Records from 1991 to 1996. Most recent: inspection, 3 March 1996.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Fire Fighting
Issued 3 March 1996
Resolved
PROVE SATISFACTORY OPERATION OF FIRE PUMP RELIEF VALVE.
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Lifesaving
Issued 3 March 1996
Resolved
PERMANENTLY REPAIR DETERIORATED GRAY WATER DRAIN LINE LODATED NEAR FRESH WATER TANK (PORT SIDE).
Condition: Unknown
Due 17 March 1996
Resolved 7 March 1996
Construction/Loadline
Issued 3 March 1996
Resolved
CONDUCT PERMANENT REPAIRS TO STRUCTURAL MEMBERS IN NO.2 PORT TOPSIDE BALLAST TANK AS PER CLASS SURVEY REPORT DATED 06MAR96 (FILE NO. 96FL025NA).
Condition: Unknown
Due 31 March 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 3 March 1996
Resolved
RENEW/REPLACE RETRO-REFLECTIVE TAPE ON PORT AND STARBOARD LIFEBOATS. SOLAS74 (AMENDED) III/30.2.7
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Lifesaving
Issued 3 March 1996
Resolved
RENEW/REPLACE RETRO-REFLECTIVE TAPE ON LIFEBUOYS THROUGHOUT SHIP. SOLAS 74 (AMENDED) III/30.2.7
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Fire Fighting
Issued 3 March 1996
Resolved
SHOW LOCATION OF ALL VENTIILATION CLOSURES ON FIRE CONTROL PLAN. SOLAS 74 (AMENDED) II-2/20.1
Condition: Unknown
Due 17 March 1996
Resolved 7 March 1996
Lifesaving
Issued 3 March 1996
Resolved
INSTALL THE PROVIDED BOWSING TACKLE FOR PORT AND STARBOARD LIFEBOATS. SOLAS 74 (AMENDED) III/11.8
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Fire Fighting
Issued 3 March 1996
Resolved
PROVIDE ON BOARD INSTRUCTIONS FOR MAINTENANCE AND OPERATION OF ALL INSTALLATIONS/EQUIPMENT FOR FIGHTING AND CONTAINMENT OF FIRE. SOLAS 74 (AMENDED) II-2/20
Condition: Unknown
Due 17 March 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 3 March 1996
Resolved
PROVIDE PROTECTIVE COVERS TO ALL NAKED LIGHTS IN ENGINE ROOM. SOLAS 74 (AMENDED) II-1/45.10
Condition: Unknown
Due 17 March 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Fire Fighting
Issued 3 March 1996
Resolved
PERMANENTLY REPAIR LEAKY FIREMAIN STARBOARD OF #4 CARGO HATCH IN WAY OF EXPANSION CURVE.
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Fire Fighting
Issued 3 March 1996
Resolved
FREE-UP DOGS FOR VENTILATION COVER FOR AIR CONDITION ROOM.
Condition: Unknown
Due 17 March 1996
Resolved 7 March 1996
Fire Fighting
Issued 3 March 1996
Resolved
PROVIDE VENT COVER FOR HOSPITAL SPACE.
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Fire Fighting
Issued 3 March 1996
Resolved
PERMANENTLY EXHIBIT FOR THE GUIDANCE OF THE SHIP'S OFFICERS A FIRE CONTROL PLAN IN ACCORDANCE WITH SOLAS 74 (AMENDED) II-2/20,
Condition: Unknown
Due 17 March 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Accommodation/Occupational Safety
Issued 3 March 1996
Resolved
PERMANENTLY SECURE (LOCK) OVERBOARD DISCHARGE VALVES FOR SEWAGE TANK WHILE VESSEL IS IN PORT.
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Fire Fighting
Issued 3 March 1996
Resolved
REPAIR AND PROVE OPERATION OF VENTILATION CLOSURES AT STERN, MAIN DECK.
