MAURY USCG vessel records
← All vessels

SHIRLEY IRENE

SHIRLEY IRENE is a 1991 passenger vessel (inspected). The Coast Guard has recorded 20 inspections since 2016, most recently in November 2025, along with 21 deficiencies — 1 with no resolution recorded — and 1 operational control.

Records from 2016 to 2025. Most recent: inspection, 17 November 2025.

Built
1991
Last inspected
17 November 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 17 November 2025
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WAR6660
357634
Flag
UNITED STATES
Maury page id
psix-357634

Documentation record

Registered dimensions (L × B × D)138.1 ft × 30.0 ft × 9.0 ft
Registered tonnagegross 67 / net 46
ITC dimensions (L × B × D)138.1 ft × 30.0 ft × 9.0 ft
ITC tonnageNot recorded
BuilderOCEAN GROUP, INC. · BAYOU LA BATRE, AL, UNITED STATES · built 1991
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portMARBLEHEAD, OH
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 9 April 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it67 - Regulatory (Subpart C or D), Gross Ton
46 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 20

17 November 2025 Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8269823
29 October 2024 Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8019735
22 October 2024 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8023505
25 September 2024 COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8007560
9 August 2024 Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8016809
29 November 2023 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7831279
16 November 2022 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7596744
22 March 2022 Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7416572
2 November 2021 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7346040
21 May 2021 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7202494
9 December 2020 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7109197
26 May 2020 Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6961190
26 May 2020 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6961986
1 November 2019 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6846911
2 October 2019 DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6815600
16 October 2018 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6562373
15 November 2017 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6299339
13 March 2017 Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6105828
6 March 2017 Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6099718
14 September 2016 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6004945

