Built
1991
Last inspected
28 January 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8814419 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
364473
Flag
UNITED STATES
366345000
Maury page id
psix-364473

Inspections, by type

…with no type recorded34
Years with a record 33 calendar years (1991–2026)
The 116 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Research Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it3051 - Regulatory (Subpart C or D), Gross Ton
3095 - Convention (Subpart B), Gross Ton
1499 - Regulatory (Subpart C or D), Net Ton
928 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

KTDQMMSI 366345000 · active · compulsorily equipped · granted 3 March 2018, expires 9 March 2028
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 116

28 January 2026 VRP Review
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8303218
13 August 2025 Drydock Exam · Hull Examination · Periodic Inspection · Internal Structural Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8208836
24 June 2025 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8178851
9 December 2024 MARPOL Annex I Examination · Annual Inspection · Deficiency Check · MARPOL Annex IV Survey · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8044852
11 October 2024 VRP Review
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8018558
14 September 2024 In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8002481
31 October 2023 Administrative Inspection · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7818700
21 September 2023 Excursion Permit
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7799589
31 March 2023 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7661767
26 October 2022 Drydock Exam · Internal Structural Exam · COI Inspection · ACP Handover Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7594744
19 September 2022 Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7561997
9 September 2022 Appeal
Administrative · USCG Northwest District (dp) · USCG Northwest District (CGD-NW) · Activity 7555331
23 June 2022 Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7485439
28 February 2022 Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7403447
7 January 2022 Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7377127
7 December 2021 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7364032
16 November 2021 Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7352452
12 October 2021 Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7331027
4 October 2021 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7344956
15 August 2021 Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7287975
27 May 2021 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7208544
15 January 2021 Plan Review (Other than "T") · Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7125180
16 December 2020 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7108420
23 October 2020 Hull Examination · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7085208
4 October 2020 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7071679
8 July 2020 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7000928
10 June 2020 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6972936
27 December 2019 MTSA/ISPS Verification · Ballast Water Examination · Annual Inspection · MARPOL Annex I Examination
Physical examination · Activities Europe · Activity 6879423
4 November 2019 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6912703
1 July 2019 Plan Review (Other than "T") · In-Service Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 6732535
1 July 2019 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6732782
26 June 2019 Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6727215
21 December 2018 Annual Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6562834
25 September 2018 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6547912
21 July 2016 Examination of Repairs
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5950480
7 December 2015 Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5777124
5 December 2015 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5775950
2 November 2015 Excursion Permit · MARPOL Annex I Examination · Periodic Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5763146
9 August 2015 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5210489
15 October 2014 Excursion Permit
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5005927
19 June 2014 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4907718
18 June 2014 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4907685
23 July 2012 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4390603
4 November 2010 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3891650
22 February 2010 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3685678
3 December 2009 Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3643653
31 March 2009 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3458627
30 March 2009 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3458690
30 October 2008 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3341746
22 September 2008 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3330517
21 May 2008 Hull Examination · Internal Structural Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3194918
28 November 2007 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3105138
21 November 2007 Plan Review (Other than "T")
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3102396
13 March 2007 Inclining Experiment · In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2902630
6 March 2006 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2595594
2 November 2005 Periodic Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 2519347
30 August 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2479335
2 December 2004 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2252324
27 October 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2229521
2 July 2004 MTSA/ISPS Verification
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2118955
30 June 2004 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2116859
15 March 2004 Annual Inspection · Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 2024418
30 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1980293
18 November 2003 Internal Structural Exam · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2003048
10 February 2003 Annual Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1734646
19 June 2002 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1672012
30 May 2002 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1624091
12 March 2002 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1493118
5 February 2002 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1486382
4 February 2002 Internal Structural Exam · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1494502
20 April 2001 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1062693
3 April 2001 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1064891
29 March 2001 Deficiency Check · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1406908
14 February 2001 Initial Construction-Excluding Oversight
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1430969
4 August 2000 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 755925
4 August 2000 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 756013
17 April 2000 Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1444313
22 March 2000 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 189544
17 March 2000 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 189545
12 March 2000 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 87122
1 December 1999 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 813296
8 September 1999 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1119656
8 July 1999 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1092592
9 April 1999 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 111709
31 March 1999 Hull Examination · Deficiency Check · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1433450
9 March 1998 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 785057
26 February 1998 Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1375284
19 June 1997 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 779228
7 March 1997 COI Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1096375
20 December 1996 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1392556
17 October 1996 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 89504
29 July 1996 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1360586
5 July 1996 Re-Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1353960
27 June 1996 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 191013
27 June 1996 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 763795
16 January 1996 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 220203
11 March 1995 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1157987
19 January 1995 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 71142
8 July 1994 Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1358440
20 May 1994 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1173027
10 November 1993 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 825676
11 August 1993 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 22679
1 April 1993 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 836331
17 February 1993 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1150241
25 August 1992 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1260148
19 August 1992 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1253424
20 July 1992 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 943512
20 July 1992 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1407080
15 July 1992 Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1417455
14 January 1992 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1353348
