VALDEZ STAR is a 1991 oil recovery. The Coast Guard has recorded 35 inspections since 2016, most recently in April 2026, along with 41 deficiencies and 3 casualty investigations between 2008 and 2021.

Records from 2008 to 2026. Most recent: inspection, 10 April 2026.

Built
1991
Last inspected
10 April 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 2016.

Inspection record

Last inspected 10 April 2026
…with no type recorded4
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9055802
WDE9239
359166
Flag
UNITED STATES
Maury page id
psix-359166

Documentation record

Registered dimensions (L × B × D)115.2 ft × 31.0 ft × 13.5 ft
Registered tonnagegross 190 / net 68
ITC dimensions (L × B × D)115.2 ft × 31.0 ft × 13.5 ft
ITC tonnagegross 357 / net 107
BuilderGOUDY & STEVENS SHIPYARD · EAST BOOTHBAY ME, UNITED STATES · built 1991
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portVALDEZ, AK
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 23 October 2025 · expires 30 November 2026
Service, as the file records itOil Recovery
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it315 - Dead Weight, Ton
357 - Convention (Subpart B), Gross Ton
190 - Regulatory (Subpart C or D), Gross Ton
107 - Convention (Subpart B), Net Ton
68 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 35

10 April 2026 Administrative Inspection · Cargo Tank Internal · Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8345838
17 February 2026 Appeal
Administrative · USCG Arctic District (dp) · USCG Arctic District (CGD-A) · Activity 8311809
29 January 2026 Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8306805
21 January 2026 Vessel Attendance · MTSA/ISPS Verification · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8297618
25 July 2025 Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8237585
18 March 2025 Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8095892
22 January 2025 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8067563
13 November 2024 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8034433
10 October 2024 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8017602
24 January 2024 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7854264
19 October 2023 Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7820829
9 March 2023 Deficiency Check · Periodic Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7648643
17 February 2023 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7639718
25 February 2022 Annual Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7403425
29 November 2021 Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7359085
29 November 2021 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7364900
16 June 2021 Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7228678
12 March 2021 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7155280
18 February 2021 Drydock Exam · Deficiency Check · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7145246
7 January 2021 COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7122764
27 February 2020 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6925408
30 January 2020 Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6902647
25 March 2019 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6656882
28 February 2019 Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6638387
8 January 2019 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6607452
19 November 2018 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6586844
31 October 2018 Deficiency Check · Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6566196
21 June 2018 Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6451796
9 January 2018 Annual Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6336642
22 December 2017 Administrative Inspection
Administrative · Navigation Center · Activity 6327905
9 February 2017 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6085746
26 April 2016 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5865169
18 April 2016 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5862347
7 March 2016 Hull Examination · Internal Structural Exam · Deficiency Check · Cargo Tank Internal
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5835249
19 January 2016 COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5800019