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Fire Fighting
Issued 3 March 1996
Resolved
PROVIDE DOGS TO VENT CLOSURE FOR BOSUN STORES AT STERN.
Condition: Unknown
Due 17 March 1996
Resolved 7 March 1996
Engineering
Issued 3 March 1996
Resolved
RENEW GASKET AT OILY WATER SEPARATOR UNIT.
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Lifesaving
Issued 3 March 1996
Resolved
PERMANENTLY REPAIR DETERIORATED ENGINE ROOM DECK DRAIN LINE NEAR #1 GENERATOR (PORTSIDE, OVERHEAD).
Condition: Unknown
Due 6 March 1996
Resolved 7 March 1996
Electrical
Issued 11 November 1995
Resolved
Replace numerous badly cracked coolant hoses for emergency generator._x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Electrical
Issued 11 November 1995
Resolved
Demonstrate that starting batteries can hold proper charge for starting emergency generator._x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Electrical
Issued 11 November 1995
Resolved
Place di-electric matting or grating on deck in front of emergency generator switchboard._x001C_ _x001C_ SOLAS 60 II/27
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Construction/Loadline
Issued 11 November 1995
Resolved
Remove approximately 5 inches of diesel oil found in engine room bilges forward, port side._x001C_ _x001C_ SOLAS 60 I/10_x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Electrical
Issued 11 November 1995
Resolved
Make satisfactory permanent repair to leaking soft patch (Hemp) on salt water cooling line for ship's service generators._x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Fire Fighting
Issued 11 November 1995
Resolved
Make operational, No. 2 Fire pump._x001C_ _x001C_ SOLAS 74 II-2/21_x001C_ _x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Fire Fighting
Issued 11 November 1995
Resolved
Repair badly leaking seal for #1 fire pump._x001C_ _x001C_ SOLAS 74 II-2/21_x001C_ _x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Fire Fighting
Issued 11 November 1995
Resolved
Repair badly leaking seal for #2 fire pump or repair the inoperable isolation valve._x001C_ _x001C_ SOLAS 74 II-2/21
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Engineering
Issued 11 November 1995
Resolved
Repair burst evaporator salt water cooling line._x001C_ _x001C_ SOLAS 60 I/10, II/65
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Engineering
Issued 11 November 1995
Resolved
Remove various drain line hoses leading from main engine and various other machinery to open manholes of numerous tanks below engine room bilges and secure manholes._x001C_ SOLAS 60 I/10 & 11_x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Documentation
Issued 11 November 1995
Resolved
Translate all required fire control plans into language understood by crew (Indonesian)._x001C_ _x001C_ SOLAS 74 II-2/20
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Lifesaving
Issued 11 November 1995
Resolved
Properly fasten lanyard/weaklink arrangement for port liferaft so it will break away from vessel in the event of vessel sinking._x001C_ _x001C_ SOLAS 74 III/38.6
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Lifesaving
Issued 11 November 1995
Resolved
Provide the following lifeboat equipment: 2 light bouyant heaving lines for both, 1 daylight signalling mirror for both, 1 spare bulb for the electric torch for stbd, spare batteries for stbd, 2 plugs for stbd, 1 plugfor port, one gal. veg. oil for both lifeboats. SOLAS 60 III/11
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Lifesaving
Issued 11 November 1995
Resolved
Install retro-reflective tape on bottom of both lifeboats._x001C_ _x001C_ SOLAS 74 III/30.2.7
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Navigation
Issued 11 November 1995
Resolved
Repair rudder angle indicator on bridge and bridge wings._x001C_ _x001C_ SOLAS 60 I/10 & 29_x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Engineering
Issued 11 November 1995
Resolved
Repair inoperable oil water separator and demonstrate satisfactory operation._x001C_ _x001C_ MARPOL ANNEX I/16
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Fire Fighting
Issued 11 November 1995
