MAURY USCG vessel records
← All vessels

USNS ABLE

USNS ABLE is a 1992 public vessel, unclassified. The Coast Guard has recorded 102 inspections since 2016, most recently in July 2026, along with 90 deficiencies — 2 with no resolution recorded — and 3 operational controls.

Records from 2016 to 2026. Most recent: inspection, 5 July 2026.

Built
1992
Last inspected
5 July 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

8923143
361659
Flag
UNITED STATES
Maury page id
psix-361659

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 2016.

Inspections, by type

…with no type recorded13
…past their stated due date1
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Tonnage as PSIX records it284 - Dead Weight, Ton
3384 - Displacement, Ton
1081 - Convention (Subpart B), Net Ton
3606 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

What it gives that this page does not: the whole record in one dated, citable document — every line with its Coast Guard activity id, the retrieval date on the cover, built to print to PDF with its page breaks — that a surveyor can attach and a lender can file. The same facts as this page, complete and in one file.

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

A request, not a checkout: leave an email and Maury replies once, with the dated document for this hull and a Stripe invoice for $299. Nothing is charged before the document is in your hands.

Inspection history · 102

5 July 2026 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8428402
10 June 2026 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8396255
2 February 2026 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8306956
7 December 2025 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8278591
23 November 2025 Examination of Repairs · Administrative Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8272746
7 November 2025 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8265450
20 October 2025 Administrative Inspection · Vessel Attendance · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8245777
11 August 2025 Internal Structural Exam · Drydock Exam
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8207043
1 June 2025 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8148982
21 May 2025 Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8135478
26 April 2025 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8120467
3 April 2025 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8104908
8 January 2025 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8059841
18 December 2024 Annual Inspection · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8037913
28 October 2024 Drydock Exam · Damage Survey
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8025510
15 October 2024 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8018863
26 July 2024 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7967300
29 June 2024 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7944825
22 May 2024 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7921170
14 April 2024 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7895905
2 April 2024 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7901089
17 January 2024 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7857685
13 November 2023 Administrative Inspection · Annual Inspection · Damage Survey
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7826292
7 November 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7821231
3 October 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7802333
8 August 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7762898
5 June 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7703343
22 May 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7693588
8 May 2023 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7685736
2 May 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7680688
24 April 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7674180
5 March 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7646677
27 February 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7645753
22 January 2023 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7625317
28 August 2022 Internal Structural Exam · COI Inspection · Deficiency Check · Hull Examination · ISM Oversight · Administrative Inspection · Examination of Repairs
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7543844
21 August 2022 Administrative Inspection · Examination of Repairs
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7539417
10 August 2022 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7554833
8 August 2022 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7527654
13 June 2022 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7475658
8 February 2022 Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7392340
7 February 2022 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7393218
19 January 2022 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7382208
29 November 2021 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7358314
20 October 2021 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7396389
4 October 2021 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7325845
26 September 2021 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7324390
2 August 2021 Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7274846
22 July 2021 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7265028
3 June 2021 Administrative Inspection · Deficiency Check
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7217699
17 May 2021 Administrative Inspection · Damage Survey
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7199812
26 April 2021 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7182743
1 February 2021 Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7133829
21 December 2020 Permit to Proceed
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7114525
27 October 2020 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7084699
26 October 2020 Administrative Inspection · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7084665
10 August 2020 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7029007
19 June 2020 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6980769
28 May 2020 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6962194
3 March 2020 Drydock Extension
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6919386
21 February 2020 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6912845
17 January 2020 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6896570
14 January 2020 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6890496
21 December 2019 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6883101
13 November 2019 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6856135
5 November 2019 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6849318
28 October 2019 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6843312
11 October 2019 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6833490
4 September 2019 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6804279
17 July 2019 Annual Inspection · Administrative Inspection · In-Service Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6752893
5 June 2019 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6704175
15 April 2019 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6669031
3 April 2019 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6654764
17 November 2018 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6583129
30 October 2018 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6570859
6 September 2018 Examination of Repairs · Deficiency Check
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6534537
31 July 2018 Ballast Water Examination · Annual Inspection · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6456227
2 July 2018 Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6468983
14 April 2018 Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6403644
9 April 2018 Damage Survey
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6404423
3 April 2018 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6383877
2 April 2018 Damage Survey
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6402891
5 February 2018 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6349424
12 January 2018 Administrative Inspection · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6336678
11 January 2018 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6368783
5 November 2017 Administrative Inspection · Deficiency Check · In-Service Inspection · Examination of Repairs
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6299957
26 October 2017 Damage Survey
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6292828
13 October 2017 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6286738
12 October 2017 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6286499
11 July 2017 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6208373
6 July 2017 Deficiency Check · Hull Examination · COI Inspection · Drydock Extension · Internal Structural Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6199189
9 June 2017 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6177321
10 May 2017 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6142849
4 May 2017 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6138604
18 April 2017 Examination of Repairs · Deficiency Check · In-Service Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6117244
20 March 2017 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6107726
17 March 2017 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6148910
5 November 2016 Examination of Repairs
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6143519
3 October 2016 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6021493
23 September 2016 Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6007366
16 August 2016 Examination of Repairs · Damage Survey
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 5973978
14 August 2016 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 5996143
10 March 2016 Deficiency Check · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 5830450