3 October 1991 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 935115
3 October 1991 Damage Survey
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1376842
2 October 1991 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 346343
1 October 1991 Initial Construction-Excluding Oversight
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1246981
29 July 1991 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 934014
3 July 1991 Initial Certification · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1246399

Deficiency record · 149

11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 17 November 2025 Resolved
If a hydrostatic release unit is used in the float free arrangement, it shall be such that each part connected to the painter system has a strength of not less than required for the painter. MI found seven life rafts onboard arranged with incorrect hydrostatic release units for small rafts 4-12 persons outside of SOLAS regulation. The life rafts onboard are for 16 and 25 persons. Install and arrange rafts with SOLAS approved hydrostatic release units to the satisfaction of the attending MI. 74 SOLAS (97) III/38.6.3.7
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 November 2025
Resolution: Cleared 20NOV2025. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 November 2025 Resolved
and non-SOLAS approved retro-reflective tape for ring buoy by aft starboard side A-Frame. In addition, MI found deteriorated retro-reflective tape on the bottom hull of the rescue boat. Install new SOLAS approved retro-reflective tape to the satisfaction of the attending MI. 74 SOLAS (97) III/30.7
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 November 2025
Resolution: Cleared 20NOV2025. All sat.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 17 November 2025 Resolved
Fire-fighting extinguishing appliances shall be kept in good working order and readily available for immediate use. Pneumatic siren for starboard propulsion motor fixed CO2 fire fighting system is not mounted. 74 SOLAS (1997) II-2/21
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 November 2025
Resolution: Cleared 20NOV2025. All sat.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 17 November 2025 Resolved
Fire-fighting extinguishing appliances shall be kept in good working order and readily available for immediate use. Port Supply fire damper and natural vent damper failed to close completely when actuated. 74 SOLAS (1997) II-2/21
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 November 2025
Resolution: Cleared 20NOV2025. All sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 November 2025 Resolved
All waste receptacles shall be constructed of non-combustible materials with no openings in the sides or bottom. Combustible waste receptacles are being used throughout the vessel. Replace combustible waste receptacles. 74 SOLAS (1997) II-2/18.5
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 November 2025
Resolution: Cleared 20NOV2025. All sat.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 17 November 2025 Resolved
Oil filtering equipment shall be of a design approved by the administration and shall be such as will ensure that any oily mixture discharged through the system has an oil content not exceeding 15 PPM. OWS testing requires hose to be installed on discharge line fitting to see visible water that has passed through the 3-way valve for verification purposes. The connection allowed the possibility of discharge of oily mixtures of greater than 15 PPM if a hose was connected to the fitting. One way valve to be installed on test fitting. MARPOL (2017) Annex 1 Reg. 14.6
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 November 2025
Resolution: Cleared 20NOV2025. All sat.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 9 December 2024 Resolved
An alarm system shall be provided indicating any fault requiring attention shall; be capable of sounding an audible alarm in the main machinery room or at the propulsion machinery control position, and indicate visually each separate alarm function. The general alarm visual indicator in the machinery room does not illuminate when the general alarm is activated.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2024
Resolved 10 December 2024
Resolution: See class report attached to document section of act.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 9 December 2024 Resolved
Electrical installations shall be such that electrical services essential for safety will be ensured under various emergency conditions. During operation of the emergency diesel generator, a ground fault was detected on the 120V Bus. In addition, the 24V Bus ground fault indicating bulb was faulty.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2024
Resolved 10 December 2024
Resolution: See class report attached to document section of act.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 December 2024 Resolved
The condition of the ship and its equipment shall be maintained with the provision of the present regulations to ensure that the ship in all aspects will remain fit to proceed to sea without danger to the ship or persons on board. The 2" salt water pipe for de-icing that aft sea chest from the D/G #4 overboard is wasted and leaking.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2024
Resolved 10 December 2024
Resolution: See class report attached to document section of act. Short Term Polar Cert issued due to temporary blanking of de-icing line. Due 08Jan26.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 December 2024 Resolved
After any survey of the ship, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration. An unapproved installation of a diesel generator was loaded onto the starboard side of the main deck. In addition, the generator is not secured properly to prevent shifting while in heavy seas.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2024
Resolved 10 December 2024
Resolution: See class report attached to document section of act.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 31 October 2023 Resolved
STBD engineroom supply dampers did not close completely when tested.
Action required: 10 - Deficiency Rectified
Due 9 November 2023
Resolved 9 November 2023
Resolution: Dampers were greased, exercised and tightened by ship crew.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 31 October 2023 Resolved
01 to 02 deck structural fire protection wire penetration was found to have pipe nipple installed for the use of passing temporary wires.
Action required: 10 - Deficiency Rectified
Due 9 November 2023
Resolved 9 November 2023
Resolution: ROXTEC block was placed where pipe nipple existed.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 6 January 2023 Resolved
Each emergency generating set shall have a second source of energy provided for an additional three starts within 30 min unless manual starting can be demonstrated to be effective. Vessel's second source of energy for starting the emergency generator was depleted at the time of inspection. SOLAS 74 (2004 Cons Ed) Ch. II-1 Reg 44.2
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 6 January 2023
Resolved 9 January 2023
Resolution: Received confirmation from ABS that secondary source of energy for emergency generator was capable of required number of starts.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 6 January 2023 Resolved
General arrangement plans shall be permanently exhibited for the guidance of the ship's officers, showing clearly for each deck the listed items in SOLAS II-2 Reg 15.2.4.1. Fire Control Plan was incorrectly depicting certain fire boundaries and fire doors. SOLAS 74 (2020 Cons Ed) Ch. II-2 Reg 15.2.4.1
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2023
Resolved 9 January 2023
Resolution: Verified that ABS has added a condition for vessel to update Fire Control Plan
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 January 2023 Resolved
Doors required to be self-closing shall not be fitted with hold-back hooks. Engine Control Room door is required to be self-closing and has a hold-back device. SOLAS 74 (1997 Cons Ed) Ch. II-2 Reg 47.2
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2023
Resolved 12 January 2023
Resolution: Received photographic evidence of removed holdback device on engine control room door.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 6 January 2023 Resolved
A fireman's outfit shall consist of personal equipment that includes an axe. All fireman's outfits were lacking the required axe. SOLAS 74 (1997 Cons Ed) Ch. II-2 Reg 17.1.1.5
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2023
Resolved 12 January 2023
Resolution: Received photographic evidence of procured fireman's axes.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 6 January 2023 Resolved
Every oil fuel pipe, which, if damaged, would allow oil to escape from a storage, settling, or daily service tank situated above the double bottom, shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside the space concerned. Remote fuel shutoff for the emergency diesel generator was painted over and thus inaccessible and unidentifiable. SOLAS 74 (1997 Cons Ed) Ch. II-2 Reg 15.2.5.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 January 2023
Resolved 9 January 2023
Resolution: Received confirmation from ABS that remote fuel shutoff from outside of space was operable and marked.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 6 January 2023 Resolved
Ships with emergency steering positions shall be at least provided with a telephone or other means of communication for relaying heading information to such positions. Sound powered telephone in propulsion room unable to communicate with bridge. SOLAS 74 (2001 Cons Ed) Ch. V Reg 12(f)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2023
Resolved 9 January 2023
Resolution: Received confirmation from ABS that sound powered telephone is operational.