Resolved
Replace two holed fire hoses located in engine room._x001C_ _x001C_ SOLAS 74 II-2/21_x001C_ _x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Electrical
Issued 11 November 1995
Resolved
Demonstrate satisfactory operational load test of emergency generator._x001C_ _x001C_ SOLAS 60 II/26_x001C_ _x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Electrical
Issued 11 November 1995
Resolved
Repair/replace badly leaking water pump for emergency generator._x001C_ _x001C_ SOLAS 60 I/10_x001C_ _x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Documentation
Issued 11 November 1995
Resolved
Re-stencil faded portions of the fire control plans posted on bulkheads._x001C_ _x001C_ SOLAS 74 II-2/20_x001C_
Condition: Unknown
Due 11 March 1996
Resolved 11 March 1996
Electrical
Issued 11 November 1995
Resolved
Install protective covers on lights located in the following:_x001C_ bilges located lower level of engine room, stbd side, forward(located near No.1/No.2 controllers for seawater cooling pumps for main engine); all lights in fixed CO2 room and emergency generator room. SOLAS 60 II/27
Condition: Unknown
Due 11 March 1996
Resolved 11 March 1996
Construction/Loadline
Issued 11 November 1995
Resolved
Repair holed ventilator cover located on forecastle, stbd side, near spare anchor. Vent cover presently has paint-covered tape covering the holes._x001C_ _x001C_ ICLL 1966 ANNEX I/19
Condition: Unknown
Due 11 March 1996
Resolved 11 March 1996
Accommodation/Occupational Safety
Issued 11 November 1995
Resolved
Repair numerous broken closure devices (dogs) for ventilation covers located on forecastle._x001C_ _x001C_ ICLL 1966 ANNEX I/19_x001C_
Condition: Unknown
Due 11 March 1996
Resolved 11 March 1996
Engineering
Issued 11 November 1995
Resolved
Repair leaking packing for #2 sea water cooling pump for main engine. LOCATION: engineroom, lower level, starboard side._x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 11 March 1996
Resolved 11 March 1996
Fire Fighting
Issued 11 November 1995
Resolved
Repair emergency fire pump suction and discharge gauges._x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 11 March 1996
Resolved 11 March 1996
Electrical
Issued 11 November 1995
Resolved
Install the protective covers on the explosion-proof lighting fixtures in_x001C_ the paint locker._x001C_ _x001C_ SOLAS 60 II/27
Condition: Unknown
Due 11 March 1996
Resolved 11 March 1996
Engineering
Issued 11 November 1995
Resolved
Repair leaking mechanical filter used for main engine diesel oil booster pump._x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Engineering
Issued 11 November 1995
Resolved
Repair leaking flange of main engine diesel oil booster pump located near its flow meter_x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Lifesaving
Issued 11 November 1995
Resolved
Clean/wipe up all diesel oil in vicinty of main engine diesel oil booster pump._x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Electrical
Issued 11 November 1995
Resolved
Repair leaking fuel injector return line on No. 8 cylinder of No. 2 ships service diesel generator engine._x001C_ _x001C_ SOLAS 60 I/10_x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Engineering
Issued 11 November 1995
Resolved
Make satisfactory permanent repair to the temporary patch on the stripping line coming from the No. 2 port fuel oil tank._x001C_ _x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Construction/Loadline
Issued 11 November 1995
Resolved
Remove diesel oil from bilges and deck plates in diesel purifier room._x001C_ _x001C_ SOLAS 60 I/10
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Engineering
Issued 11 November 1995
Resolved
Remove black hose used to directly discharge fuel from oil settling tank into bilges._x001C_ _x001C_ SOLAL 60 I/10 & 11_x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995
Engineering
Issued 11 November 1995
Resolved
Remove green hoses used to directly discharge fuel oil from boiler fuel oiltank overflow to bilges._x001C_ _x001C_ SOLAS 60 I/10_x001C_
Condition: Unknown
Due 14 November 1995
Resolved 15 November 1995