a)(2)
705c
At each initial and subsequent inspection for certification of a vessel, the owner shall be prepared to have the vessel ready for inspection of lifesaving equipment and systems, including inspection of each marine buoyant device. Inspector observed improper installation of mounting bracket to secure water light.
Action required: 705 - Other - as specified
Due 15 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 January 2025
Resolved
46CFR185.604(i)
705c
Each rescue boat and ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018. Inspector observed missing retroreflective material.
Action required: 705 - Other - as specified
Due 15 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2025
Resolved
46CFR176.804(c)
16c
At each subsequent inspection for certification, the owner shall be prepared to have the vessel ready for inspections of machinery, fuel, and piping systems, including inspection of all machinery essential to the routine operation of the vessel including generators. Inspector observed raw water hose cracking on fwd generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2025
Resolved
46CFR176.800(a)
16c
Machinery, equipment, materials, and arrangements may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Inspector observed STBD MDE fuel supply line corroded and requires replacement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2025
Resolved
46CFR176.800(a)
16c
Machinery, equipment, materials, and arrangements may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Inspector observed exhaust manifold missing bolt.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2025
Resolved
46cfr176.800(a)
16c
Machinery, equipment, materials, and arrangements may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Inspector observed port MDE fuel filter housing not properly attached.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2025
Resolved
46CFR179.320(c)
16c
A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Inspector observer penetration in bulkhead not watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2025
Resolved
46CFR176.800(a)
16c
Machinery, equipment, materials, and arrangements may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Inspector observed engine room house keeping not IAW good marine practice.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 28 January 2025
Resolution: Engineroom has been cleaned and is in satisfactory condition.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 8 January 2025
Resolved
46CFR183.410(c)(1)
16c
Each fixture must comply with § 183.200. Inspector observed light fixture not operational.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 14 January 2025
Resolution: Received picture from vessel rep, all sat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 8 January 2025
Resolved
46CFR176.818
16c
At each inspection for certification, toilet and washing spaces, galleys, serving pantries, lockers, and similar spaces may be examined to determine that they are serviceable and in a sanitary condition. Inspector observed galley and similar spaces were not in sanitary condition.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 28 January 2025
Resolution: Galley had been cleaned and was in satisfactory condition.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 8 January 2025
Resolved
46CFR176.800(a)
50c
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Inspector observed AC accumulator tank not properly secured IAW good marine practice.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2025
Resolved 28 January 2025
Resolution: Accumulator tanks was properly mounted.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 11 January 2024
Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturer's instructions.
Pre-engineered system storage cylinder gauge in the the bow thruster space is in the red indicating the storage cylinder is not sufficiently charged.
Bow thruster is not to be used until the cylinder is recharged or replaced.
46 CFR 181.420(a)(4)
Action required: 705 - Other - as specified
Due 11 January 2024
Resolved 12 February 2024
Resolution: Cylinder recharged and system tested SAT.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 January 2024
Resolved
The minimum number of portable fire extinguishers required on a vessel must be acceptable to the OCMI.
40-B:C fire extinguisher gauge in the main salon locker is in the the red indicating the bottle is not sufficiently charged; extinguisher must be replaced.
46 CFR 181.500(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2024
Resolved 11 January 2024
Resolution: Extinguisher replaced in kind.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 January 2024
Resolved
Portable fire extinguisher installation and location must be to the satisfaction of the [name withheld] fire extinguisher in the galley is not mounted; extinguisher to be properly mounted.
46 CFR 181.500
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2024
Resolved 23 January 2024
Resolution: Extinguisher mounted.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 11 January 2024
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail
Starboard propulsion engine attached pump belt is not protected by a guard. Install guard around belt and pulleys.
46 CFR 177.960
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2024
Resolved 23 January 2024
Resolution: Guard installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 January 2024
Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type.
Breaker panel in potable water tank space does not have a door or cover. Install door onto panel.
46 CFR 183.330(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2024
Resolved 23 January 2024
Resolution: Panel cover installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 April 2023
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from machinery failure, and personnel injury.
Vessel reported loss of propulsion of stbd engine resulting in allision with pier.
Provide damage assessment and proof of proper system operation for CG review and approval prior to carrying passengers.
