MAURY USCG vessel records Sign in
← All vessels

SAM PATCH

SAM PATCH is a 1991 passenger vessel (inspected). The Coast Guard has recorded 69 inspections since 1991, most recently in May 2026, along with 115 deficiencies, 1 operational control and 9 casualty investigations between 2007 and 2026.

Records from 1991 to 2026. Most recent: inspection, 30 May 2026.

Built
1991
Last inspected
30 May 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDE2888
363855
Flag
UNITED STATES
367330970
Maury page id
psix-363855

Inspections, by type

…with no type recorded14
Years with a record 34 calendar years (1991–2026)
The 69 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)54.0 ft × 12.0 ft × 5.3 ft
Registered tonnagegross 23 / net 18
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMID-LAKES NAVIGATION CO · SKANEATELES, NY, UNITED STATES · built 1991
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portROCHESTER, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 12 June 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it23 - Simplified, Gross Ton
18 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDL7072MMSI 367330970 · active · compulsorily equipped · granted 1 August 2020, expires 1 August 2030
WDE2888MMSI 367330970 · expired · compulsorily equipped · granted 12 January 2008, cancelled 17 March 2018
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 69

30 May 2026 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8387207
19 November 2025 Drydock Exam · Internal Structural Exam
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8271525
5 August 2025 Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8243485
4 August 2025 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8208413
11 April 2025 Annual Inspection · In-Service Inspection · Plan Review "T" Boat
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8131921
28 August 2024 In-Service Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7991810
28 August 2024 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7996009
20 June 2024 Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7938805
22 May 2024 COI Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7915514
4 September 2023 Annual Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7791494
4 August 2023 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7762413
20 June 2022 Administrative Inspection · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7483051
24 February 2022 Administrative Inspection · Plan Review "T" Boat
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7401574
8 September 2021 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7307115
11 June 2021 Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7224722
11 June 2021 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7247009
25 March 2021 Internal Structural Exam · Drydock Exam
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7158983
29 September 2020 Administrative Inspection · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7051989
30 May 2019 Deficiency Check · DAPI Audit · Administrative Inspection · COI Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6698739
26 June 2018 Deficiency Check · Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6392365
13 June 2017 Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6174265
2 May 2016 Deficiency Check · Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5867627
28 October 2015 Examination of Repairs · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5757129
21 September 2015 Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5724554
20 September 2015 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5724356
19 September 2015 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5728873
3 September 2015 Administrative Inspection · Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5233782
2 September 2015 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5233396
17 June 2014 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4991241
29 May 2014 Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4873584
24 July 2012 DAPI Audit · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4391025
29 June 2012 Plan Review "T" Boat · Examination of Repairs · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4361066
1 May 2012 Simplified Stability Test
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4307743
19 December 2011 Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4210938
19 July 2011 Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4086399
15 July 2009 Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3534267
6 May 2008 Periodic Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3200805
6 June 2007 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2954180
6 June 2007 Annual Inspection · Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2954308
17 May 2006 Re-Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2653241
2 March 2006 Hull Examination
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2594237
3 May 2005 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2348348
29 April 2005 COI Inspection · Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2345720
19 May 2004 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2072260
1 May 2004 Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2057903
20 May 2003 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1794878
6 June 2002 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1622515
22 June 2001 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1067753
14 May 2001 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1379427
7 June 2000 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 167515
28 April 2000 Deficiency Check · COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1423403
4 August 1999 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 687672
29 July 1999 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 809223
13 May 1999 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1372619
11 March 1999 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 810769
7 July 1998 Deficiency Check · Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1466528
5 June 1997 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1437271
8 August 1996 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1088391
1 August 1996 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1093008
15 July 1996 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1359195
15 December 1995 Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1411202
10 July 1995 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1414492
31 May 1994 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1425459
28 July 1993 Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1155389
7 June 1993 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1395939
28 September 1992 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 943193
3 August 1992 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1259653
6 July 1992 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1412433
1 June 1991 Hull Examination · Initial Certification
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 888522

Deficiency record · 115

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 August 2025 Resolved
Vessel is experiencing vibration issues due to damaging the prop during a recent grounding. Vessel owner/operator shall repair or replace the propeller to ensure safe and proper operation of the vessel.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 August 2025