Deficiency record · 90

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2025 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessels management self reported that they are experiencing the beginning of what has been deemed a port stern tube forward seal failure. Mitigation efforts have been put into place and appear to be effective. Make repairs once a return to port has occurs.
Action required: 15 - Rectify deficiencies by next port
Due 7 December 2025
Resolved 16 December 2025
Resolution: Accepted as a condition of class
11 - Life Saving Appliances › N/A - No Subsystem › Fast Rescue Boats
Issued 24 October 2025 Resolved
Operational readiness. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. During MOB drill for inspection with USCG, rescue boat could not be operated in forward propulsion. ASP was able to repair by the end of the inspection. 46 CFR 199.190(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 October 2025
Resolution: Rescue boat was lowered to the water and was able to get underway, witnessed a satisfactory propulsion test.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 24 October 2025 Resolved
Vessels must be equipped with independently driven fire pumps in accordance with Table 95.10-5(a). During testing of the fire pumps during USCG inspection, port side fire pump gasket failed. Crew made repairs prior to end of inspection. 46 CFR 95.10-5(a)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 October 2025
Resolution: New gasket for the port side fire pump was installed and tested, all satisfactory.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 24 October 2025 Resolved
The minimum instrumentation, alarms, and safety controls required for specific types of systems are listed in Table 62.35-50: Bilge Level – High/Location. During testing for USCG inspection, 06 bilge alarms were inoperable. Crew was able to repair by the end of the inspection. 46 CFR 62.35-50
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 October 2025
Resolution: Crew was able to repair by the end of the inspection, all 06 bilge alarms were re-tested. all tested satisfactory and operational.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 24 October 2025 Resolved
If the prime mover is a diesel engine, there must be an audible alarm that sounds on…high cooling water temperature. During inspection with USCG, high temperature jacket water temperature was not alarming. Crew swapped out the inoperable thermocouple and demonstrated alarm notification as per revised PSTPs prior to end of inspection. 46 CFR 112.50-1(h)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 October 2025
Resolution: Crew swapped out the inoperable thermocouple and demonstrated alarm notification as per revised PSTPs prior to end of inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 24 October 2025 Resolved
Each space used by…crew must be fitted with lighting that provides for safe habitable and working environment under normal working conditions. Marine Inspectors found several lights that are out about the vessel. Identify all non-operational lights and make repairs to satisfaction of OCMI. 46 CFR 111.75-15(c)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2025
Resolved 7 November 2025
Resolution: All passageway lighting: 25 lighting fixtures throughout the vesselwere verified working.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 24 October 2025 No resolution recorded
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Systems addressed must include fire detection and extinguishing, flooding safety, propulsion, maneuvering, electric power generation and distribution, and emergency internal communications. During annual inspection and acceptance of PSTPs, it was found that PSTPs do not include testing or remote operated fire dampers which is part of the fire extinguishing system. Submit revised PSTPs and receive MSC approval prior to unmanned watches implemented. 46 CFR 61.40-6
Condition: Improper Installation
Action required: 705 - Other - as specified
11 - Life Saving Appliances › N/A - No Subsystem › Fast Rescue Boats
Issued 24 October 2025 Resolved
Operational readiness. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. inspection with USCG masthead all-around navigation light and anchor light could not be energized. Vessel authorized a temporary repair utilizing an all-around flashlight until permanent repairs are made. 46 CFR 199.190(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2025
Resolved 7 November 2025
Resolution: USCG masthead all-around navigation light was replaced in kind and tested by ABS.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 October 2025 Resolved
The symbols used to identify the aforementioned details shall be in accordance with IMO Assembly resolution A.654(16). Crew stateroom 2-146-2 door does not have sticker for fire damper that is inside. 46 CFR 97.36-1(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2025
Resolved 7 November 2025
Resolution: Crew stateroom 2-146-2 door has sticker for fire damper
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 October 2025 Resolved
In general, connections and terminations to all conductors must retain original electrical, mechanical, flame-retarding, and where necessary, fire resisting properties of the cable. Marine inspector found the old wiring from the starboard speed log preamp still in place and with exposed conductors. Remove all dead-end wiring in the associated space to satisfaction of OCMI. 46 CFR 111.60-17(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2025
Resolved 7 November 2025
Resolution: Completion of removal of obsolete electrical wiring and fire-putty application, examined by the undersigned ABS surveyor and found satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 24 October 2025 Resolved
Cylinders must always be secured, and when not in use, they must be stowed in a rack in an upright position, with the valve protection cap in place. There were several cylinders stowed in various locations throughout the ship that did not fit into their designed braces, did not have their wood bases, and or not secured properly and were next to or nearby the rack, but not in the rack. Inventory all required compressed gas, make racks required and stow cylinders at next maintenance period to satisfaction of OCMI. 46 CFR 147.60(b)(1)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 14 November 2025