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 6 January 2023 Resolved
All ships of over 150 gross tonnage, when engaged on international voyages, shall have on board an efficient daylight signaling lamp which shall not be solely dependent upon the ship's main source of electrical power. Daylight signaling lamp does not have a source of power that is independent from the ship's power supply. SOLAS 74 (2001 Cons Ed) Ch. V Reg 11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2023
Resolved 13 January 2023
Resolution: Received confirmation from that battery was found and placed on board for signaling lamp.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 6 January 2023 Resolved
A line throwing appliance complying with section 7.1 of the LSA Code shall be provided. Line Throwing Appliance consists of only two independent units (two lines and two charges). SOLAS 74 (2020 Cons Ed) Ch. III Reg 18 LSA Code 7.1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2023
Resolved 9 January 2023
Resolution: Received confirmation from ABS that proper number of Line Throwing Appliances were provided.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 6 January 2023 Resolved
Lifejackets and immersion suits hall be so placed as to be readily accessible and their position shall be plainly indicated. Stowage area for lifejackets and immersion suits on the bridge were lacking the required IMO marking/signs. 74 SOLAS (2020 Cons Ed) Ch III Reg 7.2.2 & 32.3.4
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 6 January 2023
Resolved 6 January 2023
Resolution: Verified proper marking of lifejacket and immersion suit storage on bridge
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2022 Resolved
Minimum instrumentation, alarms and safety controls listed in Table 62.35-50 shall be in proper working order. Replace inoperable jacket water temperature probe on generator #3.
Action required: 705 - Other - as specified
Due 12 January 2022
Resolved 11 January 2022
Resolution: Received videos and pictures via e-mail.
01 - Certificates & Documentation › 013 - Documents › Fire safety operational booklet
Issued 7 January 2022 Resolved
The SOLAS training manual shall contain instructions and information on the life-saving appliances provided on the ship. The fire-fighting training manual shall detail operation and use of fire-fighting systems and appliances. Insert information into manuals for ship specific appliances (i.e. different types of fixed fire-fighting systems found on board and new rescue boat installation.)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2022
Resolved 21 January 2022
Resolution: Received statement from Master that full review was completed and all on board LSA/FIFI items added to manuals.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 9 December 2021 Resolved
The statutes relating to inspection of public vessels are primarily contained in 46 U.S.C. 2101(24) and 2109. a. 46 U.S.C. 2101(24) defines a public vessel as one that "is owned, or demise chartered, and operated by the United States Government or a government of a foreign country; and…is not engaged in commercial service." The THOMAS G. THOMPSON is owned by the United States Navy (Office of Naval Research), operated by the University of Washington, and is not engaged in commercial service. U.S. Navy and National Oceanic and Atmospheric Administration (NOAA) vessels as defined in 46 U.S.C. 2101(24) operated for oceanographic research are not required to be inspected and certificated by the Coast Guard. However, such vessels may be inspected and certificated upon request by the parent agency and upon an “interagency agreement to this effect.” Without an interagency agreement, the Coast Guard does not have authority to conduct inspections, or casualty investigations on the THOMAS G. THOMPSON. You are required to "establish" an interagency agreement between the Office of Naval Research (ONR) and the United States Coast Guard no later than December 22, 2022, when vessel's Certificate of Inspection expires. Failure to establish an interagency inspection agreement with the Coast Guard prior to the Certificate of Inspection(COI) expiring will result in the vessel being deactivated in the Coast Guard's database. In addition, Coast Guard Sectors Puget Sound and Columbia River will not conduct COI renewal inspections without an interagency inspection agreement. The THOMAS G. THOMPSON does not need a COI to operate as a Government owned Oceanographic Research Vessel. Failure to establish an inspection agreement will not limit vessel operations. It is our understanding that the Office of Naval Research owns several research vessels that are operating in a similar manner. It would be beneficial to enter all ONR owned research vessels under the same interagency agreement. If you disagree with this decision you may ask for reconsideration, or appeal this decision in accordance with 46 CFR 1.03-20.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 22 December 2022
Resolved 31 March 2023
Resolution: CG-CVC has determined that they will not require ONR to enter into an interagency agreement or MOA/MOU with the CG. Policy guidance is under development by CG-CVC regarding inspection of vessels under the University-National Oceanographic Labratory System
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 October 2021 Resolved
The statutes relating to inspection of public vessels are primarily contained in 46 U.S.C. 2101(24) and 2109. a. 46 U.S.C. 2101(24) defines a public vessel as one that "is owned, or demise chartered, and operated by the United States Government or a government of a foreign country; and…is not engaged in commercial service." The THOMAS G. THOMPSON is owned by the United States Navy (Office of Naval Research), operated by the University of Washington, and is not engaged in commercial service. U.S. Navy and National Oceanic and Atmospheric Administration (NOAA) vessels as defined in 46 U.S.C. 2101(24) operated for oceanographic research are not required to be inspected and certificated by the Coast Guard. However, such vessels may be inspected and certificated upon request by the parent agency and upon an “interagency agreement to this effect.” Without an interagency agreement, the Coast Guard does not have authority or jurisdiction to conduct inspections, or casualty investigations on the THOMPSON. You are required to "initiate" an interagency agreement between the Office of Naval Research (ONR) and the United States Coast Guard no later than November 12, 2021. Failure to establish an interagency agreement with the Coast Guard will result in the Coast Guard withdrawing the vessel’s Certificate of Inspection (COI). It is our understanding that the Office of Naval Research owns several research vessels that are operating in a similar manner. It would be beneficial to enter all ONR research vessels under the same interagency agreement. If you disagree with this decision you may ask for reconsideration, or appeal this decision in accordance with 46 CFR 1.03-20.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 November 2021
Resolved 8 December 2021
Resolution: U.S> Navy - Office of Naval Research Intiated talks with CVC-4. Cleared this Requirement and issued another requirement to "establish an inspections agreement no later than 22Dec2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 August 2021 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules. Vessel reported two of four main engines inoperable. Proceed directly to berth, propose repair plan, and make satisfactory repairs to the satisfaction of a CG marine inspector prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 August 2021
Resolved 18 August 2021
Resolution: Two ECM's replaced on #3 generator; #3 generator full operational. #2 generator remains inoperable. New deficiency issued.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 August 2021 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules. # 2 ships service generator reported inoperable due to mechanical failure in the electrical section. Parts have been ordered with a long lead time. Complete repairs at next dockside availability in Seattle scheduled for 02 OCT 2021, but not later than 31 OCT 2021. Vessel may operate in accordance with the document titled, (Additional Information on Electrical Load Analysis for R/V Thomas G. Thompson), Submitted to the Coast Guard by the vessel operator on 08 AUG 2021.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 31 October 2021
Resolved 16 November 2021
Resolution: ABS report provided during yardwork period.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 16 December 2020 Resolved