Resolved 7 August 2025
Resolution: Vessel's prop was resurfaced and the vessel no longer is experiencing vibration issues.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 11 April 2025 Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level. Vessels high water indicating alarm float swith was removed during engine replacement and not re-installed. Make frequent rounds of engine space to ensure no flooding. Repair high water alarm to the satisfaction of attending CG Marine Inspector. 46 CFR 182.530
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 9 May 2025
Resolution: Corrected on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 August 2024 Resolved
Operator notified OCMI after the vessel experienced a loss of propulsion. Vessel reported that the control cable for the reduction gear failed, resulting in the gear being stuck in reverse. Repair to the satisfaction of attending Coast Guard Marine Inspector prior to carrying passengers. 46CFR185.202
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2024
Resolved 29 August 2024
Resolution: New shift cable installed and tested sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 May 2024 Resolved
Conduct and log man overboard, fire, and abandon ship drills with newly reported crewmembers and every 3 months. Provide Coast Guard Marine Inspector objective evidence (log book) of drills conducted. 46 CFR 185.420& 46 CFR 185.520& 46 CFR 185.524
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 June 2024
Resolved 28 May 2024
Resolution: Objective evidence provided (log)
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 22 May 2024 Resolved
Label life jacket stowage under embarkation ladder on starboard side to the satisfaction of attending Coast Guard Marine Inspector. 46 CFR 185.604(f)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 June 2024
Resolved 20 June 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 May 2024 Resolved
Outfit first aid kit with the contents of 46 CFR 199.175(b)(10). 46 CFR 184.710
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 June 2024
Resolved 20 June 2024
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 22 May 2024 Resolved
Certificate of Documentation is expired. Objective evidence of renewal application submission was provided to marine inspector. Provide a copy of the COD to attending CG Marine Inspector upon receipt. 46 CFR 67
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2024
Resolved 20 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 September 2023 Resolved
Vessels Shaft slid from the engine coupling and therefore damaged the shaft. Vessel Owner/Operator shall repair or replace the shaft to esnure proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 September 2023
Resolved 14 September 2023
Resolution: Vessels shaft, bearing and coupling were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 September 2021 Resolved
The vessels float light battery was noticed to be expired. The vessel owner/operator shall replace the battery with a new battery of the approved type.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2021
Resolved 21 September 2021
Resolution: Vessel operator replaced float light battery with new battery.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 September 2021 Resolved
The forward lifering labeling and refelective tape were found deteriorated. The vessel owner/operator shall replace with Solas type reflective tape and replace the lettering to ensure the vessels name is legible.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2021
Resolved 21 September 2021
Resolution: Vessel Operator replaced the lettering and reflective tape on the life ring with appropriate lettering and reflective material.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 September 2021 Resolved
The forward lifering was not supplied with a bracket. The vessel owner/operator should develop a system to hang the lifering to ensure the lifering is always stored in the same location.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2021
Resolved 21 September 2021
Resolution: Vessel operator supplied and installed the vessel with a bracket for the lifering.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 September 2021 Resolved
A vessel not required to have a power driven fire pump must have at least three 2 1/2 gallon buckets. Vessel was only supplied with 2 buckets, vessel owner/operator shall supply the vessel and crew with a 3rd fire bucke
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2021
Resolved 21 September 2021
Resolution: Vessel operator bought and marked a new fire bucket for the vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 June 2021 Resolved
Loss of propulsion control due to a failure of throttle mechanism.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 June 2021
Resolution: Replaced throttle. Op tested new throttle. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2021 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from machinery failure. While conducting an inspection of the vessel’s shaft bearing, it was noted that the bearing was cracked and showing signs of delamination from the metal housing. Any cracking and/or delamination found on the rubber part of the bearing must be replaced prior to the vessel returning to service. Replace unsatisfactory bearing to satisfaction of attending Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2021
Resolution: Replaced unsatisfactory bearing to satisfaction of attending Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 30 May 2019 Resolved
A vessel must be provided with an auxiliary means of steering. Vessel's auxiliary means of steering is their bow thruster which is operating intermittently. Auxiliary means of steering must be repaired to the satisfaction of attending Marine Inspector and operationally tested while underway. Rectify prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 May 2019
Resolution: Auxiliary means of steering repaired to the satisfaction of attending Marine Inspector and operationally tested while underway
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 May 2019 Resolved
A submersible electric bilge pump may be used as a power bilge pump provided that the pump is listed by an independent laboratory as meeting the requirements in UL 1113. Submersible electric bilge pump located in void under galley did not indicate it was UL 1113 listed. Provide proof of proper UL listing or replace with satisfactory bilge pump to the satisfaction of attending Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2019
Resolved 28 June 2019
Resolution: Replace with satisfactory bilge pump to the satisfaction of attending Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 May 2019 Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Life jacket box in bow is not marked. Satisfactorily mark location of life jackets in forward stowage box to the satisfaction of the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 June 2019
Resolved 28 June 2019
Resolution: Satisfactorily marked location of life jackets in forward stowage box to the satisfaction of the attending Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 May 2019 Resolved
A vessel not required to have a power driven fire pump must have at least three 2.5 gallon buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. The words “FIRE BUCKET” were not visible on one bucket. Re-stencil "FIRE BUCKET" on deficient bucket to satisfaction of Marine Inspector.