46 CFR 182.100
Action required: 17 - Rectify deficiencies prior to departure
Due 12 April 2023
Resolved 12 April 2023
Resolution: See narrative notes.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2022
Resolved
The main engine exhaust piping must be properly supported by noncombustible hangers or blocks.
The port main diesel engine exhaust piping was found installed without supports or hangers.
46 CFR 182.43(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2022
Resolved 24 October 2022
Resolution: The operator installed new hangers from the overhead to support the port main diesel exhaust piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2022
Resolved
Nonmetallic hose may be used for wet exhaust systems provided it is double clamped.
The port main diesel engine flexible exhaust hose was found with only one hose clamp attached.
46 CFR 182.43(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2022
Resolved 24 October 2022
Resolution: The operator installed two hose clamps on the exhaust piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2022
Resolved
Gauges to indicate engine jacket water discharge temperature must be provided for all propulsion engines installed in the vessel.
The port main diesel engine jacket water temp gauge was found inoperable during an test of the main propulsion system.
46 CFR 182.410(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2022
Resolved 24 October 2022
Resolution: The operator discovered a disconnected signaling conductor and attached the conductor back to the temp sensor. The sensor was operationally tested and found in good order.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2022
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements.
MI observed dry rot, cracking and wear on the starboard main engine alternator drive belt.
46 CFR 182.200(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2022
Resolved 24 October 2022
Resolution: The operator replaced the drive belt like and in kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to protect persons and the vessel from electrical hazards.
MI observed the positive conductor on the starboard generator starter with sharp bends and a loose connection.
46 CFR 183.220(b)
Action required: 705 - Other - as specified
Due 11 October 2022
Resolved 11 October 2022
Resolution: The operator removed the conductor's previous crimp and installed a new crimp. The conductor was re-connected to the starter with a tight connection.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 October 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to protect persons and the vessel from electrical hazards.
MI observed the ground conductor with loose connections at the ground bus inside of the switchboard.
46 CFR 183.220(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2022
Resolved 24 October 2022
Resolution: The operator provided a new crimp and re-connected the conductor to the ground bus making a tight connection.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 11 January 2021
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system.
Identified both port and starboard closures need to be adjusted to make complete closure of the devices.
46 CFR 182.465(h)
Action required: 705 - Other - as specified
Due 18 January 2021
Resolved 26 January 2021
Resolution: Both port and starboard vent closures for the engine room were adjusted and gasket material added. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 January 2021
Resolved
Where flexibility is necessary, a section of flexible metallic hose may be used. Nonmetallic hose may be used for wet exhaust systems provided it is especially adapted to resist the action of oil, acid, and heat, has a wall thickness sufficient to prevent collapsing or panting, and is double clamped where practicable.
Identified nonmetallic hose dripping from the #2 generator exhaust piping where it was hose clamped from both ends.
46 CFR 182.430(e)
Action required: 705 - Other - as specified
Due 18 January 2021
Resolved 26 January 2021
Resolution: #2 generator exhaust hose was adjusted by tighting the double hose clamps to stop the dripping of salt water. All SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 14 January 2019
Resolved
The Weather deck on a flush deck vessel must be watertight.
Submit proposal for crop out and renew of corrosion found on the aft port side weather deck stairs.
46CFR178.410(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 28 January 2020
Resolved 17 January 2020
Resolution: Owner/Operator croped out and renewed wastage found aft deck, located port side penetrating steering space below main deck.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 January 2019
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended.
Forward generator is leaking coolant during operation.
Repair coolant leak and bring generator back to designed operation prior to placing in service. 46 CFR 182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2019
Resolved 11 January 2019
Resolution: Operator installed new coolant pump.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 18 September 2018
Resolved
Permanently repair wastage on overhead, located in starboard side liquor hold, as accepted in approved repair proposal created 20SEP2018.
IAW: 46CFR115.610 (b)
Action required: 705 - Other - as specified
Due 30 January 2019
Resolved 11 January 2019
Resolution: Verified weld repair.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 16 October 2017
Resolved
05 PFDs' unserviceable. 46 CFR 180.71(a) Reduced to 145 passengers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 October 2017
Resolution: Provided new PFDs. 05.