Vent outlets from all tanks which may emit flammable or combustible vapors must be fitted with a single screen of corrosion-resistant wire of at least 30 by 30 mesh, or two screens of at least 20 by 20 mesh. The clear area through the mesh must not be less than the internal unobstructed area of the required pipe. Required to ensure the flame screen on the 6C FO pipe is properly secured at the opening of the pipe. 46 CFR 56.50-85 (a) (8)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 29 December 2020
Resolution: Flame screen has been properly installed.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 December 2020 Resolved
The integrity of a stairtower shall be maintained by “A” class doors at every level. The door shall be of the self-closing type. Holdback hooks will not be permitted. However, magnetic holdbacks operated from the bridge or other suitable remote control positions are acceptable. Noticed at least 4 fire doors (2 in the galley, 1 in the stairwell, and 1 near the engineroom) that did not self close. Test all fire doors throughout the vessel and ensure they are all operating properly and self closing. 46 CFR 190.17-10 (d) (4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 29 December 2020
Resolution: All fire doors throughout the vessel were tested and fixed (if needed). All close completely.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 16 December 2020 Resolved
Equip each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe during oil transfer operations with a portable container of at least a 5 U.S. gallon capacity. Require a mechanical means of closing each drain and scupper in the container or enclosed deck area required by this section. Required to locate a means to close the drain of the aft containment. 33 CFR 155.320
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 29 December 2020
Resolution: Installed a plug.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 16 December 2020 Resolved
Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes. Required to provide means to close the pipes leading from the aft weather deck to the wire room. Remove the wooden plug from the smaller pipe. Need to make both pipe openings capable of being watertight. 46 CFR 42.15-45 46 CFR 42.15-50
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 29 December 2020
Resolution: The smaller pipe was re-threaded and a cap was screwed on. The larger pipe was cut about 5" down and a new pipe was welded on with a 4" cap. The cap is attached to the new pipe with a chain.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 16 December 2020 Resolved
Means of escape shall be maintained in a safe condition, adequate for emergency situations. The escape hatch leading to the weather deck on the aft stbd side needs to be fixed so that is can be quickly opened from both sides in the event of an emergency. 46 CFR 190.10 SOLAS II-2/ Reg 13.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 7 January 2021
Resolution: Replaced the springs and sent a video showing that the scuttle easily opened from the deck side.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 December 2020 Resolved
On behalf of the United States of America, the American Bureau of Shipping is authorized to issue or reissue the appropriate load line certificates. The required load line certificate issued to a specific vessel shall certify to the correctness of the load line marks assigned and marked on the vessel and compliance with authorized conditions, restrictions, and/or exemptions, if any. Noticed that the load lines marked on the hull of the vessel do not match the load line certificate. Required to rectify the issue with ABS. 46 CFR 42.07-35
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 29 December 2020
Resolution: We agree that load line was painted incorrectly after our recent shipyard. I was able to get a pint of paint from the shipyard and the crew will paint over the additional freshwater mark to match the Load Line Certificate. They well rectify with ABS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 December 2020 Resolved
Demonstrate shutdown of emergency generator under both low lube oil pressure and high jacket water temperature. ABS 4 46 CFR 58.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 30 December 2020
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 16 December 2020 Resolved
Approved copy of PSTPs not on board, vessel has developed PSTPs and is working with Sector Puget Sound and MSC on approval and implementation. Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Systems addressed must include fire detection and extinguishing, flooding safety, propulsion, maneuvering, electric power generation and distribution, and emergency internal communications. 46 CFR 61.40-6
Action required: 705 - Other - as specified
Resolved 16 February 2021
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 20 January 2020 Resolved
Periodic safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Periodic safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. There was no approved copy of the PSTP's on board.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 January 2020
Resolved 11 March 2020
Resolution: Replaced the mechanical seal and added a gland cooling line to prevent the mechanical seal from overheating. Inspected motor bearings and cleaned out the grease drain plugs. Operated the pump for over an hour with no leaks.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 20 January 2020 Resolved
All ships shall have a minimum of two two-way portable radiotelephone apparatus for each fire party for fire-fighter´s communication shall be carried on board. Those two two-way radiotelephoneapparatus shall be of an explosion-proof type or intrinsically safe. The radios onboard weren't intrinsically safe.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 5 February 2020
Resolution: Provided invoice for instrinsically safe radios.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 20 January 2020 Resolved
It is the duty of the owner, master, or person in charge to have performed at least once in every 12 months the tests and inspections of all hand portable, semiportable fire extinguishers, and fixed fire extinguishing systems on board, as described in Tables 91.25-20(a)(1) and 91.25-20(a)(2) in § 91.25-20 of this subchapter. CO2 bottles were not weighed during annual inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 5 February 2020
Resolution: Provided documentation from Viking that all CO2 bottles were weight tested. Confirmed by ABS.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 January 2020 Resolved
All electrical installations in hazardous locations must comply with the general requirements of section 33 of IEEE 45-1998. Lighting fixtures in the E-Gen room, over the workbench area in ER, and over the number 3 SSDG covers were missing or inadequate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 10 February 2020
Resolution: Provided photo evidence of all pictures in mentioned spaces.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 January 2020 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. The general service/ fire pump's seal was leaking.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 30 December 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019 Resolved
The material, design construction, workmanship of the arrangements of the main propulsion and of each auxillary directly connected to the engine must be at least equivalent to ABS steel vessel rules. See uploaded 835 for the remianing details.
Condition: Improper Installation
Action required: 702 - Prior to embarking on international voyage
Due 19 August 2019
Resolved 19 August 2019
Resolution: Vessel rep install new materilas that meet the regualtions.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019 Resolved
Provide plans from caterpillar manufacture stating the modification to the engines do not change the performance of the engine or any other specifications of the engine design.
Condition: Invalid
Action required: 702 - Prior to embarking on international voyage
Due 19 August 2019
Resolved 19 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019 Resolved
Provide new modification specifications to Marine Safety Cneter.
Condition: Invalid
Action required: 702 - Prior to embarking on international voyage
Due 19 August 2019
Resolved 19 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019 Resolved
Provide specification to CG to attend that the crankcase hoses are approved for the engine modification.
Condition: Invalid
Action required: 702 - Prior to embarking on international voyage
Due 19 August 2019
Resolved 19 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019 Resolved
Provide documentation that the fire load of the engine stack has not been comprimised.