Deficiency record · 41

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 22 January 2026 Resolved
At each inspection for certification and periodic inspection the marine inspector must conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as they feel necessary to check safe operation. Both the Port and Starboard Main Engine low lube oil pressure alarm switch did not set off the alarm at the panel until the test pressure was at 0 P.S.I. which is below the manufacture recommended shutdown pressure of 15 P.S.I. 46 CFR 61.20-3(a)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 January 2026
Resolution: New adjustable oil pressure switch installed and tested.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 22 January 2026 Resolved
A hinged watertight bulkhead door must be fitted with a quick action closing devise operable from both sides ofthe door and indicator lights at the operating station showing whether the door is open or closed. The indicator light for the lazerette door was not illuminating when the door was open. 46 CFR 170.255
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2026
Resolved 28 January 2026
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 22 January 2026 Resolved
Each vessel must carry the following equipment for the line-throwing appliance: An auxiliary line that; Has a breaking strength of at least 9,000 pounds-force; and Is, if synthetic, of a dark color or certified by the manufacturer to be resistant to deterioration from ultraviolet light. 46 CFR 199.170(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2026
Resolved 10 April 2026
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 January 2026 Resolved
Electrical installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. MI observed open penetrations in the main distribution panel in the engine room and the forward generator posing electrical hazards to the crew. 46CFR111.01-1(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2026
Resolved 4 February 2026
Resolution: Received email from vessel rep with photo of deficiency correction.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 22 January 2026 Resolved
Where natural ventilation is provided for spaces protected by a carbon dioxide extinguishing system, provisions shall be made for easily and effectively closing off the ventilation. The ventilation closure gasket was painted on the aft exterior bulkhead of the pump room making the closure seal ineffective. Renew the gasket to original condition. 46 CFR 95.15-35(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2026
Resolved 22 January 2026
Resolution: New gaskets installed on ventilation closures.
10 - Safety of Navigation › N/A - No Subsystem › Electronic charts (ECDIS)
Issued 22 January 2026 Resolved
As appropriate for the intended voyage, all vessels except barges, vessels operating exclusively on rivers, and motorboats other than those certificated for ocean or coastwise route, must carry adequate and up-to-date charts. The vessel is utilizing and electronic charting system (ECS) "Coastal Explorer" which is not a certified for use on commercial vessels. 46 CFR 97.05-5
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2026
Resolved 10 February 2026
Resolution: Received email from vessel rep stating that they would utilize paper charts instead of electronic charts.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 January 2026 Resolved
Each boiler must be available forexamination by the marine inspector at intervals specified by table 1 to § 61.05-10, and more often, if necessary, to determine that the complete unit is in a safe and satisfactory condition. The auxiliary boiler was not inspected within the required time frames. 46 CFR 61.05-10(a)
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 4 May 2026
Resolution: Boiler was decommisioned by capping of fuel supply to the boiler and disconnecting power supply at the distrobution panel.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 10 October 2024 Resolved
On vessels required by 112.05(a) to have temporary emergency power source, the following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency source: (f) At least one light in each space where a person may be transiting, such as public spaces, work spaces. (g) Lighting for survival craft launching, including must stations, embarkation stations, the survival craft, it launching appliances and the area of the water where it is to be launched. The passage way leading into the galley, life raft stowage area and embarkation area did not have emergency lights. 46 CFR 112.15-1 (f) & (g)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 November 2024
Resolved 13 November 2024
Resolution: Lights work as intended
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 10 October 2024 Resolved
Electrical plans are required for vessel applicable to 46 CFR Sub-chapter J. Plans shall include (a) Elementary one-line wiring diagram of the power system. (d) deck wiring or schematic plans of the power system and lighting system, including symbol lists, with name and identification of each item of electric equipment. Vessel's electrical plan was missing information related to the emergency lighting. 46 CFR 110.25-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 November 2024
Resolved 22 January 2025
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 24 January 2024 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval. Different versions of the fire control plan were found posted throughout the vessel, some of which were missing required markings.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2024
Resolved 10 October 2024
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 January 2024 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work except as modified by § 91.45–1. The general scope of the plans shall be as noted in § 91.55–5. Electrical plans were missing alterations to the mast and laundry facilities that were added to the vessel. The crew was unable to secure power to the laundry facilities.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2024
Resolved 10 October 2024
Resolution: Updated plans have been approved.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 24 January 2024 Resolved
It shall be the responsibility of the master to assure himself that all exposed cargo hatches and other openings in the hull of his vessel are closed, made properly watertight by the use of tarpaulins, gaskets or similar device. Hatches through the deck, to the water at the aft end of the forecastle had deteriorated gaskets.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2024
Resolved 8 March 2024
Resolution: gaskets replaced
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 January 2024 Resolved
Where fitted, it shall be the duty of the master to see that the emergency lighting and power systems are operated and inspected at least once in each week. Starboard emergency light in forecastle was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2024
Resolved 8 March 2024
Resolution: operator error. works as intended
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 24 January 2024 Resolved
Each room, locker, and box for storage batteries must be arranged or ventilated to prevent accumulation of flammable gas. A battery was being stored in the forecastle, an unventilated space.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 February 2024
Resolved 8 March 2024
Resolution: Battery removed
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 January 2024 Resolved
The foam agent, its container, and all controls and valves for the operation of the system shall be of an approved type. Firefighting foam in the forecastle was manufactured in 1990, beyond the 10-20 year shelf life of foam agent.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2024
Resolved 4 April 2024
Resolution: Vessel has 02 new AFFF containers
09 - Working and Living Conditions › 091 - Living Conditions › Laundry
Issued 24 January 2024 Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended and so that they can be kept in a clean, workable, and sanitary condition. The crew laundry was arranged in an unsuitable manner, with a dryer stacked unsecured on top of a washer.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 25 January 2024