Action required: 10 - Deficiency Rectified
Due 30 May 2019
Resolved 30 May 2019
Resolution: Re-stenciled "FIRE BUCKET" on deficient bucket to satisfaction of Marine
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 May 2019 Resolved
Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10. Debris was found in nozzle to 01 fire extinguisher. Have extinguisher nozzle maintained as per NFPA 10 and to the satisfaction of an attending Marine Inspector. Until serviced and deficiency cleared, have appropriate sized standby extinguisher on board vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2019
Resolved 28 June 2019
Resolution: Fire extinguisher made satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 30 May 2019 Resolved
A vessel on a rivers route must carry:three hand red flare distress signals and three hand orange smoke distress signals approved in accordance with §160.037 in subchapter Q of 46 CFR. Hand red flare distress signal may be substituted for any hand orange smoke distress signals. Vessel only had 04 hand red flare distress signals on board. Have satisfactory amount/type of distress signals on board.
Action required: 10 - Deficiency Rectified
Resolved 30 May 2019
Resolution: Has satisfactory amount/type of distress signals on board.
04 - Emergency Systems › N/A - No Subsystem › Damage control plan
Issued 30 May 2019 Resolved
The owner, charterer, master or managing operator shall instruct each crew member, upon first being employed and prior to getting underway for the first time on a particular vessel and at least once every three months, as to the duties that the crew member is expected to perform in an emergency. Crew was unaware of location of port to collision bulkhead for dewatering. Moving forward drill with all crew on proper dewatering of collision bulkhead and maintain access so as to not seize.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2019
Resolved 18 September 2019
Resolution: Provided recordeed training.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 June 2018 Resolved
A vessel must be provided with bilge pump where the pump is listed by an independent laboratory as meeting the requirements in UL 1113. Bilge pump was found to not meet UL 1113. Please replace with appropriate pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 August 2018
Resolution: O/O replaced with appropriate pump.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 26 June 2018 Resolved
The emergency instructions must be designed to address the particular equipment, arrangement, and operation of each individual vessel. Emergency instructions posted did not follow the actual actions of the ship's crew in case of a Man Overboard (MOB). Make posted emergency instructions as to the actual emergency practices of the vessel and drill procedures of the crew. Make any changes necessary to express changes in procedure (tethering/life jacket on Master/not using passengers)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 August 2018
Resolution: Made posted emergency instructions as to the actual emergency practices of the vessel and drill procedures of the crew.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 26 June 2018 Resolved
Lifejackets must be properly stowed. Two lifejackets (as required by the vessel's COI) were not properly stowed. Provide proper stowage of lifejackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 August 2018
Resolution: Provided proper stowage of lifejackets.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 3 May 2016 Resolved
Provide Consortium contract for 2016 with listing of covered employees.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: Contract statement provide on board.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 3 May 2016 Resolved
Provide proof of MIS submission for 2015.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: Viewed copy of the 2015 MIS.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 3 May 2016 Resolved
Provide proof of supervisors / masters completed 1 hr EAP training.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: Training completed with signed statements for all crew within vessel's DAPI file.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 3 May 2016 Resolved
Identify Substance Abuse Professional (SAP)with contact information.(49CFR40.289)
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: SAP information provided to each crew member during EAP training as well posted on vessel.
Lifesaving › Lifebuoys › Approval
Issued 3 May 2016 Resolved
Waterlight w/ CRES clip attached around the body of the ring with lanyard 3-6'.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: New water light with lanyard and corrosion resistant clip on board vessel.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 3 May 2016 Resolved
Mark direction of operation for fuel shut off valves; exercise valves.