Condition: Invalid
Action required: 702 - Prior to embarking on international voyage
Due 19 August 2019
Resolved 19 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019 Resolved
Vessel shall provide documents to MSC to view all plans and ensure plans approval prior to going overseas.
Condition: Invalid
Action required: 702 - Prior to embarking on international voyage
Due 19 August 2019
Resolved 19 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019 Resolved
Vessel rep shall provide CG with approved plans of the newly install crankcase piping system prior to credit dry dock in the year 2020.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 16 December 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019 Resolved
The vessel representative must submit final plans and documents to the Marine Safety Center of the newly installed crankcase piping. In addition, the vessel must have approved plans of this system from the Marine Safety Center prior to credit dry dock.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 April 2020
Resolved 16 December 2020
Navigation › Piloting/Steering › Gryo Compass Repeater
Issued 22 December 2017 Resolved
Gyro Compas Repeaters for Bridge wing consoles were inopperable. Durring DDX gyrocompass repeaters were replaced with defective units. New units are on order and will be installed at first availability.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 1 February 2018
Resolution: Sperry Technitian Attended vessel found incorrect configuration. All Sat.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 21 July 2016 Resolved
Obtain approval for change on Fire Control Plan to declassify the bulkhead between MCR and SCR.
Condition: Design Flaw
Due 31 January 2018
Resolved 1 February 2018
Resolution: Recieved approved plan with revision for bulkhead between ECR and SCR.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 2 November 2015 Resolved
Properly remove removable clips from water lights and permanently affix to ring buoy.
Action required: 705 - Other - as specified
Due 2 November 2015
Resolved 2 November 2015
Fire Fighting › Fire Hoses › Condition
Issued 2 November 2015 Resolved
Renew one failed 1.5 x 50' fire hose.
Action required: 705 - Other - as specified
Due 2 November 2015
Resolved 2 November 2015
Resolution: Renewed with spare hose, tested same with sat result.
Fire Fighting › Fire Main › Material
Issued 2 November 2015 Resolved
Properly install new expansion joints IVO fire pump inlet, fire pump outlet, port and starboard prop motor inlet and outlet total (6) IAW 46 CFR 61.15-12.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 November 2015
Resolved 6 November 2015
Resolution: Replaced all 6 expansion joints.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 2 November 2015 Resolved
Incinerator currently not in use, to be removed at next drydock 2016. Vessel shall notify Coast Guard if intend to use to prove proper operation and testing prior to operation.
Action required: 705 - Other - as specified
Due 31 December 2016
Resolved 22 December 2017
Resolution: Incenerator was removed in DDX MISLE Activity #5950480.
Lifesaving › Emergency Outfit › Breathing Apparatus
Issued 2 November 2015 Resolved
Properly replace and install EEBD IWO ER port lower.
Action required: 705 - Other - as specified
Due 6 November 2015
Resolved 6 November 2015
Resolution: Replaced EEBD.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 2 November 2015 Resolved
Provide proof of MSC/ OCMI approval letter for design verification testing and periodic safety testing procedures IAW 46 CFR 61.40-1(a).
Action required: 705 - Other - as specified
Due 1 July 2016
Resolved 26 December 2017
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 4 November 2010 Resolved
Make proper repairs to echosounder.
Due 11 February 2011
Resolved 1 April 2011
Resolution: New echosounder installed and working properly.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 28 November 2007 Resolved
30sec pilot delay observed too long at 48sec; manual activation pull missing; system operation placards mislabeled
Due 3 December 2007
Resolved 4 December 2007
Resolution: rcvd report stating - pilot delay replaced and tested satisfactory, manual activation lever installed, system operation placards properly labeled over.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 28 November 2007 Resolved
continues to discharge overboard at 15PPM and above
Due 3 December 2007
Resolved 30 November 2007
Resolution: recirc valve adjusted ensuring overboard discharge is secured at and above 15PPM until system reads below 15PPM
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 2 November 2005 Resolved
Replace time delays to Paint locker, E/Gen, and Incinerator Rooms. Provide safety observer anytime the aformentioned spaces are occupied.
Action required: 15 - Rectify deficiencies by next port
Resolved 21 November 2005
Lifesaving › Launching Appliances › Falls
Issued 2 November 2005 Resolved
Conduct weight test of rescue boat falls iaw 46CFR199.45(c)
Action required: 15 - Rectify deficiencies by next port
Resolved 21 November 2005
Construction/Loadline › Structures › Machinery Space Opening
Issued 2 November 2005 Resolved
Install time delay for WTD pre-closure alarm iaw 46CFR170.270(c)(2).
Due 3 December 2005
Resolved 21 November 2005
Engineering › Pressure Vessel › Relief Valve
Issued 2 November 2005 Resolved
Conduct testing of HP air relief valve
Due 3 December 2005
Resolved 21 November 2005
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 2 November 2005 Resolved
Provide standard discharge connection
Due 3 December 2005
Resolved 21 November 2005
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Overspeed Device
Issued 2 November 2005 Resolved
Perform shutdown and operational testing on #1 SDG on completion of rebuild.
Due 3 December 2005
Resolved 21 November 2005
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 2 November 2005 Resolved
Repair/ install shutdown to galley range on activation of fixed fire system iaw 46CFR193.01-5
Due 3 December 2005
Resolved 21 November 2005
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 15 March 2004 Resolved
Repair overspeed trip on #5 generator. LEGACY COMPONENT DESC: Overspeed Device
Action required: 15 - Rectify deficiencies by next port
Resolved 15 March 2004
Engineering › Compressed Air System (control)
Issued 15 March 2004 Resolved
Provide ceritfication of testing on High Pressure (seismic) relief valves. LEGACY COMPONENT DESC: Valve
Action required: 15 - Rectify deficiencies by next port
Resolved 20 May 2004
Resolution: Received testing notification from port eng.
