04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 10 June 2025
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Crew member was not proficient with MOB recovery. MI administered training on the spot and Master followed up with additional instruction. 46 CFR 185.520(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 10 June 2025
Resolved 10 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 June 2025
Resolved
A bilge pipe in a vessel of not more than 19.8 meters (65 feet) in length must be not less than 25 millimeters (1 inch) nominal pipe size. A bilge pipe in a vessel of more than 19.8 meters (65 feet) in length must be not less than 40 millimeters (1.5 inches) nominal pipe size. A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. Hand bilge pump line was partially air bound due to incorrect fitting size. Replace fitting with appropriate size. 46 CFR 182.510(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2025
Resolved 17 June 2025
Resolution: fitting replaced
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 June 2025
Resolved
At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. Each lifeline on a ring life buoy must:(1) Be buoyant;(2) Be of at least 18.3 meters (60 feet) in length;(3) Be non-kinking;(4) Have a diameter of at least 7.9 millimeters (5/16 inch);(5) Have a breaking strength of at least 5 kilonewtons (1,124 pounds); and(6) Be of a dark color if synthetic, or of a type certified to be resistant to deterioration from ultraviolet light. Lifeline was worn, replace with new. 46 CFR 180.70(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2025
Resolved 24 June 2025
Resolution: line replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 June 2025
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. Stbd fuel tank COV partially wasted, replace. 182.455(b)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2025
Resolved 10 June 2025
Resolution: Replaced valve with new
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 9 June 2025
Resolved
A vessel must be fitted with ground tackle and mooring lines necessary for the vessel to be safely anchored or moored. Bow anchor plate was wasted, replace. 46 CFR 184.300
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2025
Resolved 30 July 2025
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 17 April 2024
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. The owner or managing operator shall submit drawings, sketches, or written specifications describing the details of any proposed alterations to the cognizant [name withheld] alterations must be approved by the OCMI before work is started.
Sailing catamaran ran aground and suffered hull damage to stbd hull. Temporary repair was applied and water intrusion was controlled.
Provide plan for transit to Subbase Drydock. Provide full damage assessment report and submit with repair proposal to USCG for review and plan approval prior to making permanent repairs. Sea trials may be required at the discretion of the attending MI.
46 CFR 176.700
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2024
Resolved 1 May 2024
Resolution: SAT repairs were made.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 2 January 2024
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. The OCMI may require an inspection and testing whenever a repair or alteration is undertaken.
HEAVENLY DAYS suffered damage to the starboard rudder adversely affecting the maneuverability of the vessel. Complete all necessary repairs, provide a report addressing the scope of work completed and provide any associates invoices/ receipts. Upon receipt of these documents, marine inspectors will schedule a follow-up exam to conduct sea trials on the HEAVENLY DAYS.
46 CFR 176.700(a)
46 CFR 176.700(d)
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2024
Resolution: Rudder replaced with new, which was constructed by Subbase Drydock to the satisfaction of the Marine Inspector.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 September 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following:
Inspection of the condition of the superstructure, masts, and similar arrangements constructed on the hull, and on a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. All inspected sailing vessel owner/operators should have a written Preventive Maintenance Plan (PMP) that specifically addresses their vessel’s sail rigging equipment and components. Vsl manager was not able to provide PMP IAW NVIC 2-16 and there is not an indication of PMP implementation. 46 CFR 176.802(a)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 December 2023
Resolved 21 December 2023
Resolution: Reviewed PMP plan. Sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 September 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following:Inspection of the condition of the superstructure, masts, and similar arrangements constructed on the hull, and on a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails.
Third party rigging survey dated 12SEP2023 noted "Ugly surface corrosion without evidence of leaking" on chain plate. O/O polished chain plate for re-inspection. MI's noted evidence of water intrusion on port chain plate due to corrosion IWO fasteners.
During re-inspection, MI's noted corrosion IWO lower Fore-stay chain plait/lug where it is embedded into cross member. Provide repair proposal from qualified third party rigger.
46 CFR 176.802(a)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 December 2023
Resolved 21 December 2023
Resolution: Completed to satisfaction of MI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 September 2023
Resolved
46 CFR 176.802(a)(3)
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: Inspection of the condition of the superstructure, masts, and similar arrangements constructed on the hull, and on a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails.