Due 3 June 2016
Resolved 21 July 2016
Resolution: Valve painted red, arrow marked IVO and operable.
Documentation › Markings/Placards › Warning Signs
Issued 3 May 2016 Resolved
Post emergency broadcast placard (corrected on spot).
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 3 May 2016
Resolution: Provided placard which was annotated with vessel number and affixed ivo radio.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 3 May 2016 Resolved
Provide operable portable lights (corrected on spot).
Due 3 June 2016
Resolved 3 May 2016
Resolution: Operable light provided with an additional spare on charger.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 May 2016 Resolved
Provide chaffing gear for wiring on engine room forward bulkhead.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: Looming provided on wiring.
Documentation › Manuals/Policy Documentation › Bridge Resource Management Policy/Procedures
Issued 3 May 2016 Resolved
Provide up-to-date Rules of the Road onboard. (emailed)
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: ROR handbook on board.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 3 May 2016 Resolved
Provide missing/expired items for first aid kit. (List provided).
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: New first aid kit provided on board with current items; dates marked on inside cover.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 3 May 2016 Resolved
Replace 1 adult lifejacket. (corrected on spot)
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 3 May 2016
Resolution: Old jacket destroyed prior to MI's departure with new jacket provided and marked appropriately.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 3 May 2016 Resolved
Stencil vessel name on life jackets as required.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 May 2016
Resolved 3 May 2016
Resolution: New jacket marked appropriately.
Engineering › Bilge Water Management System › Pump
Issued 3 May 2016 Resolved
Provide bilge pump meeting UL 1113 approval.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: Corrected.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 3 May 2016 Resolved
Provide rubber matting under fire extinguishers.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 21 July 2016
Resolution: Rubber installed on base of mount.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 3 May 2016 Resolved
Alcohol testing swabs expired, if carried must be current. (removed from vessel)
Action required: 705 - Other - as specified
Due 3 May 2016
Resolved 3 May 2016
Resolution: Expired testing swabs removed from vessel.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 21 September 2015 Resolved
Sample fuel in both port and starboard tanks to determine remediation measure required to clean system of sludge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 September 2015
Resolved 21 September 2015
Resolution: Samples taken of black sludge.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 21 September 2015 Resolved
Clean fuel oil storage tanks and filtering systems and make available for inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 September 2015
Resolved 21 September 2015
Resolution: Tanks, filters and associated piping cleaned and flushed with photos provided.
Engineering › Diesel Engine (propulsion-reduction gear) › Injector (fuel injection)
Issued 21 September 2015 Resolved
Once approved by the attending CGMI fill tanks and prove proper operation of vessels propulsion system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 September 2015
Resolved 22 September 2015
Resolution: Attended vessel witnessed proper operation of propulsion system and received photos of remedial action discussed within narrative of act.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 29 May 2014 Resolved
Certificate of Documentation expired. Submit for renewal
Action required: 705 - Other - as specified
Due 6 August 2014
Resolved 18 July 2014
Resolution: New COD reflected in MISLE vessel details.
Stability › Unintentional Flooding › General
Issued 29 May 2014 Resolved
No adequate method to provide dewatering capabilities to forward void.
Action required: 705 - Other - as specified
Due 6 August 2014
Resolved 19 July 2014
Resolution: Sounding tube located under bench seat that is large enough to accomodate a portable dewatering pump.
Stability › Freeing Ports › General
Issued 1 May 2012 Resolved
When operating with more than 39 persons (including crew) forward scruppers are to be made watertight until permanent (approved) non-return valves are installed. Maximum capacity will be 49 passengers + 2 crew for a total of 51 persons.
Action required: 705 - Other - as specified
Due 1 July 2012
Resolved 29 June 2012
Resolution: Modified scuppers by installiing check-ball.
Documentation › Certificates/Documents › Stability Letter
Issued 19 December 2011 Resolved
No valid Stability letter on file, no proof of stability available. Provide proof of stability.
Action required: 705 - Other - as specified
Due 1 July 2012
Resolved 1 May 2012
Resolution: Simplified Stability Test witnessed this date. Stability proven for 37 passengers and 2 crew, if forward deck drain scuppers have one way checks installed passenger capacity may be increased to 49 and 2 crew.