Engineering › Diesel Engine (propulsion-electric)
Issued 30 January 2003 Resolved
Prove/demonstrate proper operation of #2 and #3 propulsion generators, including overspeed and loss of lube oil alarms and shutdowns.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 February 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 30 January 2003 Resolved
Label emergency escape, upper level, port side engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Fire Fighting › International Shore Connection
Issued 30 January 2003 Resolved
Store/place International Shore Connection as indicated on vessel's Fire Control Plan.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Construction/Loadline › Penetrations
Issued 30 January 2003 Resolved
Demonstrate that audible alarm for all watertight doors is sufficient to be heard by personnel over the ambient noise in the space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Fire Fighting › Miscellaneous Items
Issued 12 March 2002 Resolved
FIRE CONTROL PLAN DOES NOT REFLECT ACTUAL OR ACCURATLY VSL FIRE FIGHT EQUIPMENT OR LOCATIONS LEGACY COMPONENT DESC: FIRE CONTROL PLAN INACCURATE
Action required: 705 - Other - as specified
Due 22 May 2002
Resolved 22 May 2002
Resolution: NAVAL ARCH UPDATE FIRE CONTROL PLAN; NEW FIRE CONTROL PLAN SUBMITTED AND APPROVED.
Engineering
Issued 29 March 2001 Resolved
PROVIDE UPDATED TEST PROCEDURE (WITH TEST PARAMETERS INCLUDED) FOR MACHINERY SPACE.
Condition: Unknown
Due 29 March 2001
Resolved 29 March 2001
Electrical
Issued 29 March 2001 Resolved
#4 S/S GEN PRIME MOVER GOVERNOR OUT FOR MAINTENANCE. PROVE PROPER OPERATION OF #4 S/S GEN PRIME MOVER (INCLUDING SAFETIES) PRIOR TO VSL'S SAILING._x001C_ _x001C_
Condition: Unknown
Due 23 April 2001
Resolved 23 April 2001
Fire Fighting
Issued 14 February 2001 Resolved
REPLACE EMERGENCY GENERATOR ROOM DOOR WITH A-0 DOOR.
Condition: Unknown
Due 14 February 2001
Resolved 14 February 2001
Accommodation/Occupational Safety
Issued 17 April 2000 Resolved
THE ACCUMULATOR FOR THE VESSEL A/C SYSTEM WERE MISSING RELIEF VALVE PIPING LEADING OVERBOARD.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Engineering
Issued 17 April 2000 Resolved
FUEL FILTER WERE MISSING FLAME IMPINGMENT BOWLS.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Fire Fighting
Issued 17 April 2000 Resolved
VESSELS FIRE CONTROL PLANS WERE FADED BEYOND READIBLE CONDITION.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Lifesaving
Issued 31 March 1999 Resolved
MAKE RESCUE BOAT AVAILABLE FOR INSPECTION AND PROVE PROPER OPERATION.
Condition: Unknown
Due 12 April 1999
Resolved 7 April 1999
Engineering
Issued 31 March 1999 Resolved
PROVE PROPER OPERATION OF SEISMIC AIR RECEIVER RELIEF VALVES.
Condition: Unknown
Due 30 April 1999
Resolved 27 April 1999
Fire Fighting
Issued 31 March 1999 Resolved
PROVE PROPER OPERATION OF FIRE DETECTION SYSTEM ZONES #5 AND #8.
Condition: Unknown
Due 12 April 1999
Resolved 12 April 1999
Electrical
Issued 31 March 1999 Resolved
PROVE PROPER OPERATION OF SHIP SERVICE DIESEL GENERATOR INCLUDING OVERSPEED, LOW LUBE OIL PRESSURE, HIGH JACKET WATER TRIPS AND REMOTE SHUTDOWN.
Condition: Unknown
Due 30 April 1999
Resolved 27 April 1999
Electrical
Issued 31 March 1999 Resolved
PROVIDE FIXED PERMANENT WIRING IN SCIENTIFIC SPACES AND CREW ACCOMODATION SPACES WHERE PORTABLE EXTENSION CORDS AND POWER STRIPS ARE IN USE.
Condition: Unknown
Due 31 March 1999
Resolved 31 March 1999
Fire Fighting
Issued 31 March 1999 Resolved
RENEW AFFF.
Condition: Unknown
Due 12 April 1999
Resolved 12 April 1999
Unknown
Issued 31 March 1999 Resolved
CONDUCT FIRE, MAN OVERBOARD, AND ABANDON SHIP DRILLS IN PRESENCE OF MARINE INSPECTOR.
Condition: Unknown
Due 2 April 1999
Resolved 7 April 1999
Lifesaving
Issued 31 March 1999 Resolved
PROVE PROPER OPS OF 6 GEN ALARM BELLS: 02 DECK - FWD OF ANTI-ROLL TANK._x001C_ 03 DK - P/S WX DECK NEAR MESS DECK; STBD WX DECK NEAR GALLEY._x001C_ MAIN DK - OUTSIDE SCIENCE OFFICE; OUTSIDE MAIN LAB; WX DECK AFT NEAR BOSUN LOCKER.
Condition: Unknown
Due 12 April 1999
Resolved 12 April 1999
Fire Fighting
Issued 31 March 1999 Resolved
PROVE PROPER OPERATION OF INCINERATOR SHUTDOWN PRESSURE SWITCH.
Condition: Unknown
Due 12 April 1999
Resolved 12 April 1999
Electrical
Issued 31 March 1999 Resolved
PROVIDE LAMP COVER FOR OVERHEAD LIGHTING IN ENGINE ROOM.
Condition: Unknown
Due 30 April 1999
Resolved 12 April 1999
Construction/Loadline
Issued 31 March 1999 Resolved
REPAIR AND PROVE PROPER OPERATION OF PASSAGEWAY DOOR LATCH AT FRAME 64.
Condition: Unknown
Due 30 April 1999
Resolved 27 April 1999
Fire Fighting
Issued 31 March 1999 Resolved
PROVE PROPER OPERATION OF FIRE DETECTION SYSTEM ZONES #7 AND #10.
Condition: Unknown
Due 30 April 1999
Resolved 27 April 1999
Lifesaving
Issued 31 March 1999 Resolved
PROVIDE LABEL FOR GENERAL ALARM BELL LOCATED PORT AFT OF ENGINE ROOM.
Condition: Unknown
Due 30 April 1999
Resolved 12 April 1999
Construction/Loadline
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF OWS
Condition: Unknown
Due 19 March 1998
Resolved 9 March 1998
Engineering
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF LUBE OIL PRESSURE ALARMS, LOW LUBE OIL SHUTDOWN AND OVERSPEED TRIP FOR #1-6 GENERATOR DIESEL ENGINES.
Condition: Unknown
Due 19 March 1998
Resolved 9 March 1998
Electrical
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF #5 AND #6 SHIP SERVICE GENERATOR REVERSE POWER RELAYS.