Engineering › Bilge Water Management System › Strainer
Issued 16 October 2017
Resolved
Bilge suction strainer in E/R was wasted and holed. Replace. 46 CFR 182.510(b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 26 October 2017
Operations/Management › Drills/Instruction › Abandon Ship
Issued 16 October 2017
Resolved
Vessel's abandon ship instructions did not task any crew member or specify who is assigned to the retrieval of the EPRIB when abandoning ship. Add to WQSB.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 October 2017
Resolved 16 October 2017
Resolution: Corrected on the spot.
Operations/Management › Drills/Instruction › Flooding Mitigation
Issued 16 October 2017
Resolved
Bilge manifold diagram in E/R confusing and does not correspond to actual bilge configuration. Renew instructions and diagram for dewatering to reflect actual mainfold set up. 46 CFR 176.800(a)
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 26 October 2017
Construction/Loadline › Hull › Hull Plating
Issued 14 September 2017
Resolved
Puncture in hull present strbd side of bow post allision with seawall. Repair to satisfaction of the Marine inspector. 46CFR176.802
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 14 October 2017
Resolved 29 September 2017
Resolution: Cropped and renewed strbd side of bow. Repaired to satisfaction of the Marine inspector.
Construction/Loadline › Hull › Hull Plating
Issued 14 September 2017
Resolved
Properly crop out and renew all damaged areas of bow, IAW submitted repair proposal.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 September 2017
Resolved 29 September 2017
Resolution: Properly croped out and renewed all damaged areas of bow to satisfaction of the Marine Inspector.
Construction/Loadline › Structures › Deck Plating
Issued 14 September 2017
Resolved
Properly crop out & renew main deck IWO the bow, IAW repair proposal.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 September 2017
Resolved 29 September 2017
Resolution: Properly croped out & renewed main deck IWO the bow to the satisfaction of the Marine Inspector.
Construction/Loadline › Structures › Superstructure
Issued 14 September 2017
Resolved
Crop out & renew square bracket on inner side of bulwark, IAW repair proposal.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 September 2017
Resolved 29 September 2017
Resolution: Cropped out & renewed square bracket on inner side of bulwark to the satisfaction of the Marine Inspector.
Construction/Loadline › Structures › Superstructure
Issued 14 September 2017
Resolved
Crop out & renew wasted steel on the aft side of chain locker, IAW repair proposal.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 September 2017
Resolved 29 September 2017
Resolution: Cropped out & renewed wasted steel on the aft side of chain locker to the satisfaction of the Marine Inspector.
Construction/Loadline › Structures › Superstructure
Issued 14 September 2017
Resolved
Crop & renew damaged areas of aft/01 deck cap rail, radius corner, bulkhead, handrails & bulwarks, IAW repair proposal.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 September 2017
Resolved 29 September 2017
Resolution: Cropped & renewed damaged areas of aft/01 deck cap rail, radius corner, bulkhead, handrails & bulwarks to the satisfaction of the Marine Inspector.
Construction/Loadline › Hull › Longitudinal Frame
Issued 14 September 2017
Resolved
Crop out or grind down end of deck longitudinal, located aft void, where hull deflection contacts the end of the longitudinal, for further CG examination.
Action required: 705 - Other - as specified
Due 27 September 2017
Resolved 22 September 2017
Resolution: The logitudinal was cropped back 2 inches, and the blkhead revealed no further damages.
Stability › Weathertight Integrity › General
Issued 7 September 2016
Resolved
Crop and renew wasted and holed steel window frames port side forward main deck prior to credit hull.
Action required: 705 - Other - as specified
Due 21 September 2016
Resolved 12 September 2016
Construction/Loadline › Structures › Deck Plating
Issued 7 September 2016
Resolved
Remove scale from deck plating located in forward life jacket locker port side and make available for inspection. Crop and renew wasted and holed deck plating as identified.
Action required: 705 - Other - as specified
Due 21 September 2016
Resolved 12 September 2016
Construction/Loadline › Hull › Hull Plating
Issued 25 February 2016
Resolved
Prior to carrying passengers, provide attending MI with copy of diver's report following accidental grounding.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 February 2016
Resolved 26 February 2016
Resolution: O/O provided diver's report attesting to minimal prop damage to port side. There were no issues noted regarding visible cracks or fractures at hull junctions relating to either struts or rudders.