Deficiency record · 21

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 September 2024 Resolved
The means provided for pumping bilges shall be tested by operation. All suction strainers shall be examined. Vessel's crew was unable to successfully operate the bilge pumping system. Crew appears to not be familiar with the arrangement and alignment. Vessel's crew shall be trained to be able to test the bilge pumping system to the satisfaction of a CG Marine Inspector. 46 CFR 176.25-10(7)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 October 2024
Resolution: DEF to be amended and reissued to provide proof of training to crewmembers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 September 2024 Resolved
At each initial and subsequent inspection for certification, re-inspection and at every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. Vessel does not have instructions for the crew to operate the fixed bilge system in the event of an emergency. 46 CFR 176.25-50
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 October 2024
Resolution: Instructions for crew provided and will be permanently attached to bilge manifold.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 September 2024 No resolution recorded
Exhaust piping shall be gas-tight throughout its length and shall be properly supported by noncombustible hangers or blocks. Aft engine room has a significant exhaust leak. Clean aft engine room, identify leaks and enact permanent repairs prior the operation of machinery to the satisfaction of a CG marine inspector. 46 CFR 182.20-20 Ref. 46 CFR 182.15-20
Action required: 705 - Other - as specified
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 September 2024 Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Noted the following issues during the inspection of the machinery space: -Wire loom for main diesel engine resting on hot manifold for all engines. Wire loom should be supported in a way that prevents damage to wire from heat. -Cable for #2 Main diesel engine control box supported in overhead with electrical tape. Support cable with metal supports to avoid chafing and other damage.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2024
Resolved 26 September 2024
Resolution: Received pictures from port engineer confiming repair.
04 - Emergency Systems › N/A - No Subsystem › Safe areas
Issued 25 September 2024 Resolved
All escape hatches and other emergency exits shall be marked on both sides using at least 1-inch letters: "Emergency Exit, Keep Clear", unless such markings are deemed unnecessary by the Officer in Charge, Marine Inspection. Neither emergency exit from the fwd and aft engine rooms where marked on the vehicle deck. 46 CFR 185.30-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2024
Resolved 26 September 2024
Resolution: Received picture from port engineer with hatches new markings.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 September 2024 Resolved
A vessel is inspected for compliance with the standards required by this subchapter. For items not covered by standards in this subchapter, inspections shall be in accordance with standards acceptable to the Officer in Charge, Marine Inspections, as good marine practice. Generators frequency meter is not currently working and not displaying generators hertz. 46 CFR 176.25-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2024
Resolved 22 October 2024
Resolution: meter tested; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 November 2021 Resolved
Lifebuoy floating light attached with non approved line. Replace floating light line with approved line per 46CFR199.70(a)3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 November 2021
Resolved 6 November 2021
Resolution: New line ordered for ring bouy and replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 November 2021 Resolved
#2 and #4 MDE have excessive oil leaks originating under bellhousing where MDE attaches to Z drive Clutch. A number of bellhousing attachment bolts are missing. Remove bellhousing and determine the cause of lubricating oil like and repair. securely attach bellhousing with required amount of fasteners.
Action required: 705 - Other - as specified
Due 1 March 2022
Resolved 6 November 2021
Resolution: Rear bellhousing removed and sealed. Bolts replaced. Engine head gasket seal will be replaced while vessel is layed up in the winter.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 May 2021 Resolved
Vessel life jackets are not readily accessible or convenient to passengers in current stowed locations under the ladders. Relocate life jackets to ensure required number are stowed properly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2021
Resolved 23 June 2021
Resolution: Vessel modified PFD locker to ensure access to passengers withouth crew intervention.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 21 May 2021 Resolved
Per vessels stability letter: Any openings that could allow water to enter into the hull or deckhouse should be kept closed when rough weather or wave conditions exist or are anticipated. Create a vessel policy/instruction to ensure these doors are secured/closed in rough weather. While doors are closed in rough weather, ensure they have the ability to be fully opened for access/egress during an emergency.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2021
Resolved 23 June 2021
Resolution: Vessel posted signage to ensure engine room doors are closed during inclement/rough weather. Verified doors can be opened to access ER in event of emergency during rough weather with vehicles parked on deck.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2020 Resolved
Aft Emergency Shut off pull would not close valve attached to tank completely. Valve will need to be adjusted and retested in the presence of a Coast Guard Marine inspector. 46 CFR182.20-40(b)3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2020
Resolved 16 December 2020
Resolution: Vessel rep Provided documentation of proper repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2020 Resolved
Steering gear leaking hydraulic oil in forward and aft machinery spaces. Replace components as needed to prevent the loss of hydraulic fluid from steering gear into the bilge spaces. 46 CFR 176.25-50
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 January 2021
Resolved 16 December 2020
Resolution: Vessel rep Provided documentation of proper repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 May 2020 Resolved
Steering electrical solenoid wire connections were not properly connected and caused the breaker to trip. Resulting in the #1 steering /propulsion unit to shut down. Wiring and solenoid needs to be replaced prior to movement of the vessel with passengers on board.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2020
Resolved 27 May 2020
Resolution: The #1 Z drive solenoid was replaced and the wiring harness was replaced. Vessel was operated underway, conducting multiple steering and propulsion tests of the #1 Z Drive. All satifactory.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 8 November 2019 Resolved
Crop and renew section of frame just aft of the access hatch, in the aft void. Frame is rusted beyond repair.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 December 2019
Resolved 9 December 2020
Resolution: Inspected and cleared.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 8 November 2019 Resolved
Port aft void has a frame that has separated from the bulkhead on the inboard side of the space just aft of the hatch. Make proper repairs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 December 2019
Resolved 9 December 2020
Resolution: Inspected and cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 November 2019 Resolved
The bilge suction remote reach rob is loose at the top just below the deck in the aft fore-peak, make proper repairs.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 December 2019
Resolved 9 December 2020
Resolution: Inspected and cleared.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 8 November 2019 Resolved
Both engine room escape hatches are deteriorated and have cracks in the collars. Make proper repairs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 December 2019
Resolved 9 December 2020
Resolution: Inspected and cleared.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 1 November 2019 Resolved
Fuel oil leaking from tank into void space.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 December 2020
Resolution: Inspected and cleared.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 November 2019 Resolved
The electrical power supply for the fire pump is chaffing as it is not run correctly.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 December 2019
Resolved 9 December 2020
Resolution: Inspected and cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 October 2018 Resolved
Water Temperature Gauge wiring on #1 and #2 MDE was not installed into the engine properly. Gau705ge was unable to read the temperature inside the engine and was giving false reading.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 October 2018
Resolved 31 October 2018
Resolution: Vessel operator replaced guages with new Guages and verified opertion.
Accommodation/Occupational Safety › Heating › Electric Air Heating Equipment
Issued 14 September 2016 Resolved
The electric heating unit located in the fwd-stbd engine room (directly above a hydraulic oil tank) is not securely mounted in it's bracket; it additionally has multiple loose un-supported electrical cables. Properly secure heater and cables. (46CFR184.210)
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 27 September 2016

Ownership record