Inspection history · 23
15 October 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8253100
14 May 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8135066
17 April 2024
COI Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7893300
17 January 2024
Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7850571
8 January 2024
Simplified Stability Test · Construction Oversight
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7846651
23 October 2023
Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7813134
16 August 2023
Construction Oversight
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7770444
12 June 2023
Administrative Inspection · Simplified Stability Test
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7714628
7 December 2022
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7600701
15 December 2021
Examination of Repairs · Annual Inspection · DAPI Audit
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7352865
9 September 2021
Examination of Repairs
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7308575
31 August 2021
Internal Structural Exam · Drydock Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7288699
13 November 2020
COI Inspection · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7094022
11 December 2019
Deficiency Check · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6870406
20 August 2019
Hull Examination · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6789643
17 January 2019
Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6611550
28 November 2018
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6588894
17 April 2018
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6393441
17 April 2018
Examination of Repairs · Damage Survey
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6393672
15 December 2017
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6325034
23 August 2017
Hull Examination · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6249699
12 March 2017
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6128417
12 December 2016
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6056555
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 May 2025
Resolved
"Alcohol testing must be conducted on each individual engaged or employed on board the vessel who is directly involved in the SMI... the alcohol testing of each individual must be conducted within 2 hours of when the SMI occured." Vessel had expired alcohol test kits onboard. Replace alcohol test kits.
46 CFR 4.06-3(a)(1)(i)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 28 May 2025
Resolution: Test kits provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 May 2025
Resolved
"A vessel must be provided with bilge pumps in accordance with Table 182.520(a)." Vessel did not have fixed power pump for forepeak space. Provide a bilge pump or a hand pump.
46 CFR 182.520(b)(1)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2025
Resolution: video of new electric submersible pump working
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 14 May 2025
Resolved
"As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: charts of large enough scale to make safe navigation possible." Vessel did not have a means to confirm date of last chart update. Provide date of last update.
46 CFR 184.420(a)(1)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 17 June 2025
Resolution: Vessel provided up-to-date charts.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 14 May 2025
Resolved
"The name of a vessel must be marked or painted in clearly legible letters and numbers: on each life float and buoyant apparatus." Life floats did not have vessel's name marked. Mark vessel's name or remove from service.
46 CFR 185.604(a)(2)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 28 May 2025
Resolution: LF's labelled.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 14 May 2025
Resolved
"The name of the vessel must be marked or painted in clearly legible letters on each life float paddle." Vessel's life floats' paddles did not have vessel name marked. Mark vessel's name or remove from service.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 28 May 2025
Resolution: LF paddle's labelled.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 May 2025
Resolved
"Each ring life buoy must be marked in clearly legible block capital letters with the vessel's name." One of the vessel's ring life buoys was not marked. Mark with vessel's name.
46 CFR 185.604(b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 9 June 2025
Resolution: Marked.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 14 May 2025
Resolved
"The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection..." Vessel's installed EPIRB did not have a float free arrangement. Install float free arrangement or remove unit from service.
46 CFR 177.100
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 9 June 2025
Resolution: Hydrostatic release installed.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 17 April 2024
Resolved
PROVIDE REQUIRED DAPI PROGRAM INFORMATION & ALCOHOL TEST PROCEDURES.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 April 2024
Resolution: O/O provided consortium enrollment & records of testing, etc.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 17 April 2024
Resolved
CORRECT MULTIPLE NAVIGATION RELATED DEFICIENCIES:
COMPASS BINACLE LIGHT
ANCHOR LIGHT (CORRECTED ON SPOT)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 April 2024
Resolved
SUBMIT ELECTRONIC THROTTLE CONTROL PLANS TO OCMI OFFICE FOR REVIEW (POSSIBLY MSC).
PRIOR TO USE (705-c)
UPDATE: DIRECTED O/O TO SUBMIT TO MSC DUE NEW INSTALL, WITH [name withheld] FOLLOWING MSC APPROVAL.