Condition: Unknown
Due 19 March 1998
Resolved 9 March 1998
Navigation
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF PORT ENGINE ORDER TELEGRAPH IN THE CONTROL ROOM
Condition: Unknown
Due 19 March 1998
Resolved 9 March 1998
Construction/Loadline
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF OF BILGE PUMP WITH SUCTION FROM THE ENGINE ROOM.
Condition: Unknown
Due 19 March 1998
Resolved 9 March 1998
Construction/Loadline
Issued 26 February 1998 Resolved
REPAIR CASING PINHOLE ON BALLAST/FIRE PUMP
Condition: Unknown
Due 19 March 1998
Resolved 9 March 1998
Fire Fighting
Issued 26 February 1998 Resolved
REMOVE EXTRA PRESSURE SWITCH FROM PAINT LOCKER CO2 SYSTEM THAT IS NOT BEINGUSED PRIOR TO DEPARTURE FROM THIS PORT TO THE SATISFACTION OF THE ATTENDINGMARINE INSPECTOR.
Condition: Unknown
Due 31 March 1998
Resolved 9 March 1998
Fire Fighting
Issued 26 February 1998 Resolved
LABEL THE PRESSURE SWITCH FOR THE PAINT LOCKER FIXED CO2 SYSTEM TO INDICATEITS FUNCTION PRIOR TO DEPARTURE FROM THIS PORT TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 March 1998
Resolved 9 March 1998
Navigation
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF CENTER CONSOLE GYRO REPEATER ON BRIDGE PRIOR TO DEPARTURE FROM THIS PORT TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR._x001C_
Condition: Unknown
Due 31 March 1998
Resolved 9 March 1998
Navigation
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF EOT IN THE PILOT HOUSE PRIOR TO DEPARTURE FROM THIS PORT TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 March 1998
Resolved 9 March 1998
Deck/Cargo
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF ANCHOR BRAKES PRIOR TO DEPARTURE FROM THIS PORT TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 March 1998
Resolved 9 March 1998
Fire Fighting
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF PAINT LOCKER FIXED EXTINGUISHED SYSTEM INCLUDING PRESSURE SWITCH AND TIME DELAY. TO BE COMPLETED PRIOR TO DEPARTURE FROM THIS PORT TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 March 1998
Resolved 9 March 1998
Navigation
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF 1JV HANDSET IN PROPULSION MOTOR/STERR ROOM.
Condition: Unknown
Due 19 March 1998
Resolved 9 March 1998
Fire Fighting
Issued 7 March 1997 Resolved
Service fixed fire extinguishing system for galley range/hood.
Condition: Unknown
Due 7 March 1997
Resolved 7 March 1997
Fire Fighting
Issued 7 March 1997 Resolved
Troubleshoot and correct ground in engineroom ventilation shutdown system.
Condition: Unknown
Due 7 March 1997
Resolved 7 March 1997
Electrical
Issued 7 March 1997 Resolved
Remove and properly install existing jury rigged tractor winch electrical power cable.
Condition: Unknown
Due 7 March 1997
Resolved 7 March 1997
Construction/Loadline
Issued 7 March 1997 Resolved
Repaint load line markings prior to departure.
Condition: Unknown
Due 9 March 1997
Resolved 9 March 1997
Unknown
Issued 7 March 1997 Resolved
Hydrostaticlly test seismic air receivers, receivers may not be used until hydrostatic test or equivilent test conducted.
Condition: Unknown
Due 7 March 1997
Resolved 7 March 1997
Fire Fighting
Issued 5 July 1996 Resolved
Repair and prove proper, reliable operation of fire alarm bell at bridge.
Condition: Unknown
Due 5 July 1996
Resolved 5 July 1996
Engineering
Issued 11 March 1995 Resolved
PROVE PROPER OPERATION OF RELIEF VALVES FOR 2000 PSI BOTTLES 906-402-A & 906-402-B.
Condition: Unknown
Due 14 April 1995
Resolved 14 April 1995
Unknown
Issued 11 March 1995 Resolved
PROVE PROPER OPERATION OF SOUND POWERED PHONE IN STEERING GEAR SPACE, FOR CALLS TO BRIDGE.
Condition: Unknown
Due 14 April 1995
Resolved 14 April 1995
Electrical
Issued 11 March 1995 Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR HIGH JACKET WATER.
Condition: Unknown
Due 14 April 1995
Resolved 14 April 1995
Construction/Loadline
Issued 8 July 1994 Resolved
Limit switch on WTD at aft end of SCR room did not operate properly. Requirement given to prove proper operation.
Condition: Unknown
Due 7 August 1994
Resolved 3 August 1994
Engineering
Issued 8 July 1994 Resolved
Stencil "EMERGENCY FUEL OIL SHUT-OFF" for Emergency Diesel Generator f/o shut-off pull cable station.
Condition: Unknown
Due 7 August 1994
Resolved 3 August 1994
Engineering
Issued 8 July 1994 Resolved
Prove proper operation of PHCS (pilot house control station machinery monitor & mimic panel) prior to approval of automation test procedures. Vessel is not due to be in US waters until 07JUL96, at which time the automation test procedures are to be completed.
Condition: Unknown
Due 8 July 1994
Resolved 8 July 1994
Construction/Loadline
Issued 8 July 1994 Resolved
Bulkhead 107 &96 WTD open/close indicators were not operational. Requirement given to prove operation.
Condition: Unknown
Due 7 August 1994
Resolved 2 August 1994
Engineering
Issued 8 July 1994 Resolved
Provide "T" wrench for Emergency Diesel Generator f/o shut off valve.
Condition: Unknown
Due 7 August 1994
Resolved 3 August 1994
Engineering
Issued 1 April 1993 Resolved
Submit to [name withheld] an automation test procedure in step-by-step or check off list format. Each test instruction must specify equipment status, apparatus necessary to perform test, safety precautions, safety control and alarm set points, procedure to follow and expected results.
Condition: Unknown
Due 1 April 1993
Resolved 1 April 1993
Fire Fighting
Issued 20 July 1992 Resolved
REPAIR REMOTE VENTILATION SHUTDOWNS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 July 1992
Resolved 20 July 1992
Construction/Loadline
Issued 15 July 1992 Resolved
REPAIR DEADLIGHT IN STATEROOM NO. 9.
