← All vessels
THUNDER BAY
Commercial Fishing Vessel · Fishing Vessel class · Built 1990s · USCG Arctic District (CGD-A) · Other hulls named THUNDER BAY
THUNDER BAY is a 1991 commercial fishing vessel. The Coast Guard has recorded 45 inspections since 1991, most recently in October 2023, along with 76 deficiencies and 1 casualty investigation in 2016.
Records from 1991 to 2023. Most recent: inspection, 30 October 2023.
- Built
- 1991
- Last inspected
- 30 October 2023
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 76 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2016
Identity
973719
USAAW
360671
Flag
UNITED STATES
—
Maury page id
psix-360671
Inspections, by type
…with no type recorded2
Years with a record
28 calendar years (1991–2023)
The 45 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Fishing Vessel class in Maury's sources begin in 1972.
Documentation record
Registered dimensions (L × B × D)43.0 ft × 14.2 ft × 6.2 ft
Registered tonnagegross 25 / net 20
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDELTA MARINE INDUSTRIES · SEATTLE, WA, UNITED STATES · built 1991
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portSEWARD, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 24 April 2026 · expires 30 April 2027
Service, as the file records itCommercial Fishing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it20 - Simplified, Net Ton
25 - Simplified, Gross Ton
25 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 45
30 October 2023
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7816694
4 April 2023
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7662704
30 April 2021
Administrative Inspection · COI Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7186104
26 August 2020
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7043458
5 July 2020
Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7000754
31 March 2020
Administrative Inspection
Administrative · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6955429
13 May 2019
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6683565
15 May 2018
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6412677
27 March 2018
Deficiency Check · Internal Structural Exam · Examination of Repairs · Drydock Exam · Plan Review "T" Boat
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6381529
8 June 2017
Type not recorded
No type recorded · USCGC MUSTANG (WPB 1310) · USCG Arctic District (CGD-A) · Activity 6174859
18 May 2017
Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6235521
2 August 2016
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6068213
10 May 2016
COI Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5868294
29 March 2016
Hull Examination · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5848126
13 May 2014
Annual Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4862645
24 March 2014
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4827307
31 January 2012
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4236390
7 May 2009
Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3473667
24 April 2008
Drydock Exam · Deficiency Check · Internal Structural Exam · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3191634
1 May 2007
Annual Inspection · MARPOL Annex V Examination · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2953599
9 May 2006
Deficiency Check · COI Inspection · MARPOL Annex V Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2649873
9 March 2006
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2599336
9 May 2005
Deficiency Check · Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2439966
13 May 2004
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2110541
26 September 2003
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1913947
5 June 2003
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1810321
14 May 2002
Annual Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1696282
24 May 2001
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1376814
11 August 2000
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1471588
29 March 2000
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1421844
16 September 1999
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1131011
4 June 1999
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1360999
13 May 1998
Hull Examination · COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1441378
10 November 1997
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 785436
21 April 1996
Hull Examination · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1371365
3 July 1995
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 882152
19 May 1995
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 875757
20 December 1994
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1154420
26 May 1994
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 861131
4 May 1994
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 859216
4 May 1993
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1358061
1 June 1992
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 825954
18 May 1992
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 825956
13 June 1991
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1025000
15 March 1991
Hull Examination · Plan Review "T" Boat · Initial Certification
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 908896
Deficiency record · 76
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 3 May 2021
Resolved
Vessel is out of the water and not operating for the 2021 season. Complete COI Inspection prior to carrying passengers. COI Inspection was started on 03MAY21.
Communications › Radio Communications › VHF Radiotelephone
Issued 15 May 2018
Resolved
Vessel operator did not have FCC operator permit. Vessel operator must have FCC operator permit onboad.
Engineering › Steering Gear System › Ram
Issued 15 May 2018
Resolved
The bearing on the steering ram is loose. Repair/renew bearing on steering ram.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 18 May 2017
Resolved
Provide ventilation closure device for engine room vent.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 18 May 2017
Resolved
Seal hole in aft engine room bulkhead make sure vapor tight.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 May 2017
Resolved
Remove or dean end in junction box abandoned electrical wiring in stbd side of engine room.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 10 May 2016
Resolved
Provide line for waterlight on ring buoy that is long enough to attached waterlight around the body of the ring buoy.
Navigation › Piloting/Steering › Marine Charts
Issued 10 May 2016
Resolved
Provide updated charts (current charts 10 years old with no corrections)
Engineering › Fuel Oil Service System › Piping
Issued 12 May 2009
Resolved
Bond fuel fill necks.