Resolution: Accepteed and cleared as ABS Finding 1116.0
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 24 October 2025 Resolved
Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he deems necessary to be assured of the safety and seaworthiness of the vessel. During inspection for COI annual, Marine inspectors found the port side water heater has started leaking and is leaving the deck wet and slippery in the space. Make permanent repairs to satisfaction of OCMI. 46 CFR 91.25-50
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 November 2025
Resolved 4 November 2025
Resolution: Item was cleared and verified.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 January 2025 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel's captain reported that the shipboard maintenance system (SAMM) in inoperable. the current SAMM system issue renders the crew unable to effect repairs in the event of an emergency and located necessary replacement parts. SOLAS 1/11(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 January 2025
11 - Life Saving Appliances › N/A - No Subsystem › Fast Rescue Boats
Issued 26 July 2024 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order ready for immediate use. USCG FEACT received a 2692 from the vessel master stating that the fast rescue boat was unable to start. Once the crew placed a temp battery charger on the boat it was able to be started. Root cause was the failure of installed battery charger. Replacement has been ordered.
Action required: 10 - Deficiency Rectified
Due 10 April 2025
Resolved 21 August 2024
Resolution: Sector Guam attended vessel while in port and verified corrected action.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 29 November 2023 Resolved
A self-contained emergency source of electrical power must be provided and the transfer of power must be accomplished in no more than 45 seconds after failure of the normal source of power. The emergency diesel generator's switchboard breaker must be manually charged as automatic charging system is faulty.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 8 February 2024
Resolution: EDG tested w/ ABS and verified operation.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 29 November 2023 Resolved
The condition of the ship's equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons on board. There is an oil leak on the #3 SSDG in way of the turbo, causing accumulation of oil on and around the outside of the turbo. #3 SSDG has been tagged out.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 14 March 2024
Resolution: ABS finding 1009.0 closed, OEM technicians investigated and closed.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 November 2023 Resolved
The construction of doors and door frames in "A" class boundaries shall provide resistance to the passage of smoke and flame equivalent to that of the bulkheads in which the doors are situated. Corrosion has caused the door frame, and adjacent bulkhead, on the starboard anchor windlass room to become detached from the deck. Temporary repair has been made. Permanent repair to be made during January 2024 MTA.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 9 February 2024
Resolution: New deficiency to be issued to reflect extension for specific door replacement at DD in Oct2024.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 29 November 2023 Resolved
The condition of the ship's equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons on board. Mounting bolt on #3 SSDG duplex fuel filter is loose; power cable in way of P/S auxiliary machinery room exit to be secured/supported; SP107 high voltage -overhead distribution panel is missing 8 bolts in the panel, causing dust and debris to collect inside the panel; multiple non-marine grade extension cords were found servicing equipment, satisfactory permanent electrical connections need to be made; reach rods for multiple ballast tank foot valves (internal) are inoperable; Multiple fire station's hose cabinets have missing or broken latches for securing the doors.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 14 March 2024
Resolution: Cleared via ABS oversight - Finding 1033.0
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 November 2023 Resolved
Nonmetallic flexible hose may be used in lube oil, fuel oil, adn fluid power systems in lengths not exceeding 30 inches. All SSDGs are using flexible hoses for diesel fuel drain lines which exceed 30".
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 8 February 2024
Resolution: Discussed with OEM and noted flexible hoses are drain lines to oil sump and non-metallic hoses not used for flexibility
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 November 2023 Resolved
Lifebuoys with lights shall be distributed as to be readily available on both sides of the ship. Lifebuoy on port side main deck has been mounted in an improper location, not allowing the berthing port-light to be secured in the open position without trapping the light behind the port-light cover. Cover was found wired open, light pinned behind, not allowing for immediate deployment.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 8 February 2024
Resolution: Lifebuoy location changed and corrected.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 November 2023 Resolved
Doors and door frames in "B" class divisions shall have a resistance to fire equivalent to that of the divisions. Door between crew's messroom and recreation room has multiple holes drilled and the door structure is fractured at the latch.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 8 February 2024
Resolution: New deficiency to be issued to reflect extension for specific door replacement at DD in Oct2024.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 29 November 2023 Resolved
Main propulsion and auxiliary machinery that are automatically or remotely controlled must be provided with an effective primary control and a safety control system. Starboard steering #2 low lube oil alarm is indicating locally but not in the control room; port propulsion field loss indicator alarm is inoperable; port steering room alarm strobe is inoperable.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 14 March 2024