Engineering › Diesel Engine (propulsion-direct drive) › Silencer (exhaust)
Issued 19 July 2011 Resolved
Replace cracked exhaust muffler.
Due 2 August 2011
Resolved 1 August 2011
Resolution: Replaced with spare muffler they had on hand.
Fire Fighting › Ventilation Systems › Ducts
Issued 19 July 2011 Resolved
Provide means to secure engine room vents in case of a fire.
Due 2 August 2011
Resolved 1 August 2011
Resolution: Fabricated metal covers and tethered them to the vents.
Engineering › Bilge Water Management System › Pump
Issued 15 July 2009 Resolved
Secure bilge and switch in engine compartment.
Action required: 705 - Other - as specified
Due 15 August 2009
Resolved 13 August 2009
Stability › Unintentional Flooding › General
Issued 15 July 2009 Resolved
Fix rudder post leak.
Action required: 705 - Other - as specified
Due 15 August 2009
Resolved 13 August 2009
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 15 July 2009 Resolved
Properly install exhaust hose to prevent chafing on engine mount. Replace hose if current chafing is to inner core.
Action required: 705 - Other - as specified
Due 15 August 2009
Resolved 13 August 2009
Engineering › Sea-water System (primary cooling) › Piping
Issued 15 July 2009 Resolved
Replace engine cooling hose from water filter.
Action required: 705 - Other - as specified
Due 15 August 2009
Resolved 13 August 2009
Engineering › Freshwater System (jacketwater cooling) › Pump
Issued 15 July 2009 Resolved
Properly mount and secure fresh water pump.
Action required: 705 - Other - as specified
Due 15 August 2009
Resolved 13 August 2009
Lifesaving › Lifebuoys › Serviceable
Issued 15 July 2009 Resolved
Repair or replace ring buoy.
Action required: 705 - Other - as specified
Due 15 August 2009
Resolved 13 August 2009
Resolution: holes repaired with silicone.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 July 2009 Resolved
Properly wire/secure bilge pump connectors behind MSD tank.
Action required: 705 - Other - as specified
Due 15 August 2009
Resolved 13 August 2009
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 6 May 2008 Resolved
Replenish first-aid kit with required materials, provided inventory list this date.
Action required: 705 - Other - as specified
Due 6 June 2008
Resolved 15 July 2009
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 6 May 2008 Resolved
Segregate child life jackets from adult jackets within forward stowage location. Mark jackets and stowage location as required.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2008
Resolved 15 July 2009
Communications › Alarms/Indicators › High Water Alarm
Issued 6 June 2007 Resolved
Prove proper operation of Engine room high level alarm.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2007
Resolution: Switch was mounted improperly which prevented the float from operating. Switch was turned around on mount and tested SAT.
Stability › Unintentional Flooding › General
Issued 6 June 2007 Resolved
Replace leaking (cooling water) exhaust hose between manifold and muffler.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2007
Engineering › Bilge Water Management System › Pump
Issued 6 June 2007 Resolved
Provide and properly mount appropriate bilge pump (min 10 gpm at a 3 foot head) and float switch in engine room.
Action required: 705 - Other - as specified
Due 31 July 2007
Resolved 26 July 2007
Resolution: Inspected arrangement and found to be satisfactory.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 6 June 2007 Resolved
Provide proof of submission of the 2006 MIS in addition to having consortium contract available.//Extended requirement to 9/14 with warning if not completed intend to pull COI.
Action required: 705 - Other - as specified
Due 14 September 2007
Resolved 18 October 2007
Resolution: Met with operator & company''s bk keeper to discuss drug and alcohol regs: all documents were provided with copy of 2006 MIS report. G-MOA DAPI provides that no report rcvd for 2004, 5 however w/current compliance no legal action taken.
Operations/Management › Drills/Instruction › Not Conducted
Issued 6 June 2007 Resolved
Provide training record on board vessel for required drills
Due 4 October 2007
Resolved 11 September 2007
Resolution: Attended vessel and reviewed log with appropriate training entries completed.
Lifesaving › Hand Flares › Expired
Issued 6 June 2007 Resolved
Provide on board 3 hand held orange flares.
Due 30 July 2007
Resolved 27 June 2007
Resolution: Received notification from ops manager that flares were purchased and on board.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 6 June 2007 Resolved
Vessel is limited to 39 passengers and a total person count of 41 until full complement of type 1 life jackets are provided on board.