Engineering › Bilge Water Management System › Hose
Issued 12 May 2009
Resolved
Double clamp hose on SW washdown pump.
Communications › Audible Communications › Horn/Whistle
Issued 12 May 2009
Resolved
Provide horn/sound producing device.
Operations/Management › Passenger Operations › Safety Orientation
Issued 12 May 2009
Resolved
Remark emergency escape hatch from both sides (inside and out).
Engineering › Bilge Water Management System › Interface Detector
Issued 12 May 2009
Resolved
Remove/repair high water alarm in space aft of collision bulkhead.
Engineering › Bilge Water Management System › Interface Detector
Issued 14 May 2008
Resolved
Repair/replace mounting bracket for HW alarm in space aft of collision bulkhead.
Engineering › Fuel Oil Service System › Filter
Issued 14 May 2008
Resolved
Replace drain plugs on fuel filter flame bowls with solid bottom type plugs.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 1 May 2007
Resolved
Provide Operators license
Lifesaving › Inflatable Buoyant Apparatus › Not on Board
Issued 1 May 2007
Resolved
Provide a properly installed survival craft
Construction/Loadline › Structures › Manhole
Issued 1 May 2007
Resolved
Mark emergency escape "Emergency Exit, Keep Clear" in 01" letter
Operations/Management › Drills/Instruction › Not Conducted
Issued 1 May 2007
Resolved
Provide crew and vessel for onboard drills
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 9 May 2006
Resolved
Repair or replace damaged IBA life raft canister
Stability › Watertight Integrity › Weathertight Enclosure
Issued 9 May 2006
Resolved
Replace gasket on forepeak hatch
Deck/Cargo › Cargo Stowage › General
Issued 9 May 2006
Resolved
Secure fish box to aft deck
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 9 May 2006
Resolved
Stencil name of vessel on lifebouy
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 9 May 2006
Resolved
Attach corrosion resistant clip to lifebuoy light lanyard
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 9 May 2006
Resolved
Provide a non-conductive cover for batteries
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 9 May 2006
Resolved
Service all portable fire extinguishers on vessel
Personnel › Training › First Aid/CPR
Issued 9 May 2006
Resolved
Provide CPR cards for crew
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 9 May 2006
Resolved
Provide proof of Drug & Alcohol program
Communications › Alarms/Indicators › Bilge Alarm
Issued 9 May 2005
Resolved
Renew labels for bilge high water alarms at operating station.
Documentation › Markings/Placards › Warning Signs
Issued 9 May 2005
Resolved
Renew label for forward emergency egress hatch.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 9 May 2005
Resolved
Renew labels at lifejacket stowage compartments.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 9 May 2005
Resolved
Renew labels at fuel shutoff valves.
Lifesaving › Inflatable Liferafts › Weak Link
Issued 9 May 2005
Resolved
Install weak link, hydro release and shackle properly to allow float free deployment of inflatable liferaft.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 9 May 2005
Resolved
Provide a portable bilge pump.
Construction/Loadline › Structures › Scuttle
Issued 26 September 2003
Resolved
Repair broken dog on hatch to forward peak.
Engineering › Fuel Oil Storage/Transfer System › Manifold
Issued 26 September 2003
Resolved
Reposition the STBD fuel shut off valve so it can operate in the full open and closed position.
Stability › Watertight Integrity
Issued 5 June 2003
Resolved
Repair holes from removed wire runs in forward engine room bulkhead.
Fire Fighting › Portable CO2 Fire Extinguisher › Number
Issued 5 June 2003
Resolved
Replace missing B-I portable fire extinguisher in pilothouse
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 5 June 2003
Resolved
Repair/replace starboard running light.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 14 May 2002
Resolved
Fabricate vent covers for E/R vents cowls on upper deck. LEGACY COMPONENT DESC: Ducts
Electrical › Electrical Distribution System (emergency) › Switch
Issued 14 May 2002
Resolved
Repair E/R bilge pump switch. LEGACY COMPONENT DESC: Switch
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 May 2002
Resolved
Replace aft door window (cracked) w/ appropriate safety glass.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 14 May 2002
Resolved
Replace missing BI portable ext.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 14 May 2002
Resolved
Service all portable F/E's
Engineering › Bilge Water Management System › Hose
Issued 14 May 2002
Resolved
Procure longer discharge and suction hose for hand bilge pump.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 14 May 2002
Resolved
Locate water intrusion via E/R bilge suction.
Fire Fighting
Issued 24 May 2001
Resolved
Plug holes in forward engineroom bulkhead with fire/vapor stop material.