Forestay chainplate and port/starboard shroud chainplates must be removed and replaced due to the age of the vessel combined with no documented history of inspection/replacement since vessel construction circa 1991.
Action required: 17 - Rectify deficiencies prior to departure
Due 17 November 2023
Resolved 21 December 2023
Resolution: Replaced chain plates to satisfaction of attending MI.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 14 June 2023
Resolved
In general, compliance with the standards established by a recognized classification society will be considered satisfactory evidence of the structural adequacy of the vessel. MI's observed sea water seeping through the lower deck of the port fwd void space in the vicinity of the waterline. Vessel must determine the source of the water ingress and ensure the watertight envelope is not compromised in that compartment.
46CFR 177.10-1
Action required: 30 - Ship detained
Resolved 30 June 2023
Resolution: Vessel determined source of water ingress. Water ingress resulted from a window, hatch, and inspection port that was left open during heavy rain. Vessel de-watered space and determined no further water ingress occurred after 24 hours.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 June 2023
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment other than small buoyancy compartments under all practical conditions. Starboard fixed hand bilge pump wasn't permanently attached to allow interconnection of the pump to the bilge piping of each individual space. Bilge portable hand pump was also missing.
46CFR 182.25-1
46CFR 182.25-10(d)
Action required: 30 - Ship detained
Resolved 30 June 2023
Resolution: Vessel made appropriate repairs to the bilge pumping arrangements. Witnessed satisfactory testing of all pumping arrangements.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 June 2023
Resolved
On or before March 11, 1999, an existing vessel must comply with the bilge high level alarm requirements in § 182.530. Port and Stbd fwd voids did not have visual and audible alarms installed. Vessel shall install audible and visual alarms for void with non-watertight closure on the main deck.
46CFR 182.115(d)
Action required: 30 - Ship detained
Resolved 30 June 2023
Resolution: Vessel made repairs to audible and visual arrangements. MIs witnessed satisfactory tests.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 June 2023
Resolved
On or before March 11, 1999, an existing vessel must comply with the bilge high level alarm requirements in § 182.530. Stbd head bilge alarm did not provide audible or visual alarm at the operating station. Vessel shall make repairs as necessary.
46CFR 182.115(d)
Action required: 30 - Ship detained
Resolved 30 June 2023
Resolution: Vessel made repairs to audible and visual arrangements. MIs witnessed satisfactory tests.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 June 2023
Resolved
The bilge suctions shall be fitted with suitable strainers having an open area not less than three times the area of the bilge pipe. MI discovered that all bilge suction points were missing foot strainers. Vessel shall install strainers as required.
46CFR 182.25-5(b)
Action required: 30 - Ship detained
Resolved 30 June 2023
Resolution: Vessel installed missing strainers in designated areas.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 June 2023
Resolved
At each initial and subsequent inspection for certification, the marine inspector shall inspect all lifesaving equipment to determine its serviceability. Attending MI’s noted that 31 of the adult life jackets were unserviceable.
46CFR 176.25-22(a)
Action required: 30 - Ship detained
Resolved 30 June 2023
Resolution: Vessel replaced unserviceable lifejackets with serviceable units.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 June 2023
Resolved
Each ring life buoy must be of an approved type. Ring life buoy did not have any approval markings or approval stamps. MI observed that ring life buoy had unsatisfactory repair that allowed water intrusion. Retro reflective material was faded, peeling off, and vessel’s name was not permanently marked. Vessel shall replace ring life w/ USCG approved type.
46CFR 180.30-1(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 June 2023
Resolution: Vessel acquired new USCG approved lifering.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 June 2023
Resolved
All life preservers shall be marked with the vessel’s name. The required child’s life preservers were not marked with the vessel’s name.
46 CFR180.25-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Vessel marked lifejackets with vessels name.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 14 June 2023
Resolved
Each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly, using the integrated test circuit and output indicator, to determine that it is operative; The EPIRB test required by paragraph (a) shall be logged or otherwise documented, as applicable. Vessel crew did not log EPRIB monthly tests.
46CFR 185.728
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 June 2023
Resolved 30 June 2023
Resolution: Witnessed documentation of EPRIB testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2023
Resolved
Flexible nonmetallic hose may be used in lube oil, fuel oil and fluid power systems, subject to the following requirements:(B) Flexible fuel hose designed for use with hose clamps may be installed with two clamps, at both ends of the hose. Attending MI’s noted that several of the hose clamps were wasted or absent from the fuel filters and flexible fuel hoses.
