Records from 1990 to 2007. Most recent: inspection, 4 December 2007.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 24
4 December 2007
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3109183
28 May 2007
ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 2936326
25 January 2006
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2573244
25 July 2005
COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2450089
13 August 2002
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1660916
13 August 2002
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1661083
29 April 2002
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1610810
28 April 2002
Certificate of Compliance
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1610235
1 February 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1660637
29 January 2001
Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1056669
13 January 2001
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 285871
12 January 2001
Tank Vessel Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1432423
22 July 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 508448
27 June 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 85322
22 June 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 429899
22 June 1999
Tank Vessel Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 881932
21 May 1998
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 416363
4 May 1998
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 654356
28 March 1998
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 414107
28 March 1998
Tank Vessel Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 787226
2 December 1993
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 481194
2 December 1993
Certificate of Compliance
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1157974
24 November 1990
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1215274
23 November 1990
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 900905
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 25 July 2005
Resolved
Have Certificate Issuing Authority examine and address window A/C unit in cargo control room. Bulkhead is currently listed as a Class "A" fire boundary in the vessel's fire control plan. Have Certificate Issuing Authority submit results of examination and recommendations to [name withheld] no later than 25 AUG 2005. SOLAS 74 Ammended Chapter II-2 Regulation 58.
Due 25 August 2005
Resolved 12 August 2005
Resolution: Received report from classification indicating that the inside acoomadation bulkhead will be modified with an installed fire damper according to class report of survey.
Lifesaving
Issued 13 January 2001
Resolved
FORWARD 6 MAN LIFERAFT DAMAGED IN HEAVY WX. REQUIRED ON BOARD PRIOR TO DEPARTURE._x001C_ _x001C_ SOLAS III/26.1.4
Condition: Unknown
Due 14 January 2001
Resolved 19 January 2001
Lifesaving
Issued 22 June 1999
Resolved
REPAIR OR REPLACE THE LAUNCHING MECHANISM WHICH IS ACTUATED FROM WITHIN THESTARBOARD LIFEBOAT TO THE SATISFACTION OF CLASS. (CABLE PARTED AND DRUM BROKEN.)
Condition: Unknown
Due 26 July 1999
Resolved 26 July 1999
Fire Fighting
Issued 28 March 1998
Resolved
Fantail deck centerline paint locker water spray fire fighting system discharge ports clogged with debris, correct as per SOLAS 74 amended II- 2/21.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Fire Fighting
Issued 28 March 1998
Resolved
Fantail deck port aft paint locker fixed fire fighting system in-line valves are frozen in place (closed position), correct as per SOLAS 74 amended II-2/21.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Lifesaving
Issued 28 March 1998
Resolved
Engine room emergency escape trunk leading to portside fantail deck is impeded by block & tackle, correct as per SOLAS 74 amended II-2/28.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Lifesaving
Issued 28 March 1998
Resolved
Emergency shutdown station located on main deck forward of cabin house not properly protected by weather cover due to deterioration of same, correct as per SOLAS 74 amended I/11.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Deck/Cargo
Issued 28 March 1998
Resolved
Cargo system piping not pressure tested within past 12 months, correct as per 33 CFR 156.170.
Condition: Unknown
Due 28 March 1998
Resolved 4 May 1998
Deck/Cargo
Issued 28 March 1998
Resolved
Tanks not fully inerted at time of inspection; eg. #6 port tank tested at 12.5%oz., correct as per 46 CFR 32.53-S.
Condition: Unknown
Due 28 March 1998
Resolved 10 April 1998
Engineering
Issued 28 March 1998
Resolved
Fuel oil vent screens improper: eg., port side aft fuel oil vent and others were observed to be holed, correct as per SOLAS 74 amended I/11.