Resolution: OEM corrected and ABS verified in satisfactory condition.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 29 November 2023 No resolution recorded
General arrangement plans shall be permanently exhibited showing clearly the various fire sections enclosed by "A" and "B" class subdivisions. Several spaces on the fire control plan are not properly labeled as "A" boundaries. Initial review indicated the galley and port and starboard fan/anchor windless rooms are indicated as "C" class spaces. A thorough review of the plan and all spaces needs to be conducted, resulting in a revision and submission to the USCG for final review and approval.
Action required: 705 - Other - as specified
Due 24 January 2024 — due date passed with no resolution recorded
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 29 November 2023 Resolved
Periodic safety test procedures do not have instructions for testing of the emergency diesel generator's safety alarms and shutdowns.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 14 November 2025
Resolution: Cleared by Lead MI and Acting CID. in MISLE Activity 8245777.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 3 October 2023 Resolved
All reasonable steps shall be taken to maintain the radio equipment in efficient working order to ensure compliance with all the functional requirements. Malfunction of the equipment for providing general radiocommunications shall not be considered as making a ship unseaworthy or as a reason delaying ship in ports where repair facilities are not readily available, provided the ship is capable of performing all distress and safety functions. Ship self-reported failure of NAVTEX (part of GMDSS suite) due to corroded exterior antennae connector. Repairs due at next port. Mitigation plan: Safety messages to be received via SAT "C" for NAVAREA 11, and backup means via Japanese official government website for navigational area messages. 74SOLAS(2014)IV/15.8
Action required: 15 - Rectify deficiencies by next port
Resolved 8 February 2024
Resolution: NAVTEX inspected and OEM verified
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 29 November 2022 Resolved
Each vessel on an international voyage shall carry at least 2 firemen's outfits. Damage Control Fire Team's outfits require servicing and adjustment for communication radios. Satisfactory servicing and synchronization required for radio communication equipment. 46 CFR 96.35-10(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 December 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2022 Resolved
Internal combustion engine exhausts shall be suitability insulated from combustible matter. MIs noted ME exhaust insulation replacement overdue in maintenance for stack area. Satisfactory insulation replacement required. 46 CFR 92.05-5(a) Extended to May2023 repair period (VRA)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 December 2022
Resolved 24 January 2023
Resolution: Inspected repairs to MDG lagging; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 29 November 2022 Resolved
Enclosed spaces within the vessel shall be properly ventilated and means shall be provided to close all vents & ventilators. MIs noted corrosion by ventilation trunk (aft bridge) and corroded vent closure (starboard deck crane). Satisfactory steel repairs required. 46 CFR 92.15-10(a) Temporary repair, Extended to May2023 repair period (VRA)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 December 2022
Resolved 24 January 2023
Resolution: Inspected repairs to ventilation trunk; all sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 November 2022 Resolved
At each COI & Periodic inspection, MI shall examine machinery spaces to inspect accumulation of oil which might create a fire hazard. MIs discovered substantial hydraulic oil leak for HPU serving SURTASS emergency winch & controls. Oil leak to be cleaned to prevent fire hazard.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 December 2022
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 29 November 2022 Resolved
COI inspection shall include inspection of ship's structure & condition of equipment. MIs noted bulkhead corrosion on starboard side bridge wing entrance (ivo searchlight cabling penetration). Satisfactory steel repairs required to be completed. clean/preserve/temporary patch, extended to May2023 VRA 46 CFR 91.25-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 December 2022
Resolved 24 January 2023
Resolution: Inspected steel repair; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 November 2022 Resolved
Provide warning of failure of lubricating oil system and other measures to prevent rapid deterioration of propulsion and auxiliary machinery and minimize the fire risks of lubricating oil. Vessel’s #3 MDG lube oil temperature sensor is bad. Replace bad sensor. 46 CFR 58.05-1(a) ABS SVR 2003 Part 4 (4-6-5/5.1.2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 January 2023
Resolved 24 January 2023
Resolution: Witnessed satisfactory testing of the newly installed temp sensor; all sat.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 29 November 2022 Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Per vessel fire plan, fire doors in ECC and its boundary is rated A-60. Fire doors and boundaries in ECC have holes. Rectify fire boundaries in ECC with A-60. Temporary fix (firestop) – new doors on order – extended to May2023 VRA 46 CFR 92.05-1 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 December 2022
Resolved 8 February 2024
Resolution: New deficiency to be issued to reflect extension for specific door replacement at DD in Oct2024.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2022 Resolved
Non-conducting deck coverings, such as non-conducting mats or gratings, suitable for the specific switchboard voltage must be installed for personnel protection at the front an rear of the switchboard and must extend the entire length of, and be of sufficient width to suit, the operating space. EDG switchboard insulation mats, front and back, too small for the area. Replace mats with suitable size.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 December 2022