Due 26 July 2007
Resolved 27 July 2007
Resolution: Received notification from ops manager that required quantity provide on board with appropriate markings.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 6 June 2007 Resolved
Provide on board first aid kit with meets requirement of 46CFR041.
Due 30 July 2007
Resolved 27 July 2007
Resolution: Received notification from ops manager that new kit was purchased and provided on board.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 June 2007 Resolved
Provide guard for rotating machinery (engine belt).
Due 4 September 2007
Resolved 11 September 2007
Resolution: Attended vessel and observed satisfactory guard installed providing protection from engine belts.
Engineering › Bilge Water Management System › Valve
Issued 6 June 2007 Resolved
Install positive shutoff valve for engine room bilge discharge line. Valve must be installed as close a practicable to skin of vessel IAW 46 CFR 182.520(e)(7).// Requirement extended to be completed prior to the 2008 operating season.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2008
Resolved 6 May 2008
Resolution: Metallic fitting with ball valve installed and operable.
Electrical › Electrical Distribution System (service) › Wiring
Issued 6 June 2007 Resolved
Install wire protection for engine, port wire connections supported on oil line.// Not completed therefore extended requirement with warning the if not complete by 9/14 COI will be pulled.
Due 14 September 2007
Resolved 18 September 2007
Resolution: Visited vsl and inspected installation finding exposed wires covered with loom providing adequate protection.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 6 June 2007 Resolved
Post all copies of COI IAW 46 CFR 176.107
Due 30 July 2007
Resolved 27 July 2007
Resolution: Received notification from ops manager that new frames were purchased and posted on vessel.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 6 June 2007 Resolved
Provide on board and to this office copies of Drug and Alcohol testing policy to allow completion of Annual DAPI Audit. Records are required to be maintained IAW 46 CFR Part 16. This requirement must be completed prior to close of business day 7/30-2007, if not completed vessel shall not be operated as a passenger carrying vessel.
Due 30 July 2007
Resolved 30 July 2007
Resolution: Received required information from ops manager attesting that vessel/company is in substantial compliance with regulations.
Documentation › Certificates/Documents › FCC SSL
Issued 6 June 2007 Resolved
Provide copy of new FCC station license.// O/O submitted via internet with notification of receipt provided therefore extended requirement.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2008
Resolved 6 May 2008
Resolution: FCC station license provided with expiration date of January 12, 1018.
Engineering › Bilge Water Management System › Pump
Issued 6 June 2007 Resolved
Provide on board portable bilge pump with adequate length of hose to discharge water from the lowest point of bilge to overboard.
Due 26 July 2007
Resolved 27 July 2007
Resolution: Received notification from ops manager attesting that portable bilge pump provided onboard.
Documentation › Certificates/Documents › Stability Letter
Issued 6 June 2007 Resolved
Provide on board the vessels stability letter. If document can not be located an additional stability test is required to be competed prior to 2008 operating season. Vessel is limited to ops on the Erie Barge Canal (Protected waters).
Action required: 705 - Other - as specified
Due 1 May 2008
Resolved 6 May 2008
Resolution: At owner/operator requested limited route on COI to within the Erie Canal where vessel has been in operation for over 5 years in lieu of stability test IAW 46 CFR 178.320(c).
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 6 June 2007 Resolved
Replace broken aft port engine mount prior to commercial operations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2008
Resolved 6 May 2008
Resolution: All engine mounts replaced.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 6 June 2007 Resolved
Replace drain line on port side engine. Heavy scale and pitting present.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2008
Resolved 6 May 2008
Resolution: Nel line installed.