46CFR 182.720(e)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Vessel made appropriate repairs to fuel hose arrangements.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2023
Resolved
Fuel lines shall be accessible, protected from mechanical injury, and effectively secured against excessive movement and vibration by the use of soft nonferrous metal straps with no sharp edges. Attending MI’s noted that the control arm that links the port and starboard rudder was making contact with the fuel supply lines to the vessels outboard engines. Re-route fuel hoses away from pinch and chafe points of the steering components.
46CFR 182.14-40(b)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Fuel lines were re-routed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2023
Resolved
Main steering apparatus. All vessels except non-self-propelled vessels shall be provided with suitable steering apparatus. Attending MI’s noted that the bolt and nut retaining the steering linkage to the port outboard engine was insufficient. Replace with adequate bolt/nut combination.
46CFR 182.30-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Bolt and nut was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Gangway, accommodation-ladder
Issued 14 June 2023
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. MI’s noted that the ladder accessing the starboard forward void was missing mounting hardware; which could hinder escape from the space or cause and injury while entering.
46CFR 177.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Mounting hardware was installed.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 14 June 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. MI observed multiple incomplete kits with wet contents.
46CFR 184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: First aid kit was replaced with new.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 14 June 2023
Resolved
Fire fighting drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. Vessel could not produce evidence of satisfactory fire drills being conducted.
46CFR 185.524(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Drill log was provided.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 June 2023
Resolved
Inspection shall be in accordance with standards acceptable to the OCMI as good marine practice. Lines that secure forward trampolines to the hull are worn and frayed.
46CFR 176.25-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Lines were replaced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 June 2023
Resolved
Electrical installations and equipment should be installed so that they will result in a vessel that is reasonably safe from fire caused by and/or originating in electrical equipment and reasonably safe from electrical shock of personnel. Electrical cables for both outboard motors were dragging in the water because it was not properly secured to the hull.
46CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Lines were secured.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 14 June 2023
Resolved
Vents must be designed and constructed to minimize clogging by the contents of the tank. Sewage tank vent was broken off in the fwd port void space.
33CFR 159.61
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Satisfactory repair was made to vent.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 14 June 2023
Resolved
If a vessel operates on exposed or partially protected waters, an opening port light is not permitted below the weather deck unless it has an inside, hinged dead cover. Port light in forward void is missing a lens and dead cover.
46CFR 171.119
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Cover was replaced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 June 2023
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure and have either a pressure type connector on each conductor; a solder lug on each conductor; a splice made with a pressure type connector to a flexible lead or conductor; or a splice that is soldered, brazed, or welded to a flexible lead or conductor. Sewage tank discharge pump wiring connections were connected by twist caps.
46 CFR 183.01-15(a)
46 CFR 183.340(i)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: Wires were properly connected and enclosed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 14 June 2023
Resolved
The Certificate of Inspection and any SOLAS Certificates must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers is likely. The COI was not posted.
46 CFR 176.302
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 30 June 2023
Resolution: COI was posted.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 14 June 2023
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Electrical wire in stbd storage head space was utilized to hang extra lifejackets, putting strain on the wire.
46CFR 176.800(a)
Action required: 10 - Deficiency Rectified
Resolved 14 June 2023
Resolution: Life jackets were removed from electril wiring.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 June 2022
Resolved
Whenever damage to hull plating or structural members that may affect the seaworthiness of a vessel is suspected, the OCMI may conduct an internal structural exam in any affected space and may require the vessel to be drydocked or taken out of service to assess the extent of the damage and to affect repairs.
Master notified USCG that the vessel struck a submerged object and or grounded which caused a loss of steerage and caused restricted maneuverability.
Provide underwater damage survey to OCMI or attend drydock for USCG hull inspection prior to operating with passengers.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 June 2022
Resolved 16 June 2022
Resolution: Satisfactory sea trial conducted.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 March 2019
Resolved
Properly label lifejacket storage locations.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 January 2020
Resolution: Labels has been provided for storage locations.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 March 2019
Resolved
Provide a preventative maintenance plan for sailing rig in accordance with NVIC 02-16.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 January 2020
Resolution: Maintenance plan has been created and used for sailing rig IAW NVIC 2-16
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 14 December 2018
Resolved
Starboard rudder damaged during vessel grounding. Repair rudder to satisfaction of attending USCG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 17 December 2018
Resolution: Vessel repaired rudder to satisfaction of attending MI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 August 2018
Resolved
Vessel failed to conduct annual inspection within 3 months of anniversary date.