Resolved 29 January 2024
Resolution: Dryer was secured to the wall with straps.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 9 March 2023 Resolved
Vessels assigned a load line shall have the deck line and load line permanently scribed or embossed. Deck line was not permanently affixed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 April 2023
Resolved 11 April 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 March 2023 Resolved
Markings for fire and emergency equipment, etc. shall be appropriate to the service of the vessel. Emergency exit does not have proper signage. 46CFR97.37-3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 April 2023
Resolved 30 March 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 March 2023 Resolved
Nonmetallic flexible hose may be used in lube oil, fuel oil and fluid power systems only where flexibility is required and in lengths not exceeding 30 inches.Hydraulic skimmer hoses in way of chain locker are greater than 30 inches and must be replaced with pipe. 46CFR56.60-25(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 April 2023
Resolved 30 March 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 March 2023 Resolved
Fire hydrant must have at least one hose (connected at all times (h)) and a spanner wrench. One wrench was missing and all hoses were disconnected. Corrected on the spot. 46CFR95.10-10 (g) & (h)
Action required: 10 - Deficiency Rectified
Due 9 March 2023
Resolved 9 March 2023
Resolution: Corrected on the spot
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 29 November 2021 Resolved
Have ballast water tank #4 and all confined spaces immediately adjacent gas freed and open for inspection.
Action required: 705 - Other - as specified
Due 3 December 2021
Resolved 3 December 2021
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 29 November 2021 Resolved
Submit a repair proposal to the local OCMI.
Action required: 705 - Other - as specified
Due 3 December 2021
Resolved 3 December 2021
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 16 June 2021 Resolved
Gas free Port Aft Ballast tank, make available for entry by an USCG Marine Inspector. Provide a repair proposal of findings after inspection.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2021
Resolution: No crack was detected during visual exam, pressed tank to 2 lbs over a ten minutes period with no leeks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 February 2021 Resolved
There is an excessive amount of debris, trash, scale, and sludge in the engine room and steering bilges. Clean and remove to prevent failure of the emergency dewatering equipment. Additionally, clean and make the bilges available to complete the inspection. This is to include removing all the above, as well as removing paint in any suspect areas identified any any areas identified during cleaning.
Action required: 10 - Deficiency Rectified
Due 2 March 2021
Resolved 2 March 2021
Resolution: Cleaned Bilges
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 7 January 2021 Resolved
Replace flexible power fluid hoses (in way of winches, pump room and forward house) with piping unless flexibility is required and then lengths shall not exceed 30 inches.
Action required: 705 - Other - as specified
Due 25 February 2021
Resolved 12 March 2021
Resolution: Installed hardpiping in winch room and shorter(less 30in) hoses in the machinery space.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 7 January 2021 Resolved
Make two lifebuoys, each with attached self-activating smoke signals, ready for quick released from the navigating bridge. When released, buoy and smoke signals should fall directly into the water without striking any part of the vessel.
Action required: 705 - Other - as specified
Due 25 February 2021
Resolved 12 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 January 2020 Resolved
Have Boiler cleaned and open for inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 March 2020
Resolved 27 February 2020
Resolution: Boiler was cleaned and inspected.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 28 February 2019 Resolved
UPDATE FIRE CONTROL PLAN IAW 46 CFR 91.55-10(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2019
Resolved 29 March 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 February 2019 Resolved
MAKE HOSES FOR GAUGES COMING FROM PIPE IN PUMP ROOM BE SUITABLE FOR OIL USAGE, COMPLY WITH SAE J1942 AND BE LESS THAN 30 INCHES. IAW 46 CFR 56.60-25(b)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2019
Resolved 25 March 2019
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 28 February 2019 Resolved
MAKE PERMANENT REPAIRS TO LEAK IN AFT GENERATOR COOLING WATER BLOCK. IAW 46 CFR 112.50-1(a)(2)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2019
Resolved 31 March 2019
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 28 February 2019 Resolved
MAKE HOSES FOR HEAD TANK SUPPLYING OIL RECOVERY BELT BEARING BE SUITABLE FOR OIL WATER USAGE, COMPLY WITH SAE J1942 AND BE LESS THAN 30 INCHES. IAW 46 CFR 56.60-25(b)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2019
Resolved 27 March 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 October 2018 Resolved
Hydraulic lines were cropped and renew for the insert of the #4 ballast tank aft bulkhead. Hydraulic line are required to be hydrostactically tested using working pressure after installation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 November 2018
Resolution: Hydraulic lines were hydraulically tested at working pressure, no leaks were detected.
Construction/Loadline › Hull › Transverse Frame
Issued 27 February 2017 Resolved
Crop and renew thinned portion of second frame from stern IWO of port rudder post stanchion NLT next dry dock. 46 CFR 92.01–10
Action required: 705 - Other - as specified
Due 31 July 2018
Resolved 16 November 2018
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 9 February 2017 Resolved
Install boiler safety relief valve to relieve at no more than 15 PSI, steam MAWP. Secure boiler until complete. 46 CFR 53.05-1
Action required: 705 - Other - as specified
Due 10 February 2017
Resolved 17 February 2017
Resolution: Witnessed proper bench test of new relief valve.
Construction/Loadline › Hull › Transverse Frame
Issued 9 February 2017 Resolved
Guage thickness of wasted frames and hull under potable water tanks in lazarette and IWO rudder post stanchions. 46 CFR 92.01–10
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 27 February 2017
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 9 February 2017 Resolved
Repair/replace screw lock on #1 24V battery charger cabinet door. 46 CFR 111.01–1(2)
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 27 February 2017
Fire Fighting › Fire Hydrants › Number
Issued 9 February 2017 Resolved
Properly stencil fire station #1. 46 CFR 97.37–15
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 27 February 2017
Communications › Alarms/Indicators › General Alarm
Issued 19 January 2016 Resolved
Install general alarm in workshop/steering gear room. 46CFR113.25-9
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 13 April 2016
Resolution: Annuciator installed and tested.
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 19 January 2016 Resolved
Demonstrate required boiler alarms, tests and shutdowns. 46 CFR 61.05
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 28 April 2016
Engineering › Engine Controls (Electric/Electronic) › Circuit Board
Issued 19 January 2016 Resolved
Demonstrate required MDE and generator alarms and shutdowns. 46 CFR 58.
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 13 April 2016
Resolution: Tests completed
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 19 January 2016 Resolved
Update vessel general arrangement plan.
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 28 April 2016

Casualty record · 3

6 November 2008Routine · role: Involved in a Marine Casualty · activity 3365534
18 April 2016Routine · role: Involved in a Marine Casualty · activity 5862347
29 November 2021Routine · role: Involved in a Marine Casualty · activity 7364900
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.