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 29 November 2022 Resolved
Each vessel must carry not less than 12 rocket parachute flares approved under approval series 160.136. All 12 rocket flares onboard expire 12/22. Vessel on day light Ops only until new flares arrived onboard. 46 CFR 199.60(c)
Action required: 705 - Other - as specified
Resolved 22 December 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2022 Resolved
Internal combustion engine exhausts shall be suitability insulated from combustible matter. Suspected exhaust leaks & cracks behind lagging for all MDG silencers & exhaust support hangers. Satisfactory investigation and exhaust piping repairs required (if damaged discovered). 46 CFR 92.05-5(a) open work order, extended to May 2023 VRA
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 December 2022
Resolved 24 January 2023
Resolution: No damage found iwo exhaust hangers.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 November 2022 Resolved
Vessels in ocean service shall be fitted with anchors,chains, and equipment in general agreement with the standards established by ABS. MIs noted temporary liquid metal patch (Belzona epoxy) on #2 anchor windlass gear casing. Permanent repair required. 46 CFR 96.07-5(a) temporary metal liquid patch installed, new parts on-board and service order requested, extended to May 2023 VRA
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 December 2022
Resolved 24 January 2023
Resolution: New cover has been installed; all sat.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 29 November 2022 Resolved
Each self-propelled vessel must have a navigation light indicator panel to control side, masthead, and stern lights. The panel must visually and audibly signal the failure of each light. Panel must have a fused feeder disconnect switch and duplicate light sources for each navigation light. MI noted the following issues: 1. Stern Light (White) - Primary bulb out 2. Range Light - Primary fuse trips when testing switch 3. Port Running Light (Red) - Primary bulb out Satisfactory repairs required.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 December 2022
Resolved 24 January 2023
Resolution: All repaired satisfactory.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 29 November 2022 Resolved
Vessel's firefighting equipment shall be ready at all times for use and condition maintained. MI noted inlet elbow pipe for Port fire pump suction line leaking. Satisfactory repairs required. 46 CFR 97.15-60(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 December 2022
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 29 November 2022 Resolved
Vessel's firefighting equipment shall be ready at all times for use and condition maintained. During hydrostatic testing of hoses, station 20 fire hose failed. Replaced with new hose. 46 CFR 97.15-60(a)
Action required: 10 - Deficiency Rectified
Resolved 29 November 2022
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 9 September 2021 Resolved
Where automated systems are provided to replace specific personnel in the control & observation of the engineering plant or reduce overall crew requirements, the safety of the vessel shall be equal to that of a fully attended machinery space; the acceptance of this reduction in engineering personnel is dependent upon the planned maintenance program, inspection, & testing of the automation to ensure continued reliability. Vessel currently has 31 inhibited alarms, with multiple vital system equipment sensors in an error state & requiring manual readings during engineering rounds. Periodically unattended machinery space (PUMS) endorsement to be suspended & vessel shall establish a manned engineering watch, effective immediately. Additional engineers/QMEDs to meet full manned engineering watch to be crewed onboard within 30 days. The manned engineering watch required will be as followed: 1 Chief Engineer, 3 licensed engineers, 3 QMEDs PUMS endorsement & engineering manning reduction will be reinstated upon satisfactory alarm servicing & grooming.
Action required: 705 - Other - as specified
Due 9 October 2021
Resolved 18 October 2021
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 31 August 2021 Resolved
A minimum of two (02) two-way portable radiotelephone apparatus shall be provided for each fire party for fire-fighter's communication. These devices shall be of an explosion-proof type or intrinsically safe. A minimum of 2 devices, compliant with above shall be provided at each fire locker within 30 days. Extended 14 days due to delivery date onboard vessel, estimated 01OCT2021. 74 SOLAS (2014) II-2/10.10.4
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2021
Resolved 18 October 2021
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 31 August 2021 Resolved
The Company should establish procedures to ensure the ship is maintained in conformity with provisions of relevant Class rules and statutory regulations. Required alarm servicing & grooming in Ship's maintenance system is flagged as over 1 year due. Noted several inhibited alarms causing alteration to engineering rounds for verification of sensors impacting vital system automation. Required servicing shall be completed and evidence provided within 30 days. Extended 8 days to 08OCT2021 to align with inport dates, and servicing provider availability. 74 SOLAS (2020)IX/2.1.2 ISM (2018) Part A 10.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2021
Resolved 18 October 2021
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 31 August 2021 Resolved
Each alternating-current generator conductor must have a voltmeter to show each phase voltage and bus voltage. Voltmeter for the emergency diesel generator was found to be inoperable. A functioning meter shall be provided for the emergency switchboard within 30 days. Extended to 15OCT2021, estimated delivery 15OCT2021 onboard. 46 CFR 111.30-25(b)(2)(i)(5)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2021
Resolved 27 January 2022
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 3 December 2020 Resolved
Vital systems that are automatically or remotely controlled must be provided with an alarm systemif instrumentation is not continously monitored for detection of a failure or unsafe condition. Vessel automation system has 38 inhibited alarms. Identify and rectify faults, provide justification for any remaining inhibited alarms.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 December 2020