Condition: Unknown
Due 29 March 1998
Resolved 10 April 1998
Navigation
Issued 28 March 1998
Resolved
Auto-pilot alarm/indicatior failed to meet regulatory requirements relatingto functionality, correct as per 33 CFR 157.440.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Documentation
Issued 28 March 1998
Resolved
No evidence available that owner/operator had plans to meet enhanced surveyrequirements at next scheduled drydock examination, correct as per 33 CFR 157.430 IMO Resolution A.744.18.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Documentation
Issued 28 March 1998
Resolved
Procedures and arrangements manual not approved by flag administration, correct as per 46 CFR 153.490.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Deck/Cargo
Issued 28 March 1998
Resolved
Cargo system pressure gauges not tested within past 12 months, correct as per 33 CFR 156.170.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Documentation
Issued 28 March 1998
Resolved
Vessel single hulled according to I.O.P.P. certificate, does not have required bridge resource management policy and procedures, correct as per 33 CFR 157.415/STCW B.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Navigation
Issued 28 March 1998
Resolved
Maneuvering tests not completed and proven to the satisfaction of the flag administration or classification society, correct as per 33 CFR 157.455/IMOResolution A.751(18).
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Lifesaving
Issued 28 March 1998
Resolved
Flammable/combustable liquids improperly stowed in port side cargo deck oilpollution locker, correct as per SOLAS 74 amended I/11.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Lifesaving
Issued 28 March 1998
Resolved
Lifeboats designed to be lowered to water by individual within the lifeboat, not rigged to facilitate lowering, correct as per SOLAS 74 amended III/19.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Electrical
Issued 28 March 1998
Resolved
Fire flap vent wiring in way of fantail main deck engine room emergency exit, not fully insulated at fire flap motor connection, correct as per SOLAS 74 amended II-1/45.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Lifesaving
Issued 28 March 1998
Resolved
Flammable/combustable liquids improperly stowed in portside main deck #140 store room, correct as per SOLAS 74 amended I/11.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Fire Fighting
Issued 28 March 1998
Resolved
Fire station valve handles located at aft portion of port side deck house require replacement, correct as per SOLAS 74 amended II-2/21.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Deck/Cargo
Issued 28 March 1998
Resolved
Cargo tank ullages, designed to have flame screens in place during some conditions of operation, were without flame screens. Vessel did not have screens in place, nor were proper screens accessible to ship's crew anywhere on board vessel, correct as per SOLAS 74 amended I/11.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Lifesaving
Issued 28 March 1998
Resolved
6 person liferaft on bow, designed to float free,(as evidenced by the presence of a hydrostatic release device) cannot float free in an emergencydue to the construction of a cage frame over the raft, correct as per SOLAS74 amended III/19.
Condition: Unknown
Due 23 June 1999
Resolved 23 June 1999
Navigation
Issued 23 November 1990
Resolved
PRIOR TO DEPARTING THE PORT OF HOUSTON, PROVE PROPER OPERATION OF THE EMERGENCY STEERING TO THE SATISFACTION OF THE CLASSIFICATION SOCIETY AND PROVIDE CLASS SOCIETY REPORT TO THE COGNIZANT OCMI.
Condition: Unknown
Due 23 November 1990
Resolved 23 November 1990
Navigation
Issued 23 November 1990
Resolved
PRIOR TO DEPARTING THE PORT OF HOUSTON, HAVE ON BOARD CURRENT AND CORRECTEDCHARTS FOR THE HOUSTON SHIP CHANNEL.
Condition: Unknown
Due 23 November 1990
Resolved 23 November 1990
Fire Fighting
Issued 23 November 1990
Resolved
PRIOR TO DEPARTING THE PORT OF HOUSTON, ALL PORTABLE FIRE EXTINGUISHERS MUST BE PROFESSIONALLY SERVICED.
Condition: Unknown
Due 23 November 1990
Resolved 23 November 1990
Deck/Cargo
Issued 23 November 1990
Resolved
PRIOR TO DEPARTING THE PORT OF HOUSTON, MAKE TEMPORARY REPAIRS TO THE LEAK IN WAY OF THE WATER DISCHARGE PIPE FOR THE IGS SCRUBBING TOWER AND MAKE PERMANENT REPAIRS NO LATER THAN 23JAN90 TO THE SATISFACTION OF THE CLASSIFICATION SOCIETY.
Condition: Unknown
Due 23 November 1990
Resolved 23 November 1990