Communications › Alarms/Indicators › High Water Alarm
Issued 17 May 2006 Resolved
securely mount the float switches for the 2 electric bilge pumps and the 3 high water alarms in the bilges- prior to operating with passengers
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2006
Resolved 18 May 2006
Resolution: repaired, verified by pictures in vessel file
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 May 2006 Resolved
remove extension cord running from the port side galley outlet to the the starboard side head area
Due 17 June 2006
Resolved 19 May 2006
Resolution: Received email pictures of electrical system repairs finding arrangement sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 May 2006 Resolved
repair wiring connections to engine room bilge pump and the fresh water demand pump with proper marine connections
Due 17 June 2006
Resolved 18 May 2006
Resolution: repaired, verified by pictures in vessel file
Engineering › Bilge Water Management System › Pump
Issued 17 May 2006 Resolved
properly mount the electric bilge pump in the mid compartment
Due 17 June 2006
Resolved 18 May 2006
Resolution: repaired, verified by pictures in vessel file
Lifesaving › Lifebuoys › Serviceable
Issued 17 May 2006 Resolved
replace grab line on ring buoy
Due 17 June 2006
Resolved 19 May 2006
Resolution: Received email pictures of life saving system repairs finding arrangement sat.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 17 May 2006 Resolved
obtain valid certificate of documentation for the vessel prior to transporting passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2006
Resolved 23 May 2006
Resolution: received fax copy from NVDC via Cornhill navigation of Cert of Documentation dated 23May 06
Engineering › Bilge Water Management System › Pump
Issued 2 March 2006 Resolved
3 submersible 12 volt bilge pumps need to be permanently mounted.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 April 2006
Resolved 19 May 2006
Resolution: Received email pictures of bilge water maintenance system repairs finding arrangement sat.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 2 March 2006 Resolved
Permenently mount 4 float switches utilized for bilge pumps/alarms.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 April 2006
Resolved 19 May 2006
Resolution: Received email pictures of bilge water maintenance system repairs finding arrangement sat.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 2 March 2006 Resolved
Install cover on outlet by sink area.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 April 2006
Resolved 19 May 2006
Resolution: Received email pictures of electrical system repairs finding arrangement sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 March 2006 Resolved
Remove deadend wire from engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2006
Resolved 19 May 2006
Resolution: Received email pictures of electrical system repairs finding arrangement sat.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 29 April 2005 Resolved
provide controlled substance testing program documentation to MSO Buffalo OCMI
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2005
Resolved 3 May 2005
Resolution: Vessel operator forwarded required documentation to MSO Buffalo OCMI for review. no discrepancies noted. Cleared outstanding 835 from COI inspection dated 30 APR 05.
Communications › Alarms/Indicators › Bilge Alarm
Issued 29 April 2005 Resolved
securely mount float switches for high water alarms in bilges
Condition: Improper Installation
Due 15 May 2005
Resolved 2 June 2005
Resolution: Witnessed satisfactory installation of bilge pump and float switch.
Operations/Management › Drug and Alcohol Testing
Issued 1 May 2004 Resolved
provide MSO Buffalo with documentation regarding compliance with 46CFR16. Current crew list - enrollment in chemical testing program
Due 15 May 2004
Resolved 19 May 2004
Communications › Alarms/Indicators
Issued 1 May 2004 Resolved
prove proper operation of high water bilge alarm in engine compartment LEGACY COMPONENT DESC: Bilge Alarm
Due 15 May 2004
Resolved 19 May 2004
Lifesaving
Issued 14 May 2001 Resolved
provide proper stowage for distress signals at operating station
Condition: Unknown
Due 14 May 2001
Resolved 14 May 2001
Electrical
Issued 14 May 2001 Resolved
correct chaffing electrical wiring on port side of main engine by 29may01
Condition: Unknown
Due 14 May 2001
Resolved 14 May 2001
Engineering
Issued 14 May 2001 Resolved
Make perminate repairs to fuel hose connectors
Condition: Unknown
Due 20 June 2001
Resolved 20 June 2001
Electrical
Issued 14 May 2001 Resolved
install covers on two batteries for bow thrusters located in foreward compartment
Condition: Unknown
Due 14 May 2001
Resolved 14 May 2001
Unknown
Issued 28 April 2000 Resolved
PROPERLY STENCIL NAME OF VESSEL ON BOW
Condition: Unknown
Due 5 June 2000
Resolved 12 July 2000
Lifesaving
Issued 28 April 2000 Resolved
SEPERATE ADULT AND CHILDREN LIFE JACKETS IN STOWAGE CONTAINER
Condition: Unknown
Due 5 June 2000
Resolved 12 July 2000
Lifesaving
Issued 13 May 1999 Resolved
Install retro reflective tape on lifering buoy as per 46 CFR 185.604.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Engineering
Issued 13 May 1999 Resolved
Replace flexible fuel hose with hose that meets SAE standard 1942-1. All hoses need crimp type pressure connections and should be less than 30 inches long.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Documentation
Issued 13 May 1999 Resolved
Prove vessel and crew enrolled and tested as per 46 CFR 16.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Construction/Loadline
Issued 13 May 1999 Resolved
Vessel found operating with passengers in violation of MI case MI99008425_x001C_ of not to load passengers until bilge alarm system installed and inspected by USCG Inspector.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Fire Fighting
Issued 13 May 1999 Resolved
Install fire buckets as per 46 CFR 181.610.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Construction/Loadline
Issued 11 March 1999 Resolved
VESSEL CAN NOT OPERATE WITH PASSENGERS UNTIL IT IS IN COMPLIANCE WITH THE NEW BILGE SYSTEM REQUIREMENTS.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Fire Fighting
Issued 7 July 1998 Resolved
REPLACE FIRE EXTINGUISHER AT OPERATING STATION WITH "MARINE TYPE", USCG APPROVED EXTINGUISHER AND APPROPRIATE BRACKET.