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 3 December 2020 Resolved
Installed fire equipment and its installation shall meet the requirements of this part. ECR fire door is holed from previous hardware installations.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 4 December 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 December 2020 Resolved
The general construction of the vessel shall be such to minimize fire hazards. Area behind ECR switchboards are not clear and being used for storage.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 4 December 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 3 December 2020 Resolved
Periodic safety test procedure documents approved by the CG must be retained aboard vessel/ Submit PSTPs to MSC for final CG approval.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 January 2021
Resolution: MSC issued final approval letter Serial:E2-2100048
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 October 2020 Resolved
Each receptacle outlet must be compatible with the voltage and current of the circuit in which it is installed. Remove daisy chain power strip in ECR.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 4 December 2020
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 17 July 2019 Resolved
Oil filtering equipment referred to in paragraph 2 of this regulation shall comply with paragraph 6 of this regulations. In addition, it shall be provided with alarm arrangements to indicate when this level cannot be maintained. The system shall also be provided with arrangements to ensure that any discharge of oily. (Cont) mixtures is automatically stopped when the oil content of effluent exceeds 15PPM. Vessels OWS can not produce effluent below 15 PPM, even when drawing suction from sea chest. OCM P/S has been altered, OCM reading did not change from 0.0. Have OCMs re-calibrated, provide accurate system diagram, conduct 20 min operational test to the satisfaction of attending USCG Marine Inspector and ABS Marine Surveyor. MARPOL 74/78 Annex I/14.7, 33CFR 155.380 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 August 2019
Resolution: Recieved state of fact/inspection from ABS attesting to proper operation and valid calibration certificates for the OWS.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 July 2019 Resolved
All power actuated valves required in emergency to vessel's machinery, maintain stability, and to operate bilge and firemain system must have a manual means of operations. remote valve controls must be accessible under service condition. STBD side ballast main deck reach rod 6-16-1 was found seized and inoperable. 46CFR 56.50-1(g ), 50c
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 August 2019
Resolution: Recieved statement of fact from ABS surveyor attesting to satisfactory repair of reach rod for valve 6-16-1.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 17 July 2019 Resolved
An audible and visible alarm must activate in the pilothouse upon failure of the electric power to the control system of any steering gear. Conducted sat steering gear test. However, STBD steering gear pump 1 has active alarm of main power fail that cannot be reset. 46CFR 58.25-25 50c *Update 9/3/2019* Received email that steering was repaired, however it has not been witnessed by ABS or the Coast Guard. Extended deficiency to 20Sep2019.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 August 2019
Resolved 11 September 2019
Resolution: Received ABS report attesting to repair/proper operation of steering alarms. ABS report uploaded into MISLE.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 17 July 2019 Resolved
Ceilings, linings, and insulation, shall be of approved incombustible materials. General workshop 2-108-1 A-60 ceiling has insulation removed from outboard rear corner. Renew with approved insulation. 46CFR92.07-10, NVIC 9-97, CH-1 , 50c
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 August 2019
Resolution: Recieved statement of fact/inspection attesting to renewal of insulation in general workshop ceiling as reuired.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 10 August 2018 Resolved
Provide some means of fire/smoke resistant sealant to all MCT and cable penetrations in A-60 boundaries to the satisfaction of Class or CG.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 7 September 2018
Resolution: Vessel temporarily sealed A-60 bulkhead MCT's with fire retardant material.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 10 August 2018 Resolved
Provide a plan to [name withheld], which addresses properly approved sealing of cable penetrations throughout the A-60 spaces. Multiple MCTs and pentration openings found with mixed systems, such as Rox Blox and Fire Stop, or multiple types/brands of sealers used. Plan should provide types of approved systems to be used and a reasonable timeline for installation.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 3 October 2018
Resolution: Penetration installation verified for correct product and installation by [name withheld].
Engineering › Steering Gear System › Rudder Bearing
Issued 5 February 2018 Resolved
When placed in autopilot, the Starboard Steering System produces an unusual noise and excessive temperatures. Troubleshoot and make permanent repairs IAW manufacturers recommended repair procedures to the satisfaction of the attending USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 14 April 2018
Resolution: Corrected by ABS.
Engineering › Steering Gear System › Valve
Issued 12 January 2018 Resolved
Properly repair steering gear to the satisfaction of the OCMI and attending classification society surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 January 2018
Resolution: Cleared by ABS.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 November 2017 Resolved
Found numerous cracks on 01 deck adjacent to Frame 74. Provide repair plan and repair all areas identified in accordance with an ABS/USCG approved plan to the satisfaction of the OCMI.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 21 December 2017
Resolved 27 December 2017