Action required: 10 - Deficiency Rectified
Resolved 24 August 2018
Resolution: Vessel was inspected by attending USCG MI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 August 2018
Resolved
No vessel crew members on board could demonstrate participation in pre-employment or random drug testing. Current consortium covered crew list was not available.
Action required: 10 - Deficiency Rectified
Resolved 24 August 2018
Resolution: Vessel provided updated covered crew list and replaced one crew member.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 24 August 2018
Resolved
Stern light not operable. Demonstrate proper operation of stern light.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 August 2018
Resolution: Vessel repaired stern light.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 August 2018
Resolved
EAP training records not available for crew members.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 September 2018
Resolution: Vessel provided EAP training that was furnished by consortium.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 August 2018
Resolved
Emergency instructions not available on board.Provide and post emergency instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 September 2018
Resolution: Vessel provided emergency instructions.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 24 August 2018
Resolved
Stability letter not available on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 September 2018
Resolution: USCG MSD St Thomas provided copy of stability letter to vessel.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 24 August 2018
Resolved
Compass illumination inoperable. Demonstrate proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 September 2018
Resolution: Vessel replaced compass.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 August 2018
Resolved
Provide and implement rigging inspection and maintenance program IAW NVIC 02-16.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 October 2018
Resolved 21 December 2018
Resolution: Vessel provided plan.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 24 August 2018
Resolved
Provide record of monthly test of on board EPIRB.
Action required: 10 - Deficiency Rectified
Resolved 24 August 2018
Resolution: Vessel conducted and logged test during inspection.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 24 August 2018
Resolved
Provide records of fire, abandon ship and man overboard drills.
Action required: 10 - Deficiency Rectified
Resolved 24 August 2018
Resolution: Vessel conducted and logged drills during inspection.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 August 2018
Resolved
Vessel was storing gasoline in space not intended for flammable liquid storage. Vessel removed gasoline.
Action required: 10 - Deficiency Rectified
Resolved 24 August 2018
Resolution: Vessel removed gasoline.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 28 February 2018
Resolved
Deck rails do not meet rail height or course spacing for excursion vessel. To be corrected prior to next drydock of next repair/replacement of rails.
Action required: 705 - Other - as specified
Resolved 5 October 2020
Construction/Loadline › Hull › Strut/Cross Tie
Issued 13 November 2017
Resolved
Work List: Investigate and repair proposal for cracks observed in the portside forward cross members in way of upper, lower, and juction with the hull.
Action required: 705 - Other - as specified
Resolved 16 November 2017
Resolution: Cracks investigated. No further repair necessary.
Construction/Loadline › Hull › Stringer
Issued 13 November 2017
Resolved
Repair crack in life float rack attachment to hull.
Action required: 705 - Other - as specified
Resolved 16 November 2017
Resolution: Crack repaired.
Construction/Loadline › Hull › Stringer
Issued 13 November 2017
Resolved
Repair separation of aft ends of rub rails.
Action required: 705 - Other - as specified
Resolved 16 November 2017
Resolution: Separation repaired.
Engineering › Steering Gear System › Rudder Stock
Issued 13 November 2017
Resolved
Repair bent rudder posts.
Action required: 705 - Other - as specified
Resolved 30 November 2017
Resolution: Rudder stock replaced and rudders re-installed.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 13 November 2017
Resolved
Show proper operation of thru-hull fitting.
Action required: 705 - Other - as specified
Resolved 16 November 2017
Resolution: Valve replaced.
Sail Rigging › Chainplates › Fasteners
Issued 13 November 2017
Resolved
Excessive rust was observed in multiple fasteners on both port and starboard chainplates. Remove fasteners showing rust indications for inspection.
Action required: 705 - Other - as specified
Resolved 16 November 2017
Resolution: Fasteners to be monitored after cleaning.
Stability › Weathertight Integrity › General
Issued 13 November 2017
Resolved
Remove rotted wood framing around port aft hatch and replace.
Action required: 705 - Other - as specified
Resolved 30 November 2017
Resolution: Rotten wood replaced.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 13 November 2017
Resolved
Reinstall port stanchions. Provide repair proposal to repair or replace rotted and damaged decking and backing in the vicinity of stanchion mountings.