Action required: 705 - Other - as specified
Resolved 14 May 2025
Resolution: DVTPs completed on annual inspection. Verified Approval letter on board.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 17 April 2024
Resolved
ENGINE ROOM OVERHEAD INSULATION, RESTORE. OVERHEAD AND BULK-HEAD PENETRATIONS PROPERLY FIRE-STOPPED (ASTM E 84)
[since modified to water / vapor tight)
RE-INSPECTED ON 08MAY24 - OPENING / DEFICIENCIES REMAIN
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2024
Resolution: Accepted submtd evidence of correction.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 April 2024
Resolved
CABIN - AFT BILGE PUMP WIRING, COMPANIONWAY OUTLET / RECEPTACLE IN CABINET. WIRING PULLING-OUT, REPAIR / REPLACE, W/ PRESSURE-CONNECTIONS.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2024
Resolution: O/O provided acceptable evidence of re-wired circuit - SAT.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 17 April 2024
Resolved
FIRE MAIN PIPING ELBOW DISCHARGE FROM PTO PUMP - REPAIR / REPLACE (due corrosion, evidence of leak)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 April 2024
Resolution: O/O provided evidence of sat repair.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 17 April 2024
Resolved
CONDUCT UNDERWAY DRILLS (FIRE & MOB) WITH NEW MOB PLATFORM / STAGE IN PRESENCE OF USCG MI's.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2024
Resolution: CONDUCTED U/W DRILLS INCL . MOPB W/ USE FO NEWLY INSTALLED STAGE / PLATFORM - O/O INTENDS TO ADD SOME SUPPORT WIRES, BUT DRILL & SERVICEABILITY, ALL SAT.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 17 April 2024
Resolved
POST NO OVERNIGHT ACCOMODATIONS ACCESS TO PASSENGERS.
(and amend COI w/ required verbiage)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 April 2024
Resolved
RE-LOCATE PORTABLE FIRE EXTINGUISHERS PER REQUIREMENTS, PROVIDE;
10-B:C TO OPERATING STATION
MINIMUM 2-A TO AFT ACCOMODATION SPACE
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 May 2024
Resolution: Accepted evidence of fire ext. re-location.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 December 2021
Resolved
Vessels on coastwise route must have a ring life buoy that is orange in color. The ring life buoy near the wheelhouse has faded and is no longer orange in color. Replace ring life buoy. 46 CFR 180.70 (b)(5)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2022
Resolved 23 December 2021
Resolution: new RLB purchased
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 December 2021
Resolved
Excavate extent of wastage to the 4 deck frames on the outboard starboard side of the engine room starting at the aft bulkhead and moving forward. Remove insulation to better see the area, and provide a repair proposal.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2022
Resolved 11 January 2022
Resolution: provided and assessed
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 11 December 2019
Resolved
EPRIB battery is expired and needs replacement. Current battery is still functioning.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 January 2020
Resolved 13 January 2020
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 11 December 2019
Resolved
Smoke detector in accomdation space is expire past 10 years. Vessel notified to replace.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 January 2020
Resolved 13 January 2020
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 11 December 2019
Resolved
Aspirin and eye wash solution is expired. Vessel notified to reaplce.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 January 2020
Resolved 16 December 2019
Resolution: Provide asiprin and eyewash.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 November 2018
Resolved
Fixed fire fighting controls must be located outside the space protected by the system. The CO2 operated pressure switch for the M/E shutdown is located in the engine room. Pressure switches are considered controls and therefore the pressure switch must be relocated outside the space. Relocation of the switch to be completed by a fire suppression service technician.
Action required: 705 - Other - as specified
Due 28 February 2019
Resolved 17 January 2019
Resolution: Recieved e-mail photo from vessel rep. showing the pressure switch re-located outside the engine room.
Construction/Loadline › Hull › Bottom Plating
Issued 17 April 2018
Resolved
Vessel must be dry-docked and inspected by a Coast Guard Marine Inspector prior to carrying passengers. This requirement is a result of a collision with a submerged navigation buoy and subsequent survey with a remotely operated underwater vehicle.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 April 2018
Resolution: Vessel dry-docked and inspected.