Fire Fighting
Issued 24 May 2001
Resolved
Install fire/washdown pump and prove proper operation.
Construction/Loadline
Issued 24 May 2001
Resolved
Install high water alarms for all additional protected spaces.
Construction/Loadline
Issued 24 May 2001
Resolved
Prove proper operation of visual function on existing high water alarms.
Navigation
Issued 11 August 2000
Resolved
PROVIDE A CURRENT COAST PILOT ON BOARD I.A.W. 46 C.F.R. 184.420
Construction/Loadline
Issued 11 August 2000
Resolved
PROVIDE ADEQUATE HATCH LOCK DOWN DEVICES (DOGS) ON CENTER ENGINE ROOM HATCHCOVER I.A.W. 46 C.F.R. 171.124
Navigation
Issued 11 August 2000
Resolved
PROVIDE TIDAL TABLES ON BOARD VSL I.A.W. 46 C.F.R. 184.420.
Electrical
Issued 11 August 2000
Resolved
REMOVE DEAD END WIRE RUNS FROM OLD GENERATOR INSTALLATION I.A.W. 46 C.F.R. 183.340.
Navigation
Issued 11 August 2000
Resolved
REPAIR/REPLACE STBD NAV LIGHT I.A.W. 46 C.F.R. 183.420 AND COLREGS.
Lifesaving
Issued 11 August 2000
Resolved
PROVIDE ONE ADDITIONAL ORANGE SMOKE SIGNAL I.A.W. 46 C.F.R. 180.68
Lifesaving
Issued 11 August 2000
Resolved
PROVIDE PROOF OF CURRENT EPIRB NOAA REGISTRATION I.A.W. 46 C.F.R. 180.64
Electrical
Issued 4 June 1999
Resolved
PROVE PROPER OPERATION OF AUXILIARY GENERATOR. 46 CFR 183.322
Construction/Loadline
Issued 4 June 1999
Resolved
PROVIDE BILGE LINE CHECK VALVES AT MANIFOLD OR IN COMPARTMENT. _x001C_ 46 CFR 182.510(c)
Navigation
Issued 4 June 1999
Resolved
PROVIDE COMPASS DEVIATION CARD. 46 CFR 184.402
Navigation
Issued 4 June 1999
Resolved
CORRECT NAVIGATION CHARTS. 46 CFR 184.420
Construction/Loadline
Issued 4 June 1999
Resolved
PROVIDE VISUAL INDICATOR LIGHT FOR BILGE PUMPS. 46 CFR 182.530
Electrical
Issued 19 May 1995
Resolved
Make electrical bonding system continuous throughout vessel.
Construction/Loadline
Issued 19 May 1995
Resolved
Provide hold down latch system for main engine hatches.
Construction/Loadline
Issued 19 May 1995
Resolved
Provide check valve and bilge suction screen on lazarrette bilge suction. The suction screen is to have no less than 3 times the cross sectional areaof the bilge pipe.
Engineering
Issued 19 May 1995
Resolved
Provide guards over pulleys and belts on front of both main engines.
Lifesaving
Issued 26 May 1994
Resolved
Replace EPIRB hydrostatic release.
Deck/Cargo
Issued 26 May 1994
Resolved
Show satisfactory operation of anchor windlass.
Lifesaving
Issued 26 May 1994
Resolved
Replace line on lifefloat.
Fire Fighting
Issued 26 May 1994
Resolved
Provide marine type fire extinguisher bracket for 1 BII portable fire extinguisher.
Fire Fighting
Issued 26 May 1994
Resolved
Install one additional BII fire extinguisher.
Lifesaving
Issued 26 May 1994
Resolved
Replace 18 adult lifejackets.
Fire Fighting
Issued 26 May 1994
Resolved
Provide hand fire pump.
Construction/Loadline
Issued 4 May 1994
Resolved
Grind out, reglass, and regelcoat minor gouges in hull in fiberglass 5 areas varying 1/8" to 5/32" in depth, 1/8" to 1/4" wide and 1/2" to 1" in length._x001C_ Repair prior to placing vessel back in water.
Navigation
Issued 15 March 1991
Resolved
PROVIDE CHARTS AND NAUTICAL PUBS TO MEET 46 CFR 185.20-35._x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 15 March 1991
Resolved
SWING MAGNETIC COMPASS AND PROVIDE CURRENT COMPASS DEVIATION TABLE._x001C_ _x001C_ _x001C_ _x001C_
Casualty record · 1
2 August 2016Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6068213
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
ARCTIC WARRIOR (2016). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.