Resolution: Corrected by ABS.
Documentation › Safety Management System › Reports and Analysis Procedures
Issued 28 November 2017 Resolved
New LSA Mod maintenance and training requirements are not identified in the vessel’s Safety Management System (SMS). Correct to the satisfaction of the OCMI.
Action required: 705 - Other - as specified
Due 21 December 2017
Resolved 19 December 2017
Resolution: Corrected.
Stability › Weathertight Integrity › General
Issued 28 November 2017 Resolved
Found numerous weathertight doors and hatches did not close properly or had missing / improper gasket material. Repair to the satisfaction of the OCMI.
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 14 April 2018
Resolution: Corrected by ABS
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 28 November 2017 Resolved
Found numerous fire doors that did not close properly or were missing closure devices. Correct to the satisfaction of the OCMI.
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 14 April 2018
Resolution: Corrected by ABS.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 28 November 2017 Resolved
The Periodic Safety Test Procedures (PSTP) specific test procedure for “Under Frequency” did not perform as written. Correct to the satisfaction of the OCMI.
Action required: 705 - Other - as specified
Due 21 December 2017
Resolved 19 December 2017
Resolution: Corrected.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 November 2017 Resolved
Reevaluate existing structural modification for Frame 74 and perform a structural stress analysis by a certified naval architect or structural engineer that identifies structural issues found onboard vessel following Frame 74 Modification. Correct to the satisfaction of the OCMI.
Action required: 705 - Other - as specified
Due 30 June 2018
Resolved 27 July 2018
Resolution: Email provided to FEACT and accepted by MI, outlining analysis report.
Construction/Loadline › Hull › Side Shell
Issued 26 October 2017 Resolved
Damage to port side shell at frame 56. Repair to satisfaction of OCMI prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 November 2017
Resolution: RCVD ABS Report attesting to satisfactory sideshell repair.
Engineering › Steering Gear System › Rudder
Issued 13 October 2017 Resolved
Make necessary repairs to Starboard Steering Gear rudder. Repairs and operational testing to be completed to the satisfaction of OCMI prior to departure from next port of call (Subic Bay, Phillippines).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2017
Resolution: RCVD ABS Report. Corrected.
Engineering › Diesel Engine (propulsion-electric) › Cylinder
Issued 13 October 2017 Resolved
Make permanent repairs to starboard main propulsion motor. Repairs and operational testing to be completed to the satisfaction of the OCMI prior to departure from next port of call (Subic Bay, Phillippines)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2017
Resolution: RCVD ABS Report. Corrected.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 18 April 2017 Resolved
Found fixed piping, portable hose arrangement, and air diaphragm pump in OWS space used to transfer bilge water from various voids & spaces throughout vessel (both hulls) to Oily Water Holding Tanks. Fixed piping and portable hose arrangement are not on any approved piping plan. Make all modified piping as original. Remove all unapproved piping and hose arrangements. Submit to ABS,USCG and MSC.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2017
Resolution: Corrected and attested by ABS, Korea.
Lifesaving › Launching Appliances › Davit
Issued 18 April 2017 Resolved
New installation of davit-launch liferafts requires an inspection of lifesaving arrangements for certification that includes proper condition and operation of survival craft launching appliances. Complete 10 percent overload test in the presence of ABS or USCG.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2017
Resolution: Witnessed by ABS, Korea.
Lifesaving › Launching Appliances › Release Mechanism
Issued 18 April 2017 Resolved
New installation of davit-launch liferafts requires an on-load release hook test. Complete required tests in the presence of ABS or USCG.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2017
Resolution: Witnessed by ABS, Korea.
Construction/Loadline › Hull › Bracket
Issued 18 April 2017 Resolved
All fuel tanks and ballast tanks must be inspected for fractures and cracks at brackets associated with house support structure by an approved ACS. All issues found by attending ACS must be corrected to their satisfaction.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2017
Resolution: Corrected and attested by ABS, Korea.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 18 April 2017 Resolved
New installation of davit-launch liferafts requires an inspection of lifesaving arrangements for certification that includes proper condition and operation of survival craft launching appliances. Complete abandonship drill, launching a davit-launch raft of comparable size and capacity in the presence of USCG.
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 28 November 2017
Resolution: Corrected.
Lifesaving › Launching Appliances › Davit
Issued 18 April 2017 Resolved
Towing strain test required by LSA Part 2, Regulation 6.2.7 can be delayed until a test liferaft is made available.
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 28 November 2017
Resolution: Witnessed satisfactory test.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 20 March 2017 Resolved
After investigating fuel oil contamination inside SWB tanks: 6-16-2. 6-56-1 and 6-124-2; vsl identified 2 fractures between FO tanks 6-56-2 and 6-40-2. Vsl shall inspect all FO and SWB tanks that could have been a source of contamination. Permanent repairs shall be approved and affected to the satisfaction of the OCMI prior to departure from port. Temporary repairs will not be authorized.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2017
Resolution: Corrected and witnessed by ABS, Korea.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 5 November 2016 Resolved
Provide repair proposal for fuel oil piping leak in ballast tank 6-108-2.
Action required: 705 - Other - as specified
Due 31 January 2017
Resolved 25 January 2017