Action required: 705 - Other - as specified
Resolved 30 November 2017
Resolution: Deck replaced in way of stanchion mountings.
Construction/Loadline › Hull › Stiffener
Issued 13 November 2017
Resolved
Provide repair proposal for cracked deck transverse stiffener portside midships.
Action required: 705 - Other - as specified
Resolved 16 November 2017
Resolution: Deck stiffener repaired. Insert was scarfed in and sistered.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 13 November 2017
Resolved
Fasteners holding forward netting showing signs of rust and deterioration. Remove rusted fasteners for inspection/replacement prior to carrying passengers on the nets.
Action required: 705 - Other - as specified
Resolved 22 October 2018
Resolution: Trampolines replaced.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 12 May 2017
Resolved
Missing DAPI program elements including MIS reports, crew roster, EAP training and phone numbers. Vessel to schedule DAPI audit with USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 9 June 2017
Resolution: DAPI audit completed.
Operations/Management › Drug and Alcohol Testing › Testing, Pre-employment
Issued 12 May 2017
Resolved
01 crew member was not pre-employment tested. Vessel to provide crew memebr that has been screened.
Action required: 705 - Other - as specified
Due 12 May 2017
Resolved 12 May 2017
Resolution: Vessel provided additional crewmember.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 12 May 2017
Resolved
Vessel to provide current FCC Safety Radio Telephony Certificate.
Action required: 705 - Other - as specified
Due 12 June 2017
Resolved 9 June 2017
Resolution: Certificate provided.
Sail Rigging › Running Rigging › Shackles
Issued 12 May 2017
Resolved
Vessel to mouse all shackles.
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 26 May 2017
Resolution: Moused
Construction/Loadline › Structures › Deck Plating
Issued 2 December 2016
Resolved
Provide repair proposal for damage to net (trampoline) supports. Demonstrate compliance with original design specifics. Passengers prohibited form being on nets until rectified.
Action required: 705 - Other - as specified
Due 2 January 2017
Resolved 18 February 2017
Resolution: Vessel repaired trampoline support in accordance with manufacturer's specifications.
Sail Rigging › Stays/Shrouds › Turnbuckles and Toggles
Issued 2 December 2016
Resolved
Develop and implement rigging inspection and maintenance plan IAW NVIC 02-16.
Action required: 705 - Other - as specified
Due 2 January 2017
Resolved 18 February 2017
Resolution: Vessel developed and implemented plan.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 2 December 2016
Resolved
Repair port side broken stanchion for lifilines.
Action required: 705 - Other - as specified
Due 2 January 2017
Resolved 11 January 2017
Resolution: Vessel repaired stanchion.
Documentation › Certificates/Documents › FCC SSL
Issued 16 June 2016
Resolved
Renew expired FCC station license and provide new call sign/MMSI number for radio, EPIRB registration, emergency broadcast placard and COI. Restricted to 1000 ft from shore until corrected.
Action required: 705 - Other - as specified
Resolved 26 July 2016
Resolution: Vessel provided FCC Station License.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 16 June 2016
Resolved
Renew expired FCC safety radiotelephony certificate. **Extended due date to 13JUL2016 from 24JUN2016.
Action required: 705 - Other - as specified
Resolved 26 July 2016
Resolution: Vessel provided FCC Safety Radio Telephony Certificate
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 16 June 2016
Resolved
Provide EPIRB testing log for monthly EPIRB tests. **Extended due date to 06JUL2016 from 24JUN2016.
Action required: 705 - Other - as specified
Due 6 July 2016
Resolved 6 July 2016
Resolution: Attending MI observed EPIRB test and entry into log.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 16 June 2016
Resolved
Replace portable fire extinguisher brackets with approved type. **Extended due date to 06JUL2016 from 24JUN2016.
Action required: 705 - Other - as specified
Due 6 July 2016
Resolved 6 July 2016
Resolution: Attending MI observed replaced brackets.
Engineering › Bilge Water Management System › Interface Detector
Issued 16 June 2016
Resolved
Mount bilge high level alarms in both hulls. Prove proper operation.
Action required: 705 - Other - as specified
Due 6 July 2016
Resolved 13 July 2016
Resolution: Vessel showed proper operation of mounted bilge alarms to attending MI.