Condition: Unknown
Due 10 July 1998
Resolved 10 July 1998
Construction/Loadline
Issued 7 July 1998 Resolved
REPAIR OR REPLACE FWD ELECTRICAL BILGE PUMP.
Condition: Unknown
Due 10 July 1998
Resolved 10 July 1998
Unknown
Issued 5 June 1997 Resolved
MAKE FUSE HOLDER IN E/R WATERTIGHT
Condition: Unknown
Due 11 July 1997
Resolved 11 July 1997
Unknown
Issued 5 June 1997 Resolved
FAX COPY OF FCC LICENSE TO USCG MSO BUFFALO OFFICE.
Condition: Unknown
Due 11 July 1997
Resolved 11 July 1997
Unknown
Issued 5 June 1997 Resolved
PROVIDE APPROVED FIRST AID KIT OR EQUIVALENT
Condition: Unknown
Due 11 July 1997
Resolved 11 July 1997
Unknown
Issued 5 June 1997 Resolved
MAKE PERMANENT REPAIRS TO STBD SIDE FWD HULL WHERE IT IS THRU BOLTED AND EPOXIED
Condition: Unknown
Due 5 June 1997
Resolved 5 June 1997
Unknown
Issued 5 June 1997 Resolved
REPLACE LUG COMPRESSION FITTING ON ALT. WIRE, STBD ALT. ON MAIN ENGINE
Condition: Unknown
Due 11 July 1997
Resolved 11 July 1997
Documentation
Issued 15 July 1996 Resolved
Develop and post Emergency Broadcast Instructions iaw 46 CFR 184.506/.510 [NEW T] to the satisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 18 July 1996
Resolved 18 July 1996
Documentation
Issued 15 July 1996 Resolved
Update Emergency Instructions iaw 46 CFR 185.510/.512 [NEW T] to the satisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 15 July 1996
Resolved 15 July 1996
Construction/Loadline
Issued 15 July 1996 Resolved
Demonstrate operation of e/r bilge pump to the satisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 15 July 1996
Resolved 15 July 1996
Unknown
Issued 15 July 1996 Resolved
Provide documentation of compliance with the provisions of 46 CFR 16 to thesatisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 15 July 1996
Resolved 15 July 1996
Lifesaving
Issued 10 July 1995 Resolved
Obtain to the satisfaction of the attending Coast Guard marine inspector six red hand flares required by 46CFR180.35 prior to 24JUL95.
Condition: Unknown
Due 10 July 1995
Resolved 12 July 1995
Electrical
Issued 6 July 1992 Resolved
provide approved electrical plan for the power feed circuit to the cellulartelephone, make installation conform to the approved plan._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 July 1992
Resolved 6 July 1992

Casualty record · 9

6 June 2007Routine · role: Involved in a Marine Casualty · activity 2954180
2 September 2015Routine · role: Involved in a Marine Casualty · activity 5233396
19 September 2015Routine · role: Involved in a Marine Casualty · activity 5728873
20 September 2015Routine · role: Involved in a Marine Casualty · activity 5724356
11 June 2021Routine · role: Involved in a Marine Casualty · activity 7247009
4 August 2023Routine · role: Involved in a Marine Casualty · activity 7762413
28 August 2024Routine · role: Involved in a Marine Casualty · activity 7996009
4 August 2025Routine · role: Involved in a Marine Casualty · activity 8208413
30 May 2026Routine · role: Involved in a Marine Casualty · activity 8387207
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.