Condition: Unknown
Due 15 July 1992
Resolved 15 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
INSTALL DRAIN LINES IN ALL FIREMAINS EXPOSED TO WEATHER.
Condition: Unknown
Due 15 July 1992
Resolved 15 July 1992
Unknown
Issued 15 July 1992 Resolved
SHOW PROPER OPERATION OF THE OILY WATER SEPARATOR.
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
MARK GENERAL ALARMS IN ACCOMMODATION VANS WITH PROPER SIGN.
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
PROVIDE SPARE CHARGES FOR PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
PROVIDE ANALYSIS REPORT OF AFFF SYSTEM.
Condition: Unknown
Due 15 July 1992
Resolved 15 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
SUBMIT REVISED FIRE CONTROL PLAN TO LOCAL OCMI FOR REVIEW/APPROVAL.
Condition: Unknown
Due 19 August 1992
Resolved 19 August 1992
Lifesaving
Issued 15 July 1992 Resolved
INSTALL DAVITS AND CHANGE OUT LIFERAFTS TO DAVIT LAUNCHED TYPE PORT AND STARBOARD SIDE.
Condition: Unknown
Due 27 July 1992
Resolved 27 July 1992
Navigation
Issued 15 July 1992 Resolved
CORRECT CONTIONUOUS PHASE ALARM ON STEERING GEAR ALARM PANEL._x001C_
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Electrical
Issued 15 July 1992 Resolved
EFFECT REPAIRS TO NO. 3 MAIN ENGINE ALTERNATOR. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
COMPLETE MODIFICATIONS TO FIXED FIRE FIGHTING SYSTEM IN GALLEY.
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
INSTALL PASS THROUGHS FOR FIRE HOSES IN FIRE SCREEN DOORS.
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
INSTALL KICKOUT PANEL IN EMERGENCY GENERATOR ROOM DOOR._x001C_
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Documentation
Issued 15 July 1992 Resolved
COMPLETE FCC INSPECTION AND UPDATE STATION LICENSE._x001C_
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Lifesaving
Issued 15 July 1992 Resolved
INSTALL EMBARKATION LADDERS NEAR LIFERAFTS PORT AND STARBOARD._x001C_
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Navigation
Issued 15 July 1992 Resolved
EFFECT REPAIRS TO NAVIGATION LIGHTS.
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Fire Fighting
Issued 15 July 1992 Resolved
REPAIR GENERAL ALARM BELL FORWARD OF HOUSE MAIN DECK LEVEL.
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Documentation
Issued 14 January 1992 Resolved
PROVIDE MARKING AND LABEL PLATES IAW 46 CFR 195.11-20. FOR EACH LABORATORYAND ACCOMODATION VAN. TOTAL OF FOUR VANS.
Condition: Unknown
Due 14 January 1992
Resolved 14 January 1992
Documentation
Issued 14 January 1992 Resolved
PROVIDE LOAD ANALYSIS SHOWING CAPACITY OF SSDG SUFFICIENT TO HANDLE LOADS CREATED BY MODIFICATION AS REQUIRED BY USCG MSC LETTER ME-10827 DATED 17DEC91.
Condition: Unknown
Due 14 January 1992
Resolved 14 January 1992
Accommodation/Occupational Safety
Issued 14 January 1992 Resolved
PROVIDE SUITABLE ACCOMODATIONS FOR 1 PERSON. UNTIL SUITABLE ACCOMODATION ARE PROVIDED, THE MAX NUMBER OF PERSONS WHICH MAY BE CARRIED SHALL BE LIMITED TO 59 PERSONS
Condition: Unknown
Due 14 January 1992
Resolved 14 January 1992
Navigation
Issued 3 July 1991 Resolved
PROVIDE NAV PUBLICATIONS, INCLUDING NEW CHARTS, LIGHT LISTS, TIDE/CURRENT_x001C_ TABLES, NOTICE TO MARINERS, U.S. COAST PILOT AND RULES OF THE ROAD._x001C_
Condition: Unknown
Due 24 October 1991
Resolved 24 October 1991
Documentation
Issued 3 July 1991 Resolved
PROVIDE CERTIFICATE OF FINANCIAL RESPONSIBILITY._x001C_
Condition: Unknown
Due 24 October 1991
Resolved 24 October 1991
Fire Fighting
Issued 3 July 1991 Resolved
CONDUCT SATISFACTORY FIRE AND BOAT DRILLS IN PRESENCE OF MARINE INSPECTOR._x001C_
Condition: Unknown
Due 15 July 1991
Resolved 24 October 1991
Engineering
Issued 3 July 1991 Resolved
PROVIDE SATISFACTORY REVIEW AND APPROVAL OF MACHINERY AUTOMATION SYSTEM FROM G-MSC-2._x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Accommodation/Occupational Safety
Issued 3 July 1991 Resolved
PROVIDE SUITABLE ACCOMODATION VANS FOR 10 ADDITIONAL PERSONS ON 01 LEVEL. UNTIL VANS ARE PROVIDED THE MAXIMUM NUMBER OF PERSONNEL CARRIED OVERNIGHT SHALL BE LIMITED TO 50.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Fire Fighting
Issued 3 July 1991 Resolved
PROVIDE REVIEW AND APPROVAL OF NEWLY SUBMITTED DRAWINGS OF NEW HALON TIME DELAYS FROM G-MSC._x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Documentation
Issued 3 July 1991 Resolved
PROVIDE OPERATING LICENSES OF ALL LICENSED CREWMEMBERS.
Condition: Unknown
Due 15 July 1991
Resolved 24 October 1991
Engineering
Issued 3 July 1991 Resolved
PROVIDE SATISFACTORY REVIEW OF DESIGN AND VERIFICATION PROCEDURES FROM_x001C_ G-MSC-2. UPON RECEIPT PROVIDE PROCEDURES TO COAST GUARD MARINE INSPECTOR_x001C_ FOR APPROVAL TESTING._x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991

Casualty record · 6

19 June 2002Routine · role: Involved in a Marine Casualty · 1 injured · activity 1672012
22 February 2010Routine · role: Involved in a Marine Casualty · activity 3685678
6 August 2010Routine · role: Involved in a Marine Casualty · activity 3822216
23 July 2012Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 4390603
18 June 2014Routine · role: Involved in a Marine Casualty · activity 4907685
24 June 2025Routine · role: Involved in a Marine Casualty · activity 8178851
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.