Resolution: Corrected.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 5 November 2016 Resolved
Make permanent repairs to fuel oil piping leak in ballast tank 6-108-2.
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 10 May 2017
Resolution: Corrected and witnessed by ABS, Korea.
Pollution Prevention/Response › Prevention Equipment › Means of Removal from within Coaming
Issued 5 November 2016 Resolved
Properly dispose of contaminated ballast water from tank 6-108-2 in compliance with local laws and USCG regulations.
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 10 May 2017
Resolution: Corrected and witnessed by ABS, Korea.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 3 October 2016 Resolved
Pressure switch for the automatic shutdown of #2 and #3 propulsion generators associated with the Halon primary firefighting system is inoperable. This deficiency was found during the annual servicing by Global Fire and Safety on 28JUL2016. Coast Guard was not notified of this issue.
Action required: 705 - Other - as specified
Resolved 17 October 2016
Resolution: Corrected by ABS.
Lifesaving › Launching Appliances › Falls
Issued 3 October 2016 Resolved
Primary lifesaving falls for the port side lifeboat show visible damage in the form of “fishhooks” and a broken strand. (7 strands per wire, 35 wires for the falls).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 October 2016
Resolution: Corrected by ABS.
Engineering › Diesel Engine (propulsion-electric) › Emergency shutdown
Issued 3 October 2016 Resolved
Emergency shutdown remote pull cable located outside the engineroom for #3 Main Propulsion Generator is badly frayed.
Action required: 705 - Other - as specified
Resolved 17 October 2016
Resolution: Corrected by ABS.
Lifesaving › Launching Appliances › Winch
Issued 3 October 2016 Resolved
Stbd winch motor controller for stbd lifeboat / rescue boat davit will not hoist lifeboat / rescue boat to the correct position due to a faulty limit switch in the winch drum. Unable to unload an injured crewmember in the event of a personnel casualty.
Action required: 705 - Other - as specified
Resolved 17 October 2016
Resolution: Corrected by ABS.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 3 October 2016 Resolved
Periodic Safety Test Procedures (PSTP) for reverse power relay test and power limiting procedures do not adequately describe actual procedures necessary to complete test for Engineering reduced manning. Power limiting test caused a complete blackout of the vessel. Reverse power relay test requires a split load pierside and does not allow independent control of each engine on the EasyGen System.
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 28 November 2017
Resolution: Witnessed satisfactory test.
Documentation › Certificates/Documents › IOPP Certificate
Issued 3 October 2016 Resolved
Found two oily water holding tanks on the IOPP SOVC may not be identified in the proper section (Section 2 and 3). ABS to determine if tanks are either required equipment for controlling oil discharge from machinery spaces or are a means of retention and disposal of oil residues.
Action required: 705 - Other - as specified
Resolved 17 October 2016
Resolution: Corrected by ABS.
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 October 2016 Resolved
Permanently repair or replace S/W piping to reefer condenser located in refrigeration machinery space.
Action required: 705 - Other - as specified
Resolved 17 October 2016
Resolution: Corrected by ABS.
Engineering › Sea-water System (primary cooling) › Valve
Issued 3 October 2016 Resolved
Permanently repair or replace valve on S/W cooling discharge piping located in the stbd pumproom.
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 17 October 2016
Resolution: Corrected by ABS.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 3 October 2016 Resolved
Prove proper operation of both port and stbd OWS in the presence of USCG Marine Inspector or ABS Surveyor.
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 17 October 2016
Resolution: Corrected by ABS.
Engineering › Diesel Engine (propulsion-electric) › Injector (fuel injection)
Issued 3 October 2016 Resolved
Repair fuel leak on #2 Main Propulsion Generator on #8 cylinder.
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 17 October 2016
Resolution: Corrected by ABS.
Communications › Alarms/Indicators › General Alarm
Issued 3 October 2016 Resolved
Make permanent to General Alarm located on the fantail.
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 17 October 2016
Resolution: Corrected by ABS.
Electrical › Electrical Distribution System (emergency) › Circuit Breaker
Issued 16 August 2016 Resolved
Make proper repairs to the emergency switchboard breaker to the satisfaction of the OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 August 2016
Resolution: Corrected by ABS.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 16 August 2016 Resolved
Make temporary repairs to the pencil-sized hole located between the oily water holding tank and the adjacent fuel tank, including striker plate, to the satisfaction of the OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 October 2016
Resolution: Corrected by ABS.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 16 August 2016 Resolved
Make permanent repairs to the oily water holding tank bottom and adjacent fuel tank overhead, including striker plate, to the satisfaction of the OCMI.
Action required: 705 - Other - as specified
Due 1 November 2016
Resolved 17 October 2016
Resolution: Corrected by ABS.
Engineering › Steering Gear System › Ram
Issued 10 March 2016 Resolved
Vessels lower steering cylinder rod has detached from the rod eye in the tiller assembly of port steering system. Make necessary repairs to port steering system to restore full system capability. Prior to departure from next port of call. To the satisfaction of attending ABS Surveyor and FEACT.
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2016
Resolved 23 March 2016
Resolution: 23MARCH2016: Received e-mail correspondence from Master with attachment showing that previously issued CG-835 had been endorsed by ABS as having satisfactorily witness repairs and testing of port steering system. (see cleared CG-835 in Documents).

Ownership record