Records from 2016 to 2025. Most recent: inspection, 28 May 2025.
Documentation record
Registered dimensions (L × B × D)40.0 ft × 12.0 ft × 3.5 ft
Registered tonnagegross 11 / net 9
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBENTZ BOATS · LEWISTON, ID, UNITED STATES · built 1991
Hull materialAluminum
PropulsionGasoline Outboard
Hull shapeShip
Hull configurationMonohull
Hailing portMOOSE, WY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 12 May 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11 - Simplified, Gross Ton
9 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
28 May 2025
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8106648
28 May 2024
Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7922794
30 May 2023
Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7684310
1 June 2022
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7412302
9 April 2021
Hull Examination · COI Inspection · Administrative Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7171971
8 October 2020
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7073853
7 July 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6999955
4 June 2019
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6690442
8 June 2018
Annual Inspection · DAPI Audit · MARPOL Annex VI Survey · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6429948
7 July 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6206475
7 June 2017
Deficiency Check · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6142932
31 May 2017
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6229525
30 March 2016
Spot Check · Drydock Extension · Examination of Repairs · Plan Review "T" Boat · Administrative Inspection · Deficiency Check · Internal Structural Exam · Special · DAPI Audit · Hull Examination · Annual Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5844454
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 May 2024
Resolved
46CFR182.460(e)
Exhaust blower switches must be of the type interlocked
with starting switch and the ignition switch so that the
blowers are started before the starter motor circuit or
engine ignition is energized. Noted there was no
interlock between blower and ignition switch, vessel was
able to operate without blowers being energized. Prove
proper operation within 30 days.
Action required: 705 - Other - as specified
Due 28 June 2024
Resolved 27 June 2024
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 June 2021
Resolved
Prove proper servicing of installed fixed fire fighting system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 June 2021
Resolved 9 June 2021
Resolution: Reviewed servicing report, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 4 June 2019
Resolved
Ring Buoy found with deteriorating grab line due to UV degradation. Provide proof of serviceable approved ring buoy.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2019
Resolved 2 July 2019
Documentation › Certificates/Documents › Certificate of Inspection
Issued 7 June 2017
Resolved
Ensure the vessel’s current COI is available in the office area. A new COI willl need to be mailed to the vessel. Only the temp COI (expired) was available.
Condition: Invalid
Due 7 July 2017
Resolved 7 July 2017
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 7 June 2017
Resolved
Ensure a fire retardant foam is installed on the vent closures.
Condition: Design Flaw
Due 14 July 2017
Resolved 12 July 2017
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 7 June 2017
Resolved
Repair or replace the two spare child PFD’s with bad retro (worn).
Condition: Improper/Lack of Maintenance
Due 7 June 2017
Resolved 7 June 2017
Resolution: Repalced with new PFD's
Engineering › Steering Gear System › Hydraulic Hose
Issued 31 May 2016
Resolved
Install chaffing gear on the outboard engines hydraulic hoses.
Condition: Improper/Lack of Maintenance
Due 30 June 2016
Resolved 14 June 2016
Resolution: Photo
Construction/Loadline › Hull › Weld
Issued 30 May 2016
Resolved
Prior to operating the vessel in 2017: Permanently weld the small pin hole fracture in port, bow, deck edge area. This area is well above the waterline.
Condition: Design Flaw
Due 15 May 2017
Resolved 7 June 2017
Construction/Loadline › Hull › Hull Plating
Issued 30 May 2016
Resolved
Prior to operating the vessel in 2017: Permanently weld the gouge in the stbd exterior, side of the hull, bow area, above the angle strake.
Condition: Damaged By Earlier Event
Due 15 May 2017
Resolved 7 June 2017
Construction/Loadline › Structures › Rake
Issued 30 May 2016
Resolved
Prior to operating the vessel in 2017: Weld the #5 skip weld on the stbd, bow, exterior, angle strake area.
Condition: Damaged By Earlier Event
Due 15 May 2017
Resolved 7 June 2017
Construction/Loadline › Hull › Transverse Frame
Issued 30 May 2016
Resolved
Prior to operating the vessel in 2017: Weld the port outboard side, interior floor frame, where it intersects with the hull chine. This is the 2nd frame forward of the engine room bulkhead. The frame was not completly welded.
Condition: Improper Installation
Due 15 May 2017
Resolved 7 June 2017
Engineering › Bilge Water Management System › Pump
Issued 30 March 2016
Resolved
Prove proper operation of the fwd (cabin bilge pump).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 May 2016
Resolution: Pump was removed and cleaned of debris (sand and grit). The pump operated normally.